This document outlines the delivery schedule for 20,000 single phase electronic kWh meters. It lists one line item, meters, with a quantity of 20,000 units to be delivered in three consignments to either the DAT Port Louis Harbour in Mauritius if from abroad or to CEB's Main Store in Roche Bois if manufactured locally. The first consignment of 7,000 units is to be delivered within 12 weeks, the second of 6,500 units within 22 weeks, and the third of 6,500 units within 32 weeks from the letter of acceptance.
This document outlines the delivery schedule for 20,000 single phase electronic kWh meters. It lists one line item, meters, with a quantity of 20,000 units to be delivered in three consignments to either the DAT Port Louis Harbour in Mauritius if from abroad or to CEB's Main Store in Roche Bois if manufactured locally. The first consignment of 7,000 units is to be delivered within 12 weeks, the second of 6,500 units within 22 weeks, and the third of 6,500 units within 32 weeks from the letter of acceptance.
This document outlines the delivery schedule for 20,000 single phase electronic kWh meters. It lists one line item, meters, with a quantity of 20,000 units to be delivered in three consignments to either the DAT Port Louis Harbour in Mauritius if from abroad or to CEB's Main Store in Roche Bois if manufactured locally. The first consignment of 7,000 units is to be delivered within 12 weeks, the second of 6,500 units within 22 weeks, and the third of 6,500 units within 32 weeks from the letter of acceptance.
Line Description of Goods Qty Physical Final Destination Delivery (as per Incoterms) Date Item unit (Project Site) as Delivery Date Bidders offered N specified in BDS Delivery date [to be provided by the bidder]
Three consignments spaced 10
EITHER weeks apart with the 1st Meter Box for DAT Port Louis consignment of 7000 units to be 1 Electronic Single Phase 20,000 Unit Harbour Mauritius delivered within 12 weeks from kWh Meter if product is from Letter of Acceptance. 2nd abroad otherwise to consignment of 6500 units to be CEBs Main Store, delivered within 22 weeks from Roche Bois if the date of issue of Letter of manufactured Acceptance and 3rd consignment locally of 6500 units within 32 weeks as from the date of issue of Letter of Acceptance. Name of Bidder _____________________________________Signature of Bidder ___________________________________