Scope of Work of BTS - DBS
Scope of Work of BTS - DBS
There are 3 parts in BTS installation. These tasks will be described respectively as follows:
1) Hardware Installation
。 Delivery equipment to the equipment room from ground floor or outside, if required.
。 RFI Check
。 Install the BTS/NodeB/Wi Max rack,DDF box and all interrelated auxiliary materials;
。 Make the E1 connectors on both sides of BTS/NodeB/Wi Max rack and DDF, and
connect them correctly;
。 Install the other cables ( GND, PGND, DC, AC, Ethernet), and connect them to the
Rack ;
。 Rectification if needed.
。 Carry out inspection for site ready for installation and submit report including MRN to
HUAWEI.
。 Receiving equipments and unpacking on site and inform Huawei about discrepancy,
if any
。 Guide the technicians to install the BTS/NodeB/Wi Max equipments and interrelated
auxiliary materials provided.
。 VSWR check and submit soft and hard copy to HUAWEI project/implementation
manager
There are 3 parts in Power system installation. These tasks will be described respectively as
follows:
1. Hardware Installation
The technicians of subcontractor shall complete DC power equipment hardware installation
including Rectifier rack, power cable, GND and PGND cable and connectors and auxiliary
materials supplied by HUAWEI or customer under supervision. The engineering team implements
hardware installation according to the design documents and equipment Installation Manual. If problems
have happened, subcontractor shall fix all problems and rectify them unconditionally.
The details as Follows:
。 Deliver the equipment to equipment room from ground floor or outside, if required;
。 Assistance during Huawei site Engg /QC with resources and tools
。 Rectification if needed.
2. Hardware Supervision
Hardware supervisor must complete the installation environment check ensuring it is Ready For
Installation, engineering negotiation (including plan of equipment, technicians, engineering and
schedule of installation) with customer and HUAWEI project manager, indicate the technicians to
install the hardware as agreed by all parties.
Supervisor shall guarantee the engineering quality based on the Hardware Quality Standard V1.5
Supervisor shall complete the engineering documents according to the Wireless Product
Engineering Manual,
Hardware Removal and Replacement must be directed by Supervisors. The equipment shall be
properly classified for the convenience to move to new place.
For detail technical requirements of power system, please refer to Product Installation Manual.
The responsibility of hardware supervisor is as following:
。 Carry out inspection for site ready for installation and submit report to HUAWEI
。 Indicate the technicians to deliver the equipments to the equipment room from
ground floor or outside;
。 Indicate the technicians to install the power system and interrelated auxiliary
materials provided.
。 Responsible for the engineering quality, organize the rectification on power system
installation if some problems happened.
3. PAT
After H/W installation and commissioning completed, Huawei will submit preliminary acceptance
application form to customer. Supervisor shall complete the PAT items (Preliminary Acceptance
Test) which are hardware parts distributed by Huawei and customer. Supervisor shall report the
progress on site and send daily report to Huawei project manager everyday.
There are 3 parts in Battery system installation. These tasks will be described respectively as
follows:
1. Hardware Installation
The technicians of subcontractor shall complete Battery Groups hardware installation including
Battery cells, Battery cable, GND and PGND cable and connectors and auxiliary materials
supplied by HUAWEI or customer under supervision. The engineering team implements hardware
installation according to the design documents and equipment Installation Manual. If problems have
happened, subcontractor shall fix all problems and rectify them unconditionally.
The details as Follows:
。 Rectification if needed.
2. Hardware Supervision
Hardware supervisor must complete the installation environment check ensuring it is Ready For
Installation, engineering negotiation (including plan of equipment, technicians, engineering and
schedule of installation) with customer and HUAWEI project manager, indicate the technicians to
install the hardware as agreed by all parties.
Supervisor shall guarantee the engineering quality based on the Hardware Quality Standard V1.5.
Supervisor shall complete the engineering documents according to the Wireless Product
Engineering Manual,
Hardware Removal and Replacement must be directed by Supervisors. The equipment shall be
properly classified for the convenience to move to new place.
For detail technical requirements of battery, please refer to Product Installation Manual.
The responsibility of hardware supervisor is as following:
。 Carry out inspection for site ready for installation and submit report to HUAWEI
。 Indicate the technicians to deliver the equipments to the equipment room from
ground floor or outside;
。 Indicate the technicians to install the battery groups and interrelated auxiliary
materials provided.
3. PAT
After Installation, Huawei will submit preliminary acceptance application form to customer.
Supervisor shall complete the PAT items (Preliminary Acceptance Test) which are hardware parts
distributed by Huawei and customer. Supervisor shall report the progress on site and send daily
report to Huawei project manager everyday.
There are 3 parts in feeder and antenna system installation. These tasks will be described respectively as
follows:
1. Hardware Installation
The technicians of subcontractor shall complete the installation including feeder cable, jumper,
antenna support, antenna, feeder connectors and auxiliary materials supplied by HUAWEI or
customer under supervision. The engineering team implements hardware installation according to the
design documents and equipment Installation Manual. If problems have happened, subcontractor shall
fix all problems and rectify them unconditionally.
The details as Follows:
2. Hardware Supervision
Hardware supervisor must complete the installation environment check ensuring it is Ready For
Installation, engineering negotiation (including plan of equipment, technicians, engineering and
schedule of installation) with customer and HUAWEI project manager, indicate the technicians to
install the hardware as agreed by all parties.
Supervisor shall guarantee the engineering quality based on the Hardware Quality Standard V1.5.
Supervisor shall complete the engineering documents according to the Wireless Product
Engineering Manual,
Hardware Removal and Replacement must be directed by Supervisors. The equipment shall be
properly classified for the convenience to move to new place.
For detail technical requirements of feeder and antenna, please refer to Product Installation
Manual.
The responsibility of hardware supervisor is as following:
。 Carry out inspection for site ready for installation and submit report to HUAWEI
。 Indicate the technicians to deliver the equipments to the equipment room from
ground floor or outside;
。 Indicate the technicians to install the feeder and antenna system and interrelated
auxiliary materials provided.
。 Test the VSWR and output the result in soft & Hard Copy file;
3. PAT
After installation, Huawei will submit preliminary acceptance application form to customer.
Supervisor shall complete the PAT items (Preliminary Acceptance Test) which are hardware parts
distributed by Huawei and customer. Supervisor shall report the progress on site and send daily
report to Huawei project manager everyday.
There are 3 parts in Board expansion of BTS/NodeB/Wi Max. These tasks will be described
respectively as follows:
1. Hardware Installation
The technicians of subcontractor shall complete expansion boards hardware installation and
auxiliary materials supplied by HUAWEI or customer under supervision. The engineering team
implements hardware installation according to the design documents and equipment Installation Manual. If
problems have happened, subcontractor shall fix all problems and rectify them unconditionally.
The details as Follows:
。 Rectification if needed.
2. Hardware Supervision
Hardware supervisor must complete the installation environment check ensuring it is Ready For
Installation, engineering negotiation (including plan of equipment, technicians, engineering and
schedule of installation) with customer and HUAWEI project manager, indicate the technicians to
install the hardware as agreed by all parties.
Supervisor shall guarantee the engineering quality based on the Hardware Quality Standard V1.5.
Supervisor shall complete the engineering documents according to the Wireless Product
Engineering Manual,
The responsibility of hardware supervisor is as following:
。 Carry out inspection for site ready for installation and submit report to HUAWEI
。 Indicate the technicians to install the boards and interrelated auxiliary materials
provided.
。 Responsible for the engineering quality, organize the rectification on their work if
some problems happened.
3. PAT
After Software test, Huawei will submit preliminary acceptance application form to customer.
Supervisor shall complete the PAT items (Preliminary Acceptance Test) which are hardware parts
distributed by Huawei and customer. Supervisor shall report the progress on site and send daily
report to Huawei project manager everyday.
Perform tests item by item and mark the items one by one on the AT document
Submission of AT documents to CUSTOMER.
Execution of AT document with CUSTOMER and sign off from CUSTOMER
If any punch point is observed the same needs to be rectified by Subcon before handing
over the same to Huawei.
Details as Follows:
。 Software downloading.
。 Software de bugging and call testing & on site in each sectors and ensure no sector
swap.
1. Indoor BTS
The technicians of subcontractor shall complete BTS/NodeB/Wi Max hardware deinstallation
including all BTS equipments supplied by HUAWEI or customer under supervision. The
engineering team implements hardware deinstallation according to the design documents and
equipment Installation Manual. If problems have happened, subcontractor shall fix all problems
and rectify them unconditionally.
2) Outdoor BTS:
3) Antenna
4) Battery Bank
5) Power Plant
6) Filter
There are 3 parts in DBS installation. These tasks will be described respectively as follows:
4) Hardware Installation
The technicians of subcontractor shall complete DBS3900hardware installation including all BTS
equipments and auxiliary materials supplied by HUAWEI or customer under supervision. The
engineering team implements hardware installation according to the design documents and equipment
Installation Manual. If problems have happened, subcontractor shall fix all problems and rectify
them unconditionally.
The details as Follows:
。 Delivery equipment to the equipment room from ground floor or outside, if required.
。 RFI Check
。 Make the E1 connectors on both sides of DBS3900rack and DDF, and connect them
correctly;
。 Install the other cables ( GND, PGND, DC, AC, Ethernet), and connect them to the
Rack ;
。 Rectification if needed.
。 Carry out inspection for site ready for installation and submit report including MRN to
HUAWEI.
。 Receiving equipments and unpacking on site and inform Huawei about discrepancy,
if any
There are 3 parts in Power system installation. These tasks will be described respectively as
follows:
4. Hardware Installation
The technicians of subcontractor shall complete DC power equipment hardware installation
including Rectifier rack, power cable, GND and PGND cable and connectors and auxiliary
materials supplied by HUAWEI or customer under supervision. The engineering team implements
hardware installation according to the design documents and equipment Installation Manual. If problems
have happened, subcontractor shall fix all problems and rectify them unconditionally.
The details as Follows:
。 Deliver the equipment to equipment room from ground floor or outside, if required;
。 Assistance during Huawei site Engg /QC with resources and tools
。 Rectification if needed.
5. Hardware Supervision
Hardware supervisor must complete the installation environment check ensuring it is Ready For
Installation, engineering negotiation (including plan of equipment, technicians, engineering and
schedule of installation) with customer and HUAWEI project manager, indicate the technicians to
install the hardware as agreed by all parties.
Supervisor shall guarantee the engineering quality based on the Hardware Quality Standard V1.5
Supervisor shall complete the engineering documents according to the Wireless Product
Engineering Manual,
Hardware Removal and Replacement must be directed by Supervisors. The equipment shall be
properly classified for the convenience to move to new place.
For detail technical requirements of power system, please refer to Product Installation Manual.
The responsibility of hardware supervisor is as following:
。 Carry out inspection for site ready for installation and submit report to HUAWEI
。 Indicate the technicians to deliver the equipments to the equipment room from
ground floor or outside;
。 Indicate the technicians to install the power system and interrelated auxiliary
materials provided.
。 Responsible for the engineering quality, organize the rectification on power system
installation if some problems happened.
6. PAT
After H/W installation and commissioning completed, Huawei will submit preliminary acceptance
application form to customer. Supervisor shall complete the PAT items (Preliminary Acceptance
Test) which are hardware parts distributed by Huawei and customer. Supervisor shall report the
progress on site and send daily report to Huawei project manager everyday.
There are 3 parts in Battery system installation. These tasks will be described respectively as
follows:
4. Hardware Installation
The technicians of subcontractor shall complete Battery Groups hardware installation including
Battery cells, Battery cable, GND and PGND cable and connectors and auxiliary materials
supplied by HUAWEI or customer under supervision. The engineering team implements hardware
installation according to the design documents and equipment Installation Manual. If problems have
happened, subcontractor shall fix all problems and rectify them unconditionally.
The details as Follows:
。 Rectification if needed.
5. Hardware Supervision
Hardware supervisor must complete the installation environment check ensuring it is Ready For
Installation, engineering negotiation (including plan of equipment, technicians, engineering and
schedule of installation) with customer and HUAWEI project manager, indicate the technicians to
install the hardware as agreed by all parties.
Supervisor shall guarantee the engineering quality based on the Hardware Quality Standard V1.5.
Supervisor shall complete the engineering documents according to the Wireless Product
Engineering Manual,
Hardware Removal and Replacement must be directed by Supervisors. The equipment shall be
properly classified for the convenience to move to new place.
For detail technical requirements of battery, please refer to Product Installation Manual.
The responsibility of hardware supervisor is as following:
。 Carry out inspection for site ready for installation and submit report to HUAWEI
。 Indicate the technicians to deliver the equipments to the equipment room from
ground floor or outside;
。 Indicate the technicians to install the battery groups and interrelated auxiliary
materials provided.
6. PAT
After Installation, Huawei will submit preliminary acceptance application form to customer.
Supervisor shall complete the PAT items (Preliminary Acceptance Test) which are hardware parts
distributed by Huawei and customer. Supervisor shall report the progress on site and send daily
report to Huawei project manager everyday.
There are 3 parts in feeder and antenna system installation. These tasks will be described respectively as
follows:
4. Hardware Installation
The technicians of subcontractor shall complete the installation including CPRI Cable,
RRU ,jumper, antenna support, antenna, feeder connectors and auxiliary materials supplied by
HUAWEI or customer under supervision. The engineering team implements hardware installation
according to the design documents and equipment Installation Manual. If problems have happened,
subcontractor shall fix all problems and rectify them unconditionally.
The details as Follows:
。 Lay out CPRI Cable and jumper with power cables and earthing cable;
5. Hardware Supervision
Hardware supervisor must complete the installation environment check ensuring it is Ready For
Installation, engineering negotiation (including plan of equipment, technicians, engineering and
schedule of installation) with customer and HUAWEI project manager, indicate the technicians to
install the hardware as agreed by all parties.
Supervisor shall guarantee the engineering quality based on the Hardware Quality Standard V1.5.
Supervisor shall complete the engineering documents according to the Wireless Product
Engineering Manual,
Hardware Removal and Replacement must be directed by Supervisors. The equipment shall be
properly classified for the convenience to move to new place.
For detail technical requirements of feeder and antenna, please refer to Product Installation
Manual.
The responsibility of hardware supervisor is as following:
。 Carry out inspection for site ready for installation and submit report to HUAWEI
。 Indicate the technicians to deliver the equipments to the equipment room from
ground floor or outside;
。 Indicate the technicians to install the feeder and antenna system and interrelated
auxiliary materials provided.
。 Test the VSWR and output the result in soft & Hard Copy file;
6. PAT
After installation, Huawei will submit preliminary acceptance application form to customer.
Supervisor shall complete the PAT items (Preliminary Acceptance Test) which are hardware parts
distributed by Huawei and customer. Supervisor shall report the progress on site and send daily
report to Huawei project manager everyday.
Perform tests item by item and mark the items one by one on the AT document
Submission of AT documents to CUSTOMER.
Execution of AT document with CUSTOMER and sign off from CUSTOMER
If any punch point is observed the same needs to be rectified by Subcon before handing
over the same to Huawei.
As one type of Micro BTS, There are four type of installation method with DBS site. These tasks will be
described respectively as follows, all the price shall base on typical S4/4/4 Configuration, in case of S2/2/2
Configuration site , we should use S4/4/4 price also:
Under this type of installation , BBU+RRU are installed inside the building .
The picture as Follows:
Under this type of installation , BBU+RRU are connected by fiber cable. RRU may located at
different address within 40km.
The picture as Follows:
Under this type of installation , BBU+RRU are connected by fiber cable. RRU may located at
different address within 40km.
The picture as Follows:
Under this type of installation , BBU+RRU are connected by fiber cable. RRU may located at the
same tower , pole or on the wall.
The picture as Follows: