Abstract: With information age approaching, for the algorithm so as to improve SLPs stability and
fierce competition between enterprises, the large-scale application[4]. Mujing-Ye, Gengui-Zhou (2005)
machinery plants, such as the coal mine, begin to apply introduced genetic algorithm and avoided SLPs
the scientific and lean management with modern subjectivity and handwork complex[5]. Yang(2000)
technology. The sound layout is instrumental in evaluated the multiple SLP schemes with AHP method[6].
controlling cost and increasing efficiency, so the Jianhua-Yang, Pengli-Jing, and Yongqing-Yang (2009)
managers think highly of the ground and transportation brought forward the enterprise logistics redesign method
system layout of coal mine, as has become a newer based on the combination of SLP and SHA[7].
research field. The coal mine, with the designed output Qiuping-Wang, Tingting-Liu, and Qizhang(2012)
of 900 thousand tons per year, is located in a mountain combined ordered sample clustering method to SLP. In
area, and because of the complex terrain and limited view of the fact A-U dividing level determined by the
space, it is significant to layout the coal mine properly. experienced proportion is always subjective, ambiguous
This article analyzes the characteristics of the coal mine and uncertainty, the ordered sample clustering method
in Shanxi province, China, with Systematic Layout was applied to dividing the intensity level of logistics[8].
Planning (SLP), to project the optimal layout pattern. In summary, researchers have applied SLP in so many
First the coal mine is divided into some related fields, but few in coal mine industry, and because of the
operational departments, and their relationship among complex terrain and the limited space, it is significant to
departments is evaluated after the analysis of work flow, layout the coal mine properly. According to the statistics,
logistics and non-logistics, so the comprehensive in the developed countries 1/4 of the production facilities
closeness of each department can be qualified. Then the needs the re-layout, while in our country, enterprises pay
departments are arranged according to the closeness rank more attention to the outside logistics and less to the
calculated. Finally, the optimized layout plan is obtained inside logistics. In this article, we analyze the
according to on-site fieldwork. The finding contributes to characteristics of the coal mine in Shanxi, as an example
the coal mine with limited space. of the underground mining enterprises, with SLP, to
Keywords: coal mine, ground layout, logistics, SLP project the optimal layout pattern.
1 Introduction 2 Methodology
With information times coming, for the fierce 2.1 Research method
competition between enterprises, the big machinery SLP combines the analysis of logistics and
plants, such as the coal mines, begin to apply the department relationship to search for the proper layout,
scientific and lean management with modern technology. which fits not only to the different scale and kind of
For example, the reasonable layout is helpful to control plants when newly-building, expanding and
the cost and increase the efficiency, so the managers reconstruction, but also to other organizations, such as
think highly of the ground and transportation system office, lab, warehouse, hospital and store, etc[9]. The
layout of coal mine, as has become a newer field of the concrete steps are as follows:
related researchers[1]. A. analyze the relationship between the work units
Traditionally, there are two ways to layout the (logistics and non-logistics), including the 5 factors, that
facilities. The first one is the quantitative method, which is P(products and materials), Q(quantity), R(production
is based on the transportation distance between the route), S(supplementary departments), T(time) [10].
departments to decrease the logistics cost[2]. And the B. synthesize to draw the work relationship chart.
second one is the qualitative method, which depends on C. allocate the positions of the work units[11.
the relationship between the departments and is D. integrate the work units positions with factual
represented by SLP put forward by Richard Muther in floor areas.
1961[3]. SLP is self-consistent and combines the analyses E. by revising and adjusting, get several feasible
of department relationship and logistics, after that plans.
Te-King Chien(2004) led into new definition and F. evaluate the plans to get the best[12].
- 1944 -
978-1-4799-0474-7/13/$31.00 2013 IEEE
2.2 Technique route of this article which, there are two hinge garage to provide the tanker
The technique route of this article is shown in Fig.1. power. Close to the derricks are belt trestle bridge,
screening workshop, and silo in accordance with the
The coal mines present situation coals flow direction. The departments indirectly serve
for the production including the repairing mill, material
mill, equipment storehouse, miner light room, office
building, control center and meeting room. The boiler
The coal mines layout house, air pump house and pond are three important
principle facilities to insure the coal mines normal operation but
have less to do with the production. The present layout of
SLP
the coal mine is shown in Fig.2.
Legend 8
1.derrick, 2. control center, 3. office building, 4. material
and equipment store house, 5. hinge garage, 6. repairing
16
workshop, 7. transportation belt, 8. coal warehouse, 9.
15
14
2 9
bath house, 10. canteen, 11. staff apartment, 12. parking 12
4
shed, 13. library, 14. boiler house, 15. air pump house,
16. pond (for life and fire protection) 7
1 5
3
6 4
13 11 10 4
- 1945 -
4.2 The optimizing process of the coal mines layout relationship between the departments, we should give a
Analyze the coal mines logistics on the base of the ratio to show the relative importance of the two. In coal
products production, reserve, transportation process and mines production, the logistics and non-logistics are
the flow pattern of the staff and material. In SLP, the nearly the same significance, therefore the ratio is 1:1.
logistics strengths decrease in order[17]and are shown by Specially, the number of A and X should be limited[19].
A, E, I, O, U and X. The grade instruction is shown in Then quantify the relationship, the value is shown in
Tab.1. The logistics relationship chart is shown in Fig.3. tab.2, and we can figure out the comprehensive
closeness of each department. Finally according to the
Tab.1 Grade instruction form closeness rank, arrange the departments position.
Grade Specification Tab.2 The relationship value form
1. derrick
2. control center
3. office building
4.material house
5. hinge garage
6. repairing workshop
7. transportation belt
8. coal warehouse
9. bath house
10. canteen
11. staff apartment
12. parking shed
13. library
14. boiler house
15. air pump house
16. pond
- 1946 -
1. derrick
2. control center
3. office building
4.material house
5. hinge garage
6. repairing workshop
7. transportation belt
8. coal warehouse
9. bath house
10. canteen
11. staff apartment
12. parking shed
13. library
14. boiler house
15. air pump house
16. pond
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 6 3 10 5 10 10 3 8 2 -2 -2 -2 5 5 4
2 6 10 0 0 0 -1 -2 6 3 1 1 1 4 3 3
3 3 10 4 -2 -2 -2 -2 5 6 4 4 4 4 0 6
4 10 0 4 6 10 4 3 0 0 -2 0 0 0 2 2
5 5 0 -2 6 8 8 0 0 0 -2 0 -2 1 3 3
6 10 0 -2 10 8 3 2 2 4 0 2 -2 1 6 1
7 10 -1 -2 4 8 3 10 3 -1 -2 -2 -2 7 2 0
8 3 -2 -2 3 0 2 10 1 0 -2 -2 -2 3 0 1
9 8 6 5 0 0 2 3 1 8 0 4 2 10 -2 10
10 2 3 6 0 0 4 -1 0 8 10 4 1 5 -2 5
11 -2 1 4 -2 -2 0 -2 -2 0 10 3 4 5 -2 5
12 -2 1 4 0 0 2 -2 -2 4 4 3 -1 0 -2 0
13 -2 1 4 0 -2 -2 -2 -2 2 1 4 -1 0 -2 2
14 5 4 4 0 1 1 7 3 10 5 5 0 0 0 0
15 5 3 0 2 3 6 2 0 -2 -2 -2 -2 -2 0 0
16 4 3 6 2 3 1 0 1 10 5 5 0 2 0 0
Comprehensive
65 35 42 39 28 45 37 13 57 45 20 9 1 45 11 42
closeness
Rank 1 10 6 8 11 3 9 13 2 3 12 15 16 3 14 6
- 1947 -
Legend
1.derrick, 2. control center, 3. office building, 4. material
and equipment store house, 5. hinge garage, 6. repairing
workshop, 7. transportation belt, 8. coal warehouse, 9.
bath house, 10. canteen, 11. staff apartment, 12. parking
shed, 13. library, 14. boiler house, 15. air pump house,
16. pond (for life and fire protection)
- 1948 -
parts plant of H company. Modern Management method, 2000.
Technology, 2012, 39(5): 24-29. [17]X Li, G Li, F Yang, G Sun. Research and practice on
[12]W Wiyaratn, A Watanapa, Improvement plant layout activity correlation analysis method of planning and
using systematic layout planning (SLP) for increased designing municipal solid waste transfer and treatment
productivity. IACSIT International Journal of station, System Science, Engineering Design and
Engineering and Technology, 2013, 5(1): 76-79. Manufacturing Informatization (ICSEM), 3rd
[13]S P Singh, V K Singh. An improved heuristic International Conference on, IEEE, Year Published, 2012:
approach for multi-objective facility layout problem. 274-277.
International Journal of Production Research, 2010, [18]T Yang, C Su, Y Hsu. Systematic layout planning: A
48(4):1171-1194. study on semiconductor wafer fabrication facilities.
[14]N P Humphrey. Does the built environment International Journal of Operations & Production
influence physical activity? Trnews, 2005, 237: 32. Management, 2000, 20(11): 1359-1371.
[15]Z Yujie, W Fang. Study on the general plane of log [19]C Cheng-pin, B Na, S Qi-fang, L Xiu-ju. The
yards based on systematic layout planning, information optimal layout scheme of the shop facilities. Industrial
management. Innovation Management and Industrial Engineering and Management, 2007, 12(1): 103-106.
Engineering, 2009 International Conference on, IEEE, [20]P Zhaotang, Y Gang, Z Zichuan. Process design of a
Year Published, 92-95. large compression-type waste transfer station.
[16]H Yonghong, H Sihui. Comprehensive evaluation Environmental Engineering, 2009, 27(S1): 359-362.
- 1949 -