Dt: 22/03/2017
Sub: Requirement of Metallic Scrap Bins for house keeping purpose at ICP & Tube
shop Reg.
********************
With reference to above subject the following Metallic Scrap Bins are required
at ICP and Tube shop for scrap handling and Housekeeping.
Sl
Dimensions Quantity
no
01 2 Mtr. X 1.5 Mtr. X 0.75 Mtr. 02
02 1.5 Mtr. X 1 Mtr. X 0.75 Mtr. 01
TUBE SHOP
Sl no Dimensions Quantity
01 1.5 Mtr. X 1 Mtr. X 0.75 Mtr. 01
Asst.Manager(casting)
Through
DGM(casting)
To
MIDHANI.
INVESTMENT CASTING PLANT
ION
Dt: 22/03/2017
Sub: Relocation of Compressed air pipeline due to water accumulation IDW pipeline
rectification Reg.
********************
With reference to above subject the compressed air pipeline at the sand
blasting machine needs to be relocated as there is water accumulation at the
pipeline end, causing sand blasting machine frequent breakdown. IDW pipeline at the
Investment casting plant is jammed and corroded, causing blockage of water. Kindly
rectify the problem
Thanking you
Asst.Manager(casting)
To
The incharge
Utilities Dept.