SIZING CALCULATION
ISOLATED PHASE BUSDUCT
R1 05.04.2010 AJ KKS
Revision Date Prepared by Reviewed by Remarks
We reserve all rights in this document and in the information therein. Reproduction, use or disclosure to third parties without express authority is strictly
forbidden.
ABB eBoP
2x150MW THERMAL POWER PLANT Doc. No.
SHREE CEMENT LIMITED, BEAWAR, AJMER 3VYN292401
DISTRICT, RAJASTHAN (INDIA)
SIZING CALCULATION
ABB LIMITED Sheet 2 of 6
ISOLATED PHASE BUSDUCT
1.
2. Table of contents
1.0 Intent
2.0 Reference documents/ drawings
3.0 Design criteria
4.0 Design inputs
5.0 Design calculation
6.0 Conclusions
We reserve all rights in this document and in the information therein. Reproduction, use or disclosure to third parties without express authority is strictly
forbidden.
ABB eBoP
2x150MW THERMAL POWER PLANT Doc. No.
SHREE CEMENT LIMITED, BEAWAR, AJMER 3VYN292401
DISTRICT, RAJASTHAN (INDIA)
SIZING CALCULATION
ABB LIMITED Sheet 3 of 6
ISOLATED PHASE BUSDUCT
List of annexure:
1. Annexure -1 - (ETAP study for IPBD symmetrical short circuit current)
2. Annexure -2 - (ETAP study for IPBD peak short circuit current)
Sizing Calculation
1.0 Intent
Intent for this document is to calculate the size of isolated phase busduct (IPBD) to be provided between
generator terminals to generator circuit breaker (GCB), generator circuit breaker to generator transformer
(GT) and tap-off to unit auxiliary (UAT) and unit station (UST) transformers.
150MW turbo-generator
We reserve all rights in this document and in the information therein. Reproduction, use or disclosure to third parties without express authority is strictly
forbidden.
ABB eBoP
Unit station transformer (UST)
400kV grid
Please refer:
Annexure-1 (ETAP study for IPBD symmetrical short circuit current), and
Annexure-2 (ETAP study for IPBD peak short circuit current)
Calculation for symmetrical short time current for IPBD main run:
6.0 Conclusions