Artson ITP
Artson ITP
W : Witness Point :- An activity which requires witnessing by owner /pmc when activity is performed after proper notification has been provided the epcc contractor is not obliged to hold
further processing if owner /pmc is not available to witness the activity. designated by owner requires witnessing by owner as the activity is performed.
S: Survialence :--Inspection by owner /pmc ( monitoring or making observation to verify whether or not materila items or service s conforms specific requirments survilance activity may
include audit , inspection and witness of testing review of quality document records.
RM : Random Point :- Points where owner plan to audit, monitor or witness in process of activity.
H : Hold Point R / V : Reviewed / Verified P: Performer
W : Witness Point :- Notification required (presence not mandatory). H : Hold Point :- Notification required (presence mandatory).
Scope of Inspection
SN Item Description Ref. Formats Remarks
Cont'r OT\PSE PJIT MINERBA
Page 1 of 8
75000 CBM DISEL STORAGE RELATED PMC
FACILITIES PROJECT AT TANJUNGBARA
INSPECTION AND TEST PLAN FOR OIL Document No: IOT-PTOT-QA/QC-0.
Rev.: 0.
STORAGE TANKS .
JOB NO:-14C1A10
W : Witness Point :- An activity which requires witnessing by owner /pmc when activity is performed after proper notification has been provided the epcc contractor is not obliged to hold
further processing if owner /pmc is not available to witness the activity. designated by owner requires witnessing by owner as the activity is performed.
S: Survialence :--Inspection by owner /pmc ( monitoring or making observation to verify whether or not materila items or service s conforms specific requirments survilance activity may
include audit , inspection and witness of testing review of quality document records.
RM : Random Point :- Points where owner plan to audit, monitor or witness in process of activity.
H : Hold Point R / V : Reviewed / Verified P: Performer
W : Witness Point :- Notification required (presence not mandatory). H : Hold Point :- Notification required (presence mandatory).
Scope of Inspection
SN Item Description Ref. Formats Remarks
Cont'r OT\PSE PJIT MINERBA
Page 2 of 8
75000 CBM DISEL STORAGE RELATED PMC
FACILITIES PROJECT AT TANJUNGBARA
INSPECTION AND TEST PLAN FOR OIL Document No: IOT-PTOT-QA/QC-0.
Rev.: 0.
STORAGE TANKS .
JOB NO:-14C1A10
W : Witness Point :- An activity which requires witnessing by owner /pmc when activity is performed after proper notification has been provided the epcc contractor is not obliged to hold
further processing if owner /pmc is not available to witness the activity. designated by owner requires witnessing by owner as the activity is performed.
S: Survialence :--Inspection by owner /pmc ( monitoring or making observation to verify whether or not materila items or service s conforms specific requirments survilance activity may
include audit , inspection and witness of testing review of quality document records.
RM : Random Point :- Points where owner plan to audit, monitor or witness in process of activity.
H : Hold Point R / V : Reviewed / Verified P: Performer
W : Witness Point :- Notification required (presence not mandatory). H : Hold Point :- Notification required (presence mandatory).
Scope of Inspection
SN Item Description Ref. Formats Remarks
Cont'r OT\PSE PJIT MINERBA
Page 3 of 8
75000 CBM DISEL STORAGE RELATED PMC
FACILITIES PROJECT AT TANJUNGBARA
INSPECTION AND TEST PLAN FOR OIL Document No: IOT-PTOT-QA/QC-0.
Rev.: 0.
STORAGE TANKS .
JOB NO:-14C1A10
W : Witness Point :- An activity which requires witnessing by owner /pmc when activity is performed after proper notification has been provided the epcc contractor is not obliged to hold
further processing if owner /pmc is not available to witness the activity. designated by owner requires witnessing by owner as the activity is performed.
S: Survialence :--Inspection by owner /pmc ( monitoring or making observation to verify whether or not materila items or service s conforms specific requirments survilance activity may
include audit , inspection and witness of testing review of quality document records.
RM : Random Point :- Points where owner plan to audit, monitor or witness in process of activity.
H : Hold Point R / V : Reviewed / Verified P: Performer
W : Witness Point :- Notification required (presence not mandatory). H : Hold Point :- Notification required (presence mandatory).
Scope of Inspection
SN Item Description Ref. Formats Remarks
Cont'r OT\PSE PJIT MINERBA
Approved by:
Contractor OT PJIT MINERBA
Page 4 of 8
OWNER PMC/TPI
EPC CONTRACTOR
Document No: Arston-QA/QC-ITP- 01, Rev. 0
INSPECTION AND TEST PLAN FOR CRUDE Date of submission
OIL STORAGE TANKS .
JOB NO:-
Scope of
S Acceptance Verifying Inspection
No Activity Remarks
Criteria Documents
Arston TPI IOCL
A DOCUMENT REVIEW
1.1 QC system Owner Specification Approved Document Wc Rw Rw
a) QA/QC Procedure
b) Organisation chart
c) Planning & Scheduling
d) Project administration
Design Drawing & Calculations
1.2
Review/Approval
Approved Design &
a) Design Calculation API-650 Wc W Rw
Drawing Document
b) Shell plate layout & Detailed Drawing API 650 3.6
Nozzle detail & shell opening Drawing,Shell API 650 Fig. 3.4A &
c)
Manhole & Shell Nozzle 3.5
d) Bottom plate Layout & Detail Drawing API 650 3.4,3.5
e) Roof plate Layout & Detail Drawing API 650 3.10
Accessories detail drawing,Shell attachment
f) API 650 3.8,3.9
& Appurentances wind girder.
g) Foundation Calculation & Drawing API 650
Material Specification Complying with
1.3 API 650 Section 2 Approved Document Wc W Rw
standered Design & Operation of Tank
5 of 8
Scope of
S Acceptance Verifying Inspection
Activity Remarks
No Criteria Documents
Arston TPI IOCL
a) Approved WPS
B FIELD INSPECTION
6 of 8
Scope of
S Acceptance Verifying Inspection
Activity Remarks
No Criteria Documents
Arston TPI IOCL
Original MTC
MTC or Material test
2.1 Material verification through IMIR accepted with API 650 Wc Rw S
result
Apendix N
Comply with Approved Tank Fabrication &
2.2 Tank Fabrication & Erection Wc Rw Rw
Procedure & Drawing Erection Record
Welding MAP &
2.3 Joint Fit-Up API 650 5.2 W W S
Alignment Record
Visual Inspection
2.4 Weld Visual inspection ASME Sec IX,API 650 W W S
Report
Inspection
Report( RT/UT/MT/PT/Va
cuum/Pressure test)
2.5 NDT Result Verification As Per NDT Procedure record W W S
certification,Calibration
of equipment and
personal certificate.
Copleteness of all
Approved MDR &
C Documentation & Report process Documents Wc W Rw
Inspection Report
and records
a) Verification of Documents
b) Inspection Report Completion
7 of 8
Scope of
S Acceptance Verifying Inspection
Activity Remarks
No Criteria Documents
Arston TPI IOCL
WC: 100%
S: Surveillance
HP: Hold point Examination by W : Witness Point
Inspection by Client
Contractor
Rw: Review of Contractor's
documentation
Approved by:
Artson TPI IOCL
8 of 8