Professional Documents
Culture Documents
RAB Lampu Jalan
RAB Lampu Jalan
SKPD :
NAMA PAKET :
LOKASI :
VOLUME :
PROP/KAB/KODYA :
HARGA SATUAN
4,467,000.00
3,680,000.00
4,325,500.00
3,850,000.00
3,375,000.00
430,000.00
500,000.00
60,000.00
450,000.00
500,000.00
85,000.00
550,000.00
2,250,000.00
50,000.00
175,000.00
55,000.00
15,250.00
10,500.00
4,455,000.00
122,500.00
90,150.00
25,000.00
41,000.00
1,800,000.00
13,500.00
42,000.00
240,000.00
4,500.00
19,000.00
19,000.00
22,000.00
13,000.00
27,000.00
6,000.00
12,000.00
12,000.00
2,350.00
2,000.00
3,893,800.00
778,000.00
55,000.00
75,000.00
16,000.00
11,000.00
10,000.00
7,500.00
450,000.00
23,500.00
225,000.00
HARGA SATUAN
5,000.00
102,500.00
10,750.00
3,500.00
25,500.00
65,800.00
180,000.00
375,000.00
215,000.00
100,000.00
15,000.00
20,000.00
20,000.00
15,000.00
135,000.00
750.00
775.00
280.00
400.00
500.00
1,000,000.00
75,000.00
DAFTAR HARGA SATUAN UPAH
SKPD :
NAMA PAKET :
LOKASI :
VOLUME :
PROP/KAB/KODYA :
NO KODE URAIAN
14 BA-014 Sopir
oh 150,000.00
oh 150,000.00
SKPD :
NAMA PAKET :
LOKASI :
VOLUME :
PROP/KAB/KODYA :
NO KODE URAIAN
10 CA-010 Stamper
hari 120,000.00
hari 250,000.00
SKPD :
NAMA PAKET :
LOKASI :
VOLUME :
PROP/KAB/KODYA :
NO KODE U R A I AN
Page 9 of 32
DAFTAR ANALISA HARGA SATUAN
Page 10 of 32
ANALISA HARGA SATUAN
SKPD :
NAMA PAKET :
LOKASI :
VOLUME :
PROP/KAB :
Bahan
1 AJ-001 Aspal 1.8000
2 AJ-004 Kerikil Saring 0.1000
3 AJ-005 Sirtu 0.1000
4 AJ-003 Pasir 0.0500
5 CA-010 Stamper 0.0357
6 CA-006 Alat bantu 0.0357
Jumlah Tenaga K
Bahan
1 AI-002 Box panel 60x40x25 cm 1.0000
2 AI-005 Angkur 22 mm 2.0000
3 AF-005 MCB 1P 2- 16 A 2.0000
5 AF-016 Kontaktor 3P, 40 A 1.0000
6 AF-019 Timer Switch type Analog/digital,24 jam 1P 1.0000
7 AF-020 Selector Switch Auto/Manual 1.0000
9 AF-022 KWH meter 1P 20/60 A 1.0000
10 AG-014 Kabel NYAF 16 mm2 5.0000
11 AF-024 OK meter 1 P 1.0000
11 AF-026 Terminal keramik 4P 60 A 1.0000
12 AH-001 Service Wedge Clamp 2.0000
12 AH-004 Tension Bracket 1.0000
13 AH-007 Line tap connector (CCS) 35/70 mm2 4.0000
14 AI-006 Pipa PVC dia.2" 8.0000
15 AI-008 Knee PVC dia.2" 6.0000
No Kode Uraian Pekerjaan Koefisien
16 AI-009 Sock PVC dia 2" 2.0000
17 AH-010 Stainless Steel Strip 3.0000
18 AH-011 Yokes/Stoping Buckle 3.0000
19 AH-012 Link 6.0000
20 AI-004 Gembok 1.0000
21 AI-010 Asesoris 1.0000
Jumlah Tenaga K
No Kode Uraian Pekerjaan Koefisien
Bahan
1 AI-011 Kabel BC 16 mm2 3.0000
2 AI-012 Grounding Rod 16 mm2 1.0000
3 AI-013 Kabel schoon 16 mm2 2.0000
4 AI-014 Pipa GIV. dia. 2" 3.0000
5 AH-010 Stainless Steel Strip 2.0000
5 AH-011 Yokes/Stoping Buckle 2.0000
6 AH-012 Link 2.0000
Jumlah Tenaga K
Bahan
1 AI-012 Grounding Rod 16 mm2 1.0000
2 AI-016 Kabel BC 6 mm2 1.5000
3 AI-017 Kabel schoon 6 mm2 1.0000
Jumlah Tenaga K
Bahan
1 AI-014 Pipa GIV. dia. 2" 1.0500
2 AI-005 Angkur 22 mm 0.5000
3 AJ-010 Kawat Duri 1.2500
4 AI-010 Asesoris 0.0300
Bahan
1 AI-006 Pipa PVC dia.2" 1.0500
2 AI-010 Asesoris 0.0300
SATUAN
Jumlah Harga
Sat. Harga Satuan
Satuan
titik 55,878.00
oh 175,000.00 1,750.00
oh 150,000.00 2,985.00
oh 150,000.00 5,970.00
oh 125,000.00 9,950.00
hari 1,650,000.00 32,835.00
hari 120,000.00 2,388.00
Jumlah 55,878.00
Pembulatan 55,878.00
titik 41,288.00
oh 175,000.00 875.00
oh 150,000.00 1,500.00
oh 150,000.00 3,000.00
oh 125,000.00 4,937.50
hari 1,650,000.00 28,875.00
hari 120,000.00 2,100.00
Jumlah 41,287.50
Pembulatan 41,288.00
titik 26,333.00
oh 150,000.00 5,000.00
oh 125,000.00 8,333.33
hari 75,000.00 5,000.00
hari 120,000.00 8,000.00
Jumlah 26,333.33
Pembulatan 26,333.00
oh 175,000.00 875.00
oh 150,000.00 1,500.00
oh 125,000.00 2,500.00
oh 150,000.00 3,000.00
hari 450,000.00 9,000.00
hari 120,000.00 2,400.00
Jumlah Upah 19,275.00
Jumlah Harga
Sat. Harga Satuan
Satuan
m3 135,000.00 4,050.00
bh 750.00 5,357.14
Jumlah Bahan 9,407.14
Jumlah Upah+Bahan 28,682.14
Pembulatan 28,682.00
Jumlah Harga
Sat. Harga Satuan
Satuan
m1 306,614.00
oh 175,000.00 17,500.00
oh 150,000.00 30,000.00
oh 100,000.00 60,000.00
hari 120,000.00 72,000.00
Jumlah 179,500.00
kg 25,500.00 45,900.00
M3 375,000.00 37,500.00
M3 215,000.00 21,500.00
M3 180,000.00 9,000.00
hari 250,000.00 8,928.57
hari 120,000.00 4,285.71
Jumlah 127,114.29
Jumlah Tenaga Kerja dan Bahan 306,614.29
Pembulatan 306,614.00
m3 163,500.00 163,500.00
oh 175,000.00 17,500.00
oh 150,000.00 30,000.00
oh 100,000.00 60,000.00
hari 250,000.00 50,000.00
hari 120,000.00 6,000.00
Jumlah 163,500.00
Pembulatan 163,500.00
oh 175,000.00 8,750.00
oh 150,000.00 15,000.00
oh 125,000.00 25,000.00
Jumlah Tenaga Kerja 48,750.00
bh 778,000.00 778,000.00
bh 75,000.00 150,000.00
bh 60,000.00 120,000.00
bh 450,000.00 450,000.00
bh 500,000.00 500,000.00
bh 85,000.00 85,000.00
bh 550,000.00 550,000.00
mtr 41,000.00 205,000.00
bh 50,000.00 50,000.00
bh 55,000.00 55,000.00
bh 4,500.00 9,000.00
bh 22,000.00 22,000.00
bh 27,000.00 108,000.00
mtr 16,000.00 128,000.00
bh 10,000.00 60,000.00
Jumlah Harga
Sat. Harga Satuan
Satuan
bh 7,500.00 15,000.00
mtr 12,000.00 36,000.00
bh 2,350.00 7,050.00
bh 2,000.00 12,000.00
bh 55,000.00 55,000.00
ls 450,000.00 450,000.00
Jumlah Bahan 3,845,050.00
Jumlah Tenaga Kerja dan Bahan 3,893,800.00
Dibulatkan 3,893,800.00
Jumlah Harga
Sat. Harga Satuan
Satuan
oh 175,000.00 17,500.00
oh 150,000.00 30,000.00
oh 125,000.00 50,000.00
Jumlah 97,500.00
oh 175,000.00 8,750.00
oh 150,000.00 15,000.00
oh 125,000.00 25,000.00
Jumlah 48,750.00
bh 225,000.00 225,000.00
mtr 10,750.00 16,125.00
bh 3,500.00 3,500.00
Jumlah 244,625.00
Jumlah Tenaga Kerja dan Bahan 293,375.00
Dibulatkan 293,375.00
oh 175,000.00 875.00
oh 150,000.00 1,500.00
oh 125,000.00 2,500.00
hari 120,000.00 2,400.00
Jumlah Upah 7,275.00
oh 175,000.00 875.00
oh 150,000.00 1,500.00
oh 125,000.00 2,500.00
hari 120,000.00 2,400.00
Jumlah Upah 7,275.00
SKPD :
NAMA PAKET :
LOKASI :
VOLUME :
PROP/KAB/KODYA :
A PEKERJAAN PENDAHULUAN
1 Pekerjaan Papan Nama Proyek
2 Mobilisasi dan Demobilisasi Peralatan
1 DA-001 BP
2 DA-002 UJL
3 DA-004 SJI
4 DA-005 SLO
TITAS DAN HARGA
1.00 Ls -
1.00 Ls -
Jumlah A -
- btg 4,325,500.00 -
4.00 btg 3,850,000.00 15,400,000.00
4.00 bh 60,000.00 240,000.00
4.00 titik 26,333.00 105,332.00
4.00 titik 223,000.00 892,000.00
4.00 titik 919,431.00 3,677,724.00
4.00 titik 138,212.00 552,848.00
4.00 titik 532,917.00 2,131,668.00
18.00 titik 41,288.00 743,184.00
Jumlah C 23,742,756.00
SKPD :
NAMA PAKET :
LOKASI :
VOLUME :
PROP/KAB. :
A Pekerjaan Pendahuluan
B Pekerjaan Pengadaan dan Pemasangan Lampu Armature
C Pekerjaan Pengadaan dan Pemasangan Tiang Lampu
D Pekerjaan Pengadaan dan Pemasangan Jaringan Kabel PJU
E Pekerjaan Pengadaan dan Pemasangan Panel
F Biaya Penyambungan Listrik
(A) Jumlah Harga Pekerjaan ( termasuk Biaya Umum dan Keuntungan )
(B) Pajak Pertambahan Nilai ( PPN ) = 10% x (A)
(C) JUMLAH TOTAL HARGA PEKERJAAN = (A) + (B)
DIBULATKAN
Terbilang : Dua ratus delapan belas juta enam ratus lima puluh ribu rupiah
Mengetahui,
REKAPITULASI
PERKIRAAN HARGA PEKERJAAN
Jumlah Harga
(Rp)
-
77,248,554.00
23,742,756.00
21,685,080.00
7,967,616.00
13,542,100.00
144,186,106.00
14,418,610.60
158,604,716.60
158,600,000.00
atus delapan belas juta enam ratus lima puluh ribu rupiah
Mengetahui,
Penerangan Jalan Umum Dua Lengan
DIBULATKAN
Upah Pekerja Harga Alat/Bahan Jumlah
(Rp) (Rp) (Rp)
1,872.50 1,872.50
10,712.50 10,712.50
4,815.00 4,815.00
3,850,000.00 3,850,000.00
450,000.00 450,000.00
4,467,000.00 4,467,000.00
234,000.00 234,000.00
1,559,250.00 1,559,250.00
250,000.00 250,000.00
45,000.00 45,000.00
125,000.00 125,000.00
1,575,000.00 1,575,000.00
25,500.00 25,500.00
37,500.00 37,500.00
= 277,980,000.00