VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01
Introduction
Introduction Introduction
Sizing
Fire Case
These Training Lectures for VALVESTAR 7 must be used by all teachers of
VALVESTAR 7 to ensure the most efficient training and the highest quality of training.
Two Phase Flow
VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 2 / 113
Introduction
Introduction Introduction
Sizing Pop-up view of VALVESTAR 7.1.2 and higher
Fire Case
Reporting
Settings
Language
Translation
www.valvestar.com
Spare Parts
VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 3 / 113
Introduction Sizing
Sizing
Sizing Sizing according to ASME, (steam/gases)
Fire Case Service condition: Air, Set pressure = 10bar g, required massflow = 11500kg/h
Two Phase Flow Valve construction: Type 441, semi nozzle, Carbon Steel body (1.0619/WCB),
Add. Sizing, Noise Level,
closed bonnet, lifting device cap H4
Reaction Force
Settings
Language
Translation
www.valvestar.com
or: see next page
Spare Parts
VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 4 / 113
Introduction Sizing
Sizing
Sizing Sizing according to ASME, (steam/gases)
Reporting
Settings
Language
Translation
www.valvestar.com
Spare Parts
VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 5 / 113
Introduction Sizing
Sizing
Sizing Sizing according to ASME, (steam/gases)
Reporting
Settings
Language
Translation
www.valvestar.com
Spare Parts
VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 6 / 113
Introduction Sizing
Sizing
Sizing Sizing according to ASME, (steam/gases)
Reporting
Settings
Language
Translation
www.valvestar.com
Spare Parts
VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 7 / 113
Introduction Sizing
Sizing
Sizing Sizing according to ASME, (steam/gases)
Reporting
Settings
Language
Translation
www.valvestar.com
Spare Parts
VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 8 / 113
Introduction Sizing
Sizing
Sizing Sizing according to ASME, (steam/gases)
Reporting
Settings
Language
Translation
www.valvestar.com
Spare Parts
VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 9 / 113
Introduction Sizing
Sizing
Sizing Sizing according to ASME, (steam/gases)
Reporting
Settings
Language
Translation
www.valvestar.com
Spare Parts
VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 10 / 113
Introduction Sizing
Sizing
Sizing Sizing according to ASME, (steam/gases)
Reporting
Settings
Language
Translation
www.valvestar.com
Spare Parts
VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 11 / 113
Introduction Sizing
Sizing
Sizing Sizing according to ASME, (steam/gases)
Reporting
Settings
Language
Translation
www.valvestar.com
Spare Parts
VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 12 / 113
Introduction Sizing
Sizing
Sizing Sizing according to ASME, (steam/gases)
Reporting
Settings
Language
Translation
www.valvestar.com
Spare Parts
VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 13 / 113
Introduction Sizing
Sizing
Sizing Sizing according to ASME, (steam/gases)
Reporting
Settings
Language
Translation
www.valvestar.com
Spare Parts
VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 14 / 113
Introduction Sizing
Sizing
Sizing Sizing according to ASME, (steam/gases)
Reporting
Settings
Language
Translation
www.valvestar.com
Spare Parts
VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 15 / 113
Introduction Sizing
Sizing
Sizing Sizing according to ASME, (steam/gases)
Reporting
Settings
Language
Translation
www.valvestar.com
Spare Parts
VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 16 / 113
Introduction Sizing
Sizing
Sizing Sizing according to ASME, (steam/gases)
Reporting
Settings
Language
Translation
www.valvestar.com
Spare Parts
VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 17 / 113
Introduction Sizing
Sizing
Sizing Sizing according to ASME, (steam/gases)
Reporting
Settings
Language
Translation
www.valvestar.com
Spare Parts
VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 18 / 113
Introduction Sizing
Sizing
Sizing Sizing according to ASME, (steam/gases)
Reporting
Settings
Language
Translation
Spare Parts
VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 19 / 113
Introduction Sizing
Sizing
Sizing Sizing according to ASME, (liquids)
Fire Case Service condition: Heavy Oil, Set pressure = 500 bar g, Temperature 20C,
required massflow = 100000kg/h, viscosity = 0,038 Pa s.
Two Phase Flow
Valve construction: Type 526, Fullnozzle, Carbon Steel body (1.0619/WCB), closed
Add. Sizing, Noise Level,
Reaction Force bonnet, lifting divice cap H2, stainless steel bellows design.
Reporting
1. Step: Sizing Standard and additional calculation
Settings
Language
Translation
www.valvestar.com
Spare Parts
VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 20 / 113
Introduction Sizing
Sizing
Sizing Sizing according to ASME, (liquids)
Reporting
Settings
Language
Translation
www.valvestar.com
Spare Parts
VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 21 / 113
Introduction Sizing
Sizing
Sizing Sizing according to ASME, (liquids)
Reporting
Settings
Language
Translation
www.valvestar.com
Spare Parts
VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 22 / 113
Introduction Sizing
Sizing
Sizing Sizing according to ASME, (liquids)
Reporting
Settings
Language
Translation
www.valvestar.com
Spare Parts
VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 23 / 113
Introduction Sizing
Sizing
Sizing Sizing according to ASME, (liquids)
Reporting
Settings
Language
Translation
www.valvestar.com
Spare Parts
VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 24 / 113
Introduction Sizing
Sizing
Sizing Sizing according to ASME, (liquids)
Reporting
Settings
Language
Translation
www.valvestar.com
Spare Parts
VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 25 / 113
Introduction Sizing
Sizing
Sizing Sizing according to ASME, (liquids)
Reporting
Settings
Language
Translation
www.valvestar.com
Spare Parts
VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 26 / 113
Introduction Sizing of inlet pressure drop
Sizing
Sizing (according AD 2000-Markblatt A2)
Reporting
Settings
Language
Translation
www.valvestar.com
Spare Parts
VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 27 / 113
Introduction Sizing of inlet pressure drop
Sizing
Sizing (according AD 2000-Markblatt A2)
Reporting
Settings
Language
Translation
www.valvestar.com
Spare Parts
VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 28 / 113
Introduction Sizing of inlet pressure drop
Sizing
Sizing (according AD 2000-Markblatt A2)
Reporting
Settings
Language
Translation
www.valvestar.com
Spare Parts
VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 29 / 113
Introduction Sizing of inlet pressure drop
Sizing
Sizing (according AD 2000-Markblatt A2)
Reporting
Settings
Language
Translation
www.valvestar.com
Spare Parts
VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 30 / 113
Introduction Sizing of built-up backpressure
Sizing
Sizing
Reporting
Settings
Language
Translation
www.valvestar.com
Spare Parts
VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 31 / 113
Introduction Sizing of built-up backpressure
Sizing
Sizing
Reporting
Settings
Language
Translation
www.valvestar.com
Spare Parts
VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 32 / 113
Introduction Sizing of built-up backpressure
Sizing
Sizing
Reporting
Settings
Language
Translation
www.valvestar.com
Spare Parts
VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 33 / 113
Introduction Sizing of built-up backpressure
Sizing
Sizing
Reporting
Settings
Language
Translation
www.valvestar.com
Spare Parts
VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 34 / 113
Introduction Fire case according to API RP 521
Sizing
Fire Case
Fire Case 3. Step: Calculation and warning
Two Phase Flow Service condition: water, temperature = 20C, Set pressure = 10bar g, effect of fire
Add. Sizing, Noise Level,
on the wetted surface of vessel, wetted surface = 10m, no
Reaction Force drainage, bare vessel, heat of evaporation 1998,5 kJ/kg
Reporting
Valve construction: Type 526, full nozzle, Carbon Steel body (1.0619/WCB),
Settings
closed bonnet, lifting device cap H2
Language
API RP 521
Translation
www.valvestar.com
Spare Parts
VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 35 / 113
Introduction Fire case according to API RP 521
Sizing
Fire Case
Fire Case API RP 521
Reporting
Settings
Language
Translation
www.valvestar.com
Spare Parts
VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 36 / 113
Introduction Fire case according to API RP 521
Sizing
Fire Case
Fire Case API RP 521
Reporting
Settings
Language
Translation
www.valvestar.com
Spare Parts
VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 37 / 113
Introduction Fire case according to API RP 521
Sizing
Fire Case
Fire Case API RP 521
Reporting
Settings
Language
Translation
www.valvestar.com
Spare Parts
VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 38 / 113
Introduction Two Phase Flow
Sizing LESER mixed formula
Fire Case Service condition: hot water, temperature = 150C, Set pressure = 10bar g,
required massflow = 10000kg/h
Two Phase
Two Phase Flow
Flow
Valve construction: Type 441, semi nozzle, Carbon Steel body (1.0619/WCB),
Add. Sizing, Noise Level,
Reaction Force closed bonnet, lifting device cap H2, evaporation while
depressuring from 10bar g to environmental pressure in case
Reporting
of blow off.
Settings
Language
Translation
www.valvestar.com
Spare Parts
VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 39 / 113
Introduction Two Phase Flow
Sizing LESER mixed formula
Fire Case
Two Phase
Two Phase Flow
Flow
Reporting
Settings
Language
Translation
www.valvestar.com
Spare Parts
VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 40 / 113
Introduction Two Phase Flow
Sizing LESER mixed formula
Fire Case
Two Phase
Two Phase Flow
Flow
Reporting
Settings
Language
Translation
www.valvestar.com
Spare Parts
VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 41 / 113
Introduction Two Phase Flow
Sizing LESER mixed formula
Two Phase
Two Phase Flow
Flow
Reporting
Settings
Language
Translation
www.valvestar.com
Spare Parts
VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 42 / 113
Introduction Two Phase Flow
Sizing VdTV Merkblatt 100
Fire Case Service condition: Butane, Set pressure = 10bar g, required massflow = 10000kg/h
Valve construction: Type 441, semi nozzle, Carbon Steel body (1.0619/WCB),
Two Phase
Two Phase Flow
Flow
closed bonnet, lifting device cap H2
Add. Sizing, Noise Level,
Reaction Force
Reporting
Settings
Language
Translation
www.valvestar.com
Spare Parts
VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 43 / 113
Introduction Two Phase Flow
Sizing VdTV Merkblatt 100
Fire Case
Two Phase
Two Phase Flow
Flow
Reporting
Settings
Language
Translation
www.valvestar.com
Spare Parts
VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 44 / 113
Introduction Two Phase Flow
Sizing VdTV Merkblatt 100
Fire Case
Two Phase
Two Phase Flow
Flow
Reporting
Settings
Language
Translation
www.valvestar.com
Spare Parts
VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 45 / 113
Introduction Two Phase Flow
Sizing VdTV Merkblatt 100
Fire Case
Two Phase
Two Phase Flow
Flow
Reporting
Settings
Language
Translation
www.valvestar.com
Spare Parts
VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 46 / 113
Introduction Two Phase Flow
Sizing VdTV Merkblatt 100
Fire Case
Two Phase
Two Phase Flow
Flow
Reporting
Settings
Language
Translation
www.valvestar.com
Spare Parts
VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 47 / 113
Introduction Two Phase Flow
Sizing VdTV Merkblatt 100
Reporting
Settings
Language
Translation
www.valvestar.com
Spare Parts
VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 48 / 113
Introduction Two Phase Flow
Sizing Omega method according API 520 Appendix D
Settings
Language
Translation
www.valvestar.com
Spare Parts
VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 49 / 113
Introduction Additional Sizings, Noise Level,
Sizing Reaction Forces
Fire Case 1. Step: Reaction force and noise level
Add.
Add. Sizing,
Sizing,Noise
NoiseLevel,
Reaction
Level, Force Force
Reaction
Reporting
Settings
Language
Translation
www.valvestar.com
Spare Parts
VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 50 / 113
Introduction Additional Sizings, Noise Level,
Sizing Reaction Forces
Fire Case 1. Step: Reaction force and noise level
Add.
Add. Sizing,
Sizing,Noise
NoiseLevel,
Reaction
Level, Force Force
Reaction
Reporting
Settings
Language
Translation
www.valvestar.com
Spare Parts
VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 51 / 113
Introduction Reporting
Sizing
Reporting
Reporting
Settings
Language
Translation
www.valvestar.com
Spare Parts
VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 52 / 113
Introduction Reporting
Sizing
Reporting
Reporting
Settings
Language
Translation
www.valvestar.com
Spare Parts
VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 53 / 113
Introduction Reporting
Sizing
Fire Case
Reporting
Reporting
Settings
Language
Translation
www.valvestar.com
Spare Parts
VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 54 / 113
Introduction Reporting
Sizing
Fire Case
Reporting
Reporting
Settings
Language
Translation
www.valvestar.com
Spare Parts
VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 55 / 113
Introduction Reporting
Sizing
Fire Case
Reporting
Reporting
Settings
Language
Translation
www.valvestar.com
Spare Parts
VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 56 / 113
Introduction Reporting
Sizing
Reporting
Reporting
Settings
Language
Translation
www.valvestar.com
Spare Parts
VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 57 / 113
Introduction Reporting
Sizing
Reporting
Reporting
Settings
Language
Translation
www.valvestar.com
Spare Parts
VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 58 / 113
Introduction Reporting
Sizing
Reporting
Reporting
Settings
Language
Translation
www.valvestar.com
Spare Parts
VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 59 / 113
Introduction Reporting
Sizing
Reporting
Reporting
Settings
Language
Translation
www.valvestar.com
Spare Parts
VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 60 / 113
Introduction Reporting
Sizing
Reporting
Reporting
Settings
Language
Translation
www.valvestar.com
Spare Parts
VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 61 / 113
Introduction Reporting
Sizing
Reporting
Reporting
Settings
Language
Translation
www.valvestar.com
Spare Parts
VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 62 / 113
Introduction Reporting
Sizing
Reporting
Reporting
Settings
Language
Translation
www.valvestar.com
Spare Parts
VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 63 / 113
Introduction Reporting
Sizing
Reporting
Reporting
Settings
Language
Translation
www.valvestar.com
Spare Parts
VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 64 / 113
Introduction Reporting
Sizing
Reporting
Reporting
Settings
Language
Translation
www.valvestar.com
Spare Parts
VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 65 / 113
Introduction Reporting
Sizing
Reporting
Reporting
Settings
Language
Translation
www.valvestar.com
Spare Parts
VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 66 / 113
Introduction Reporting
Sizing
Reporting
Reporting
Settings
Language
Translation
www.valvestar.com
Spare Parts
VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 67 / 113
Introduction Reporting
Sizing
Reporting
Reporting
Settings
Language
Translation
www.valvestar.com
Spare Parts
VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 68 / 113
Introduction Reporting
Sizing
Reporting
Reporting
Settings
Language
Translation
www.valvestar.com
Spare Parts
VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 69 / 113
Introduction Reporting
Sizing
Reporting
Reporting
Settings
Language
Translation
www.valvestar.com
Spare Parts
VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 70 / 113
Introduction Reporting
Sizing
Reporting
Reporting
Settings
Language
Translation
www.valvestar.com
Spare Parts
VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 71 / 113
Introduction Reporting
Sizing
Reporting
Reporting
Settings
Language
Translation
www.valvestar.com
Spare Parts
VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 72 / 113
Introduction Reporting
Sizing
Reporting
Reporting
Settings
Language
Translation
www.valvestar.com
Spare Parts
VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 73 / 113
Introduction Reporting
Sizing
Reporting
Reporting
Settings
Language
Translation
www.valvestar.com
Spare Parts
VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 74 / 113
Introduction Reporting
Sizing
Reporting
Reporting
Settings
Language
Translation
www.valvestar.com
Spare Parts
VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 75 / 113
Introduction Reporting
Sizing
Reporting
Reporting
Settings
Language
Translation
www.valvestar.com
Spare Parts
VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 76 / 113
Introduction Reporting
Sizing
Reporting
Reporting
Settings
Language
Translation
www.valvestar.com
Spare Parts
VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 77 / 113
Introduction Reporting
Sizing
Settings
Language
Translation
www.valvestar.com
Spare Parts
VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 78 / 113
Introduction Reporting
Sizing
Fire Case How can I add data to the initial name plate?
Reporting
Reporting
Settings
Language
Translation
www.valvestar.com
Spare Parts
VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 79 / 113
Introduction Reporting
Sizing
Fire Case How can I add data to the initial name plate?
Reporting
Reporting
Settings
Language
Translation
www.valvestar.com
Spare Parts
VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 80 / 113
Introduction Reporting
Sizing
Reporting
Reporting
Settings
Language
Translation
www.valvestar.com
Spare Parts
VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 81 / 113
Introduction Settings
Sizing Profiles
Fire Case
Reporting
Settings
Settings
Language
Translation
www.valvestar.com
Spare Parts
VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 82 / 113
Introduction Settings
Sizing Profiles
Fire Case
Reporting
Settings
Settings
Language
Translation
www.valvestar.com
Spare Parts
VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 83 / 113
Introduction Settings
Sizing Profiles
Fire Case
Reporting
Settings
Settings
Language
Translation
www.valvestar.com
Spare Parts
VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 84 / 113
Introduction Settings
Sizing Profiles
Fire Case
Reporting
Settings
Settings
Language
Translation
www.valvestar.com
Spare Parts
VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 85 / 113
Introduction Settings
Sizing Profiles
Fire Case
Reporting
Settings
Settings
Language
Translation
www.valvestar.com
Spare Parts
VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 86 / 113
Introduction Settings
Sizing Profiles
Fire Case
Reporting
Settings
Settings
Language
Translation
www.valvestar.com
Spare Parts
VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 87 / 113
Introduction Settings
Sizing Profiles
Fire Case
Reporting
Settings
Settings
Language
Translation
www.valvestar.com
Spare Parts
VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 88 / 113
Introduction Settings
Sizing Profiles
Fire Case
Reporting
Settings
Settings
Language
Translation
www.valvestar.com
Spare Parts
VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 89 / 113
Introduction Settings
Sizing Profiles
Fire Case
Reporting
Settings
Settings
Language
Translation
www.valvestar.com
Spare Parts
VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 90 / 113
Introduction Settings
Sizing Profiles
Fire Case
Reporting
Settings
Settings
Language
Translation
www.valvestar.com
Spare Parts
VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 91 / 113
Introduction Settings
Sizing Profiles
Fire Case
Reporting
Settings
Settings
Language
Translation
www.valvestar.com
Spare Parts
VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 92 / 113
Introduction Language
Sizing
Fire Case
Reporting
Settings
Language
Language
Translation
www.valvestar.com
Spare Parts
VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 93 / 113
Introduction Translation
Sizing
Fire Case
Reporting
Settings
Language
Translation
Translation
www.valvestar.com
Spare Parts
VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 94 / 113
Introduction Translation
Sizing
Fire Case
Reporting
Settings
Language
Translation
Translation
www.valvestar.com
Spare Parts
VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 95 / 113
Introduction How to change data
Sizing
Fire Case
Reporting
Settings
Language
Translation
How to
How to change
changedata
data
www.valvestar.com
Spare Parts
VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 96 / 113
Introduction How to change data
Sizing
Fire Case
Reporting
Settings
Language
www.valvestar.com
Spare Parts
VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 97 / 113
Introduction How to change data
Sizing
Fire Case
Reporting
Settings
Language
Translation
How to
How to change
changedata
data
www.valvestar.com
Spare Parts
VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 98 / 113
Introduction How to change data
Sizing
Fire Case
How to manually input a reseller article no.
First: Do a standard sizing
Two Phase Flow
Reporting
Settings
Language
Translation
How to
How to change
changedata
data
www.valvestar.com
Spare Parts
VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 99 / 113
Introduction How to change data
Sizing
Fire Case
How to manually input a reseller article no.
Second: Add a reseller article no.
Two Phase Flow
Reporting
Settings
Language
Translation
How to
How to change
changedata
data
www.valvestar.com
Spare Parts
VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 100 / 113
Introduction Copy and Paste
Sizing
Fire Case
Reporting
Settings
Language
Translation
Copy and
Copy andpaste
paste
www.valvestar.com
Spare Parts
VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 101 / 113
Introduction Copy and Paste
Sizing
Fire Case
Reporting
Settings
Language
Translation
Copy and
Copy andpaste
paste
www.valvestar.com
Spare Parts
VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 102 / 113
Introduction How to change data
Sizing
Fire Case
What are the features for better handling?
Sort function in menue View
Two Phase Flow
Reporting
Settings
Language
Translation
Copy and
Copy andpaste
paste
www.valvestar.com
Spare Parts
VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 103 / 113
Introduction How to change data
Sizing
Fire Case
What are the features for better handling?
Printing in one pdf-file for all sizings of one project can be done with documentation
Two Phase Flow
report full-version
Add. Sizing, Noise Level,
Reaction Force
Reporting
Settings
Language
Translation
Copy and
Copy andpaste
paste
www.valvestar.com
Spare Parts
VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 104 / 113
Introduction How to change data
Sizing
Fire Case
Where is the pdf-filed automatically?
Filed in the project storage
Two Phase Flow
Reporting
Settings
Language
Translation
Copy and
Copy andpaste
paste
www.valvestar.com
Spare Parts
VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 105 / 113
Introduction Update via Internet
Sizing
Fire Case
Reporting
Settings
Language
Translation
Update via
Update viaInternet
Internet
www.valvestar.com
Spare Parts
VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 106 / 113
Introduction Update via Internet
Sizing
Fire Case
Reporting
Settings
Language
Translation
Update via
Update viaInternet
Internet
www.valvestar.com
Spare Parts
VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 107 / 113
Introduction Update via Internet
Sizing Homepage www.leser.com
Fire Case
Reporting
Settings
Language
Translation
Update via
Update viaInternet
Internet
www.valvestar.com
Spare Parts
VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 108 / 113
Introduction Update via Internet
Sizing www.leser.com/en/services/valvestar
Fire Case
Reporting
Settings
Language
Translation
Update via
Update viaInternet
Internet
www.valvestar.com
Spare Parts
VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 109 / 113
Introduction www.valvestar.com
Sizing
Fire Case
Reporting
Settings
Language
Translation
www.valvestar.com
www.valvestar.com
Spare Parts
VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 110 / 113
Introduction Spare Parts
Sizing
Reporting
Settings
Language
Translation
www.valvestar.com
Spare Parts
Spare Parts
VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 111 / 113
Introduction Spare Parts
Sizing
Fire Case What is a spir list and how I generate a spir list?
Settings
Language
Translation
www.valvestar.com
Spare Parts
Spare Parts
VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 112 / 113
Introduction Spare Parts
Sizing
Fire Case What is a spir list and how I generate a spir list?
Reporting
Settings
Language
Translation
www.valvestar.com
Spare Parts
Spare Parts