DAFTAR HARGA SATUAN BAHAN

SKPD :
NAMA PAKET :
LOKASI :
VOLUME :
PROP/KAB/KODYA :

NO KODE URAIAN SAT


1 AA-002 Armature LED Nikkon Stealth J3 90 W lengkap bh
2 AA-003 Armature LED Nikkon Stealth J3 60 W lengkap bh
3 AE-001 Tiang Heksagonal 9 meter SO type baseplate btg
4 AE-002 Tiang Heksagonal 8 meter SO type baseplate btg
5 AE-003 Tiang Heksagonal 7 meter SO type baseplate btg
6 AF-001 GPAS/ ELCB 25 A bh
7 AF-002 GPAS/ ELCB 40 A bh
8 AF-005 MCB 1P 2- 16 A bh
9 AF-016 Kontaktor 3P, 40 A bh
10 AF-019 Timer Switch type Analog/digital,24 jam 1P bh
11 AF-020 Selector Switch Auto/Manual bh
12 AF-022 KWH meter 1P 20/60 A bh
13 AF-023 KWH meter 3P 20/60 A bh
14 AF-024 OK meter 1 P bh
15 AF-025 OK meter 3 P bh
16 AF-026 Terminal keramik 4P 60 A bh
17 AG-003 Kabel Twisted 4x16 mm2 mtr
18 AG-007 Kabel NYY 2x1,5mm2 mtr
19 AG-008 Kabel NYY 4x6 mm2 rol
20 AG-005 Kabel NYFGbY 4x16mm2 mtr
21 AG-009 Kabel NYFGbY 4x10mm2 mtr
22 AG-013 Kabel NYAF 10 mm2 mtr
23 AG-014 Kabel NYAF 16 mm2 mtr
24 AG-015 Kabel NYMHYO 3x2.5 mm2 rol
25 AG-016 Kabel NYY 3x 2.5 mm2 mtr
26 AG-017 Kabel NYY 4x4 mm2 mtr
27 AG-018 Kabel NYFGbY 4x6 mm2 mtr
28 AH-001 Service Wedge Clamp bh
29 AH-002 Suspension Clamp bh
30 AH-003 Suspension Bracket bh
31 AH-004 Tension Bracket bh
32 AH-006 Line tap connector (CCS) 6/25 mm2 bh
33 AH-007 Line tap connector (CCS) 35/70 mm2 bh
34 AH-008 Jointing Konektor Bimetal AL/CU 16 - 6 + pengaman bh
35 AH-009 Konektor Tembus kedap air bh
36 AH-010 Stainless Steel Strip mtr
37 AH-011 Yokes/Stoping Buckle bh
38 AH-012 Link bh
39 AI-001 Panel Kontrol Distribusi PJU type APP-1P bh
40 AI-002 Box panel 60x40x25 cm bh
41 AI-004 Gembok bh
42 AI-005 Angkur 22 mm bh
43 AI-006 Pipa PVC dia.2" mtr
44 AI-007 Pipa PVC dia.1 1/2" mtr
45 AI-008 Knee PVC dia.2" bh
46 AI-009 Sock PVC dia 2" bh
47 AI-010 Asesoris ls
48 AI-011 Kabel BC 16 mm2 mtr
49 AI-012 Grounding Rod 16 mm2 bh
NO KODE URAIAN SAT
50 AI-013 Kabel schoon 16 mm2 bh
51 AI-014 Pipa GIV. dia. 2" mtr
52 AI-016 Kabel BC 6 mm2 mtr
53 AI-017 Kabel schoon 6 mm2 bh
54 AJ-001 Aspal kg
55 AJ-002 Semen Portland(50 kg) zak
56 AJ-003 Pasir M3
57 AJ-004 Kerikil Saring M3
58 AJ-005 Sirtu M3
59 AJ-006 Papan cor m2
60 AJ-007 Besi beton tulangan kg
61 AJ-008 Kawat beton kg
62 AJ-009 Paku Campur kg
63 AJ-010 Kawat Duri m'
64 AJ-011 Pasir Urug m3
65 AJ-012 Batu Bata bh
66 DA-001 BP VA
67 DA-002 UJL VA
68 DA-003 Jaminan Instalasi & Konsuil VA
69 DA-004 SJI VA
70 DA-005 SLO LS
71 DA-006 Mutasi Data VA
AN

HARGA SATUAN
4,467,000.00
3,680,000.00
4,325,500.00
3,850,000.00
3,375,000.00
430,000.00
500,000.00
60,000.00
450,000.00
500,000.00
85,000.00
550,000.00
2,250,000.00
50,000.00
175,000.00
55,000.00
15,250.00
10,500.00
4,455,000.00
122,500.00
90,150.00
25,000.00
41,000.00
1,800,000.00
13,500.00
42,000.00
240,000.00
4,500.00
19,000.00
19,000.00
22,000.00
13,000.00
27,000.00
6,000.00
12,000.00
12,000.00
2,350.00
2,000.00
3,893,800.00
778,000.00
55,000.00
75,000.00
16,000.00
11,000.00
10,000.00
7,500.00
450,000.00
23,500.00
225,000.00
HARGA SATUAN
5,000.00
102,500.00
10,750.00
3,500.00
25,500.00
65,800.00
180,000.00
375,000.00
215,000.00
100,000.00
15,000.00
20,000.00
20,000.00
15,000.00
135,000.00
750.00
775.00
280.00
400.00
500.00
1,000,000.00
75,000.00
DAFTAR HARGA SATUAN UPAH

SKPD :
NAMA PAKET :
LOKASI :
VOLUME :
PROP/KAB/KODYA :

NO KODE URAIAN

1 BA-001 Mandor/Tenaga Ahli Listrik

2 BA-002 Mandor/Tenaga Ahli konstruksi

3 BA-003 Operator Truck Crane bucket

4 BA-004 Operator Truck Crane kapasitas 2,5 ton

5 BA-005 Operator Truck kapasitas 7 ton

6 BA-006 Operator Truck Tangga 12 meter

7 BA-007 Tukang Listrik

8 BA-008 Tukang Konstruksi

9 BA-009 Pembantu Tukang Listrik

10 BA-010 Pembantu Tukang Konstruksi

11 BA-011 Mandor Tenaga Ahli Sipil

12 BA-012 Tukang Batu

13 BA-013 Pembantu Tukang Batu

14 BA-014 Sopir

15 BA-015 Tukang Gali Tanah


DAFTAR HARGA SATUAN UPAH

URAIAN SAT HARGA SATUAN

Mandor/Tenaga Ahli Listrik oh 175,000.00

Mandor/Tenaga Ahli konstruksi oh 175,000.00

Operator Truck Crane bucket oh 150,000.00

Operator Truck Crane kapasitas 2,5 ton oh 150,000.00

Operator Truck kapasitas 7 ton oh 150,000.00

Operator Truck Tangga 12 meter oh 150,000.00

Tukang Listrik oh 150,000.00

Tukang Konstruksi oh 150,000.00

Pembantu Tukang Listrik oh 125,000.00

Pembantu Tukang Konstruksi oh 100,000.00

Mandor Tenaga Ahli Sipil oh 175,000.00

oh 150,000.00

Pembantu Tukang Batu oh 100,000.00

oh 150,000.00

Tukang Gali Tanah oh 100,000.00


DAFTAR HARGA SATUAN SEWA ALAT

SKPD :
NAMA PAKET :
LOKASI :
VOLUME :
PROP/KAB/KODYA :

NO KODE URAIAN

1 CA-001 Sewa Truck Crane Bucket

2 CA-002 Sewa Truck Crane kapasitas 2,5 ton

3 CA-003 Sewa Truck kapasitas 7 ton

4 CA-004 Sewa Truck tangga 12 meter

5 CA-005 Tangga 7 meter

6 CA-006 Alat bantu

7 CA-007 Katrol pengangkat tiang

8 CA-008 Beton molen

9 CA-009 Penggetar beton/ Vibrator

10 CA-010 Stamper

11 CA-011 Jack Hammer

12 CA-012 Mobil Pickup


DAFTAR HARGA SATUAN SEWA ALAT

URAIAN SAT. HARGA SATUAN

Sewa Truck Crane Bucket hari 1,650,000.00

Sewa Truck Crane kapasitas 2,5 ton hari 1,650,000.00

Sewa Truck kapasitas 7 ton hari 1,500,000.00

Sewa Truck tangga 12 meter hari 1,500,000.00

Tangga 7 meter hari 150,000.00

hari 120,000.00

Katrol pengangkat tiang hari 220,000.00

Beton molen hari 250,000.00

Penggetar beton/ Vibrator hari 250,000.00

hari 250,000.00

Jack Hammer hari 450,000.00

Mobil Pickup hari 450,000.00


DAFTAR ANALISA HARGA SATUAN

SKPD :
NAMA PAKET :
LOKASI :
VOLUME :
PROP/KAB/KODYA :

NO KODE U R A I AN

1 EA-001 Pemasangan armatur/gearbox di top tiang/stang ornament


2 EA-002 Setting dan aiming armatur
3 EA-003 Pemasang Box MCB dan koneksi MCB 1 Phasa
4 EA-007 Tarikan kabel twist
5 EA-009 Gelar kabel tanah, perapian dan instalasi jaringan kabel tanah
6 EA-011 Galian pondasi tanah keras
7 EA-012 Galian Tanah Aspal dan Perapian Kembali
8 EA-013 Galian Tanah keras dan perapian kembali
9 EA-014 Panel kontrol distribusi type APP-1P
10 EA-015 Pemasangan Grounding Panel Kontrol PJU
11 EA-016 Pemasangan Panel Kontrol PJU
12 EA-018 Pondasi Tiang PJU Oktagonal
13 EA-020 Finishing pondasi tiang PJU Oktagonal
14 EA-034 Crossing Kabel pada Jembatan
15 EA-035 Crossing Kabel pada Jalan
16 EA-026 Ereksion PJU Oktagonal
17 EA-033 Pemasangan grounding pada Tiang LPJU

Page 9 of 32
DAFTAR ANALISA HARGA SATUAN

U R A I AN SAT. HARGA SATUAN

masangan armatur/gearbox di top tiang/stang ornament titik 55,878.00


tting dan aiming armatur titik 41,288.00
masang Box MCB dan koneksi MCB 1 Phasa titik 26,333.00
rikan kabel twist m' 4,160.00
elar kabel tanah, perapian dan instalasi jaringan kabel tanah m' 28,682.00
alian pondasi tanah keras titik 223,000.00
alian Tanah Aspal dan Perapian Kembali m' 306,614.00
alian Tanah keras dan perapian kembali m' 163,500.00
nel kontrol distribusi type APP-1P set 3,893,800.00
masangan Grounding Panel Kontrol PJU titik 743,200.00
masangan Panel Kontrol PJU titik 334,954.00
ndasi Tiang PJU Oktagonal titik 919,431.00
nishing pondasi tiang PJU Oktagonal titik 138,212.00
ossing Kabel pada Jembatan m' 184,650.00
ossing Kabel pada Jalan m' 37,575.00
eksion PJU Oktagonal titik 532,917.00
masangan grounding pada Tiang LPJU titik 293,375.00

Page 10 of 32
ANALISA HARGA SATUAN

SKPD :
NAMA PAKET :
LOKASI :
VOLUME :
PROP/KAB :

No Kode Uraian Pekerjaan Koefisien

I EA-001 Pemasangan armatur


1 BA-001 Mandor/Tenaga Ahli Listrik 0.0100
2 BA-003 Operator Truck Crane bucket 0.0199
3 BA-007 Tukang Listrik 0.0398
4 BA-009 Pembantu Tukang Listrik 0.0796
5 CA-001 Sewa Truck Crane Bucket 0.0199
6 CA-006 Alat bantu 0.0199

II EA-002 Setting dan aiming armatur 1.0000


1 BA-001 Mandor/Tenaga Ahli Listrik 0.0050
2 BA-003 Operator Truck Crane bucket 0.0100
3 BA-007 Tukang Listrik 0.0200
4 BA-009 Pembantu Tukang Listrik 0.0395
5 CA-001 Sewa Truck Crane Bucket 0.0175
6 CA-006 Alat bantu 0.0175

III EA-003 Pemasang dan koneksi MCB 1 Phasa 1.0000


1 BA-007 Tukang Listrik 0.0333
2 BA-009 Pembantu Tukang Listrik 0.0667
3 CA-005 Tangga 7 meter 0.0667
4 CA-006 Alat bantu 0.0667

IV EA-007 Tarikan kabel twisted 1.0000


1 BA-001 Mandor/Tenaga Ahli Listrik 0.0010
2 BA-007 Tukang Listrik 0.0040
3 BA-009 Pembantu Tukang Listrik 0.0080
4 BA-014 Sopir 0.0030
5 CA-005 Tangga 7 meter 0.0030
6 CA-006 Alat bantu 0.0030
7 CA-012 Mobil Pickup 0.0030

V EA-009 Gelar kabel tanah, perapian dan instalasi 1.0000


jaringan kabel tanah
Tenaga Kerja
1 BA-001 Mandor/Tenaga Ahli Listrik 0.0050
2 BA-007 Tukang Listrik 0.0100
3 BA-009 Pembantu Tukang Listrik 0.0200
4 BA-014 Sopir 0.0200
5 CA-012 Mobil Pickup 0.0200
6 CA-006 Alat bantu 0.0200
No Kode Uraian Pekerjaan Koefisien
Bahan
1 AJ-011 Pasir Urug 0.0300
2 AJ-012 Batu Bata 7.1429
No Kode Uraian Pekerjaan Koefisien

VI EA-011 Galian pondasi tanah keras 1.0000


1 BA-001 Mandor/Tenaga Ahli Listrik 0.2000
2 BA-012 Tukang Batu 0.4000
3 BA-015 Tukang Gali Tanah 0.8000
4 CA-006 Alat bantu 0.4000

VII EA-012 Galian Tanah Aspal dan Perapian Kembali


Tenaga Kerja
1 BA-011 Mandor Tenaga Ahli Sipil 0.1000
2 BA-012 Tukang Batu 0.2000
3 BA-013 Pembantu Tukang Batu 0.6000
4 CA-006 Alat bantu 0.6000

Bahan
1 AJ-001 Aspal 1.8000
2 AJ-004 Kerikil Saring 0.1000
3 AJ-005 Sirtu 0.1000
4 AJ-003 Pasir 0.0500
5 CA-010 Stamper 0.0357
6 CA-006 Alat bantu 0.0357

Jumlah Tenaga K

VIII EA-013 Galian Tanah keras dan perapian kembali 1.0000


1 BA-011 Mandor Tenaga Ahli Sipil 0.1000
2 BA-012 Tukang Batu 0.2000
2 BA-013 Pembantu Tukang Batu 0.6000
3 CA-010 Stamper 0.2000
4 CA-006 Alat bantu 0.0500

IX EA-014 Panel kontrol distribusi type APP-1P 1.0000


Tenaga Kerja
22 BA-001 Mandor/Tenaga Ahli Listrik 0.0500
23 BA-007 Tukang Listrik 0.1000
24 BA-009 Pembantu Tukang Listrik 0.2000

Bahan
1 AI-002 Box panel 60x40x25 cm 1.0000
2 AI-005 Angkur 22 mm 2.0000
3 AF-005 MCB 1P 2- 16 A 2.0000
5 AF-016 Kontaktor 3P, 40 A 1.0000
6 AF-019 Timer Switch type Analog/digital,24 jam 1P 1.0000
7 AF-020 Selector Switch Auto/Manual 1.0000
9 AF-022 KWH meter 1P 20/60 A 1.0000
10 AG-014 Kabel NYAF 16 mm2 5.0000
11 AF-024 OK meter 1 P 1.0000
11 AF-026 Terminal keramik 4P 60 A 1.0000
12 AH-001 Service Wedge Clamp 2.0000
12 AH-004 Tension Bracket 1.0000
13 AH-007 Line tap connector (CCS) 35/70 mm2 4.0000
14 AI-006 Pipa PVC dia.2" 8.0000
15 AI-008 Knee PVC dia.2" 6.0000
No Kode Uraian Pekerjaan Koefisien
16 AI-009 Sock PVC dia 2" 2.0000
17 AH-010 Stainless Steel Strip 3.0000
18 AH-011 Yokes/Stoping Buckle 3.0000
19 AH-012 Link 6.0000
20 AI-004 Gembok 1.0000
21 AI-010 Asesoris 1.0000

Jumlah Tenaga K
No Kode Uraian Pekerjaan Koefisien

X EA-015 Pemasangan Grounding Panel Kontrol PJU 1.0000


Tenaga Kerja
1 BA-001 Mandor/Tenaga Ahli Listrik 0.1000
2 BA-007 Tukang Listrik 0.2000
3 BA-009 Pembantu Tukang Listrik 0.4000

Bahan
1 AI-011 Kabel BC 16 mm2 3.0000
2 AI-012 Grounding Rod 16 mm2 1.0000
3 AI-013 Kabel schoon 16 mm2 2.0000
4 AI-014 Pipa GIV. dia. 2" 3.0000
5 AH-010 Stainless Steel Strip 2.0000
5 AH-011 Yokes/Stoping Buckle 2.0000
6 AH-012 Link 2.0000

Jumlah Tenaga K

XI EA-016 Pemasangan Panel Kontrol PJU 1.0000


1 BA-001 Mandor/Tenaga Ahli Listrik 0.1832
2 BA-007 Tukang Listrik 0.7326
3 BA-009 Pembantu Tukang Listrik 0.7326
4 BA-014 Sopir 0.0500
5 CA-012 Mobil Pickup 0.0500
4 CA-005 Tangga 7 meter 0.3663
5 CA-006 Alat bantu 0.3663

XII EA-018 Pondasi Tiang PJU Oktagonal 1.0000


1 AJ-002 Semen Portland(50 kg) 2.3652
2 AJ-003 Pasir 0.2160
3 AJ-004 Kerikil Saring 0.1440
4 AJ-007 Besi beton tulangan 19.3836
5 AJ-006 Papan cor 1.9200
6 AI-007 Pipa PVC dia.1 1/2" 2.0000
7 AJ-009 Paku Campur 0.0700
8 AJ-008 Kawat beton 0.0200
9 BA-011 Mandor Tenaga Ahli Sipil 0.0278
10 BA-012 Tukang Batu 0.0556
11 BA-013 Pembantu Tukang Batu 0.1667
12 BA-014 Sopir 0.1667
13 CA-012 Mobil Pickup 0.1667
14 CA-008 Beton molen 0.0556
15 CA-009 Penggetar beton/ Vibrator 0.0556
16 CA-006 Alat bantu 0.0556

XIII EA-020 Finishing pondasi tiang PJU Oktagonal 1.0000


1 AJ-002 Semen Portland(50 kg) 0.1238
2 AJ-003 Pasir 0.0240
6 BA-011 Mandor Tenaga Ahli Sipil 0.1820
7 BA-012 Tukang Batu 0.3636
8 BA-013 Pembantu Tukang Batu 0.3636
11 CA-006 Alat bantu 0.0250
No Kode Uraian Pekerjaan Koefisien
No Kode Uraian Pekerjaan Koefisien

XIV EA-026 Ereksion PJU Oktagonal 1.0000


1 BA-002 Mandor/Tenaga Ahli konstruksi 0.0667
2 BA-008 Tukang Konstruksi 0.2500
3 BA-010 Pembantu Tukang Konstruksi 0.3750
4 BA-004 Operator Truck Crane kapasitas 2,5 ton 0.1250
5 BA-005 Operator Truck kapasitas 7 ton 0.1250
6 CA-002 Sewa Truck Crane kapasitas 2,5 ton 0.1250
7 CA-003 Sewa Truck kapasitas 7 ton 0.1250
8 CA-006 Alat bantu 0.1250

XV EA-033 Pemasangan grounding pada Tiang LPJU 1.0000


Tenaga Kerja
1 BA-001 Mandor/Tenaga Ahli Listrik 0.0500
2 BA-007 Tukang Listrik 0.1000
3 BA-009 Pembantu Tukang Listrik 0.2000

Bahan
1 AI-012 Grounding Rod 16 mm2 1.0000
2 AI-016 Kabel BC 6 mm2 1.5000
3 AI-017 Kabel schoon 6 mm2 1.0000

Jumlah Tenaga K

XVI EA-034 Crossing Kabel pada Jembatan 1.0000


Tenaga Kerja
1 BA-001 Mandor/Tenaga Ahli Listrik 0.0050
2 BA-007 Tukang Listrik 0.0100
3 BA-009 Pembantu Tukang Listrik 0.0200
4 CA-006 Alat bantu 0.0200

Bahan
1 AI-014 Pipa GIV. dia. 2" 1.0500
2 AI-005 Angkur 22 mm 0.5000
3 AJ-010 Kawat Duri 1.2500
4 AI-010 Asesoris 0.0300

XVII EA-035 Crossing Kabel pada Jalan 1.0000


Tenaga Kerja
1 BA-001 Mandor/Tenaga Ahli Listrik 0.0050
2 BA-007 Tukang Listrik 0.0100
3 BA-009 Pembantu Tukang Listrik 0.0200
4 CA-006 Alat bantu 0.0200

Bahan
1 AI-006 Pipa PVC dia.2" 1.0500
2 AI-010 Asesoris 0.0300
SATUAN

Jumlah Harga
Sat. Harga Satuan
Satuan

titik 55,878.00
oh 175,000.00 1,750.00
oh 150,000.00 2,985.00
oh 150,000.00 5,970.00
oh 125,000.00 9,950.00
hari 1,650,000.00 32,835.00
hari 120,000.00 2,388.00
Jumlah 55,878.00
Pembulatan 55,878.00

titik 41,288.00
oh 175,000.00 875.00
oh 150,000.00 1,500.00
oh 150,000.00 3,000.00
oh 125,000.00 4,937.50
hari 1,650,000.00 28,875.00
hari 120,000.00 2,100.00
Jumlah 41,287.50
Pembulatan 41,288.00

titik 26,333.00
oh 150,000.00 5,000.00
oh 125,000.00 8,333.33
hari 75,000.00 5,000.00
hari 120,000.00 8,000.00
Jumlah 26,333.33
Pembulatan 26,333.00

m' 4,160.00 4,160.00


oh 175,000.00 175.00
oh 150,000.00 600.00
oh 125,000.00 1,000.00
oh 150,000.00 450.00
hari 75,000.00 225.00
hari 120,000.00 360.00
hari 450,000.00 1,350.00
Jumlah 4,160.00
Pembulatan 4,160.00

m' 28,682.00 28,682.00

oh 175,000.00 875.00
oh 150,000.00 1,500.00
oh 125,000.00 2,500.00
oh 150,000.00 3,000.00
hari 450,000.00 9,000.00
hari 120,000.00 2,400.00
Jumlah Upah 19,275.00
Jumlah Harga
Sat. Harga Satuan
Satuan

m3 135,000.00 4,050.00
bh 750.00 5,357.14
Jumlah Bahan 9,407.14
Jumlah Upah+Bahan 28,682.14
Pembulatan 28,682.00
Jumlah Harga
Sat. Harga Satuan
Satuan

titik 223,000.00 223,000.00


oh 175,000.00 35,000.00
oh 150,000.00 60,000.00
oh 100,000.00 80,000.00
hari 120,000.00 48,000.00
Jumlah 223,000.00
Pembulatan 223,000.00

m1 306,614.00

oh 175,000.00 17,500.00
oh 150,000.00 30,000.00
oh 100,000.00 60,000.00
hari 120,000.00 72,000.00
Jumlah 179,500.00

kg 25,500.00 45,900.00
M3 375,000.00 37,500.00
M3 215,000.00 21,500.00
M3 180,000.00 9,000.00
hari 250,000.00 8,928.57
hari 120,000.00 4,285.71
Jumlah 127,114.29
Jumlah Tenaga Kerja dan Bahan 306,614.29
Pembulatan 306,614.00

m3 163,500.00 163,500.00
oh 175,000.00 17,500.00
oh 150,000.00 30,000.00
oh 100,000.00 60,000.00
hari 250,000.00 50,000.00
hari 120,000.00 6,000.00
Jumlah 163,500.00
Pembulatan 163,500.00

set 3,893,800.00 3,893,800.00

oh 175,000.00 8,750.00
oh 150,000.00 15,000.00
oh 125,000.00 25,000.00
Jumlah Tenaga Kerja 48,750.00

bh 778,000.00 778,000.00
bh 75,000.00 150,000.00
bh 60,000.00 120,000.00
bh 450,000.00 450,000.00
bh 500,000.00 500,000.00
bh 85,000.00 85,000.00
bh 550,000.00 550,000.00
mtr 41,000.00 205,000.00
bh 50,000.00 50,000.00
bh 55,000.00 55,000.00
bh 4,500.00 9,000.00
bh 22,000.00 22,000.00
bh 27,000.00 108,000.00
mtr 16,000.00 128,000.00
bh 10,000.00 60,000.00
Jumlah Harga
Sat. Harga Satuan
Satuan
bh 7,500.00 15,000.00
mtr 12,000.00 36,000.00
bh 2,350.00 7,050.00
bh 2,000.00 12,000.00
bh 55,000.00 55,000.00
ls 450,000.00 450,000.00
Jumlah Bahan 3,845,050.00
Jumlah Tenaga Kerja dan Bahan 3,893,800.00
Dibulatkan 3,893,800.00
Jumlah Harga
Sat. Harga Satuan
Satuan

titik 743,200.00 743,200.00

oh 175,000.00 17,500.00
oh 150,000.00 30,000.00
oh 125,000.00 50,000.00
Jumlah 97,500.00

mtr 23,500.00 70,500.00


bh 225,000.00 225,000.00
bh 5,000.00 10,000.00
mtr 102,500.00 307,500.00
mtr 12,000.00 24,000.00
bh 2,350.00 4,700.00
bh 2,000.00 4,000.00
Jumlah 645,700.00
Jumlah Tenaga Kerja dan Bahan 743,200.00
Dibulatkan 743,200.00

titik 334,954.00 334,954.00


oh 175,000.00 32,060.00
oh 150,000.00 109,890.00
oh 125,000.00 91,575.00
oh 150,000.00 7,500.00
hari 450,000.00 22,500.00
hari 75,000.00 27,472.50
hari 120,000.00 43,956.00
Jumlah 334,953.50
Dibulatkan 334,954.00

titik 919,431.00 919,431.00


zak 65,800.00 155,630.16
M3 180,000.00 38,880.00
M3 375,000.00 54,000.00
kg 15,000.00 290,754.00
m2 100,000.00 192,000.00
mtr 11,000.00 22,000.00
kg 20,000.00 1,400.00
kg 20,000.00 400.00
oh 175,000.00 4,865.00
oh 150,000.00 8,340.00
oh 100,000.00 16,670.00
oh 150,000.00 25,005.00
hari 450,000.00 75,015.00
hari 250,000.00 13,900.00
hari 250,000.00 13,900.00
hari 120,000.00 6,672.00
Jumlah 919,431.16
Dibulatkan 919,431.00

titik 138,212.00 138,212.00


zak 65,800.00 8,142.75
M3 180,000.00 4,320.00
oh 175,000.00 31,850.00
oh 150,000.00 54,540.00
oh 100,000.00 36,360.00
hari 120,000.00 3,000.00
Jumlah 138,212.75
Dibulatkan 138,212.00
Jumlah Harga
Sat. Harga Satuan
Satuan
Jumlah Harga
Sat. Harga Satuan
Satuan

titik 532,917.00 532,917.00


oh 175,000.00 11,666.67
oh 150,000.00 37,500.00
oh 100,000.00 37,500.00
oh 150,000.00 18,750.00
oh 150,000.00 18,750.00
hari 1,650,000.00 206,250.00
hari 1,500,000.00 187,500.00
hari 120,000.00 15,000.00
Jumlah 532,916.67
Dibulatkan 532,917.00

titik 293,375.00 293,375.00

oh 175,000.00 8,750.00
oh 150,000.00 15,000.00
oh 125,000.00 25,000.00
Jumlah 48,750.00

bh 225,000.00 225,000.00
mtr 10,750.00 16,125.00
bh 3,500.00 3,500.00
Jumlah 244,625.00
Jumlah Tenaga Kerja dan Bahan 293,375.00
Dibulatkan 293,375.00

m' 184,650.00 184,650.00

oh 175,000.00 875.00
oh 150,000.00 1,500.00
oh 125,000.00 2,500.00
hari 120,000.00 2,400.00
Jumlah Upah 7,275.00

mtr 102,500.00 107,625.00


bh 75,000.00 37,500.00
m' 15,000.00 18,750.00
ls 450,000.00 13,500.00
Jumlah Bahan 177,375.00
Jumlah Upah+Bahan 184,650.00
Pembulatan 184,650.00

m' 37,575.00 37,575.00

oh 175,000.00 875.00
oh 150,000.00 1,500.00
oh 125,000.00 2,500.00
hari 120,000.00 2,400.00
Jumlah Upah 7,275.00

mtr 16,000.00 16,800.00


ls 450,000.00 13,500.00
Jumlah Bahan 30,300.00
Jumlah Upah+Bahan 37,575.00
Pembulatan 37,575.00
DAFTAR KUANTITAS DAN HARGA

SKPD :
NAMA PAKET :
LOKASI :
VOLUME :
PROP/KAB/KODYA :

NO KODE URAIAN PEKERJAAN

A PEKERJAAN PENDAHULUAN
1 Pekerjaan Papan Nama Proyek
2 Mobilisasi dan Demobilisasi Peralatan

B PENGADAAN DAN PEMASANGAN LAMPU ARMATUR


1 AA-003 Armature LED Nikkon Stealth J3 90 W lengkap
2 AA-003 Armature LED Nikkon Stealth J3 60 W lengkap
2 EA-001 Pemasangan armatur
3 EA-033 Pemasangan grounding pada Tiang LPJU

C PENGADAAN DAN PEMASANGAN TIANG LAMPU


1 AE-001 Tiang Heksagonal 9 meter SO type baseplate
2 AE-002 Tiang Heksagonal 8 meter SO type baseplate
3 AF-005 MCB 1P 2- 16 A
4 EA-003 Pemasang dan koneksi MCB 1 Phasa
5 EA-011 Galian pondasi tanah keras
6 EA-018 Pondasi Tiang PJU Oktagonal
7 EA-020 Finishing pondasi tiang PJU Oktagonal
8 EA-026 Ereksion PJU Oktagonal
9 EA-002 Setting dan aiming armatur

D PENGADAAN DAN PEMASANGAN JARINGAN KABEL PJU


1 AG-016 Kabel NYY 2x1,5mm2
2 AG-018 Kabel NYY 4x6 mm2
3 AG-009 Kabel Twisted 4x16 mm2
5 EA-013 Galian Tanah keras dan perapian kembali
6 EA-009 Gelar kabel tanah, perapian dan instalasi jaringan kabel tanah
7 EA-035 Tarikan kabel twist
8 EA-036 Galian Tanah Aspal dan Perapian Kembali
E PENGADAAN DAN PEMASANGAN PANEL
1 EA-014 Panel kontrol distribusi type APP-1P
2 EA-015 Pemasangan Grounding Panel Kontrol PJU
3 EA-016 Pemasangan Panel Kontrol PJU
4 AG-005 Kabel NYFGbY 4x16mm2
5 DA-006 Mutasi Data

F BIAYA PENYAMBUNGAN LISTRIK


1 DA-001 BP
2 DA-002 UJL
3 DA-004 SJI
4 DA-005 SLO

1 DA-001 BP
2 DA-002 UJL
3 DA-004 SJI
4 DA-005 SLO
TITAS DAN HARGA

VOLUME SAT. HARGA JUMLAH

1.00 Ls -
1.00 Ls -
Jumlah A -

6.00 bh 4,467,000.00 26,802,000.00


12.00 bh 3,680,000.00 44,160,000.00
18.00 titik 55,878.00 1,005,804.00
18.00 titik 293,375.00 5,280,750.00
Jumlah B 77,248,554.00

- btg 4,325,500.00 -
4.00 btg 3,850,000.00 15,400,000.00
4.00 bh 60,000.00 240,000.00
4.00 titik 26,333.00 105,332.00
4.00 titik 223,000.00 892,000.00
4.00 titik 919,431.00 3,677,724.00
4.00 titik 138,212.00 552,848.00
4.00 titik 532,917.00 2,131,668.00
18.00 titik 41,288.00 743,184.00
Jumlah C 23,742,756.00

54.00 m' 10,500.00 567,000.00


- rol 4,455,000.00 -
1,088.00 mtr 15,250.00 16,592,000.00
- oh 109,500.00 -
- m' 28,682.00 -
1,088.00 m' 4,160.00 4,526,080.00
m' 306,614.00
Jumlah D 21,685,080.00
- set 3,893,800.00 -
4.00 titik 743,200.00 2,972,800.00
4.00 titik 334,954.00 1,339,816.00
28.00 mtr 122,500.00 3,430,000.00
3.00 ls 75,000.00 225,000.00
Jumlah E 7,967,616.00

6,600.00 VA 775.00 5,115,000.00


6,600.00 VA 172.00 1,135,200.00
6,600.00 VA 500.00 3,300,000.00
1.00 Ls 1,000,000.00 1.00
9,550,201.00

7,700.00 VA 775.00 5,967,500.00


7,700.00 VA 172.00 1,324,400.00
7,700.00 VA 500.00 3,850,000.00
1.00 Ls 1,000,000.00 1,000,000.00
12,141,900.00
Jumlah F 13,542,100.00
REKAPITULASI
PERKIRAAN HARGA PEKERJAAN

SKPD :
NAMA PAKET :
LOKASI :
VOLUME :
PROP/KAB. :

No. Divisi Uraian

A Pekerjaan Pendahuluan
B Pekerjaan Pengadaan dan Pemasangan Lampu Armature
C Pekerjaan Pengadaan dan Pemasangan Tiang Lampu
D Pekerjaan Pengadaan dan Pemasangan Jaringan Kabel PJU
E Pekerjaan Pengadaan dan Pemasangan Panel
F Biaya Penyambungan Listrik
(A) Jumlah Harga Pekerjaan ( termasuk Biaya Umum dan Keuntungan )
(B) Pajak Pertambahan Nilai ( PPN ) = 10% x (A)
(C) JUMLAH TOTAL HARGA PEKERJAAN = (A) + (B)
DIBULATKAN

Terbilang : Dua ratus delapan belas juta enam ratus lima puluh ribu rupiah

Ponosakan Belang, Februari 2015


Diperiksa oleh, Dibuat Oleh,

Mengetahui,
REKAPITULASI
PERKIRAAN HARGA PEKERJAAN

Jumlah Harga
(Rp)

-
77,248,554.00
23,742,756.00
21,685,080.00
7,967,616.00
13,542,100.00
144,186,106.00
14,418,610.60
158,604,716.60
158,600,000.00

atus delapan belas juta enam ratus lima puluh ribu rupiah

Ponosakan Belang, Februari 2015


Dibuat Oleh,

Mengetahui,
Penerangan Jalan Umum Dua Lengan

Jumlah Satuan Uraian Pekerjaan Harga Satuan


(Rp)
0.0107 hari Mandor 175,000.00
0.0857 hari Pekerja 125,000.00
0.0321 hari Tukang Listrik 150,000.00
1 btg Tiang PJU H-11 3,850,000.00
1 Ls Pondasi 450,000.00
1 Bh Armature LED Nikkon Stealth J3 90 W lengkap 4,467,000.00
13 m' Kabel Instalasi NYM 3 x 2.5 mm 18,000.00
35 m' Kabel Tanah NYY 4 x 6 mm 44,550.00
1 Ls Panel Penerangan 250,000.00
1 Ls Pelindung Kabel 45,000.00
1 Ls Ground Perlengkapan 125,000.00
35 m' Galian Tanah keras dan perapian kembali 45,000.00
1 Ls Peralatan Listrik 25,500.00
0.5 jam Lift Car 75,000.00

Total/Titik PJU = 15 Titik

(A) Jumlah Harga Pekerjaan ( termasuk Biaya Umum dan Keuntungan


(B) Pajak Pertambahan Nilai ( PPN ) = 10% x (A)
(C) JUMLAH TOTAL HARGA PEKERJAAN = (A) + (B)

DIBULATKAN
Upah Pekerja Harga Alat/Bahan Jumlah
(Rp) (Rp) (Rp)
1,872.50 1,872.50
10,712.50 10,712.50
4,815.00 4,815.00
3,850,000.00 3,850,000.00
450,000.00 450,000.00
4,467,000.00 4,467,000.00
234,000.00 234,000.00
1,559,250.00 1,559,250.00
250,000.00 250,000.00
45,000.00 45,000.00
125,000.00 125,000.00
1,575,000.00 1,575,000.00
25,500.00 25,500.00
37,500.00 37,500.00

17,400.00 12,618,250.00 12,635,650.00

m dan Keuntungan ) = 252,713,000.00 189,534,750.00


= 25,271,300.00
= 277,984,300.00

= 277,980,000.00