Professional Documents
Culture Documents
Daily Inspection Report: Location: Workshop Date: 16-11-2016
Daily Inspection Report: Location: Workshop Date: 16-11-2016
Weding inspection of
Pyramid Steel ZKB JV Welding thikness is less
5 Base Plate of Column for Ashraf Structure GA-DR-001-01-01 3 Saeed
Structure Fabcon as per drawing
Gentry Crane -1
Saeed Anwar
Prepared By Checked By
Doc. No: QA/QC
Rev.: 00
Date: 17-11-16
Page: 1 of 1
Go ahed _
Rectification
Hold not yet
completed
Go ahed _
Go ahed _
Rectification
Hold not yet
completed
Go ahed _
Rectification not
HOLD
yet completed