Diketahui:

GOR awal 500 scf/stb


Gas lift GOR 700 scf/stb
ID 2.259 in 0.188 ft
0.0006
Average tubing P 800 psia
T 175 F 635 R
oil 0.8 g/cm3 49.942 lb/ft3
oil 2 cp
oil 30 dynes/cm
gas 0.0131 cp
z gas 0.935
gas 0.709
V
Ditanyakan: GOR
Penurunan pressure gradient V
Jawab:
Tube cross section 0.028 ft2
Pressure gradient awal
V oil 100 bbl/day
V gas 50000 scf/day
P sc 14.7 psia
T sc 60 F 520 R
Oil superficial velocity (usL) 0.233 ft/s
Gas superficial velocity (usG) 0.436 ft/s
Mixtur velocity (um) 0.670 ft/s
Input fraction of gas (g) 0.651
LB 0.543 (g > LB bukan bubble flow menggunakan
LB 0.13
NvL 0.514
NvG 0.960
ND 29.359
NL 0.009
X1 0.478
Y -2.695
CN L 0.002
X2 0.0001
yL/ 0.245
X3 0.0001
0.911
yL/ 0.223
yL 0.203
gas 2.579 lbm/ft3
Mt 30748 lbm/day
Nre 98635
1/(fF)^0.5 13.858
fF 0.005
Average 12.214 lbm/ft3
Assume kinetic energy contribution to press grad is negligible
dP/dz 0.085 psi/ft

Pressure gradient gas lift


V oil 100 bbl/day
V gas 70000 scf/day
P sc 14.7 psia
T sc 60 F 520 R
Oil superficial velocity (usL) 0.233 ft/s
Gas superficial velocity (usG) 0.6107 ft/s
Mixtur velocity (um) 0.844 ft/s
Input fraction of gas (g) 0.723
LB 0.231 (g > LB bukan bubble flow menggunakan
NvL 0.514
NvG 1.344
ND 29.359
NL 0.009
X1 0.478
Y -2.695
CN L 0.002
X2 0.00004
yL/ 0.225
X3 0.000
0.911
yL/ 0.205
yL 0.187
gas 2.579 lbm/ft3
Mt 31831 lbm/day
Nre 111127
1/(fF)^0.5 13.957
fF 0.005
Average 11.416 lbm/ft3
Assume kinetic energy contribution to press grad is negligible
dP/dz 0.079 psi/ft

Penurunan pressure gradient 0.006 psi/ft


Vgas
GOR
Voil

ble flow menggunakan mH-B)


ble flow menggunakan mH-B)