F - QCD - 06 Check List For Suspn TWR
F - QCD - 06 Check List For Suspn TWR
Line :
ii. All nuts, split pins face inwards or as per the Clients Engineers
instructions.
iii. Nuts, locknuts, washers and split pins are fitted appropriately.
vi. Step bolts below anti climbing device level have been removed.
vii. Danger / Warning Plate has been fixed properly & securely.
viii. Tower Identification Plate has been fixed properly & securely.
>
v. All bolts / nuts in the insulator hardwares are confirming with the
approved drawings.
Check that all hardwares / fittings are installed / fitted in appropriate manner and are
in good condition
>
Check that all hardwares / accessories are installed in proper manner and are in
good condition.
6. Signature
>