INVESTMENT CASTING PLANT

ION

Dt: 22/03/2017

Sub: Requirement of Metallic Scrap Bins for house keeping purpose at ICP & Tube
shop Reg.

********************

With reference to above subject the following Metallic Scrap Bins are required
at ICP and Tube shop for scrap handling and Housekeeping.

INVESTMENT CASTING PLANT

Sl
Dimensions Quantity
no
01 2 Mtr. X 1.5 Mtr. X 0.75 Mtr. 02
02 1.5 Mtr. X 1 Mtr. X 0.75 Mtr. 01

TUBE SHOP

Sl no Dimensions Quantity
01 1.5 Mtr. X 1 Mtr. X 0.75 Mtr. 01

It is requested to arrange the same at the earliest.

Asst.Manager(casting)

Through

DGM(casting)

To

Sr.Manager(EMS & Civil),

MIDHANI.
INVESTMENT CASTING PLANT
ION

Dt: 22/03/2017

Sub: Relocation of Compressed air pipeline due to water accumulation IDW pipeline
rectification Reg.

********************

With reference to above subject the compressed air pipeline at the sand
blasting machine needs to be relocated as there is water accumulation at the
pipeline end, causing sand blasting machine frequent breakdown. IDW pipeline at the
Investment casting plant is jammed and corroded, causing blockage of water. Kindly
rectify the problem

Thanking you

Asst.Manager(casting)

To

The incharge

Utilities Dept.