POWER TRANSMISSION LIMITE

1. REQUEST FOR MATERIAL INSPECTION


PROJECT :

CONTRACT :

To :

Request Reference No. Date of R


Work will be ready for Owner/Engineer Inspection on : at KPTL Stores
You are kindly requested to inspect the following works/materials :

Reference : Drawing :
Document/Spec : DTS -

Note : Work has been checked by contractor/Subcontractor AND


We undertake that the works are carried out as per Specification and manufacturers instruction and
understand that this approval does not relieve us of our responsibilities for any discrepancies, error
mistakes and omissions in the document or the material.

Contractor's Name : Kalpataru Power Transmission Ltd. Sign :

To : KALPATARU POWER TRANSMISSION LTD.

We acknowledge receipt of your request on and comment as follows :


We have inspected your materials as mentioned above on at

You are authorized to continue with your next operation


You are not authorized to continue with your next operation

Comments :

For MML : Name : Sign :

We acknowlede receipt of Owner/Engineer comments and we will proceed accordingly.


For Kalpataru Power Transmission Ltd, Name : Sign : Dat
ION LIMITED
F/QCD/01/CSA, Issue No.01

Date of Request :
KPTL Stores

cturers instruction and we


ny discrepancies, errors,

Date :

and

Date :
gn : Date :