PROJECT SEMESTER

GOAL REPORT
(Project Semester June December 2016)

(NHAI) Project Four laning of Kharar - Kurali Section


of NH 205 (old NH-21) 16+200 km to 29+900 km and
Proposed Bye Pass of Kurali Town in State of Punjab

Submitted by
Jatin Maggo
101302046

Under the Guidance of

Devinder Pal Singh


Project Manager
(M.G Contractors Pvt Limited)

DEPARTMENT OF CIVIL ENGINEERING


THAPAR UNIVERSITY, PATIALA
(Declared as Deemed-to-be-University u/s 3 of the UGC Act,1956)
The following objectives and goals are to be completed
during Project Semester (June 2016 December):-

Construction of Flexible Pavement


Laying of GSB
Laying of WMM( in 2 layers)
Laying of DBM
Laying of bituminous macadam
Construction of Rigid Pavement
Laying of GSB
Laying of DLC
Seperation of membrane
Laying of PQC
Design of Flexible Pavement
Design of Rigid Pavement
Construction of Box Culvert
Construction of Side Drains
Field Testing( Density test and Moisture test)
Lab testing of various materials
Surveying used at various points in construction of
flexible of flexible and rigid pavement.