Professional Documents
Culture Documents
1 6 2 10i131648 Fco2 PDF
1 6 2 10i131648 Fco2 PDF
1 6 2 10i131648 Fco2 PDF
n:10I131648
Rev.00
CONICALTYPESTRAINERS Date:13/12/2010
FCO2 M.Ghisoni
Pag.1/3
GENERALNOTESTRAINERSPRODUCTION SIZES
Temporaryfilter,inline,suitableforfilteringfluidsorgases,designedfor
briefperiodsofuse,suchasthefinetuningandstartupofaplant.
Installedtoremoveanycoarse detritussuchasrags,electrodes,deposits
andrustleftinsidethepipes.
Comprisingarolledperforatedsheetintheformofaconewelded
perpendicularlytoaringjoint,theconicalfilteriseasytoinstalland
replacebecauseitispositionedbetweentwoflangesofapipe.
Filtersuitableforhighpressures,easytomaintainandreplaceandcapable
offiltrationofmorethan200%oftheinletarea.
OPENAREARATIO= 100xMeshOpenAreaxScreenArea
Inletarea
(The calculations are based on the filtering percentage of the meshs
surfaceareaonly.) SIZES
All of Blu Zac products have been designed to satisfy the requests and 23468101216182024
specific requirements of the customer, including high pressure
applications.
CONNECTIONS
Generalnotes:Standardproductionfiltersmodels
Flanged FLG ANSIB16.5
GENERALNOTESTRAINERSSTANDARDPRODUCTION
FLOW
InternalFlow ExternalFlow
REINFORCING
Withoutreinforcing Withinternalreinforcing Withexternalreinforcing
CONNECTION
ConnectionRForFF ConnectionRJ
Blu Zac srl reserves the right to carry-out any necessary modification without prior notice
[Digitare il testo] Doc.n:10I131648
Rev.00
CONICALTYPESTRAINERS Date:13/12/2010
FCO2 M.Ghisoni
Pag.2/3
Size
1 2 2.1/2 3 4 6 8 10 12 14 16 18 20 24
(inches)
D 73 92 105 127 157 216 270 324 381 412 470 534 584 692
H 60 80 100 120 150 230 300 350 400 470 550 700 800 900
L 70 70 70 70 80 100 100 110 110 120 130 130 140 150
S 3 3 3 3 3 5 5 5 5 5 8 8 8 8
A 32 46 55 70 94 143 190 240 285 315 360 405 450 540
B 20 25 25 35 50 80 120 150 180 180 225 230 230 230
Weight
0,5 0,5 1 1 1,5 2 3,5 5 7 9 15 18 17 20
(kg)
Note1:Dimension:areinmillimeters(mm)
Note2:RJconnectionareaccordingtoASMEB16.20(seebelow)
DIMENSIONTOLLERANCE INSTALLATIONINSTRUCTION
DIMENSION* 1) Installthebasketinthebodyandbetweenthetwo
flanges
SIZE B
D 2) Positionthegasketandtheflangeconnection,
H&L 3) Thenscrewthestudsandnutsoftheflangeinthe
1/2"to2.1/2" 1 1 correctposition
3"to4" 1 2
MAINTENACEINSTRUCTIONS
6"to8" 2 3 1) Unscrewcoverstudsandnuts,
10"to18" 2 5 thenremovetheconnectionflangeandgasket.
20"to24" 3 8 2) Removethestrainerandcleanorreplaceit.
3) Whenyoureinstallit,useanewgasket.
*S,SF,A,HandH1
areinmillimeters(mm)
Blu Zac srl reserves the right to carry-out any necessary modification without prior notice
[Digitare il testo] Doc.n:10I131648
Rev.00
CONICALTYPESTRAINERS Date:13/12/2010
FCO2 M.Ghisoni
Pag.3/3
Note1:OtherMaterialsandDimensionsonRequest
Note2:Detail7and8areoptionalifrequiredbyclient.
Note3:Detail5isoptional;itisnecessaryforguarantytheresistanceonlywhenthedifferentialpressureisgreaterthanvalueof1bar.
Note4:Detail6isoptional;itisnecessaryforguarantytherigidityonlywhenthedimensionHisgreaterthan1000mm.
ORDERCODE
i.e.FCO22150RFM20O1AISI304
Blu Zac srl reserves the right to carry-out any necessary modification without prior notice