EXISTING RAILWAY LINE

OUTERING ROAD
60 M ROAD RESERVE

ENTRANCE

172.61 M pv

3,480
2,797
A pv
6m rail curb A

400

data & telephone duct


electrical duct
400 6,639 pv
6,739 A: 918.19 sq ft A: 964.35 sq ft

12,197
11,351
GS 25 GS 24

10,100
GS 26 GS 23 GS22 GS 21 pv

9,838

10,100
6,073
STAIRS RAMP

6,802

8,355
A: 679.00 sq ft A: 890.12 sq ft

7,547
GS 30 GS 29 GS 28 GS 27 A: 779.09 sq ft A: 1,030.06 sq ft
pv
GS 20
GS 33 GS 31 A: 491.98 sq ft A: 548.02 sq ft
A: 718.85 sq ft A: 658.91 sq ft A: 669.78 sq ft pv
A: 723.48 sq ft

9,908
GS 34

9,070
8,332
GS 35 GS 32
pv

7,577
pv pv
GS 36

6,776
pv pv

6,011
pv

200
5,261

A: 911.69 sq ft pv
benches 3NO,s urinals

4,600
4,599

wc
GS 37
3,977

GS 39 GS 38
9 MH PASSAGE
ducts

4,600
00 A: 662.62 sq ft
A: 596.24 sq ft A: 606.12 sq ft
wc wc wc wc wc wc
A: 487.94 sq ft

3,203
2,
cleaners
7,000 4,400 3,300 water fauntain

E-15
wc GENTS
A: 374.84 sq ft A: 431.39 sq ft pv
A: 1,029.30 sq ft
CTION wc
A: 232.29 sq ft pv pv pv pv

2,550
LADIES pv pv pv pv pv pv
pv pv pv pv pv
8,199

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31
pv pv
pv

GL-1/A3
INCOMING
basins passage 4,871 16 x 131 = 2.100 m

3-5/A6
U/G

3-5/A6
CABLES

PASSAGE/
lift

9,500
LAMP STAIR
9,500

CORRIDOR
E-25

9,500
proposed

9,500
PROMOTION AREA
3,666

16 x 131 = 2.100 m

9,500
31 x 126 = 3.900 m

transformer pv
A: 504.94 sq ft A: 2,799.69 sq ft
200

E-26
A18 A18

16

15

14

13

12

10
11

2,550
GS 40
VEHICULAR lift A: 2,016.67 sq ft

4,258
435

3,163 14,000 7,000 7,600 7,000


5,000

RAMP
RAMP
VOID
450

1,900
board main distn.
200 6,800 200 7,000 8,200 14,000 PASSAGE/CORRIDOR
E-27

PROPOSED SUBSTATION
E-24
pv GS 19
200 E-28

pv pv
FOR UP TO 1000KVA
pv pv
329

pv pv pv pv pv
435

water fauntain 9,964 pv


7,000 7,000 7,000 7,600
6

GL-1/A5
pv

10

8
200

7
6,800 200

10 x 175 = 1.750 m
5

FIRE POINT

-OFF
4

3
FIRE ESCAPE STAIRS
GS 1 GS 2 GS 3 GS 4 GS 5
6.71

300x500 duct 1

A: 1,439.13 sq ft RESTA

GL-1/A4
200 4,850 200
5,800

A: 1,439.13 sq ft A: 1,439.13 sq ft
%

FIRE POINT
%

6.71

GS 7

9,700
GARBAGE DISPOSAL
GS 15

9,600
1
22

A: 723.33 sq ft A: 785.33 sq ft A: 723.28 sq ft GS 6 GS 17 GS 18

bench
1

9,700
2 22
21 1

GS 16
22 x 121 = 2.653 m
8,09 8

A: 722.92 sq ft A: 723.31 sq ft
22 1
2,

2 22

GS 11
3 21

22 x 121 = 2.653 m
pv
A: 857.80 sq ft
7,698
8,09

20 2

GS 12 GS 13
21 2

22 x 121 = 2.653 m
DW GS 14
3 21

22 x 121 = 2.653 m
4 20
00

19 12 3
20 3
4 20
5 19
18 11 4

5,800
A: 1,0
19 4
5 19

A: 616.85 sq ft
6 18
9

A: 474.60 sq ft
17 10 5

RAMP
A: 437.17 sq ft A: 436.77 sq ft
18 5

lift lobby
6 18
2
200

RAMP UP
7 17

A: 321.56 sq ft
16 9 6

200 4,000 200 A: 282.28 sq ft A: 437.21 sq ft


17 6
7 17
8

data & telephone


8 16
15 7

A: 723.33 sq ft
16 7

GS8 A: 1,315.78 sq ft

electrical
8 16

1:7 GS9
9 15

GS 10
14 7 10 8
15 8

UP
9 15

PLAN 1:50
9

ELINE
10 6 14
13 9
14 9
10 8 14

12 x 133 = 1.600 m
11 5 13
10

lift pit
7 13 10
11 13
12 4 6

1,858 1,825
11
11

FIRE ESCAPE STAIRS


12 5
3
12
4 12
2

2,016 1,9059
3

7,000
1 2

PASSAGE

11,900
1

2,00 pv pv

200
pv pv pv pv pv pv pv pv pv pv pv pv pv pv

LOADING ACCESS
pv pv pv pv pv pv
ic ic 2 ic ic ic ic

GL-1/A4
ic ic ic ic ic ic ic
ducts RAMP
FIRE ESCAPE STAIRS

ic Z
CAR ENRANCE TO
FIRE ESCAPE STAIRS BASEMENT 1:7
GL-1/A3

GL-1/A5
E-11
6,000
7,000 7,000 7,000

6X20.7M PIPE LINE GATE FOR KENYA


12,700

WAYLEAVE PIPELINE STAFF)


Loading Area/service bay

57 50
40 30 30
26
& (waiting areas)

128.86 M SERVICE
BAY
TOTAL FLOOR AREA = 5,350 SM (57,570 SF)
UPPER PARKING = 5,640 SM (60,700 SF)

L.R. No. 209/13938 PROPOSED SERVICED APARTMENTS


38.78 M

8M WIDE DRIVE WAY

0. GROUND FLOOR PLAN 1:765.07