Professional Documents
Culture Documents
Qaqc Manual
Qaqc Manual
PROCESS CONTROLS
During project setup the Project Manager develops the project QA/QC plan
covering all construction activities and applicable processes which directly affect
quality. The Project Manager shall ensure that these processes are carried out
under controlled conditions. The controlled conditions shall include the following: