Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 3

Daily Report

www.GQIS.co.uk

Project: HPC-HINKLEY POINT C-


AGGREGATE JETTY-
Customer: EDGEN MURRAY
PRELIMINARY STEEL
PILE PROJECT
Sub-Vendor: ZHEJIANG CHANKONG
Vendor: ESC GROUP
STEEL PIPE CO.,LTD
PUTUO,SHANG HAI, Sub-Vendor Address: TIANNING,JIASHAN,ZHE
Vendor Address:
CHINA JIANG

Vendor Reference: Sub-Vendor Reference:

Purchase Order No: 3568 Customer Reference:

GQIS Assignment No: Report No: GQIS--031

8 PM, 22th Sept. -- 8 AM, Next Visit Date:


Date of Visit:
23h Sept. 2016
MATERIAL INSPECTED THIS VISIT
Item No. Quantit Description Tag No., Batch No., Serial
No., Cast, Heat No.
y
3568-C09-053 1 1778x(25x2.7M+30x5.7M+25x16.086M)
SSAW+LSAW+SSAW

SUMMARY / AREAS OF CONCERN

GUI-036-00 (Revision 0) Flash Report Dated: 22nd March 2016


Daily Report
www.GQIS.com
Customer: EDGEN MURRAY Purchase Order 3568
No.:

1.0 SUMMARY / AREAS OF CONCERN

1.1 LIST OF APPLICABLE DOCUMENTS

EM-COS007-2500307-A-DM-PILE-
001 Devi
EM-COS007-2500307-A-NM-PILE-
001tion Register and Requests (If
Applicable) - Piles
Concession Requests (If Applicable) - Piles
EM-COS007-2500307-C-NP-PILE-
001 Handling, Packing and Shipping Procedure - Piles
EM-COS007-2500307-E-BMC-PILE-
001 Base Material Certificates - Piles
EM-COS007-2500307-A-TL-PILE-
001 Plate Traceability List - Piles
EM-COS007-2500307-E-MC-PILE-
001 Material Certificates - Piles
EM-COS007-2500307-MB-PILE-
001 Manufacturing Record Book - Piles
EM-COS007-2500307-W-CC-PILE-
001 Welding Consumables Certificates - Piles
EM-COS007-2500307-F-BQ-PILE-
001 Calibration Test Certificates - Piles
EM-COS007-2500307-D-UP-PILE-
001 NDT Procedures - Piles
EM-COS007-2500307-MM-PILE-
001 Welding Consumable Handling Procedure - Piles
EM-COS007-2500307-D-WP-PILE- Welding Procedure and Welding Qualification Procedure
001 (WPS / WPQR) inc Repair Procedure - Piles
EM-COS007-2500307-A-IP-PILE-
001 Inspection and Test Plan - Piles
EM-COS007-2500307-B-GM-PILE- Fabrication Drawings - Piles - Shop Drawing for Berthing
001 Island (1/3)
EM-COS007-2500307-B-GM-PILE- Fabrication Drawings - Piles - Shop Drawing for Berthing
002 Island (2/3)
EM-COS007-2500307-B-GM-PILE- Fabrication Drawings - Piles - Shop Drawing for Berthing
003 Island (3/3)
EM-COS007-2500307-B-GM-PILE- Fabrication Drawings - Piles - Shop Drawing for Dolphin
004 A,B,D,F
EM-COS007-2500307-B-GM-PILE-
005 Fabrication Drawings - Piles - Shop Drawing for Dolphin C
EM-COS007-2500307-B-GM-PILE- Fabrication Drawings - Piles - Shop Drawing for Jetty Bridge
006 (1/3)
EM-COS007-2500307-B-GM-PILE- Fabrication Drawings - Piles - Shop Drawing for Jetty Bridge
007 C01(2/3)
EM-COS007-2500307-B-GM-PILE- Fabrication Drawings - Piles - Shop Drawing for Jetty Bridge
008 (3/3)
EM-COS007-2500307-D-ZP-PILE-
001 Manufacturing Procedure Specification - Piles
EM-COS007-2500307-E-UQ-PILE-
001 NDT Operator Qualifications - Piles
GUI-035-00 (Revision 0) Inspection Report Dated:After
22nd March 2016
corrected
Daily Report
www.GQIS.com
Customer: EDGEN MURRAY Purchase Order 3568
No.:

Accepted Yes Non-Compliant

Technical Specialist: Su Jinlong Operations Coordinator:


CSWIP 3.2/3.1, CWI, API 510, API 570, ASNT Level Date:
II RT&UT&PT&MT&VT
Date: 8 PM, 22th Sept. -- 8 AM, 23th Sept. 2016

GUI-035-00 (Revision 0) Inspection Report Dated: 22nd March 2016

You might also like