MSHEIREB STATION,
FINISHES MATERIALS AND STRUCTURAL WORKS SPECIFICATIONS,
P1.2 SECONDARY SHELTERS DETAIL DESIGN
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
TABLE OF CONTENTS
1 SECTION 01 11 05 - SUMMARY OF WORKS .................................................................................. 5
1.1 PART 1 GENERAL ...................................................................................................................... 5
1.2 PART 2 PRODUCTS - NOT USED ................................................................................................ 6
1.3 PART 3 EXECUTION - NOT USED ............................................................................................... 6
2 SECTION 01 31 05 - PROJECT COORDINATION ............................................................................... 7
2.1 PART 1 GENERAL ...................................................................................................................... 7
2.2 PART 2 PRODUCTS - NOT USED ................................................................................................ 8
2.3 PART 3 EXECUTION ................................................................................................................... 8
3 SECTION 01 32 05 - CONSTRUCTION PROGRESS SCHEDULE......................................................... 15
3.1 PART 1 GENERAL ..................................................................................................................... 15
3.2 PART 2 PRODUCTS - NOT USED ............................................................................................... 16
3.3 PART 3 EXECUTION ................................................................................................................. 16
4 SECTION 01 35 05 - HEALTH AND SAFETY REQUIREMENTS.......................................................... 19
4.1 PART 1: GENERAL .................................................................................................................... 19
4.2 PART 2: PRODUCTS - NOT USED .............................................................................................. 21
4.3 PART 3: EXECUTION ................................................................................................................ 21
5 SECTION 01 35 10 - SECURITY PROCEDURES ............................................................................... 28
5.1 PART 1 GENERAL .................................................................................................................... 28
5.2 PART 2 PRODUCTS - NOT USED .............................................................................................. 29
5.3 PART 3 EXECUTION - NOT USED ............................................................................................. 29
6 SECTION 01 43 05 - QUALITY ASSURANCE ................................................................................... 30
6.1 PART 1 GENERAL .................................................................................................................... 30
6.2 PART 2 PRODUCTS - NOT USED .............................................................................................. 32
6.3 PART 3 EXECUTION ................................................................................................................. 32
7 SECTION 01 51 05 - TEMPORARY UTILITIES ................................................................................. 36
7.1 PART 1 GENERAL .................................................................................................................... 36
7.2 PART 2 PRODUCTS - NOT USED .............................................................................................. 39
7.3 PART 3 EXECUTION - NOT USED ............................................................................................. 39
8 SECTION 01 58 13 - PROJECT SITE SIGNAGE ................................................................................ 40
8.1 PART 1 - GENERAL ................................................................................................................... 40
8.2 PART 2 PRODUCTS ................................................................................................................ 40
8.3 PART 3 EXECUTION NOT APPLICABLE ................................................................................ 41
9 SECTION 01 61 05 - COMMON PRODUCT REQUIREMENTS .......................................................... 42
9.1 PART 1 GENERAL .................................................................................................................... 42
9.2 PART 2 PRODUCTS .................................................................................................................. 49
9.3 PART 3 EXECUTION ................................................................................................................. 50
10 SECTION 01 73 05 - EXECUTION .................................................................................................. 53
10.1 PART 1 GENERAL .................................................................................................................... 53
10.2 PART 2 PRODUCTS .................................................................................................................. 56
10.3 PART 3 EXECUTION ................................................................................................................. 56
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
This Project consists of the construction of Doha Underground Major Stations - Mshereib and
Education City.
C. Time Restrictions:
A. Unless otherwise noted, all provisions of the sections listed below apply to all
contracts.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
L. Section 01 73 05 - Execution.
Where abbreviations and acronyms are used in Specifications or other Contract Documents,
they shall mean the recognized name of the entities in the following list.
END OF SECTION
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
A. Preconstruction meeting.
C. Progress meetings.
E. Progress photographs.
H. Submittal procedures.
C. Section 01 73 05 - Execution.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
B. Attendance Required:
1. Owner.
2. Engineer.
3. Contractor.
C. Agenda:
D. Contractor to record minutes and distribute copies within two days after meeting to
participants, with email copies to Engineer, Owner, participants, and those affected
by decisions made.
A. Engineer will schedule meeting at the Project site prior to Contractor occupancy.
B. Attendance Required:
1. Contractor.
2. Owner.
3. Engineer.
4. Contractor's Superintendent.
5. Major Subcontractors.
C. Agenda:
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
D. Contractor to record minutes and distribute copies within two days after meeting to
participants, with email copies to Engineer, Owner, participants, and those affected
by decisions made.
B. Contractor to make arrangements for meetings, prepare agenda with copies for
participants, preside at meetings.
C. Attendance Required:
1. Contractor.
2. Owner.
3. Engineer.
4. Contractor's Superintendent.
5. Major Subcontractors.
D. Agenda:
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
E. Contractor to record minutes and distribute copies within two days after meeting to
participants, with email copies to Engineer, Owner, participants, and those affected
by decisions made.
A. Within 10 days after date of the Agreement, submit preliminary schedule defining
planned operations for the first 60 days of Work, with a general outline for
remainder of Work.
1. Include written certification that major contractors have reviewed and accepted
proposed schedule.
A. Submit photographs with each application for payment, taken not more than 3 days
prior to submission of application for payment.
B. Maintain one set of all photographs at project site for reference; same copies as
submitted, identified as such.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
F. Views:
A. When the following are specified in individual sections, submit them for review:
1. Product data.
2. Shop drawings.
3. Samples for selection.
4. Samples for verification.
5. Other types as indicated in this specification.
B. Submit to Engineer for review for the limited purpose of checking for conformance
with the design concept expressed in the contract documents.
A. When the following are specified in individual sections, submit them for information:
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
1. Design data.
2. Certificates.
3. Test reports.
4. Inspection reports.
5. Manufacturer's instructions.
6. Manufacturer's field reports.
7. Other types as indicated in this specification.
C. When the following are specified in individual sections, submit them at project
closeout:
1. Transmit each submittal other than drawings with a correctly filled Submittal
Form in Engineer Approved format.
2. Enclose one correctly filled Transmittal Form in Engineer Approved Format
with each transmission of single or multiple submittals.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
END OF SECTION
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
A. Preliminary schedule.
3.1.3 SUBMITTALS
1. Include written certification that major contractors have reviewed and accepted
proposed schedule.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
Listings: In chronological order according to the start date for each activity. Identify each
activity with the applicable specification section number.
3.3.2 CONTENT
A. Show complete sequence of construction by activity, with dates for beginning and
completion of each element of construction.
F. Provide separate schedule of submittal dates for shop drawings, product data, and
samples, owner-furnished products, Products identified under Allowances, and
dates reviewed submittals will be required from Engineer. Indicate decision dates
for selection of finishes.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
B. Illustrate order and interdependence of activities and sequence of work; how start
of a given activity depends on completion of preceding activities, and how
completion of the activity may restrain start of subsequent activities.
B. Evaluate project status to determine work behind schedule and work ahead of
schedule.
C. After review, revise as necessary as result of review, and resubmit within 10 days.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
A. Maintain schedules to record actual start and finish dates of completed activities.
B. Indicate progress of each activity to date of revision, with projected completion date
of each activity.
D. Identify activities modified since previous submittal, major changes in Work, and
other identifiable changes.
G. Provide narrative report to define problem areas, anticipated delays, and impact on
the schedule. Report corrective action taken or proposed and its effect including
the effects of changes on schedules of separate contractors.
END OF SECTION
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
B. Section 01 10 00 - Summary.
A. Comply with all applicable requirements of the Owners Construction Safety Manual
including work permit procedures for confined space entry, cold work, hot work and
release of hazardous liquids or gasses.
C. Prepare and submit Safety program at project mobilization for review and approval
by the Owner.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
F. Ensure that all supervisory personnel understand the requirements of the Project
Safety Program.
B. The person or persons responsible for raising the alarm shall make
himself/themselves known to a responsible member of the site organisation.
He/they shall be kept available to inform responsible organisations of the exact
location(s) of the emergency and to describe the cause of any emergency.
C. Provide alternative means of escape available from each floor of the building to
facilitate evacuation.
D. A manually operated alarm system shall be set up to signal to evacuate the site.
E. Manually operated sirens shall be positioned at every third floor in order that the
alarm can be raised locally.
F. Staff shall be instructed on how to act when the alarm sounds, for example:
A. Establish procedures for efficient evacuation of all personnel from the area, to be
followed in the event of an external security situation arising which affects their
safety or well-being. Ensure that procedures account for all employees and those of
subcontractors, whether at the project site, accommodation locations or at other
identifiable locations.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
A. Ensure that safe construction practices are utilised and that such practices are in
accordance with accepted procedures.
C. Safety walk-throughs of all areas of the project shall be conducted with the
Engineer on a regular basis. A Safety walk-through report shall be prepared
identifying non-compliances with the Safety program and any other safety hazards
for immediate action.
D. Ultimate responsibility for safety matters shall lie with the Contractor.
A. Visitors to the site (those not occupied on a full time basis on site), shall be required
to comply with all safety requirements specified herein.
1. First aid facilities shall be provided on site sufficient for initial treatment in the
event of accident.
2. Maintain a purpose-constructed facility for first aid and primary treatment in
the event of injury to Contractors, subcontractors, Engineers and Owners
personnel and visitors. Clearly identify the location of the facility on the site.
The facility shall be equipped with all necessary equipment and consumables
required to treat the range of physical injuries which could occur during the
course of the Works.
3. Employ a certified nurse or health care practitioner capable of administering
first aid and primary medical treatment throughout the construction period.
4. Maintain a properly equipped ambulance in ready condition with driver
available for emergency transportation of injured personnel from the project
site to Hospital, 24 hours per day, 7 days per week, throughout the
construction period.
5. The telephone number of hospital or other facility suitable for the treatment of
serious accidents or injuries shall be displayed prominently.
6. All personnel shall be required to report all accidents, no matter how minor, to
a designated safety representative. The responsible person shall be required
to complete an accident report form.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
C. Notify the Engineer & relevant jurisdictional authorities in writing, within one day of
occurrences during the project, involving accidental fire and/or resulting in:
1. Death
2. Loss of Consciousness
3. One or More Days Away from Work
4. Restrictions on Work
5. Job Transfer or Essential Job Functions Affected
6. Significant Injury, Illness or Disability as Diagnosed by a Physician or likely to
be so diagnosed where no Physician examination was performed, eg.
Asbestosis, Fracture, Perforated Eardrum.
7. Medical Treatment beyond First Aid as defined by US CFR Title 29 Subpart
1904.7.
B. Safety notices distributed around the site shall be in Arabic and English language
shall be posted in strategic locations and shall include, but not be limited to the
following:
1. "No Smoking".
2. "Hard Hat Area.
3. "Danger: Construction Site, Do Not Enter".
4. "Goods Lift Only".
5. "Authorised Personnel Only"
6. "Caution Inflammable Material"
D. Weekly tool box safety meetings shall be held by foremen to review safety issues.
E. The Contractor shall impose sanctions on any employee who fails to follow the
prescribed safety program requirements. If the number of recorded incidents of
non-compliance is high, the Contractor shall impose sanctions at the supervisory
and site management level. Should this not be enforced effectively, the Engineer
may impose appropriate sanctions.
A. In the event of fire, priority shall be given to ensuring egress of personnel over
extinguishing of fires. After evacuation, containment shall become the prime
consideration until such time as the alarm has been transmitted to the fire
department and they arrive on site.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
B. Fire extinguishers will be distributed around the Site in strategic locations and shall
be of the type relevant to the particular adjacent hazard. Personnel shall be trained
in their proper operation. A suitable maintenance program shall be developed to
ensure that the extinguishers operate properly.
C. The use of flammable items, or items likely to pose a fire hazard, shall be kept to a
minimum. Procedures shall be generated for handling specific materials.
D. Waste materials shall be collected into one central location and disposed of
regularly to reduce potential fire hazards. Flammable material shall be stored
outside buildings in suitable stores/containers.
E. Fire watchmen shall be employed full time to watch and attend all works involving
burning, welding, cutting and grinding and any other work which may generate heat
or sparks.
F. In the event of a fire, a designated person shall ensure that the fire department
authorities have been alerted and that authorised visitors to site have knowledge of
the fire and that no one attempts to enter affected parts of the site.
H. Personnel shall be instructed on how to deal with outbreaks of fire that can easily
be contained with the means available.
J. If volatile fluid wastes occur during the construction process, they shall be disposed
of fully in accordance with methods approved by the local authorities.
K. Emergency exit paths shall be maintained clear of all obstructions and well
illuminated.
M. Contractor shall ensure that the integrity of the building structure in respect of fire is
maintained during construction.
N. Care shall be taken to ensure that following trades do not damage fire safety
separations.
A. Inform all employees as to the necessity for protective clothing, particularly when
carrying out potentially dangerous operations (e.g. welding).
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
C. Safety goggles shall be worn by personnel operating electric saws, planes, sanders
and grinders.
4.3.6 MATERIALS
A. Do not permit personnel to operate small hand tools requiring power without
suitable electrical connections (i.e. suitably grounded plugs are to be used and
loose wires wedged into position shall not be permitted).
B. Do not use electrically operated tools in areas where it would be hazardous (e.g.
areas where there may be standing water).
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
E. Welders shall be skilled and know the basic safety principles applicable to the
storage of gases and of welding in confined spaces. For welding operations,
welders shall:
A. Cranes, hoists and other plant items shall be well maintained and operated only by
personnel properly trained in their use, in accordance with the manufacturers
instructions and standards. Installation of tower cranes shall be subject to the
following:
A. Brace and shore masonry walls as necessary during construction to maintain their
integrity.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
B. Design scaffolding, formwork and other temporary works to suitable standards with
adequate margins of safety.
C. Scaffolding shall have adequate working boards and shall be erected, modified or
dismantled only by qualified personnel. Scaffolding shall be tagged and inspected
at regular intervals to assess and ensure that it is safe for use. Scaffolding shall be
wide enough to allow employees to walk safely and shall be provided with toe
boards and guard rails if the height is 2 meters and above from ground level.
D. Ladders shall be secured and shall rise no more than 4m without platforms.
Ladders shall be higher by 1 meter above landings and platforms. The angle of
repose of ladders shall be not less than 75 degrees.
E. Keep exit passages and stairs free of pits, holes or protruding objects.
F. Provide suitable barriers and/or handrails around all internal openings perimeters to
prevent falls.
1. Chemical - liquids, paints, dusts, fumes, etc.: Provide protection to site staff
from the danger posed by such substances by means of face masks or self-
contained breathing apparatus when required. In the event of any additional
hazard (such as installation of wet batteries) further protective clothing shall be
worn and additional protective measures shall be taken. Adequate ventilation
shall be provided. Solvents shall, as far as possible, be non-toxic and non-
flammable.
2. Physical - radiation, noise, pressure, etc.: Provide earplugs and ensure that
they are worn when necessary.
3. Biological - viruses, bacteria, fungi and insects.: Establish a vermin control
program.
C. Prior to any work commencing, the section leader responsible for that element of
work shall assess the area concerned for potential hazards as categorised above.
D. Keep the site clear or any deleterious materials and in a neat state. Nails and other
sharp, protruding items shall not be left in positions where they would be likely to
cause injury (e.g. when stripping packing cases, etc.). Waste materials shall not be
left lying around.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
E. Inform section leaders of the need to keep working areas clear and to inform
management of anything that they consider hazardous.
G. Eating places shall be maintained within the Contractor's control, which shall
ensure they are clean, free from harmful levels of dust, smoke, fumes, pollution or
contamination. Contractor shall be responsible for the cleanliness of eating areas.
END OF SECTION
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
Security measures including formal security program, entry control, personnel identification,
guard service, and miscellaneous restrictions.
5.1.2 REFERENCESTANDARD
B. Section 01 10 00 - SUMMARY.
A. Protect Work and Owner's operations from fire, theft, vandalism, and unauthorized
entry.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
A. Restrict entrance of persons and vehicles into Project site and existing facilities.
Employ uniformed guard service to provide watch persons at site twenty four hours a day,
seven days a week.
END OF SECTION
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
B. Mock-ups.
C. Control of installation.
D. Tolerances.
6.1.3 SUBMITTALS
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
1. Prior to start of Work, submit agency name, address, and telephone number,
and names of full time registered Engineer and responsible officer.
2. Submit copy of report of laboratory facilities inspection made by NIST
Construction Materials Reference Laboratory or authorized KSA equivalent,
during most recent inspection, with memorandum of remedies of any
deficiencies reported by the inspection.
3. Qualification Statement: Provide documentation showing testing laboratory is
accredited under IAS AC89.
B. Design Data: Submit for Engineer's knowledge as contract administrator for the
limited purpose of assessing conformance with information given and the design
concept expressed in the contract documents, or for Owner's information.
C. Test Reports: After each test/inspection, promptly submit two copies of report to
Engineer and to Contractor.
1. Include:
a. Date issued.
b. Project title and number.
c. Name of inspector.
d. Date and time of sampling or inspection.
e. Identification of product and specifications section.
f. Location in the Project.
g. Type of test/inspection.
h. Date of test/inspection.
i. Results of test/inspection.
j. Conformance with Contract Documents.
k. When requested by Engineer, provide interpretation of results.
2. Test report submittals are for Engineer's knowledge as contract administrator
for the limited purpose of assessing conformance with information given and
the design concept expressed in the contract documents, or for Owner's
information.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
C. Maintain copy at project site during submittals, planning, and progress of the
specific work, until Substantial Completion.
A. Contractor shall employ and pay for services of an independent testing agency to
perform specified testing and inspection.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
D. Comply with specified standards as minimum quality for the Work except where
more stringent tolerances, codes, or specified requirements indicate higher
standards or more precise workmanship.
G. Secure products in place with positive anchorage devices designed and sized to
withstand stresses, vibration, physical distortion, and disfigurement.
6.3.2 MOCK-UPS
A. Tests shall be performed under provisions identified in this section and identified in
the respective product specification sections.
6.3.3 TOLERANCES
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
D. Contractor Responsibilities:
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
B. If, in the opinion of Engineer, it is not practical to remove and replace the Work,
Engineer will direct an appropriate remedy or adjust payment.
END OF SECTION
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
A. Temporary utilities.
E. Security requirements.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
A. Provide and pay for all electrical power, lighting, water, heating and cooling, and
ventilation required for construction purposes.
A. Provide, maintain, and pay for telecommunications services to field office at time of
project mobilization.
A. Provide and maintain required facilities and enclosures. Provide at time of project
mobilization.
7.1.6 BARRIERS
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
D. Protect non-owned vehicular traffic, stored materials, site, and structures from
damage.
7.1.7 FENCING
B. Provide m high fence around construction site; equip with vehicular and pedestrian
gates with locks.
7.1.9 SECURITY
A. Provide security and facilities to protect Work, and Owner's operations from
unauthorized entry, vandalism, or theft.
A. Provide waste removal facilities and services as required to maintain the site in
clean and orderly condition.
D. Open free-fall chutes are not permitted. Terminate closed chutes into appropriate
containers with lids.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
C. No other signs are allowed without Owner permission except those required by law.
END OF SECTION
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
8.1.2.1 Standards:
A. Qatar Construction Specification 2010 ( Qcs ) or whats equivalent in latest
version:
8.1.3 SUBMITTALS
The Contractor shall submit a copy of a Project Site Signage to the Engineer for his review
and approval.
8.2.1 DESCRIPTION
The Project Site Signage, review and approved by the Engineer, shall be erected at the
project site.
If changes and/or additions occurre through construction time, the Project Site Signage could
be renovated and or integrated on Engineers approval and a non-permanent sign shall
remain in place through construction.
The Project Site Signage is to be removed at substantial completion.
The Contractor shall be responsible for the Project Site Signage, for its construction, location
and installation and their costs will be charged on Contractor.
The copy on the construction sign shall include, at a minimum, the items listed below in order
of placement on the sign.
1. Official name of the building as approved by Board having authority;
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
According to the dimension of the Project Site Signage, this shall be mounted on a rigid
supporting frame or structure that shall be installed and authorized by the Engineer or other
board having authority.
Project Site Signage will be maintained in good and neat condition until the
Architect/Engineer authorizes their removal.
END OF SECTION
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
F. Maintenance materials, including extra materials, spare parts, tools, and software.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
Required Documents
1) Manufacturers data showing the Materials SRI value, & manufacturer.
2) product names, manufacturers names, costs, percentage postconsumer content, and
percentage preconsumer content.
3) list of actual materials costs, excluding labor and equipment for CSI Division 0310, 31
(Section 31.60.00 Foundations) and 32 (Sections 32.10.00 Paving, 32.30.00 Site
Improvements, and 32.90.00 Planting) only; including Division 12 is optional.
4) cutsheets or manufacturers letters to document the listed products recycled content.
5) list of product purchases manufactured, extracted, or harvested regionally.
6) List of distances between the project and manufacturer,and distances between the project and
the extraction site.
7) cutsheets that document material origin and manufacture within a 500-mile radius of the project
site.
8) FSC certifications for all FSC certified wood products.
9) List of all new wood products (not reclaimed, salvaged, or recycled) on the project and
identifying which components are FSC certified and the cost of all new wood products as well.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
a) Architectural paints and coatings applied to interior walls and ceilings must not exceed the
volatile organic compound (VOC) content limits established in Green Seal Standard GS-11,
Paints, 1st Edition, May 20, 1993.
b) Anti-corrosive and anti-rust paints applied to interior ferrous metal substrates must not
exceed the VOC content limit of 250 g/L established in Green Seal Standard GC-03, Anti-
Corrosive Paints, 2nd Edition, January 7, 1997.
c) Clear wood finishes, floor coatings, stains, primers, and shellacs applied to interior
elements must not exceed the VOC content limits established in South Coast Air Quality
Management District (SCAQMD) Rule 1113, Architectural Coatings, rules in effect on
January 1, 2004.
[IEQ Credit 4.3] Low-Emitting Materials Flooring Systems.
Flooring systems must comply with one of the following options:
OPTION 1
All flooring must comply with the following as applicable to the project scope:
a) All carpet & carpet cushion installed in the building interior must meet the testing and
product requirements of the Carpet and Rug Institute Green Label Plus program.
b) All hard surface flooring must be certified as compliant with the FloorScore standard -
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
Required documents
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
9.1.3 SUBMITTALS
B. Shop Drawing Submittals: Prepared specifically for this Project; indicate utility and
electrical characteristics, utility connection requirements, and location of utility
outlets for service for functional equipment and appliances.
1. For selection from standard finishes, submit samples of the full range of the
manufacturer's standard colors, textures, and patterns.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
C. Where all other criteria are met, Contractor shall give preference to products that:
A. Furnish extra materials, spare parts, tools, and software of types and in quantities
specified in individual specification sections.
B. Submittals are document each such proposal with complete data substantiating
compliance of proposed substitution with Contract Documents.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
D. Substitutions will not be considered where acceptance would require revision to the
Contract Documents.
H. Arrange for the return of packing materials, such as wood pallets, where
economically feasible.
A. Designate receiving/storage areas for incoming products so that they are delivered
according to installation schedule and placed convenient to work area in order to
minimize waste due to excessive materials handling and misapplication.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
E. For exterior storage of fabricated products, place on sloped supports above ground.
F. Provide bonded off-site storage and protection when site does not permit on-site
storage or protection.
J. Store loose granular materials on solid flat surfaces in a well-drained area. Prevent
mixing with foreign matter.
K. Prevent contact with material that may cause corrosion, discoloration, or staining.
END OF SECTION
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
10 SECTION 01 73 05 - EXECUTION
B. Pre-installation meetings.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
B. Section 01 10 00 - SUMMARY:
10.1.3 SUBMITTALS
A. Survey work: Submit name, address, and telephone number of Surveyor before
starting survey work.
B. Cutting and Patching: Submit written request in advance of cutting or alteration that
affects:
10.1.4 QUALIFICATIONS
A. For survey work, employ a land surveyor registered in the State in which the Project
is located and acceptable to Engineer. Submit evidence of Surveyor's Errors and
Omissions insurance coverage in the form of an Insurance Certificate.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
B. For field engineering, employ a professional engineer of the discipline required for
specific service on Project, licensed in the State in which the Project is located.
B. Grade site to drain. Maintain excavations free of water. Provide, operate, and
maintain pumping equipment.
C. Protect site from puddling or running water. Provide water barriers as required to
protect site from soil erosion.
E. Dust Control: Execute work by methods to minimize raising dust from construction
operations. Provide positive means to prevent air-borne dust from dispersing into
atmosphere and over adjacent property.
F. Noise Control: Provide methods, means, and facilities to minimize noise produced
by construction operations. Comply with 01 10 00 Time Restrictions on noisy
operations, as defined therein.
G. Pest and Rodent Control: Provide methods, means, and facilities to prevent pests
and insects from damaging the work.
H. Rodent Control: Provide methods, means, and facilities to prevent rodents from
accessing or invading premises.
10.1.6 COORDINATION
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
A. Coordinate scheduling, submittals, and work of the various sections of the Project
Manual to ensure efficient and orderly sequence of installation of interdependent
construction elements, with provisions for accommodating items installed later.
C. Verify that utility requirements and characteristics of new operating equipment are
compatible with building utilities. Coordinate work of various sections having
interdependent responsibilities for installing, connecting to, and placing in service,
such equipment.
E. In finished areas except as otherwise indicated, conceal pipes, ducts, and wiring
within the construction. Coordinate locations of fixtures and outlets with finish
elements.
A. New Materials: As specified in product sections; match existing products and work
for patching and extending work.
C. Product Substitution: For any proposed change in materials, submit request for
substitution described in Section 01 61 05 - COMMON PRODUCT
REQUIREMENTS.
10.3.1 EXAMINATION
A. Verify that existing site conditions and substrate surfaces are acceptable for
subsequent work. Start of work means acceptance of existing conditions.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
E. Verify that utility services are available, of the correct characteristics, and in the
correct locations.
10.3.2 PREPARATION
B. Require attendance of parties directly affecting, or affected by, work of the specific
section.
E. Record minutes and distribute copies within two days after meeting to participants,
with two copies to Engineer, Owner, participants, and those affected by decisions
made.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
C. Contractor shall locate and protect survey control and reference points.
E. Protect survey control points prior to starting site work; preserve permanent
reference points during construction.
G. Replace dislocated survey control points based on original survey control. Make no
changes without prior written notice to Engineer.
J. Establish elevations, lines and levels. Locate and lay out by instrumentation and
similar appropriate means:
1. Site improvements including pavements; stakes for grading, fill and topsoil
placement; utility locations, slopes, and invert elevations.
2. Grid or axis for structures.
3. Building foundation, column locations, ground floor elevations.
L. Maintain a complete and accurate log of control and survey work as it progresses.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
C. Make vertical elements plumb and horizontal elements level, unless otherwise
indicated.
D. Install equipment and fittings plumb and level, neatly aligned with adjacent vertical
and horizontal lines, unless otherwise indicated.
A. Whenever possible, execute the work by methods that avoid cutting or patching.
C. Execute work by methods that avoid damage to other work and that will provide
appropriate surfaces to receive patching and finishing. In existing work, minimize
damage and restore to original condition.
D. Employ original installer to perform cutting for weather exposed and moisture
resistant elements, and sight exposed surfaces.
E. Cut rigid materials using masonry saw or core drill. Pneumatic tools not allowed
without prior approval.
G. Fit work air tight to pipes, sleeves, ducts, conduit, and other penetrations through
surfaces.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
I. Patching:
A. Maintain areas free of waste materials, debris, and rubbish. Maintain site in a clean
and orderly condition.
B. Remove debris and rubbish from pipe chases, plenums, attics, crawl spaces, and
other closed or remote spaces, prior to enclosing the space.
C. Broom and vacuum clean interior areas prior to start of surface finishing, and
continue cleaning to eliminate dust.
D. Collect and remove waste materials, debris, and trash/rubbish from site periodically
and dispose off-site; do not burn or bury.
C. Provide temporary and removable protection for installed products. Control activity
in immediate work area to prevent damage.
E. Protect finished floors, stairs, and other surfaces from traffic, dirt, wear, damage, or
movement of heavy objects, by protecting with durable sheet materials.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
B. Verify that each piece of equipment or system has been checked for proper
lubrication, drive rotation, belt tension, control sequence, and for conditions that
may cause damage.
C. Verify tests, meter readings, and specified electrical characteristics agree with
those required by the equipment or system manufacturer.
D. Verify that wiring and support components for equipment are complete and tested.
G. Submit a written report that equipment or system has been properly installed and is
functioning correctly.
10.3.11 ADJUSTING
Adjust operating products and equipment to ensure smooth and unhindered operation.
C. Clean interior and exterior glass, surfaces exposed to view; remove temporary
labels, stains and foreign substances, polish transparent and glossy surfaces,
vacuum carpeted and soft surfaces.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
D. Remove all labels that are not permanent. Do not paint or otherwise cover fire test
labels or nametallates on mechanical and electrical equipment.
G. Clean debris from roofs, gutters, downspouts, scuppers, overflow drains, area
drains, and drainage systems.
I. Remove waste, surplus materials, trash/rubbish, and construction facilities from the
site; dispose of in legal manner; do not burn or bury.
E. Conduct Substantial Completion inspection and create Final Correction Punch List
containing Engineer's and Contractor's comprehensive list of items identified to be
completed or corrected and submit to Engineer.
F. Correct items of work listed in Final Correction Punch List and comply with
requirements for access to Owner-occupied areas.
G. Notify Engineer when work is considered finally complete and ready for Engineer's
Substantial Completion final inspection.
10.3.14 MAINTENANCE
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
END OF SECTION
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
This Part specifies the clearance and maintenance requirements of the Site.
B. Section 01 10 00 - SUMMARY:
L. Section 01 73 05 - Execution
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
A. Owner requires that this project generate the least amount of trash and waste
possible.
B. Employ processes that ensure the generation of as little waste as possible due to
error, poor planning, breakage, mishandling, contamination, or other factors.
D. Owner may decide to pay for additional recycling, salvage, and/or reuse based on
Landfill Alternatives Proposal specified below.
E. Required Recycling, Salvage, and Reuse: The following may not be disposed of in
landfills or by incineration:
F. Contractor shall submit periodic Waste Disposal Reports; all landfill disposal,
incineration, recycling, salvage, and reuse must be reported regardless of to whom
the cost or savings accrues; use the same units of measure on all reports.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
11.1.4 DEFINITIONS
A. Clean: Untreated and unpainted; not contaminated with oils, solvents, caulk, or the
like.
F. Recyclable: The ability of a product or material to be recovered at the end of its life
cycle and remanufactured into a new product for reuse by others.
G. Recycle: To remove a waste material from the project site to another site for
remanufacture into a new product for reuse by others.
I. Return: To give back reusable items or unused products to vendors for credit.
J. Reuse: To reuse a construction waste material in some manner on the project site.
K. Salvage: To remove a waste material from the project site to another site for resale
or reuse by others.
L. Sediment: Soil and other debris that has been eroded and transported by storm or
well production run-off water.
M. Source Separation: The act of keeping different types of waste materials separate
beginning from the first time they become waste.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
P. Waste: Extra material or material that has reached the end of its useful life in its
intended use. Waste includes salvageable, returnable, recyclable, and reusable
material.
11.1.5 SUBMITTALS
B. Once Owner has determined which of the landfill alternatives addressed in the
Proposal above are acceptable, prepare and submit Waste Management Plan;
submit within 10 calendar days after notification by Engineer.
1. Analysis of the trash and waste projected to be generated during the entire
project construction cycle, including types and quantities.
2. Landfill Options: The name, address, and telephone number of the landfill(s)
where trash/waste will be disposed of, the applicable landfill tipping fee(s), and
the projected cost of disposing of all project trash/waste in the landfill(s).
3. Landfill Alternatives: List all waste materials that will be diverted from landfills
by reuse, salvage, or recycling.
a. List each material proposed to be salvaged, reused, or recycled.
b. List the local market for each material.
c. State the estimated net cost, versus landfill disposal.
4. Meetings: Describe regular meetings to be held to address waste prevention,
reduction, recycling, salvage, reuse, and disposal.
5. Materials Handling Procedures: Describe the means by which materials to be
diverted from landfills will be protected from contamination and prepared for
acceptance by designated facilities; include separation procedures for
recyclables, storage, and packaging.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
1. Submit updated Report with each Application for Progress Payment; failure to
submit Report will delay payment.
2. Submit Report on a form acceptable to Owner.
3. Landfill Disposal: Include the following information:
a. Identification of material.
b. Amount, in cubic meters, of trash/waste material from the project
disposed of in landfills.
c. State the identity of landfills, total amount of tipping fees paid to landfill,
and total disposal cost.
d. Include manifests, weight tickets, receipts, and invoices as evidence of
quantity and cost.
4. Incinerator Disposal: Include the following information:
a. Identification of material.
b. Amount, in cubic meters, of trash/waste material from the project
delivered to incinerators.
c. State the identity of incinerators, total amount of fees paid to incinerator,
and total disposal cost.
d. Include manifests, weight tickets, receipts, and invoices as evidence of
quantity and cost.
5. Recycled and Salvaged Materials: Include the following information for each:
a. Identification of material, including those retrieved by installer for use on
other projects.
b. Amount, in cubic meters, date removed from the project site, and
receiving party.
c. Transportation cost, amount paid or received for the material, and the net
total cost or savings of salvage or recycling each material.
d. Include manifests, weight tickets, receipts, and invoices as evidence of
quantity and cost.
e. Certification by receiving party that materials will not be disposed of in
landfills or by incineration.
6. Material Reused on Project: Include the following information for each:
a. Identification of material and how it was used in the project.
b. Amount, in cubic meters.
c. Include weight tickets as evidence of quantity.
7. Other Disposal Methods: Include information similar to that described above,
as appropriate to disposal method.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
B. For each proposed product substitution, submit the following information in addition
to requirements specified in Section 01 61 05:
1. Pre-bid meeting.
2. Pre-construction meeting.
3. Regular job-site meetings.
E. Facilities: Provide specific facilities for separation and storage of materials for
recycling, salvage, reuse, return, and trash disposal, for use by all contractors and
installers.
1. As a minimum, provide:
a. Separate area for storage of materials to be reused on-site, such as wood
cut-offs for blocking.
b. Separate dumpsters for each category of recyclable.
c. Recycling bins at worker lunch area.
2. Provide containers as required.
3. Provide temporary enclosures around piles of separated materials to be
recycled or salvaged.
4. Provide materials for barriers and enclosures that are nonhazardous,
recyclable, or reusable to the maximum extent possible; reuse project
construction waste materials if possible.
5. Locate enclosures out of the way of construction traffic.
6. Provide adequate space for pick-up and delivery and convenience to
subcontractors.
7. If an enclosed area is not provided, clearly lay out and label a specific area on-
site.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
8. Keep recycling and trash/waste bin areas neat and clean and clearly marked
in order to avoid contamination of materials.
G. Recycling: Separate, store, protect, and handle at the site identified recyclable
waste products in order to prevent contamination of materials and to maximize
recyclability of identified materials. Arrange for timely pickups from the site or
deliveries to recycling facility in order to prevent contamination of recyclable
materials.
H. Reuse of Materials On-Site: Set aside, sort, and protect separated products in
preparation for reuse.
I. Salvage: Set aside, sort, and protect products to be salvaged for reuse off-site.
END OF SECTION
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
B. Section 01 73 05 - Execution.
12.1.3 SUBMITTALS
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
A. Maintain on site one set of the following record documents; record actual revisions
to the Work:
1. Drawings.
2. Specifications.
3. Addenda.
4. Change Orders and other modifications to the Contract.
5. Reviewed shop drawings, product data, and samples.
6. Manufacturer's instruction for assembly, installation, and adjusting.
B. Ensure entries are complete and accurate, enabling future reference by Owner.
F. Record Drawings and Shop Drawings: Legibly mark each item to record actual
construction including:
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
A. Source Data: For each product or system, list names, addresses and telephone
numbers of Subcontractors and suppliers, including local source of supplies and
replacement parts.
B. Product Data: Mark each sheet to clearly identify specific products and component
parts, and data applicable to installation. Delete inapplicable information.
1. Product data, with catalog number, size, composition, and color and texture
designations.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
A. Assemble operation and maintenance data into durable manuals for Owner's
personnel use, with data arranged in the same sequence as, and identified by, the
specification sections.
B. Where systems involve more than one specification section, provide separate
tabbed divider for each system.
C. Binders: Commercial quality, 210 x 297 mm wire-ring binders with durable plastic
covers; 50 mm maximum ring size. When multiple binders are used, correlate data
into related consistent groupings.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
D. Cover: Identify each binder with typed or printed title OPERATION AND
MAINTENANCE INSTRUCTIONS; identify title of Project; identify subject matter of
contents.
E. Project Directory: Title and address of Project; names, addresses, and telephone
numbers of Engineer, Consultants, Contractor and subcontractors, with names of
responsible parties.
F. Tables of Contents: List every item separated by a divider, using the same
identification as on the divider tab; where multiple volumes are required, include all
volumes Tables of Contents in each volume, with the current volume clearly
identified.
G. Dividers: Provide tabbed dividers for each separate product and system; identify
the contents on the divider tab; immediately following the divider tab include a
description of product and major component parts of equipment.
I. Drawings: Provide with reinforced punched binder tab. Bind in with text; fold larger
drawings to size of text pages.
1. Project Directory.
2. Table of Contents, of all volumes, and of this volume.
3. Operation and Maintenance Data: Arranged by system, then by product
category.
a. Source data.
b. Operation and maintenance data.
c. Field quality control data.
d. Photocopies of warranties and bonds.
B. Verify that documents are in proper form, contain full information, and are notarized.
E. Manual: Bind in commercial quality 210 x 297 mm wire ring binders with durable
plastic covers.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
F. Cover: Identify each binder with typed or printed title WARRANTIES AND BONDS,
with title of Project; name, address and telephone number of Contractor and
equipment supplier; and name of responsible company principal.
G. Table of Contents: Neatly typed, in the sequence of the Table of Contents of the
Project Manual, with each item identified with the number and title of the
specification section in which specified, and the name of product or work item.
H. Separate each warranty or bond with index tab sheets keyed to the Table of
Contents listing. Provide full information, using separate typed sheets as
necessary. List Subcontractor, supplier, and manufacturer, with name, address,
and telephone number of responsible principal.
END OF SECTION
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
13.1.3 SUBMITTALS
A. Draft Training Plans: Owner will designate personnel to be trained; tailor training to
needs and skill-level of attendees.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
B. Training Manuals: Provide training manual for each attendee; allow for minimum of
two attendees per training session.
C. Training Reports:
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
A. Commissioning Authority will prepare the Training Plan based on draft plans
submitted.
D. Do not start training until Functional Testing is complete, unless otherwise specified
or approved by the Commissioning Authority.
F. The Commissioning Authority is responsible for determining that the training was
satisfactorily completed and will provide approval forms.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
1. The location of the O&M manuals and procedures for use and preservation;
backup copies.
2. Typical contents and organization of all manuals, including explanatory
information, system narratives, and product specific information.
3. Typical uses of the O&M manuals.
END OF SECTION
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
14.1.3 SUBMITTALS
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
B. Product Data: If submittals to Engineer do not include the following, submit copies as
soon as possible:
1. Manufacturer's product data, cut sheets, and shop drawings.
2. Manufacturer's installation instructions.
3. Startup, operating, and troubleshooting procedures.
4. Fan and pump curves.
5. Factory test reports.
6. Warranty information, including details of Owner's responsibilities in regard to
keeping warranties in force.
A. Review of the building and its systems and architectural design to the requirements of
the Owner.
B. To bring mechanical, electrical and building architectural systems and components
from a state of static completion to a state of dynamic operation.
C. To verify conformance to contract requirements and to ensure completed facility
meets user stated requirements.
D. To confirm installations meet requirements and design intent of contract drawings and
specifications.
E. To compile and submit to the Contractor and the Owner a Commissioning Report, as
defined within the Commissioning Plan.
F. To review and assemble written verification that training was conducted for all
systems being commissioned. The training will be of sufficient quality and depth to
ensure that facility staff have all the needed information to effectively operate and
maintain all commissioned systems.
G. To verify accuracy and completeness of as-built drawings and Operations &
Maintenance Manuals with regards to the commissioned systems.
Commissioning Plan consisting of, but not limited to the following, has been developed by the
Commissioning Agent and the Owner and includes:
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
14.1.7 CONSULTANTS
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
14.3.1 GENERAL
Commissioning is the systematic process of ensuring all site and building components,
equipment, systems, and interfaces among systems perform in accordance with the design
intent and the contract documents. The commissioning process encompasses and
supplements the traditionally separate functions of system, equipment, and component
installation, check-out, start-up, calibration, operational testing, adjustment and balancing,
functional performance testing, development of O&M manuals, development of system
manuals, development of as-constructed drawings, operation and maintenance training, final
acceptance testing, and deferred functional performance and seasonal testing.
The commissioning process proceeds through construction according to the Commissioning
Plan and as described below.
A. The commissioning process commence during design and will proceed through
construction and post construction to the following general process and schedule.
Particularly during:
1. Design: Through design a review and planning process have been completed;
B. Construction:
1. Commissioning begins with Kick-off (or scoping) meeting called by the
contractors. Generally it shall be held within 90 days of projects award;
2. Throughout the course of construction the Division contractors are to complete
all specified contractor proving tests and submit the necessary documentation.
3. The Commissioning Agents will witness this testing at their discretion.
4. Throughout the course of construction the Division contractors are to complete
the Pre-Functional Check-sheets for each specified system/equipment for which
they are responsible.
5. A minimum 120 days prior to the start of the Functional Performance Tests a site
testing schedule will be developed by the Contractor in cooperation with the
Commissioning Team.
6. At this time copies of all Functional Performance Test Check-sheets will be made
available.
7. During the last three months of the construction process there will be a monthly
commissioning meeting to review the construction schedule and commissioning
8. Within 30 days of the start of the startup, check out and commissioning
verification process a dedicated Test Planning and Scheduling meeting will be
completed to coordinate the commissioning verification process.
9. Upon completion of the construction the design Consultant will identify that the
building startup and checkout is completed and the systems are suitable for
verification.
A. Commissioning Verification:
1. Verification of start-up and check-outs as specified in the project specifications,
Contracts documents and by the Commissioning Plan.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
2. Where the contractor identifies missing PC's they are to advise the
Commissioning Agent in writing. The Commissioning Agent will then provide the
missing verification forms within 21 days.
3. During the course of construction the Contractor shall complete the contractor
portion of the PC forms.
4. A minimum 14 days prior to commencing any performance tests the Contractor
shall submit the completed hard copies of the forms for review by the
Commissioning Agent. The Commissioning Agent will advise the Contractor of
any missing information which the Contractor shall rectify in a timely manner. It is
recommended, however, that the Contractor prepare the PC's during the course
of construction and submit then as they are completed during site review
meetings.
5. Upon receipt and acceptance off a portion or all of the PC's the Commissioning
Team under the direction of the Commissioning Agent shall verify all or a
selected portion there of for the completed PC's.
6. Any deficiencies in the PC's shall be corrected in a timely manner by the
Contractor.
C. Contractor will record all data gathered on site on start-up report forms and
commissioning PC and FPT sheets.
D. Contractor will make copies of all starting and testing data before equipment and
system start-up personnel leave site. Maintain one copy of all data taken during
starting on site.
E. Contractor will maintain one copy of all final starting, testing, adjusting and balancing
reports on site up to Substantial Completion of the Work for reference purposes.
A. Functional performance tests (FPT's) are the process to ensure the systems operate
to the contract requirements.
B. To complete this work real time 100% point testing of all systems is completed by the
responsible Division Contractors under the direction and witness of the
Commissioning Agent and Team.
C. Prior to the FPT's commencing all Contractor and manufacturers startup and proving
tests specified elsewhere are to be completed and approved.
D. Prior to the FPT's commencing all PC's are to be completed and approved.
E. Prior to the FPT's commencing all integrated automation and testing, adjusting and
balancing of building architectural, mechanical and electrical systems for verification
is to be completed and approved.
F. Prior to the FPT's commencing all Third Party Testing and Contractor Proving Tests
are to be completed and approved unless specified otherwise.
G. FPT's shall be first conducted by the Contractor independent to the Commissioning
Team and then re-conducted and witnessed by the Commissioning Team based on
the mutually agreed schedule developed by the Commissioning Agent.
H. The FPT forms will be generated by the Commissioning Agent from an approved data
base and provided to the Contractors a minimum 30 days prior to commencing the
functional performance testing.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
I. Where the Contractor identifies missing FPT forms they are to advise the
Commissioning Agent in writing. The Commissioning Agent will provide the missing
verification forms within 14 days.
J. Contractor to record all data gathered on site on start-up report forms and
commissioning PC and FPT sheets.
K. Contractor to make copies of all starting and testing data before equipment and
system start-up personnel leave site. Maintain one copy of all data taken during
starting on site.
L. Contractor to maintain one copy of all final starting, testing, adjusting and balancing
reports on site up to Substantial Completion of the Work for reference purposes.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
For each part of commissioned equipment or system, the report should contain the disposition
of the commissioning team regarding the adequacy of the equipment and documentation
according to contract documents in the following areas:
A. Equipment/System meeting its specifications.
B. Equipment/System installation.
C. Functional performance and efficiency.
D. Equipment/System documentation and design intent.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
This section include natural stone cladding, including trim, base and accessories are shown
on the Drawings. The Contractor shall furnish all labor, materials, tools, and equipment
required to complete the Work.
NFPA 130 Standard for Fixed Guideway Transit and Passenger Rail Systems
NFPA 101 Life Safety Code
A. Section 1 General
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
1
13.1.2.4 Global Sustainability Assessment System (Gsas)
1
Each material will be submit with complete assessment sheet Template. Refer section 01 61 05
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
15.1.2 SUBMITTALS
2. For final Review leading to final Design Certification, submit the Regional
Materials Calculator and the following supporting documents:
a.Bill of Quantities
b.List of materials
c.Specifications listing manufactures and locations
d.Cost estimates
e.Description of the material
f.Description of how the material has been reused
g.Report providing distances of manufacturers
h.Any documentation from manufacturers outlining thirdparty sourcing
standards such as FSC Chain of Custody Certification or ISO
Certification
D. Set of sample and array shall be delivered within 90 days before installation.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
E. Shop Drawing ( BIM model and dwgs ): Indicate natural stone (granite) cladding
layout, patterns, color arrangement, perimeter conditions, and junctions with
dissimilar materials, control and expansion joints, thresholds, accessories, and
setting details.
G. Extra Materials:
1. Provide wrapped, packaged and labelled extra material consisting of three
pieces of each type, size and configuration of stone used ont the project.
A. The Contractor shall be responsible for the quality of work and shall develop and
propose programs and methods of construction and testing to achieve the specified
quality to the approval of Project owner & Engineer.
B. Quality assurance
1. Comply with the applicable provisions of the standards and specifications.
2. Provide materials obtained from only one source and from the same
manufactured lot for each type and color of tile.
3. Cut natural stone shall be standard grade, free of flaws, reeds, rifts,
laminations, cracks, seam, starts or other defects which may impair its
strength, durability, or function. Exposed surfaces shall be free from spots,
spalls, chips, stains, discoloration or other defects which are not within the
approved sample range and would affect its appearance.
4. Color texture and finish of the stone shall be within the range of approved
samples.
5. Source: Provide stone units, which are the products of one supplier and one
quarry as specified. Stone material shall comply with the relevant standards.
C. Allowable variations in finished work shall not exceed the following deviations from
level of plumb and elevations, locations, slopes, and alignments shown:
1. Floors: 3 mm in 3 m run, any direction, 3 mm at any location, 0.8 mm offset
at any location.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
E. Mock-Up
1. The Contractor shall construct mock-up panel using materials specified for final
work.
2. The Contractor shall construct mock-up as directed, at location indicated or
directed, and of full thickness and obtain Project Owner & Engineer
acceptance of visual qualities of mock-up.
The Contractor shall deliver, handle and store equipment and material units in as the
following requirements:
B. Deliver packaged materials and store in a dry place in original containers with seals
unbroken and labels intact until time of use, in accordance with manufacturer's
directions.
A. Temperature shall not be less than 10C during the work and for 7 days after
completion.
C. The Contractor shall provide adequate ventilation when using organic grouts.
13.1.3 WARRANTY
Product Warranty as defined in the tender contract; Guarantee shall cover repair and
replacement of defective material and workmanship.
15.2.1 DESCRIPTION
A. Cut natural stone shall be of sound flat surface, free from foreign matter, veins, hair-
cracks and pits.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
B. Cut natural stone shall have edges in good condition and without any broken
corners.
13.1.3.1 Sealants
The following sealant material shall be used as specified by Project Owner & Engineer :
B. Polyurethane sealant.
C. Poly-sulphide sealant.
D. Silicone sealant.
13.1.3.2 Accessories
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
13.1.5 TOLERANCE
A. All arises shall be clean, plane and of uniform dimension. Wearing surface areas
shall not be less than 70% of the plan area.
1. Tolerances: Length& Width +/- 2mm
2. Thickness +/- 3mm
15.3.1 GENERAL
13.1.5.1 Inspection
A. The Contractor shall examine surfaces to receive granite natural stone cladding,
fixing materials and accessories before commencing tile work and make sure
that the deviations are within allowable tolerances for granite stone installation
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
D. Electrical and mechanical items, grounds, anchors, supports, plugs, hangers etc.
to be installed in coordination with the work of other trades shall be in correct
place before proceeding with the tile work.
E. Installer's Examination
1. The installer shall examine conditions under which construction activities of this
Section are to be performed, including but not limited to conditions specified in
paragraph above, and submit written notification if substrates or conditions are
unacceptable.
2. The Contractor shall transmit 2 copies of installer's report to Project Owner &
Engineer within 24 hours of receipt of report.
F. Beginning construction activities of this Section indicates the Contractors
acceptance of substrates and conditions under which construction activities of
this Section are to be performed.
13.1.5.2 Preparation
The Contractor shall:
A. Clean surfaces and damp clean.
B. Neutralize, seal, and prepare substrates to receive tile in accordance with ANSI
A108.1 through A108.7 as applicable and in accordance with manufacturer's
recommendations of proprietary setting materials.
C. Seal substrate surface cracks with filler. Level existing substrate surfaces to
acceptable flatness tolerances.
15.3.2 INSTALLATION
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
C. Use proper adhesive and for a secure installation of natural stone units, fix them
mechanically to support.
D. Grout stone units except at expansion and control joints indicated to be filled with
sealant. Select grout materials to match the approved samples. Fill all gaps to produce a
finished joint which is uniform in color, smooth and without voids, pinholes or low spots.
F. Cure grout by maintaining in a moist condition for not less than 7 days
G. Form expansion and control joints as per specs. Provide where indicated, removable
divider strips of the same depth as the finished tile including setting bed. Remove strips
after grouting. Seal joints with sealant as specified .
B. The contractor shall clean grout and setting materials from face of tile while materials are
workable. Leave tile face clean and free of all foreign material. Clean sealer from faces of
tile. Except as specifically recommended by both tile manufacturer and grout materials
manufacturer, acid cleaning of tile and grout surfaces is prohibited.
13.1.5.3 PROTECTION
A. The contractor shall apply to all clean completed stone cladding works a protective coat
of neutral cleaner solution, 1 part cleaner to 1 part water or as specified by the
manufacturer of the cleaner.
B. The contractor shall protect installed work with craft paper or other hcovering during the
construction period to prevent damage. Protective coverings shall be removed before
final inspection.
C. Leave finished installation clean and free of cracked, chipped, broken, unbonded, or
otherwise defective work.
END OF SECTION
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
The Work under this section consist of furnishing, fabrication and erection of structural steel
work as shown on drawings and specified herein.
1. Structural steel.
2. Prefabricated building columns with beams.
3. Accessories and grout.
Location
A. Secondary Shelters Canopy as per architectural drawings
The fire alarm system contractor shall be registered with, and on the approved list of, the Civil
Defence Department.
A. Section 1 General
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
2
Each material will be submitted with complete assessment sheet Template. Refer section 01 61 05
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
B. 01 00 00 General requirements
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
C. ASTM International:
ASTM A572 Standard Specification for High-Strength Low-Alloy Columbium-
Vanadium Structural Steel.
American Institute of Steel Construction (AISC):
AISC Northridge Interim Observations and Recommendation on
Technical Bulletin No. 2 Steel Moment-Resisting Frames, October 1994
American Society for Nondestructive Testing (ASNT):
ASTM E94 Guide for Radiographic Testing
ASTM E142 Method for Controlling Quality of Radiographic
ASTM E164 Practice for Ultrasonic Contact Examination of Weldments
ASTM E165 Test Method for Liquid Penetrant Inspection Method
ASTM E709 Guide for Magnetic Particle Examination
ASTM E1032 Method for Radiographic Examination of Weldments American
Welding Society (AWS):
AWS A2.4 Standard Symbols for Welding, Brazing and Nondestructive Examination
AWS A3.0 Standard Welding Terms and Definitions, Including Terms for Brazing,
Soldering, Thermal Spraying and Thermal Cutting
AWS A5 Welding Rods, Electrodes, and Filler Metals Series
AWS B1.10 Guide for the Nondestructive Inspection of Welds AWS C5.4
Recommended Practices for Stud Welding
AWS D1.1 Structural Welding Code Steel
AWS D1.2 Structural Welding Code Aluminum
AWS D1.3 Structural Welding Code - Sheet Steel
AWS D10.4 Recommended Practices for Welding Austenitic Chromium- Nickel
Stainless Steel Piping and Tubing
AWS D10.9 Specification for Qualification of Welding Procedures and Welders for
Piping and Tubing 14. AWS QC 1 Standard for AWS Certification of Welding
Inspectors
D. EN Eurocodes
EN 1993-1-1:2005 Eurocode 3: Design of steel structures - Part 1-1: General rules
and rules for buildings
EN 1993-1-4:2006 Eurocode 3: Design of steel structures - Part 1-4: General rules -
Supplementary rules for stainless steels
EN 1993-1-8:2005 Eurocode 3: Design of steel structures - Part 1-8: Design of joints
ENs, ETAGs and ETAs for construction products relevant for steel structures;
EN 1090: Execution of steel structures Technical requirements;
SCI P291: Structural design of stainless steel
16.1.4 Summary
A. The Contractor shall provide structural steel as shown on the Drawings, specified
herein, and needed for a completed and proper installation. The Drawings referred to
in these Contract Documents and those subsequently provided are intended to
indicate the outline of the structure, related elements and structural members to be
employed and the standard of detail required. After consideration of all criteria and his
own production arrangements, the Contractor may make proposals for changes in
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
any of the details, sizes or materials shown or referred to in the Tender Documents.
However such change shall be only limited to the extent that they do not change the
stiffness and behaviour of the structure.
B. If the changes suggested by the Contractor are of such nature that they affect the
structural stiffness and behaviour significantly then the Contractor shall be
responsible for carrying out the independent Wind Tunnel Test from the prior
approved agency to arrive at the appropriate wind loads on the structure. All
expenses towards such tests and all associated consultancy changes shall be borne
by the Contractor.
A. Section Includes:
1. Structural steel.
2. Prefabricated building columns with beams.
3. Grout.
16.1.4.1 Definitions
A. Structural Steel: Elements of structural-steel frame, as classified by BS EN 10088-
Part 1-2005 Stainless Steels, BS EN 1993-Part 1-4-2006 Eurocode 3 - Steel
Structures - Supplementary Rules For Stainless Steels and SCI P291: Structural
design of stainless steel.
B. Seismic-Load-Resisting System: Elements of structural-steel frame designated as
"SLRS" or along grid lines designated as "SLRS" on Drawings, including columns,
beams, and braces and their connections.
C. Protected Zone: Structural members or portions of structural members indicated as
"Protected Zone" on Drawings. Connections of structural and non-structural
elements to protected zones are limited.
D. Demand Critical Welds: Those welds, the failure of which would result in significant
degradation of the strength and stiffness of the Seismic-Load-Resisting System and
which are indicated as "Demand Critical" or "Seismic Critical" on Drawings.
16.1.5 Submittals
A. Product Data:
Submit two (2) copies, to the Engineer on demand, of the manufacturers test
certificates verifying that the materials comply with the relevant British Standards for
all structural steel, bolting materials and welding consumables.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
B. Shop Drawings:
1. The Engineer will supply the Contractor with information necessary for the
preparation of his drawings and documents. If the Contractor discovers any
contradiction or ambiguity in the information supplied by the Engineer then
written clarification shall be obtained from the Engineer.
2. The drawings referred to herein and those subsequently provided are intended to
indicate the outline of the structure, related elements and structural members to
be employed and the standard of detail required. After consideration of all
criteria and his own production arrangements, the Contractor may make
proposals for changes in any of the details, sizes or materials shown or referred
to in the Tender documents. The shop drawings must show fabrication of
structural-steel components and include;
a. Include details of cuts, connections, splices, camber, holes, and other
pertinent data.
b. Include embedment drawings.
c. Indicate welds by standard BS EN 22553 symbols, distinguishing between
shop and field welds, and show size, length, and type of each weld.
Show backing bars that are to be removed and supplemental fillet welds
where backing bars are to remain.
d. Indicate type, size, and length of bolts, distinguishing between shop and
field bolts. Identify pretensioned and slip-critical high-strength bolted
connections.
e. Identify members and connections of the seismic-load-resisting system.
f. Indicate locations and dimensions of protected zones.
g. Identify demand critical welds.
h. For structural-steel connections indicated to comply with design loads,
include structural design data.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
4. Two (2) copies of each document shall be submitted to the Engineer for his
approval and fabrication shall not be commenced until such approval has been
given in writing. The drawings shall be submitted in related batches sufficiently
in advance of the scheduled fabrication date to ensure that the Engineer has
sufficient time and information to give full consideration to the proposals on the
documents and for any changes to be incorporated and re-submitted for
approval. Unless otherwise specified or agreed in writing, a period of at least 30
days shall be allowed from receipt of the documents by the Engineer to their
return. These approval copies shall be additional to the number of copies of final
drawings to be supplied.
5. All documents submitted for approval shall have already been checked by the
Steelwork Contractor and certified accordingly.
6. The Engineer will verify the correct interpretation of his requirements but is not
responsible for verifying the dimensions or checking the strength or practicability
of the details.
7. Approval of the documents by the Engineer shall not relieve the Contractor of his
obligations. The Contractor shall be entirely responsible for his drawings
including their accuracy (relative to the Engineer's drawings) the correctness of
detail and the proper design of connections and joints and shall be responsible
for any additional work required as a result of defects in his drawings.
8. Where the steelwork connects to an existing structure, the Contractor shall verify
all dimensions that may affect fabrication and notify the Engineer in writing of
any discrepancies before fabrication commences.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
I. Design Guide
1. The structural steelwork shown on the drawings and described in this
specification has been designed to BS 5950, EN 1993-1-4:2006 and SCI P291
where applicable, unless stated otherwise.
2. Notwithstanding the details relating to the tender, the Contractor will be
responsible for the complete design of member connections to BS 5950 and EN
1993-1-4:2006.
3. Steel grade(s) unless shown otherwise on the drawings:-
a) Sections other than hollow sections S275 to BS EN 10025;
b) Hollow sections S275 to BS EN 10210.
c) Stainless Steel 316L to EN 1993-1-4:2006
4. Complete the design and detailing of connections to BS 5950, EN 1993-1-4:2006
and SCI P291 to satisfy loading requirements specified or otherwise calculable
from the information given.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
a) Unless specified otherwise preloaded high strength bearing type bolts shall
be used for all connections to main structural members and trusses.
b) Unless specified otherwise, ordinary bolts in clearance holes tightened to the
snug tight condition will be acceptable for connections of such members as
wind bracings, sheeting rails and purlins and for minor secondary members.
c) Nuts in connections subject to vibration shall be of the self-locking type or
provided with lock-nuts, except where high strength friction grip fasteners are
used.
d) Whenever bolted connections are used, the reduced sectional area of
members shall be computed and the members strengthened if required.
2. Connections of Runway Beams and Trolley Beams:
a) Connections of runway beams shall comply with BS 2853. Special attention is
drawn to the provisions of Appendix G of BS 2853 - see Amendment No. 3
(PD 6225). Connections of trolley beams for window cleaning trolleys and the
like shall be designed as for runway beams.
L. Design Constraints
1. Unless required or permitted otherwise, comply with the following when
completing the design and detailing of the work:
a) Position members forming bracing systems or girders of lattice construction
so that their lines of action intersect at a point.
b) Bolts to be grade A4-70 or 80 and not less than 16 mm diameter.
c) Weld leg length to be 6mm fillet weld minimum unless notes otherwise.
M. In order to meet the requirements for erection tolerances under final dead load, and
the criteria of BS 5950 for deflections due to live loads, it will be necessary to pre-
camber those members or pre-set those elements that would not otherwise comply.
The amount of camber or pre-setting necessary to meet the requirements of this
Specification shall be agreed with the Engineer and shall be shown on the shop
drawings.
A. The Contractor shall operate a Quality Assurance System for all stages of the work
and all work shall be in accordance with that system. The Contractor shall have
internationally acceptable accreditation to the approval of the Engineer.
B. The Contractor shall operate a Quality Assurance System for all stages of the work
to the approval of the Engineer and all work shall be in accordance with the
requirements set out in Section 1.
C. All workmanship, material and tests (where required) shall comply with the
appropriate British Standard and be in accordance with the drawings all to the
satisfaction of the Engineer.
D. Preinstallation Conference: Conduct conference at Project site.
E. Any Approval by the Engineer does not relieve the Contractor of his responsibilities.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
1. Non-destructive testing:
5 Documentation: All tests shall be recorded for references. Records shall include
location of welds test samples, types of test, date of test, inspection or testing
personnels information, and test result. The test records shall be submitted for
records / make available for inspections.
6 Corrective measures: All welds that fail the tests shall be rectified and re-tested if
this is not possible, the metal section shall be partially or entirely replaced at no
additional cost. The corrective actions shall be proposed, approved, executed and
documented for further records.
7 In the event that a failure is observed, an additional 15% weld locations (locations
to be confirmed by Site Engineer) are to be tested at the Faade Contractors own
cost.
A. Store materials to permit easy access for inspection and identification. Keep steel
members off ground and spaced by using pallets, dunnage, or other supports and
spacers. Protect steel members and packaged materials from corrosion and
deterioration.
1. Do not store materials on structure in a manner that might cause distortion,
damage, or overload to members or supporting structures. Repair or replace
damaged materials or structures as directed.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
R. Temporary bracing shall be removed by the Main Contractor and the structure
made good as deemed necessary by the Contract Administrator at the expense of
the Main Contractor.
16.1.9 Coordination
A. Carry out all inspection and testing in accordance with this section and the relevant
standards.
B. In the event that materials or workmanship fail to comply with the requirements
specified herein, carry out further inspection and testing to satisfy the engineer.
Testing laboratories shall be to the approval of the Engineer.
C. Carry out any additional inspection and testing required by the Engineer at
Contractor cost.
D. Demonstrate to the Engineer that full records are maintained through all stages of
the work. Make these records freely available for inspection by the Engineer at any
time.
A. Obtain acceptance of the Engineer wherever required, in writing before the work is
undertaken.
B. If any deviation is required from any part of this Specification, obtain such approvals
in writing before proceeding with any such deviation.
A. All stainless steel plates or elements shall be per AISI grade 316L
B. All stainless steel bolts, washers and nuts shall be AISI grade 316 grade 70 or 80
C. Stainless steel member to be laser fuse welded.
1. Basis of design: MONTANSTAHL (www.monstanstahl.com)
D. Welding Electrodes:
1. All electrodes shall have a yield strength, tensile strength, toughness and
ductility not less than those specified for the grade of steel being welded.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
2. Covered electrodes for manual metal-arc welding shall comply with the
requirements of BS 639.
3. When weathering steel is to be welded the welding electrodes shall be of
matching composition to the parent material.
F. Welding:
1. Stainless Welding: Welding electrodes and welding rods for stainless steel shall
conform to AWS A5.4 and AWS A5.9 as recommended by their manufacturers
for the positions and other conditions of actual use. Matching filler metals shall
be compatible with the Type 316 stainless steel, as applicable.
2. The dimensions of rolled steel sections shall comply with BS 4: Part 1 or BS
4848. Dimensional tolerances shall comply with BS EN 10034 or BS EN 10056
as appropriate. The dimensional tolerances for flats round and square bars shall
be as specified in BS EN 10025 Clause 2.2. The tolerances for plate and strip
produced on continuous mills shall comply with BS EN 10051 or BS1449 as
appropriate. Tolerances for plates produced by non-continuous mills shall
comply with BS EN 10029, and thickness class A tolerances shall apply. The
tolerance over or under the nominal thickness shall be equal to half the total
thickness tolerance.
3. All steel in plates and sections shall comply with the Standards listed in Table 1
as appropriate, except that rimming steel shall not be used. Only new steel shall
be used; the surface condition of steel shall be in accordance with subsection
Fabrication - Surfaces.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
a. Option B4. The carbon equivalent value shall not exceed the value given in
Table B1 of BS 7668.
13. Steel castings and forgings shall comply with BS3100 and BS29 respectively and
shall only be used when the use of such materials will not be detrimental.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
gauge length of 5.65 A when tested in accordance with BS18. Shear Studs will
have a shank diameter of 19mm and a height to suit the slab thickness with a
minimum height of 100 mm after through deck welding.
C. Shear Stud Welding:
1. Welders to be certified by the equipment manufacturer or other recognised
authority as competent for the work.
2. Top surface of the bean flange to be free from mill scale, rust, grease, oil, paint
and any other substance detrimental to welding. Ensure that flange is clean prior
to laying decking.
3. Prefabrication primer and other paints should not be used in areas to be welded.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
3. Fabricated Bolts
a) Where bolts are fabricated from plain round bar the threads shall be ISO
metric, coarse pitch series, free fit as specified in BS 3643. Both ends
shall be threaded and the nut at the bottom end shall be welded in place to
prevent it from turning. The diameters used shall be those for standard
bolts quoted in BS 3692 and BS 4190 as appropriate.
b) The weight of the bar shall be within plus or minus 2.5% of the weight
appropriate to the true cross sectional area. The bolt shall be straight
within a tolerance of 2mm per metre length of the bolt, with a minimum
tolerance of 2mm. The overall length shall be accurate within a tolerance
of plus or minus 3mm, the bottom nut being so positioned that the length
shall be within a tolerance of minus zero and plus 5mm. The threaded
length shall be accurate within a tolerance of minus zero and plus 20mm.
c) Nuts shall comply with the requirements of BS 3692 or BS 4l90 as
appropriate and shall be of a strength grade such that the specified proof
load stress of the nut is not less than the specified minimum ultimate
tensile strength of the bolt material, except that the nuts of strength grade
4 may be used with bolts of grade 43 steel to BS 4360. Nuts shall be of
normal standard thickness; thin nuts shall only be used as locknuts.
d) Unless specified otherwise, bolts shall be of grade 43 steel to BS 4360
with nuts of strength grade 8.8 or higher.
4. Anchor Plates:
a) Unless specified otherwise, anchor plates shall be fabricated from grade
43 steel to BS 4360. Anchor plates shall be accurate in plan size within a
tolerance of minus zero and plus 10mm; the thickness of plate shall be
within normal rolling margins as specified in BS 4360. Anchor plates shall
be sufficiently flat and free from warping to prevent grout from entering at
the bottom of the sleeve (if used). The positions of snugs welded to the
underside of anchor plates shall be accurate within a tolerance of plus or
minus 1.0mm.
5. Washer Plates:
a) The washer plates which are welded to the heads (or bottom nuts) of
smaller diameter bolts to prevent them from turning between the snugs on
the anchor plate shall be grade 43 steel to BS 4360 unless specified
otherwise. Washer plates shall be accurate in plan size within a tolerance
of plus 2mm and minus 3mm and the corners shall be square within a
tolerance of plus or minus 2. The thickness of plate shall be within normal
rolling margins as specified in BS 4360. The plates shall be flat and free
from warping.
6. Washers:
a) Unless specified otherwise standard washers shall be normal diameter
black mild steel washers to BS 4320. Where the holes in the baseplate are
larger than normal clearance holes, special washers will be required to
details shown on the schedules; unless specified otherwise these special
washers shall be fabricated from grade 43 steel to BS 4360.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
2. Thinners shall not be added to paint to change in any way its constitution or
consistency unless agreed by International Coatings.
3. All finishes should be durable, of uniform testure and colour and should be
resilient.
4. All finishes should be uniform in texture, colour and appearance within the
limits of the agreed samples and without irregulatiries or distortion. Finish
coatings shall match the colour and gloss of the ageed control samples.
5. There shall be an interval of at least 24 hours between successvie coats of
painting or as recommended by International Coatings.
B. Suitability Of Conditions:
1. Do not apply coatings:
2. To surfaces affected by moisture or frost.
3. Unless the steel temperature is at least 3 degC above the dew point with
conditions stable or improving.
4. Unless the relative humidity is below 85%.
5. When heat is likely to cause blistering or wrinkling.
6. Take all necessary precautions including restrictions on working hours,
providing temporary protection and allowing extra drying time, to ensure that
coatings are not adversely affected by climatic conditions before, during and
after application.
7. Application of coatings will be taken as joint acceptance by the Main Contractor
and Subcontractor of the suitability of surfaces and conditions within any given
area.
C. Applying Coatings:
1. Multiple coats of the same material must be of a different tint to ensure that
each coat provides complete coverage.
2. Apply coatings to clean, dust free, suitably dry surfaces in dry atmospheric
conditions and after any previous coats have cured adequately.
3. Apply coatings evenly to give a smooth finish of uniform thickness and colour,
free from brush marks, nibs, sags, runs and other defects.
4. Keep all surfaces clean and free from dust during coating and drying.
Adequately protect completed work from damage.
D. Film Thickness:
1. Check the thickness of each coat during application using a wet film thickness
wheel or comb gauge in accordance with BS EN ISO 2808
2. After each coat has dried measure the total accumulated dry film thickness
using a magnetic or electromagnetic meter, checked against standard shims
and recalibrated regularly against a smooth steel reference plate, the number
and position of measurements to be as directed by the Engineer. If requested
carry out the testing in the presence of the Engineer. Submit written reports to
the Engineer.
3. Over any square metre of coating the average accumulated dry film thickness
must equal or exceed the specified thickness, with no reading less than 75% of
the specified thickness.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
4. If at any stage the accumulated dry film thickness is deficient, the Engineer
may require application of additional coat(s) at no extra cost.
5. The Dry Film Thickness (DFT) of the top coat must be sufficient to give an
even, solid, opaque appearance.
6. Where a minimum DFT has been specifiied any areas found to be below the
specified figure will be made good at no extra cost.
E. Stripe Coat
1. Stripe coating of any flanges or edges, external angles, nuts, bolt heads, rough
weld seams, and any areas that are difficult to access is to be carried out by
brush prior to the spray application of the specified primer.
16.2.1.3 Grout
A. Grouts used for bedding steel bases or bearing plates on concrete foundations
shall be agreed with the Engineer. A high strength, non shrink or expanding type of
proprietary cementitious compound for grouting is required.
B. The Contractor shall design the mix for the grout such that the grout has sufficient
bearing capacity for the loads to be transferred through it.
C. Foundations are to be pre-soaked with water the day prior to grouting of a base
plate.
D. The Contractor is to ensure that prior to pouring the grout the areas is free from
water and debris such as oil, grease or adherent material. If the concrete surface is
defective, it must be cut back to a sound base. Bolt holes are to be blown clean of
dirt.
E. The Contractor must demonstrate that there are no gaps, and that no cracks
develop once the grout has been poured.
16.2.2 Fabrication
A. Structural Steelwork
1. Inform the Engineer when fabrication is due to start 2 weeks before
commencement.
2. Before fabricating, ensure that surface condition of steel which is to be coated
complies with requirements for cleaning given elsewhere in this specification.
3. Ensure that fabrication processes do not cause changes in properties of
materials resulting in non-compliance with specified requirements.
4. Trial assemblies shall be carried out in general and for any large truss elements
in particular.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
10. Smithed Work: All forging shall be performed in such a manner as not to impair
the strength of the metal. The metal shall not be worked after it has fallen to a
'blue heat'.
11. Baseplates Provide 25 mm diameter holes in all base plates more than 1 m2
in area to allow the escape of air when grouting after erection of columns.
C. BOLT HOLES:
1. Holing shall be in accordance with BS 5950 Part 2 (or BS 4604: Part 1 in the
case of holes for friction grip bolts). All 'burrs' and 'rags' shall be removed.
2. Slotted holes shall either be punched in one operation or else formed by
punching or drilling two round holes and completed by high quality flame cutting
and dressing, to ensure that the bolt can travel the full length of the slot freely.
3. Circular holes for bolts shall not be flame cut.
4. Cut, drill, mechanically thermal cut, or punch standard bolt holes perpendicular
to metal surfaces.
A. Bolted Connections
1) Bolting up with Close Tolerance Bolts: Holes for close tolerance bolts shall be
drilled and reamed. Where the holes are not drilled through all thicknesses in
one operation, the parts to be joined together shall be accurately lined up with
parallel drifts of a diameter not greater than the nominal size of the hole and not
smaller than 0.15 mm less than the nominal diameter and the holes then
reamed. A close tolerance bolt shall be fitted in each hole reamed and tightened
before the next hole is reamed. All bolts shall be re-tightened after the last bolt
has been fitted.
2) Bolted Movement Connections: Slotted holes for movement connections shall be
provided with shouldered bolts, spring washers and flat washers.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
3) Correcting hole alignments: Drifting to align holes shall not enlarge the holes or
distort the metal. Holes which cannot be aligned without distortion shall be a
cause for rejection unless enlargement by reaming is specifically approved by
the Engineer.
4) Provision of washers:
a) Washers shall be provided at slotted holes and elsewhere as specified. With
metal sprayed steelwork a washer shall always be provided under both head
and nut.
b) Square taper washers shall be provided for all bolts where the bolt head or
nut is bearing on a surface at an angle to the bolt axis greater than 93 or less
than 87.
5) Bolting Metal Sprayed or Galvanised Steelwork: Ordinary bolted connections on
metal sprayed or galvanised steelwork shall be made using spun galvanised or
sheradised bolts, nuts and washers except where connecting coated steelwork
to black steelwork.
B. Weld Connections:
Welding shall comply with the requirements and recommendations of BS 5135 and
American Welding Society (AWS) except as otherwise directed in this Specification and
on the Contract Drawings.
1. The Contractor shall determine the welding procedure details to meet the
requirements of this Specification, including the requirements of Inspection and
Quality Control.
2. Unless otherwise specified, T-butt welds shall be reinforced by equal-leg fillet
welds of leg length equal to a quarter of the thickness of the thinner plate joined,
but not less than 3mm nor greater than 10mm.
3. Where the steelwork is to be blasted and metal sprayed or galvanised after
fabrication, cleats and other solid attachments welded to the member shall be
welded all round to seal the unprotected surface.
4. Except as otherwise specified, the fit up of elements before welding shall
conform to the recommendations for manual welding given in the note in clause
11.1 of BS 5135.
5. The root edges or root faces of butt welds shall not be out of alignment by more
than 15 percent of the thickness of the thinner material but not greater than
3mm.
6. The Contractor shall demonstrate to the satisfaction of the Engineer that the
proposed weld procedure details are derived from procedures which have
already been approved. Where weld procedure tests are required to be
performed to demonstrate this, the tests shall be in accordance with BS EN 288.
7. All welders shall be suitably qualified and experienced for the work on which they
are employed and shall have satisfied the relevant requirements of BS EN 287 or
BS 4872: Part 1 as appropriate. The Contractor shall keep records identifying the
welder for each welded joint. Copies of welders' qualifications shall be provided
by the Contractor when requested by the Engineer.
8. Welded attachments for fabrication or erection purposes shall be subject to the
Engineer's approval and shall be clearly shown on the fabrication drawings.
9. Unless otherwise specified, all welds shall not be undersized. Butt welds shall
have a uniform convexity up to a maximum of (weld size/5) or 3mm whichever is
lesser. Concave fillet weld shall have a throat thickness not less than 0.7 times
the specified leg length. Convex fillet welds shall have a throat thickness not
more than 0.9 times the actual leg length. All welds shall have a smooth surface.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
10. In addition to the above requirements, all welds on steelwork which is not clad
shall be ground smooth.
11. Site Welding: Site welding is not permitted unless shown on drawings or
otherwise approved. When permitted, the Contractor shall ensure suitable, safe
working conditions. Do not weld when surfaces are wet or when the ambient
temperature is below 0C. A method statement is required for prior review
detailing all procedures for management and control of site welding procedures.
All site welding to be subject to 100% testing.
C. Marking
1. Each piece of steel shall be uniquely identified throughout the fabrication
process.
2. Each piece of steelwork shall be distinctly marked before despatch in
accordance with the marking drawing prepared by the Steelwork Contractor.
Where applicable it shall also be given other marks and symbols to assist
erection at site, by showing from which works it has come and to which crane or
area it is to be delivered.
3. The location of marks on members shall be consistent and shall be such that the
marks are clearly visible both before and after erection.
4. Painted marks shall be applied using a paint that is compatible both in colour and
chemically with the final site anti-corrosion treatment.
5. The method of marking steelwork which is to be supplied to site fully painted
shall, unless specified otherwise, be as agreed with the Engineer.
6. The painting of the Contractor's name or other advertising matter on steelwork is
not permitted. Any such advertisement must be in the form of labels which are to
be removed after the steel arrives on site.
7. The marking of Safe Working Load on runway beams shall comply with BS 2853.
8. Where high strength bolts and threaded rods are used, additional marking must
be visible which will identify the strength of these. The manufacturers standard
markings will suffice provided that they can be easily read on site before the
bolts are fixed.
9. Marking of steel which is to be blast cleaned, pickled, metal sprayed or
galvanised to be by an approved method which cannot be obliterated.
10. Hard stamping must not be used except where specified on the drawings by the
Engineer.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
1. Steel surfaces shall not be more heavily pitted or rusted than Grade C of
BS 7079 Part A1. Any major surface defects shall be reported to the
Engineer and his instructions followed.
2. Any minor surface defects such as surface laminations, blow holes and
crevices exposed by blast cleaning shall, subject to the approval of the
Engineer, be made good as specified in BS EN 10025, BS EN 10113, BS
EN 10155, BS 7613, BS EN 10210 or BS 7668 as appropriate.
3. Surfaces which become inaccessible after fabrication or assembly, such
as the inside of structural hollow sections and other box sections, shall be
sealed off from the outside atmosphere by continuous welds unless
specified otherwise.
4. Hollow members which are to be galvanised shall have vent holes. These
shall be large enough to ensure internal galvanising or if so specified shall
be sealed after the member has been galvanised.
5. Contact surfaces, other than those where HSFG fasteners are to be used,
shall be treated as required by Specification of Corrosion Protection. The
Contractor shall check the faying surfaces in steel 25 mm thick or more for
deformities such as bowing, twist or rippling which may reduce slip factor
to below design limit. The contractor shall agree remedial measures with
the Engineer.
6. Where specified on the drawings machined surfaces shall receive an
approved coat of travel varnish within four hours of machining.
16.2.5 Galvanizing
A. Hot-Dip Galvanized Finish: Apply zinc coating according to Section 099113 Part A
B. Fill vent and drain holes that will be exposed in the finished Work unless they will
function as weep holes, by plugging with zinc solder and filing off smooth.
Revise locations below where galvanizing is required to suit Project. Subparagraph
is an example only; delete and indicate items to be galvanized on Drawings if
preferred.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
16.3.1 Examination
16.3.2 Preparation
A. Provide temporary shores, guys, braces, and other supports during erection to keep
structural steel secure, plumb, and in alignment against temporary construction
loads and loads equal in intensity to design loads. Remove temporary supports
when permanent structural steel, connections, and bracing are in place unless
otherwise indicated.
B. Do not remove temporary shoring supporting composite deck construction until
cast-in-place concrete has attained its design compressive strength.
16.3.3 Erection
A. Method of Erection
1) The Contractor shall submit a detailed Method Statement to the Engineer for
approval prior to erection. When necessary to amplify the information given in his
Method Statement, the Contractor shall prepare Erection Drawings for approval
by the Engineer.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
2) Erection of the steelwork shall be carried out in a safe manner and the work shall
be arranged in such a manner as to facilitate phased hand over of the steelwork
for subsequent operations.
B. The Contractor shall supply adequate plant, tools, service bolts, drifts, bolt
tightening devices and other equipment to ensure that the steelwork is correctly
erected in accordance with the programme.
C. Transport, Storage, Handling and Attachments
1) Care shall be taken when transporting, storing, handling or erecting all material
to ensure that no part is damaged. Damage to any part of the structure either
before or during erection shall immediately be brought to the notice of the
Engineer. Damaged material shall be rectified or replaced. No part that has been
damaged shall be assembled into the structure without the written approval of
the Engineer.
2) Steelwork to be stored shall not be placed directly on the ground. It shall be
stored in such a manner as to avoid water retention.
3) Particular care shall be taken when transporting, handling or storing parts which
have been metal sprayed, galvanised or painted. If the coating is damaged it
shall be restored to comply with the relevant requirements of the Specification for
Corrosion Protection for Steelwork.
4) Lifting points shall be suitably wrapped and protected and steel slings shall not
be allowed to come into direct contact with coated steelwork.
5) Welded attachments shall not be employed unless they are clearly shown on the
fabrication drawings.
D. Foundations
1) All the necessary anchorage materials which are to be built into the foundations
shall be supplied to site in time to meet the agreed programme.
2) Immediately the foundations are available the Contractor shall satisfy himself
that the foundations have been correctly formed and that the holding down bolts
have been accurately set and have the full amount of play shown on the
drawings and shall inform the Engineer accordingly, in writing.
E. Temperature Effect
1) In setting out and erecting continuous structures proper adjustments shall be
made as approved by the Engineer to counteract dimensional discrepancies
owing to temperature variations.
2) Where stanchion bases are to be cast into pockets formed in concrete
foundations, any horizontal steel members which tie the stanchions together
shall be fixed first and the stanchions shall then be lined, levelled, plumbed and
concreted in and the concrete in the pockets allowed to harden before fixing the
rest of the steelwork to them.
3) Except where specified otherwise, sliding joints shall be treated with
molybdenum disulphide grease before erection.
4) The Contractor shall limit the temperature effects during erection by adequately
controlling the temperature of the element using thermal insulation or an
alternative system approved by the Engineer. He shall demonstrate that the
change in temperature of any element or elements shall not cause undue effects
on the structure
F. Lining and Levelling
1) The permanent welding or bolting up of connections shall not be carried out until
a sufficient portion of the structure has been erected and temporarily connected
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
up, to ensure that there will be no straining of members during the erection and
lining up of the remainder of the structure.
2) Adequate temporary bracing shall be provided and left in position until such time
as the building is sufficiently far advanced for such bracing to be no longer
required.
3) Packs for levelling up stanchions shall be shown on the drawings submitted for
the Engineer's approval. At least three sets of packs shall be used for each
stanchion. The number of packs provided shall be 25% in excess of the
theoretical requirement.
4) Packs shall not be larger than is necessary for their purpose, they shall be sawn
and not sheared or flame cut. Packs shall not protrude unduly from the stanchion
base; they shall be grouted in and the grout shall totally enclose them.
G. Grouting up of Structures
1) The Engineer shall be informed when stanchions or other members have been
lined, levelled and plumbed and no grouting or concreting-in shall be done until
the Engineer has approved the alignment and plumbing.
2) Following such approval the Contractor shall immediately grout the base plates
and concrete in the stanchions or other members.
H. Composite Columns
1) Welding to Concrete Filled Columns: Primary load bearing structural components
shall be welded to the column before commencing to fill with concrete. Subject to
the approval of the Engineer, the welding of relatively small lugs and fittings after
filling may be allowed.
2) Column Welded Splices: To allow welding to take place, the concrete filling shall
be stopped at a level approximately 250mm below the top of the column. The
next column length can then be spliced into place using a full penetration butt
weld with a backing ring. Following this, concrete filling can be resumed.
3) Bolted Flange Joints: When a flanged connection is used, the flange shall be
welded to the column before filling. When flanges are used at both ends of a
column length at least one flange shall have to incorporate an aperture for filling.
In order to ensure complete filling under this flange, the maximum size of any lip
shall not exceed 15mm
4) Preparation for Concrete Placi
a) Surfaces to receive concrete shall conform to Specification for Corrosion
Protection for Steelwork: Internal - Concrete encased.
b) All loose material and debris shall be removed from the bottom of the column.
Any free water which may have collected at the bottom shall also be
removed.
5) Placing and Compacting the Concrete in Composite Tube Columns:
a) The Contractor shall submit a detailed Method Statement to the Engineer for
approval prior to construction.
b) The Contractor shall conduct a full scale test on site to the satisfaction of the
Engineer to demonstrate the proposed method of filling, compaction and
making good.
c) Comply with pertinent provisions of Specification for Cast-in Place Concrete.
d) The columns shall be concrete filled by pumping concrete into the column
through temporary ports in the base of the column. The Contractor shall
design, fabricate, install, remove and make good the opening and works
associated with the temporary ports.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
e) The concrete filling method shall ensure compaction of the concrete during
placing.
f) Drain holes that are present in the column to prevent build up of water on site
and to allow escape of moisture in the event of fire shall be temporarily
plugged whilst the concrete is being placed. The plugs shall be removed after
the concrete has achieved its initial set.
g) Polythene sheeting shall be placed over the top and tied or taped around the
column to prevent early drying out of the concrete at the top surface.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
bolt in one continuous line. This marking is to record their subsequent relative
positions.
f) Before final tightening is carried out the Engineer shall be informed so that he
may check that the bolts have been correctly bedded down.
g) A tolerance of +20% on the specified bedding down torque will be permitted
to allow for slight variations in the calibration of the devices used for
tightening and checking.
h) When permission to proceed has been obtained from the Engineer the bolts
shall be further tightened so that the nut is turned relative to the bolt shank by
the amount given in Table 3 of BS4604 Part 1.
i) After completion of the turn of the nut the Engineer shall be informed so that
he may check that the nut has been turned the correct amount relative to the
bolt.
6) System B - Tightening using Load Indicating Washers
a) The load indicating washers shall be used in conjunction with HSFG bolts
manufactured in accordance with BS4395 Part 1.
b) The Contractor shall ensure that the load indicating washers do not jam on
the shanks of the bolts. This can be checked before installation by placing the
load indicating washer upside down on the bolt (i.e. with the protrusions away
from the bolt head). If the washer does not turn freely on the shank right up to
the underside of the bolt head, the washer or the bolt, whichever is at fault,
shall be rejected.
c) The load indicating washer shall preferably by fitted with the protrusions
bearing against the bolt head. If this is not possible, it may be fitted against a
special nut face washer fitted against the nut.
d) Where a hardened taper washer is necessary the bolt shall preferably be
fitted in such a way that the taper washer can be placed between the nut and
the steelwork or, if this is not possible, the taper washer may be placed
between the load indicating washer and the steelwork.
e) Where the load indicating washer is fitted under the head of the bolt care
must be taken that the head of the bolt does not turn during tightening.
f) Where it is necessary to use the special nut face washers the manufacturers
instructions on assembly shall be carefully followed to ensure proper
functioning of the load indicating washer in this position.
g) No methods other than the above shall be used.
h) After assembly all the bolts in the joint shall be tightened to a "snug tight"
condition, to ensure that the parts of the joint are brought into good contact
with each other. Snug tight is defined as the tightness attained by a few
impacts of an impact wrench or the full effort of a man using a spanner.
Alternatively the bolts shall be tightened to a specified bedding torque as in
System A, subsections a. and b.
i) During the tightening of any one joint, the first few bolts tightened may relax
and it may be necessary to tighten each bolt more than once until the bedding
down torque is achieved.
j) After bedding down, the parts joined together must be in close contact over
their full area, with no signs of distortion in any of the parts. This stage of
tightening is not intended as a corrective for faulty workmanship in the
assembled plies.
k) Before final tightening is carried out the Engineer shall be informed so that he
may check that the bolts have been correctly bedded down.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
l) When permission to proceed has been obtained from the Engineer each bolt
shall be further tightened so that the average gap is reduced to 0.40 mm
maximum in normal assemblies or 0.25 mm maximum against a nut face
washer. The gaps shall not be reduced to less than 0.10 mm.
m) After completion of the tightening the Engineer shall be informed so that he
can check that the gaps have been closed to within the limits.
n) The time, torque and amount of turn required to obtain the specified gap shall
be observed and these should remain substantially constant for similar bolts.
o) Where excessive time or turn or unusual force is required to reduce the gap
the reason for this shall be sought and rectified before proceeding with the
work.
7) High Strength Bearing Type joints.
a) For bearing type joints an applied finish on the contact finishes shall be
permitted.
b) The procedure for tightening bearing type joints shall be the same as for
HSFG bolts.
8) Tightening of Galvanised or Plated Nuts and Bolts a) Care shall be taken to
ensure that coating materials do not strip off and jam the threads as this will give
a false indication of torque.
9) In the case of contact surfaces of HSFG bolted connections receive paint, slip
resistant test shall be performed to the satisfaction of the Engineer.
B. Site Bolting
1) All sites bolting shall meet the relevant requirements stated in this
Specification.
2) Bolting up and final tightening of bolts shall be carried out progressively as
the erection, alignment and grouting proceeds in order to release the
steelwork and the area under it for subsequent operations.
3) Care shall be taken not to damage bolts by over-tightening.
C. Site Welding
1) Where site welding is required the requirements stated in subsection
Fabrication - Welding shall be met and the welding shall be subject to the
inspection and testing requirements stated in subsection Inspection and
Quality Control. Special attention shall be paid to the safety of welders
working on site.
2) Due precautions shall be taken against inclement weather. Welding shall not
be carried out during rain except under cover and with adequate protection
against ingress of water to the zone to be welded. Electrodes shall be kept
dry and stored in an appropriate environment.
3) Gas shielded welding shall only be carried out with adequate protection from
wind and draughts.
D. Co-ordination with other trades
1. The erection of the structural steelwork shall be co-ordinated with all trades
and parties involved and it shall not delay to the overall building programme.
The Contractor shall be responsible for co-ordinating information between his
Sub-Contractors to allow production of steelwork to proceed according to
programme.
2. The Contractor shall not cut, drill or otherwise alter the work of other trades,
or his own work to accommodate other trades unless such work is clearly
specified on the drawings. Whenever such alteration is required, written
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
Table 2 Positional Tolerance for Holding Down Bolts in Sleeves for slab type base plates.
Table 3 Positional Tolerance for Holding Down Bolts in Sleeves - for thick castings and for
base plates where the bolts pass through holes at two levels.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
3. The Contractor shall notify the Engineer when the space beneath any column
base is less than 10mm or over 40 mm greater than the specified dimension.
4. The Contractor to check accuracy of erection and correct all errors before
filling and bedding beneath bases and carrying out any other adjacent work.
H. Mortar Filling/Bedding of Column Bases
1. The bolt pockets shall be completely filled with a neat cement slurry and the
space beneath column base plates with grout or mortar as follows:
2. Spaces 25 to 50 mm deep: Mortar of 1:1 cement: sand, just fluid enough to
pour and well tamped as filling proceeds.
3. Spaces 50 to 80 mm deep: Damp mortar of 1:2 cement: sand, well tamped
against properly fixed supports as filling proceeds.
4. Cement: Portland cement to BS 12, Class 42.5N or Class 52.5N.
5. Sand: To BS 882, Grading limit M.
I. Movement Joints
1. The sliding surfaces shall be coated with molybdenum disulphide grease
before connecting.
2. The Contractor to ensure that bolts are in centre of slotted holes after erection
of structure and that the joint is free to move.
B. Testing Of Welds
1. The whole of the total length of each full strength butt weld shall be examined
by radiography or other approved non-destructive testing method and approved
by the Engineer. Non-destructive tests are to be carried out on all other major
welds by the contractor and he shall carry out radiographic examination if
instructed by the Engineer.
2. Defective welding revealed by testing shall be made good to the satisfaction of
the Engineer at the cost of the contractor.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
shall be tested beyond these limits 10% of the length of the weld shall be
tested.
D. Lamination Testing
1. Except in the case of special plate with through thickness properties
guaranteed by the manufacturer, all plates and sections 25mm or over in
thickness shall be ultrasonically tested for laminations, and shall meet the
acceptance criteria of level B6 to BS 5996.
2. Other plates may be specified to be ultrasonically tested for laminations. Unless
otherwise specified they shall meet the requirements of level B6 to BS 5996.
3. Welded joints that cause high tensile through thickness strains to occur (as
discussed in Appendix G of BS 5135), shall be fabricated from steel that meets
the quality level Z35 of BS EN 10164.
4. For all steel plates and sections which will be subject to through-thickness
stresses, the Contractor shall carry out non-destructive testing on the steel to
ensure that the affected zones are free from laminations and inclusions. Table
5, 18 and 19 of BS 5135 shall be used to determine acceptance levels for steel
products.
a. Setting out and Erection Tolerances
b. The Contractor shall be responsible for the correct positioning and the
correct levels of the structure.
c. Unless otherwise specified the tolerances for position and level of the
steelwork shall be:
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
The Contractor is responsible for ensuring the steelwork is erected within the above
tolerances prior to any work being undertaken by following on trades. The Contractor
shall obtain approval of methods of rectification before starting modification or remedial
work.
E. As Erected Drawings
F. A detailed survey of erected steelwork levels is to be carried out by the Contractor
not more than 4 weeks after the erection of steelwork and prior to the
commencement of works by following contractors.
G. The Contractor shall submit survey information to the Engineer for review allowing
10 working days for their review.
H. On completion of the Contract, the Contractor shall provide the Engineer with CD
ROM (AutoCAD 2005 format) and a set of paper prints of As Erected drawings
comprising:
a. General arrangement drawings.
b. Fabrication drawings
c. Drawings made after fabrication revisions.
d. The fabrication drawing register.
1. The Contractor shall demonstrate to the Engineer that full records are
maintained through all stages of the work and these records shall be freely
available for inspection by the Engineer or his representatives at any time.
2. The Contractor shall allow the Engineer and an independent inspection
authority access at any reasonable time to his works and to those of any
suppliers to enable inspection of the work to be carried out during fabrication.
The Contractor shall provide all facilities, hand tools, lighting etc as necessary
to ensure adequate inspection.
3. The inspection and acceptance of materials and fixings, etc, by the Engineer
shall not in any way relieve the Contractor of his own responsibilities for
ensuring that the materials and fixings are sound and of the requisite quality.
4. The Contractor shall notify the Engineer 14 days prior to completion of the
fabrication of the elements in order that, if necessary, inspections or tests may
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
2. The Contractor shall carry out inspection and testing of welding to meet the
requirements and recommendations of BS 5135, except as otherwise directed in
the Specification and on the Contract Drawings. Welds shall be inspected and
tested in accordance with Tables 4 and 5. Testing procedures shall be in
accordance with BS 2600, BS 2910, BS 3923 or equivalent approved.
3. All welds shall have 100 percent visual inspection to BS 5289 in addition to the
requirements given in this Specification and Contract Drawings.
4. Inspection and testing by the Contractor shall be carried out by suitably qualified
and experienced staff to the approval of the Engineer and all in accordance with
the relevant British Standards listed in this Specification. Testing shall be carried
out by an independent and accredited laboratory approved by the Engineer.
A. General
1. The Contractor shall be responsible for carrying out all inspection and testing in
accordance with this Specification.
2. In the event that materials or workmanship fail to comply with the requirements
of this Specification any further inspection and testing which is necessary to
satisfy the Engineer shall be the responsibility of the Contractor. Testing
laboratories shall be accredited where appropriate.
3. Additional inspection and testing may be required by the Engineer.
4. The Contractor shall demonstrate to the Engineer that full records are
maintained through all stages of the work and these records shall be freely
available for inspection by the Engineer or his representatives at any time.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
5. The Contractor shall allow the Engineer and an independent inspection authority
access at any reasonable time to his works and to those of any suppliers to
enable inspection of the work to be carried out during fabrication. The Contractor
shall provide all facilities, hand tools, lighting etc as necessary to ensure
adequate inspection.
6. The inspection and acceptance of materials and fixings, etc, by the Engineer
shall not in any way relieve the Contractor of his own responsibilities for ensuring
that the materials and fixings are sound and of the requisite quality.
7. The Contractor shall notify the Engineer 14 days prior to completion of the
fabrication of the elements in order that, if necessary, inspections or tests may
be carried out by the Engineer at the Contractors works prior to despatch of
steelwork to site.
8. All welds which are uneven in size or are oversized shall be rejected if in the
opinion of the Engineer they will prove unsuitable in their final state. All such
welds shall be made good at the Contractor's expense.
2. The Contractor shall carry out inspection and testing of welding to meet the
requirements and recommendations of BS 5135, except as otherwise directed
in the Specification and on the Contract Drawings. Welds shall be inspected
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
C. Testing Runway Beams, Trolley Beams and Supports for Permanently Installed
Suspended Access Equipment
1. The testing of runway beams shall be carried out in accordance with BS 2853
and all statutory requirements. The Steelwork Contractor shall provide all
labour, materials and equipment necessary for the test. When the runway
beams are ready for testing the Engineer shall be informed and the tests shall
be carried out in the presence of the Engineer or his representative and all
relevant approval bodies, including the Health and Safety Executive and
Insurance Representatives.
2. Trolley beams for window cleaning trolleys and the like shall be tested as
runway beams.
3. Supports for Permanently Installed Suspended Access Equipment shall be
tested to meet the requirements of BS 6037.
4. All beams and supports shall be marked to show the safe working load where
this is not clearly indicated on the lifting equipment itself.
D. Products
1. A copy of tests certificates for all project steelwork is to be retained by the
Contractor for review by the Engineer upon request.
A. Defective Work. As soon as possible after any part of the work or any materials are
known or suspected to be defective, submit proposals to the Engineer for further
testing, inspection or replacement and obtain instructions.
To ensure good technical and aesthetic success of the welds in the project, it will be request
the realization of all the mock up necessary to properly define the correct degree of finish.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
1. Heat tint from stainless steel fabrications shall be remove using brush-on
pastes or gels, spray or immersion acid pickling or electrolytic methods will
normally be satisfactory.
2. The nitric acid used in these treatments will also leave the steel surface in the
'passive' condition.
END OF SECTION
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
Location
The fire alarm system contractor shall be registered with, and on the approved list of, the Civil
Defence Department.
A. Section 1 General
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
4.5.17.1 Balustrades should be designed to resist a horizontal load of at least 0.5 KN/m
(according to DIN 1055.3) without unacceptable deflections and distortions.
4.13.1.2 Safety: Non-combustible and Non-Toxic conforming to all applicable standards and
codes to meet or exceed the appropriate standards
4.13.1.3 Economy: Cost-effective and, to a consistent level of quality, commonly available and
not restricted to a few suppliers based on current industry levels of technology and
local building practice. Proven in use, they will not required new research, designs or
manufacturing techniques.
4.13.1.4 Durability: Materials shall be carefully selected for their wear, strength and weathering
qualities. They are to be resistant to abrasion, impact, vandalism, humidity,
temperature change, sunlight and the marine atmosphere. Colour and appearance
shall remain unchanged during the life cycle of the material.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
4.13.1.6 Maintainability: Materials shall be easily cleaned, in a single operation, with standard
cleaning equipment and agents. Repair and replacement with regards to the
availability of material in the region shall be considered in the selection of materials.
4.13.6.1 Finish materials on walls and columns within reach of public shall be highly resistant to
wear and vandalism. The internal wall finishes shall be of a panel system that is
supported either from the top of the bottom. The fixings shall be resistant to vibration
and insensitive to wind or train generated pressure fluctuation, i.e. no rattling,
squeaking, etc.
4.13.6.2 Provisions shall be made for replacement in case of damage, e.g. individual panels
shall be demountable for purposes of maintenance, cleaning and replacement without
necessitating the removal of adjacent panels.
4.13.6.3 Wall finishes at exposed levels shall be capable of withstanding a 1.5 kN applied point
load according to the technical specifications.
4.14.13.6 Non-reflecting surfaces in the room shall be of the following reflectance degrees:
a) Ceiling 70 %
i. Walls 50 %
ii. Partition Walls 20-50%
5.5.4.1 Vertical Deflection Limits: The final deflection due to all loads including the effects of
temperature, creep and shrinkage shall be measured from the as-cast level of the
supports of floors, roofs and all other horizontal members and should not exceed the
ratio of (span)/250.
3
17.1.2.5 Global Sustainability Assessment System (Gsas)
3
Each material will be submitted with complete assessment sheet Template. Refer section 01 61 05
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
2. 01 00 00 General requirements
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
- ASTM E 894 -Standard Test Method for Anchorage of Permanent Metal Railing
Systems and Rails for Buildings;
- ASTM E 935 -Standard Test Methods for Performance of Permanent Metal Railing
Systems and Rails for Buildings ;
- EN410-2011 - Glass in building. Determination of luminous and solar characteristics
of glazing;
- EN673-2011 - Glass in building. Determination of thermal transmittance (U value).
Calculation method;
- EN572-9:2004 - Glass in building. Basic soda lime silicate glass products. Evaluation of
conformity/Product standard;
- ISO 9001-2000 - Quality management systems Requirements ;
- NFPA 101 - Life Safety Code;
- NF P01-010 6 -Environmental quality of construction products - Environmental and
health declaration of building products ;
- CPSC 16 CFR 1201 Safety standars for architectural glazing materials
- ANSI Z97.1 Standard - Safety Glazing Materials Used in Buildings - Safety Performance
Specifications and Methods of Test.
17.1.3 SUBMITTALS
17.1.3.1 General
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
2. For final Review leading to final Design Certification, submit the Regional
Materials Calculator and the following supporting documents:
a. Bill of Quantities
b. List of materials
c. Specifications listing manufactures and locations
d. Cost estimates
e. Description of the material
f. Description of how the material has been reused
g. g.Report providing distances of manufacturers
h. h.Any documentation from manufacturers outlining thirdparty sourcing
standards such as FSC Chain of Custody Certification or ISO
Certification
B. Submit shop drawings ( BIM model and dwgs ) showing set out, assembly
including all associated fixings and bracketry in accordance with local building
code requirements. Upon approval, general contractor shall send to field or job-
site superintendent copy of final approved shop drawing.
D. Submit fabricated handrail sample including joints, end plates, fixings, specified
finish and code compliance marking.
F. Set of sample and array shall be delivered within 90 days before installation
G. Mockups: Build mockups to verify selections made under sample submittals and
to demonstrate aesthetic effects and set quality standards for fabrication and
installation.
1. Build mockups as shown on Project drawings.
2. Build mockups for each form and finish of railing consisting of two posts,
top rail, infill area, and anchorage system components that are full height
and are not less than 600 mm in length.
3. Approved mockups will not form part of the completed Work.
17.1.3.2 Glass
A. Product Data: Submit manufacturers technical data for glazing material and
fabricated glass product required, including installation and maintenance
instructions.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
17.1.4.1 General
B. Use adequate number of skilled workmen who are thoroughly trained and
experienced in the necessary crafts, and who are completely familiar with the
specified requirements and the methods needed for proper performance of
the work of this Section.
C. Use materials which shall be free from defects impairing strength, durability,
and appearance; shall be of best commercial quality for purpose required;
and shall comply with approved drawings.
D. Use manufacturer who has had ten (10) years of experience in the
manufacture of specified product.
17.1.4.2 Glass
B. Source Limitations for Glass: Obtain ultraclear float glass, tinted float glass,
coated float glass, laminated glass and insulating glass from single source
from single manufacturer for each glass type.
C. Source Limitations for Glazing Accessories: Obtain from single source from
single manufacturer for each product and installation method.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
Protect glass and glazing materials during delivery, storage and handling to comply with
manufacturer's written directions and as required to prevent edge damage to glass, and damage
to glass and glazing materials from effects of moisture including condensation, of temperature
changes, of direct exposure to sun, and from other causes, including high altitude limitations for
insulating glass.
A. Do not proceed with glazing when ambient and substrate temperature conditions are
outside limits permitted by glazing material manufacturer or when joint substrates are
wet due to rain, frost, condensation or other cause.
17.1.7 WARRANTY
Product Warranty as defined in the tender contract; Guarantee shall cover repair and
replacement of defective material and workmanship.
17.2.1 DESCRIPTION
Laminated glass for balustrade is installed vertically and made of two layers of 8mm clear fully
tempered (HST) glass laminated with 3.04mm PVB interlayers.
17.2.1.1 Glass
Canopy laminated glass, is 15.10.4 fully tempered (HST) glassmade of:
A. One layer of fully tempered (HST) 15 mm thick, clear glass (same colour of glazed
curtain wall), bevelled on edges.
C. One layer of fully tempered (HST) 10 mm thick, clear glass (same colour of glazed
curtain wall), bevelled on edges.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
17.2.1.2 Adhesives
A. Acceptable manufacturers and products whose formulation determined by glazing
system manufacturer.
B. Metal profiles and plates: metal profiles and plates for Structural Glass Fin Installation
shall comply specification as defined on the drawings and engineer calculation.
C. Anchorage devices: Clips, anchors, fasteners, and shims required for secure
installation of glass fin structure. Type, size, and spacing as recommended by glass
fin structure manufacturer and/or as defined on the drawings and Engineer
calculation.
17.2.1.4 TOLERANCE
A. Manufacturing Tolerances: data to be provided
B. Erection Tolerances:
Otherwise specified in shop-drawings or by manufacturer, installed system shall be
less than the limits specified herein.
Limit variations from plumb, level, or dimensional angle to the following:
1. Not more than 3 mm (1/8 inch) deviation in 1 story height, in 3 m (10 foot)
vertical, angular run, or in 6 m (20 foot) horizontal run.
2. Not more than 6 mm (1/4 inch) deviation in 12 m (40 foot) run, in any
direction.
3. At battered wall areas, plumb is defined to match indicated slope.
Limit variations from location (theoretical calculated position in plan or elevation
based on established floor lines and column lines), including variations from plumb
and level, to the following:
1. Not more than 9.5 mm (3/8 inch) total deviation for member at any location.
2. Not more than 3 mm (1/8 inch) change in deviation for member for 3 m (10
foot) run.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
17.2.3 GENERAL
A. Examine areas and conditions, with Installer present, for compliance with installation
requirements for installation tolerances, true and level bearing surfaces, and identify
conditions detrimental to proper and or timely completion or other conditions affecting
performance of the Work.
B. Prior to erection:
1. Dimensional verification measurements prior to fabricating glass fin structure
components
2. Verify location of structural supports and roof anchoring and if their position is
within tolerances and proper alignment.
C. Proceed with application only after unsatisfactory conditions have been corrected.
D. Coordination: Coordinate provision of glass fin structure with casting of concrete (
floor slabs), structural steel frame (roof), shelters cladding, ventilation plant etc.
E. Structural steel frame:
Ensure that metal profiles and plates, anchor bolts etc and other structure
components to be fixed to roof structures are provided, accurately placed, and
properly sized. Ensure that provision is made for attachments and transfer of
calculated loads.
17.2.4 INSTALLATION
A. Site assemble and erect glass in accordance with approved shop drawings,
manufacturer's installation instructions and GANA Glazing Manual.
B. Particularly:
1. Do not install glass with edge damaged or other imperfections.
2. Allow for settling, expanding, and contracting to occur without breaking glass.
3. Do not field cut or alter structural framing without written approval from
manufacturer and Architect.
C. Install structural glass in metal profiles and fittings as in manufacturers instructions
and in approved shop drawings.
D. Secure glass panels to fittings as in approved shop drawings.
E. Coordinate installation work with erection tolerances, Glazed Curtain Wall installation
works and sealing. Also coordinate installation with Mechanical & Electrical Plant
involved.
F. Coordinate installation work with other related works.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
END OF SECTION
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
Location
GRADE LEVEL
Secondary Shelter - Public area
Elevator frames / elevators
The fire alarm system contractor shall be registered with, and on the approved list of, the Civil
Defence Department.
A. Section 1 General
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
4.13.1.2 Safety: Non-combustible and Non-Toxic conforming to all applicable standards and
codes to meet or exceed the appropriate standards
4.13.1.3 Economy: Cost-effective and, to a consistent level of quality, commonly available and
not restricted to a few suppliers based on current industry levels of technology and
local building practice. Proven in use, they will not required new research, designs or
manufacturing techniques.
4.13.1.4 Durability: Materials shall be carefully selected for their wear, strength and weathering
qualities. They are to be resistant to abrasion, impact, vandalism, humidity,
temperature change, sunlight and the marine atmosphere. Colour and appearance
shall remain unchanged during the life cycle of the material.
4.13.1.6 Maintainability: Materials shall be easily cleaned, in a single operation, with standard
cleaning equipment and agents. Repair and replacement with regards to the
availability of material in the region shall be considered in the selection of materials.
4.13.6.1 Finish materials on walls and columns within reach of public shall be highly resistant to
wear and vandalism. The internal wall finishes shall be of a panel system that is
supported either from the top of the bottom. The fixings shall be resistant to vibration
and insensitive to wind or train generated pressure fluctuation, i.e. no rattling,
squeaking, etc.
4.13.6.2 Provisions shall be made for replacement in case of damage, e.g. individual panels
shall be demountable for purposes of maintenance, cleaning and replacement without
necessitating the removal of adjacent panels.
4.13.6.3 Wall finishes at exposed levels shall be capable of withstanding a 1.5 kN applied point
load according to the technical specifications.
4
18.1.2.5 Global Sustainability Assessment System (Gsas)
4
Each material will be submitted with complete assessment sheet Template. Refer section 01 61 05
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
2. 01 00 00 General requirements
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
18.1.3 SUBMITTALS
2. For final Review leading to final Design Certification, submit the Regional
Materials Calculator and the following supporting documents:
a. Bill of Quantities
b. List of materials
c. Specifications listing manufactures and locations
d. Cost estimates
e. Description of the material
f. Description of how the material has been reused
g. Report providing distances of manufacturers
h. Any documentation from manufacturers outlining thirdparty sourcing
standards such as FSC Chain of Custody Certification or ISO
Certification
B. Product Data: For each type of product indicated. Include finishing materials.
C. Shop Drawings ( BIM model and dwgs ): Show fabrication and installation
details for all associated bracketry and fixings.
D. Samples for Initial Selection: For products involving selection of color, texture,
or design, including mechanical finishes.
E. Samples for Verification: For each type of exposed finish required, prepared
on 300 mm square Samples of metal of same thickness and material
indicated for the Work. Sample include 2 prepared edges, a corner and
preparation for fixing.
F. Set of sample and array shall be delivered within 90 days before installation
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
H. Coordination Drawings ( Also with model BIM ): For decorative formed metal
elements that house items specified in other Sections ( Section 09 60 00
Flooring, Section 09 70 00 Wall finishes). Show dimensions of housed items,
including locations of housing penetrations and attachments, and necessary
clearances.
K. Welding certificates.
L. Maintenance manuals.
D. Code Required Marking of Safety Glazing: All glazing required by SBC 2007
to be safety glazing, such as all glazing in guardings, is to be permanently
labelled to the requirements of SBC 2007.
Deliver decorative formed metal products wrapped in protective coverings and strapped
together in suitable packs or in heavy-duty cartons. Remove protective coverings before they
stain or bond to finished surfaces.
Store products on elevated platforms in a dry location.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
Field Measurements: Verify actual locations of walls, columns, beams, and other construction
contiguous with decorative formed metal by field measurements before fabrication and
indicate measurements on Shop Drawings.
18.1.7 WARRANTY
Product Warranty as defined in the tender contract; Guarantee shall cover repair and
replacement of defective material and workmanship.
18.2.1 DESCRIPTION
Stainless Steel - Satin finish - 316 grade brushed - for Elevator and elevators frames.
The Material / component is required to match the look & feel agreed benchmark sample.
The look & feel benchmark samples is available in the QR samples room.
18.2.1.1 General
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
A. Assembly: Join lengths, seal open ends, and conceal exposed mounting
bolts and nuts using slip-on non-weld mechanical fittings, flanges,
escutcheons, and wall brackets.
B. Joints: Tightly fitted and secured, machined smooth with hairline seams.
D. Welded and Brazed Joints: Make exposed joints butt tight, flush, and
hairline; use methods that avoid discoloration and damage of finish; grind
smooth, polish, and restore to required finish.
1. Ease exposed edges to small uniform radius.
2. Welded Joints:
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
SAMPLE
18.2.2.2 Accessories
D. Close exposed ends of hollow railing members with prefabricated end fittings.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
18.2.2.3 TOLERANCE
18.3.1 GENERAL
18.3.2 INSTALLATION
A. Locate and place decorative formed metal items level and plumb and in
alignment with adjacent construction. Perform cutting, drilling, and fitting
required to install decorative formed metal.
B. Do not cut or abrade finishes that cannot be completely restored in the field.
Return items with such finishes to the shop for required alterations, followed
by complete refinishing, or provide new units as required.Site cutting not
allowed for these elements.
E. Form tight joints with exposed connections accurately fitted together. Provide
reveals and openings for sealants and joint fillers as indicated.
F. Install concealed gaskets, joint fillers, sealants, and flashings, as the Work
progresses.
G. Install concealed gaskets, joint fillers, sealants, and insulation, as the Work
progresses, to make interior decorative formed metal items soundproof or
lightproof as applicable to type of fabrication indicated.
H. Use the suitable abrasive belt to provide the required Satin finish as per
approved sample look and feel
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
END OF SECTION
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
This Section includes protective stainless steel flashing Elevator - and accessories to be
installed in secondary shelters as elevator cladding and where indicated.
Location:
The fire alarm system contractor shall be registered with, and on the approved list of, the Civil
Defence Department.
A. Section 1 General
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
4.13.1.2 Safety: Non-combustible and Non-Toxic conforming to all applicable standards and
codes to meet or exceed the appropriate standards
4.13.1.3 Economy: Cost-effective and, to a consistent level of quality, commonly available and
not restricted to a few suppliers based on current industry levels of technology and
local building practice. Proven in use, they will not require new research, designs or
manufacturing techniques.
4.13.1.4 Durability: Materials shall be carefully selected for their wear, strength and weathering
qualities. They are to be resistant to abrasion, impact, vandalism, humidity,
temperature change, sunlight and the marine atmosphere. Colour and appearance
shall remain unchanged during the life cycle of the material.
4.13.1.5 Aesthetics: Emphasis shall be laid on clear, simple use of materials and avoidance of
overstatement in design. Also to be avoided are short-lived or ephemeral design
fashions or fads, pastiche and applied ornamentation. Stations are to provide a
comfortable and controlled environment and are to be bright, colorful and welcoming.
Attempts shall be made where possible to introduce natural lighting to enhance
internal spaces.
4.13.1.6 Maintainability: Materials shall be easily cleaned, in a single operation with standard
cleaning equipment and agents. repair and replacement with regards to the availability
of material in the region shall be considered in the selection of materials
4.13.9.1 For facade areas with extensive fenestration, a proprietary unitized system shall be
installed.
4.13.9.2 Glazing shall be composed of double glazed units. The glass shall have a low-
emissivity coating delivering a minimal G-Value (SHGC value) of between 0.20 to 0.30,
2
U-value 1.1 W/m K, acoustic isolation ca. 40 dB.
4.13.9.3 The glazing shall withstand the design wind loads created at wind speeds of 160 km/h
a wind of 180 km/h for 3 seconds.
4.13.9.4 For glazing where there i risk of collision, manifestartions are to be provided on the
glass elements in suitable intervals so as to minimize this risk.
5
19.1.2.5 Global Sustainability Assessment System (Gsas)
5
Each material will be submit with complete assessment sheet Template. Refer section 01 61 05.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
B. 01 00 00 General requirements
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
19.1.3 SUBMITTALS
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
C. Shop Drawings ( BIM model and dwgs ): Details showing each condition separately
and cross-referenced with applicable details on the Drawings, including the following:
1. wall and openings elevations, sections, dimensions.
3. Metal flashing locations and relationship to adjacent materials, conditions at
adjacent and dissimilar construction, corners, terminations, parapets, soffits,
sills, etc.
4. Anchorage and connection details, including dimensioning for sizing and
setting embedded items, expansion joints both vertically and horizontally.
Locations and details of connection hardware attached to structure
5. Jamb, head, sill, and corner conditions and specific anchorage details for
each situation.
6. Installation procedures or erection sequence for special conditions.
E. Set of sample and array shall be delivered within 90 days before installation
F. Qualification Data: For firms and persons specified in "Quality Assurance" Article to
demonstrate their capabilities and experience. Include lists of completed projects with
project names and addresses, names and addresses of architects/engineers and
owners, and any other information required by Contractor.
G. Test submittals:
a. Source quality control test reports.
b. stainless steel falshing and Fitting materials test report
c. Sealant adhesion field tests.
d. Field quality control test report
A. Manufacturer Qualifications: A firm that complies with the following requirements and
is experienced in manufacturing flashing and sheet metal materials and products
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
similar to those indicated for this Project and with a record of successful in-service
performance.
1. Assumes responsibility for engineering flashing and sheet metal materials to
comply with performance requirements. This responsibility includes preparation
of Shop Drawings and comprehensive engineering analysis by a qualified
professional engineer.
2. Has sufficient production capacity to produce required units without delaying the
Work.
E. Mock-ups: Before installing flashing and sheet metal materials, build mock-ups for
each form of construction and finish required to verify selections made under sample
Submittals and to demonstrate finished joints, aesthetic effects and qualities of
materials and execution. Build mock-ups to comply with the following requirements,
using materials indicated for the completed Work:
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
B. Store materials in manufacturer's unopened packaging until ready for installation and
to comply with manufacturer's written instructions to prevent deterioration from
moisture or other detrimental effects. Protect materials from contact with soil, staining,
and physical damage.
B. Limit areas to traffic during installation and for appropriate time period after
installation as recommended in writing by manufacturer.
19.1.7 WARRANTY
Product Warranty as defined in the tender contract; Guarantee shall cover repair and
replacement of defective material and workmanship.
19.2.1 DESCRIPTION
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
19.3.1 GENERAL
A. Examine areas and conditions, with Installer present, for compliance with
installation requirements for installation tolerances, true and level bearing
surfaces, and identify conditions detrimental to proper and or timely completion
or other conditions affecting performance of the Work.
B. Apply sheet metal and other flashing material to surfaces which are smooth,
sound, clean, dry and free from defects that might affect the application.
19.3.2 INSTALLATION
A. Install bolts, rivets, and screws where indicated, specified, or required in accordance
with the SMACNA Sheet Metal Manual. Space rivets at 75 mm (3 inch) on centers in
two rows in a staggered position. Use neoprene washers under fastener heads when
fastener head is exposed.
B. Coordinate with roofing work for the installation of metal base flashings and other
metal items having roof flanges for anchorage and watertight installation.
C. Where required to prevent galvanic action between dissimilar metal isolate the
contact areas of dissimilar metal with sheet lead, waterproof building paper, or a coat
of bituminous paint.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
D. Terminate exterior edge beyond face of wall approximately 6 mm (1/4 inch) with drip
edge where not part of counter flashing.
END OF SECTION
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
The Work under this section consist of furnishing, fabrication and erection of a metal screen
made of anodised aluminium perforated panels mounted on anodised aluminium sub-frame
modules as shown on drawings and including the following:
Location:
At grade level / Canopy
The fire alarm system contractor shall be registered with, and on the approved list of, the Civil
Defence Department.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
3. BS 1387 Screwed and socketed steel tubes and tubulars and plain end
steel tubes suitable for welding or for screwing to BS 12 threads
6
Each material will be submit with complete assessment sheet Template. Refer section 01 61 05
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
a) Identify the products and materials that are available within region
( < 200 kilometers).
b) Materials & Products must be assembled as a finished product within the region to be considered
locally sourced.
[M.2] Responsible Sourcing of Materials
All materials must comply with the following standards.
a) Timber: FSC (Forest Stewardship Council) Chain of Custody Certification.
b) ISO 260000, ISO 9001, ISO 14001.
c) BS8902: 2009 or equivalent.
[M.3] Recycled Materials
Verify and document the post- and Pre-consumer content of recycled material through manufacturer
or supplier specifications.
[IE.9] Low-Emitting Materials
a) All indoor materials and finishes shall be verified the VOC content (Refer to attached VOC Limit).
b) Material Safety Data Sheets or other documentation listing VOC content can be acceptable.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
20.1.3 SUBMITTALS
1. For Initial Review, submit the Regional Materials Calculator and the following
supporting documents:
a. Intended list of materials
b. Documentation outlining all applicable materials and the percent of the
recycle content.
c. Full representative panel assembly / quality sample;
d. Mock up.
e. QCD certification
f. Material / Component technical data with Health and Safety
requirements;
g. Material / Component / Assembly calculation.
h. Method statement for construction / installation.
i. O&M manual and as built BIM and drawings
2. For final Review leading to final Design Certification, submit the Regional
Materials Calculator and the following supporting documents:
a. Bill of Quantities
b. List of materials
c. Specifications listing manufactures and locations
d. Cost estimates
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
C. Design Analysis and Calculations: Provide design analysis and calculations for
supporting anodised sub-frame modules, including brackets, fixations and
connections to other works and other member intersections or openings on screen
wall.
D. Shop Drawings ( BIM model and dwgs ): Include plans, elevations, sections, all
framing, fixings, bracketry and support, connections to other Work. Also include
details and schedules for fabrication, assembly and erection of supporting sub-frame
members. Provide setting drawings, procedures and erection plan, diagrams, details
of cuts, connections, camber, holes and other pertinent data.
Set of samples and array shall be delivered within 90 days before installation
F. Qualification Data: For firms and persons specified in "Quality Assurance" Article to
demonstrate their capabilities and experience. Include lists of completed projects
with project names and addresses, names and addresses of architects/engineers
and owners, and any other information required by Contractor.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
A. Manufacturer Qualifications: A firm that complies with the following requirements and
is experienced in manufacturing Anodised Aluminium panels and sub-frame profiles
indicated for this Project and with a record of successful in-service performance.
B. Erector's Qualifications: Anodised Aluminium sub-frame and panels, for final metal
screen, shall be erected by a firm that has not less than 5 years successful
experience in the erection of work similar to that required for this project and that
has been licensed by the manufacturer of the Anodised Aluminium screen. Erector
(Firm) shall be subject to approval of the Engineer.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
F. Mock-ups: Before installing Anodised Aluminium panels and sub-frame profiles and
accessories, build mock-ups for each form of construction and finish required to
verify selections made under sample Submittals and to demonstrate finished joints,
aesthetic effects and qualities of materials and execution.
Build mock-ups to comply with the following requirements, using materials indicated
for the completed Work:
1. Build mock-up of typical wall area as shown on Drawings separately from
building.
A. Handle and transport Anodised Aluminium panels and sub-frame profiles using
proper spacers, package system and position to avoid damage.
1. Place non-staining resilient spacers between panels.
3. Protect panels from dirt and damage during handling and transport.
B. Store Anodised Aluminium materials to protect them from contact with soil, staining,
and physical damage and with labels clearly visible.
1. Store panels with non-staining resilient supports in same positions as when
transported.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
A. Environmental Limitations:
2. Limit areas to traffic during anodised sub-frame and panels installation and for
appropriate time period after application as recommended in writing by
manufacturer.
20.1.7 WARRANTY
Product Warranty as defined in the tender contract; Guarantee shall cover repair and
replacement of defective material and workmanship.
20.2.1 DESCRIPTION
The metal screen for canopy, as per drawing, is made of perforated anodised aluminium
panels mounted on anodised aluminium sub-frame. The sub-frame shall be installed as per
drawing.
As per drawing, the painted anodised aluminium panels are differently perforated as the void
percentage increases from bottom to top of the screen.
Opening for maintenance inspections shall be realized on screen as detailed and specified in
drawings.
Both sub-frame and panels shall be painted, preferably by manufacturer as specified in
drawings and on colour sample selection.
The look & feel benchmark samples is available in the QR samples room.
Anodizing increases resistance to corrosion and wear, and provides better adhesion for paint
primers and glues than does bare metal.
The final Anodised Aluminium profiles and its colour and finish, approved by Contractor and
Design Consultant on sample selection, shall be installed according to shop drawings, using
manufacturers recommended materials and instruments complying mentioned requirements
and authorized by Contractor and Design Consultant.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
The definitive colour and final texture must be authorized by Contractor and Design
Consultant sample selection.
The definitive colour and final perforation pattern must be authorized by Contractor and
Design Consultant sample selection.
20.2.1.3 Openings
Openings on the Metal Screen shall be realized in order to have access to metal plants and
their maintenance or for emergency exits.
Openings have their proper supporting structure, connected to cladding sub-frame, and
panels realized a continuous pattern.
1. Fabricate and assemble sub-frame and panels in shop to greatest extent possible.
2. Fabricate items of anodised aluminium sub-frame and panels as indicated on final shop
drawings.
3. Fabricate components and necessary field connections required for erection to permit
easy assembly and disassembly.
4. Fabricate components in such a manner that once assembled, they may be
disassembled, repackaged and reassembled with a minimum amount of labour.
Clearly and legibly mark each piece and part of the assembly to correspond with
previously prepared erection drawings, diagrams and instruction manuals.
B. Supporting Framing: Shop fabricate supporting frame components to the size and section
indicated on approved shop drawings complete with brackets and other accessories required
for erection. Provide required holes for fixings or connections either shop drilled or punched
to template dimensions.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
20.3.1 GENERAL
A. Prior to start the Anodised Aluminium sub-frame installation, the subcontractor shall
examine the surfaces and locations where the Anodised Aluminium sub-frame profiles
shall be installed and advise the Main Contractor and Design Consultant of any existing
conditions or surface contamination which will require correction before the work
commences.
2. Examine supporting substrates to ensure that surfaces are properly cured and
dry, free from dirt and other deleterious matter before sub-structural frame
installation or any installation according to the type of Anodised Aluminium
sub-frame profile work and within flatness/uprightness tolerances of substrates
that should comply with QCS or BS according to the type of work to be
installed. If not, adjust in consultation with Main Contractor and Design
Consultant
3. Verify that plant equipment presence does not interfere or affect performance
with installations work.
4. Verify that joints and cracks in substrates / supporting frames etc doesnt
interfere with Anodised Aluminium profiles and panels' installations; if not,
adjust in consultation with Contractor and Design Consultant
B. Proceed with installations work only after unsatisfactory conditions have been
corrected.
20.3.2 INSTALLATION
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
C. Install Anodised Aluminium sub-frame profile works having surfaces free from
distortion and other defects in appearance, according to manufacturers instructions
and following shop-drawings lay-out.
D. Install anodised aluminium panels works having surfaces free from distortion,
scratches and other defects in appearance, according to manufacturers instructions
and following shop-drawings lay-out.
E. Terminate work neatly at obstructions, edges and corners without disrupting pattern
or joint alignments. After installation clean surfaces as per manufacturers
instructions.
F. A certain quantity of Anodised Aluminium profiles and panels screen, suitable for any
replacement, are to be handed to the Contractor.
B. Upon completion of the cleaning, the cleaned surfaces provide final protection with
clean dustsheets, hardboard or similar, to prevent damage from dust, scratch or
other.
C. When Anodised Aluminium panels have been completely installed, the owner and/or
his representative shall inspect all finished work to validate that the work has been
completed in compliance with these specifications.
D. The Subcontractor shall provide at the end of installation the following administrative
and procedural requirements for Operation and Maintenance (O&M) Manuals,
including the following: Preparing and submitting Instruction Manuals covering the
care, preservation, and maintenance of the architectural products and finishes
END OF SECTION
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
This Section includes Exterior Glass Elevator Type 1 and accessories to be installed in
secondary shelters as elevator cladding and where indicated.
Location:
The fire alarm system contractor shall be registered with, and on the approved list of, the Civil
Defence Department.
D. Section 1 General
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
4. BS 6375 Performance
4.13.1.2 Safety: Non-combustible and Non-Toxic conforming to all applicable standards and
codes to meet or exceed the appropriate standards
4.13.1.3 Economy: Cost-effective and, to a consistent level of quality, commonly available and
not restricted to a few suppliers based on current industry levels of technology and
local building practice. Proven in use, they will not require new research, designs or
manufacturing techniques.
4.13.1.4 Durability: Materials shall be carefully selected for their wear, strength and weathering
qualities. They are to be resistant to abrasion, impact, vandalism, humidity,
temperature change, sunlight and the marine atmosphere. Colour and appearance
shall remain unchanged during the life cycle of the material.
4.13.1.5 Aesthetics: Emphasis shall be laid on clear, simple use of materials and avoidance of
overstatement in design. Also to be avoided are short-lived or ephemeral design
fashions or fads, pastiche and applied ornamentation. Stations are to provide a
comfortable and controlled environment and are to be bright, colorful and welcoming.
Attempts shall be made where possible to introduce natural lighting to enhance
internal spaces.
4.13.1.6 Maintainability: Materials shall be easily cleaned, in a single operation with standard
cleaning equipment and agents. repair and replacement with regards to the availability
of material in the region shall be considered in the selection of materials
4.13.9.1 For facade areas with extensive fenestration, a proprietary unitized system shall be
installed.
4.13.9.2 Glazing shall be composed of double glazed units. The glass shall have a low-
emissivity coating delivering a minimal G-Value (SHGC value) of between 0.20 to 0.30,
2
U-value 1.1 W/m K, acoustic isolation ca. 40 dB.
4.13.9.3 The glazing shall withstand the design wind loads created at wind speeds of 160 km/h
a wind of 180 km/h for 3 seconds.
4.13.9.4 For glazing where there i risk of collision, manifestartions are to be provided on the
glass elements in suitable intervals so as to minimize this risk.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
7
21.1.2.5 Global Sustainability Assessment System (Gsas)
7
Each material will be submit with complete assessment sheet Template. Refer section 01 61 05.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
20) product names, manufacturers names, costs, percentage postconsumer content, and
percentage preconsumer content.
21) list of actual materials costs, excluding labor and equipment for CSI Division 0310, 31
(Section 31.60.00 Foundations) and 32 (Sections 32.10.00 Paving, 32.30.00 Site
Improvements, and 32.90.00 Planting) only; including Division 12 is optional.
22) Cut sheets or manufacturers letters to document the listed products recycled content.
23) list of product purchases manufactured, extracted, or harvested regionally.
24) List of distances between the project and manufacturer,and distances between the project
and the extraction site.
25) cutsheets that document material origin and manufacture within a 500-mile radius of the
project site.
26) FSC certifications for all FSC certified wood products.
27) List of all new wood products (not reclaimed, salvaged, or recycled) on the project and
identifying which components are FSC certified and the cost of all new wood products as well.
D. 01 00 00 General requirements
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
- UNI EN 1279-2 Glass in building. Insulating glass units. Long term test method and
requirements for moisture penetration
- UNI EN 1279-3 Glass in building. Insulating glass units. Long term test method and
requirements for gas leakage rate and for gas concentration tolerances.
- UNI EN 1279-4 Glass in building.Test method for the physical properties of the
sealing edge.
- UNI EN 1279-6 Glass in building. Factory production control and periodic test.
- EN 15434 Glass in building. Product standard for structural and/or ultra-violet
resistant sealant (for use with structural sealant glazing and/or insulating glass units
with exposed seals)
- EN 13022 Glass in building. Structural sealant glazing. Assembly rules
- EN 11925-2 Reaction to fire tests. Ignitability of products subjected to direct
impingement of flame. Single-flame source test
- DIN 4102-B1 Fire Test to Building material - Classification
- EN 356 Safety glass. Testing and classification against manual attack.
- UNI EN 673:2011 Glass In Building - Determination Of Thermal Transmittance
(U Value) - Calculation Method
- EN 410 Determination of luminous and solar characteristics of glazing.
- ISO 9050 Glass in building - Determination of light transmittance, solar direct
transmittance, total solar energy transmittance, ultraviolet transmittance and related
glazing factors
- EN 13501-2 Fire classification of construction products and building elements.
Classification using data from fire resistance tests, excluding ventilation services
- EN 13501-1 Fire classification of construction products and building elements.
Classification using test data from reaction to fire tests
- UNI EN 1063 Classification and strength tests to the bullets
- EN 12758 Glazing and sound insulation by air. Product descriptions and
determination of properties.
- UNI EN 12600 Pendulum test. Impact test method and classification for flat glass.
UNI EN 13541 safety glass. Testing and classification of resistance against
explosion pressure.
- ISO 868 Plastics and ebonite. Determination of indentation hardness by means of a
durometer (Shore hardness)
- ISO 37 Rubber, vulcanized or thermoplastic. Determination of tensile stress-strain
properties
- ISO 34 General requirements for the competence of reference material producers
- ISO 9001-2000 Quality management systems Requirements ;
- ISO 14000-2004 Environmental management systems - Requirements with guidance
for use;
21.1.3 SUBMITTALS
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
b.
Documentation outlining all applicable materials and the percent of the
recycle content.
c. Full representative panel assembly / quality sample;
d. Mock up.
e. QCD certification
f. Material / Component technical data with Health and Safety
requirements;
g. Material / Component / Assembly calculation.
h. Method statement for construction / installation.
i. O&M manual and as built BIM and drawings
2. For final Review leading to final Design Certification, submit the Regional
Materials Calculator and the following supporting documents:
a. Bill of Quantities
b. List of materials
c. Specifications listing manufactures and locations
d. Cost estimates
e. Description of the material
f. Description of how the material has been reused
g. Report providing distances of manufacturers
h. Any documentation from manufacturers outlining third party sourcing
standards such as FSC Chain of Custody Certification or ISO
Certification
C. Shop Drawings ( BIM model and dwgs ): Show fabrication, assembly and
installation details for glazed curtain wall panels, including the following:
1. Structural analysis data signed and sealed by the qualified professional
engineer responsible for their preparation.
2. Glazed curtain wall and openings elevations, sections, dimensions.
3. Relationship to adjacent materials, conditions at adjacent and dissimilar
construction, corners, terminations, parapets, soffits, sills, etc.
4. Anchorage and connection details, including dimensioning for sizing and
setting embedded items, expansion joints both vertically and horizontally.
Locations and details of connection hardware attached to structure
5. Glass types, sizes, and edge clearances.
6. Jamb, head, sill, and corner conditions and specific anchorage details for
each situation.
7. Installation procedures or erection sequence for special conditions.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
I. Set of sample and array shall be delivered within 90 days before installation
J. Qualification Data: For firms and persons specified in "Quality Assurance" Article to
demonstrate their capabilities and experience. Include lists of completed projects with
project names and addresses, names and addresses of architects/engineers and
owners, and any other information required by Contractor.
K. Test submittals:
a. Glass certifications on required glass properties
b. Fitting materials test report
c. Source quality control test reports.
d. Sealant adhesion field tests.
e. Field quality control test report
A. Manufacturer Qualifications: A firm that complies with the following requirements and
is experienced in manufacturing Glazed Curtain Wall and products similar to those
indicated for this Project and with a record of successful in-service performance.
1. Assumes responsibility for engineering Glazed Curtain Wall to comply with
performance requirements. This responsibility includes preparation of Shop
Drawings and comprehensive engineering analysis by a qualified professional
engineer.
2. Has sufficient production capacity to produce required units without delaying the
Work.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
E. Mock-ups: Before installing Glazed Curtain Wall, build mock-ups for each form of
construction and finish required to verify selections made under sample Submittals
and to demonstrate finished joints, aesthetic effects and qualities of materials and
execution. Build mock-ups to comply with the following requirements, using materials
indicated for the completed Work:
A. Deliver materials in original packages and containers, with seals unbroken, bearing
manufacturer's labels indicating brand name and directions for storage, mixing with
other components, and application.
Handle and transport Glazed Curtain Wall components to avoid excessive stresses or
damage.
1. Lift or support packaged materials only at points indicated by manufacturer or
on Shop Drawings.
2. Place non-staining resilient spacers of even thickness between packaged
materials units.
3. During shipment and transport, support packaged materials units on non-
staining shock-absorbing material otherwise suggested by manufacturers
instructions.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
4. Protect packaged materials from dirt and damage during handling and
transport.
B. Store materials in manufacturer's unopened packaging until ready for installation and
to comply with manufacturer's written instructions to prevent deterioration from
moisture or other detrimental effects. Particularly, protect materials from contact with
soil, staining, and physical damage.
1. Store packaged materials units with non-staining resilient supports in same
positions as when transported.
2. Store packaged materials units on firm, level and smooth surfaces.
3. Place stored packaged materials units so identification marks are clearly
visible.
4. Store and dispose of solvent-based materials and materials used with solvent-
based materials, in accordance with requirements of local authorities having
jurisdiction.
B. Close areas to traffic during Glazed Curtain Wall installation and for appropriate time
period after installation as recommended in writing by manufacturer.
21.1.7 WARRANTY
Product Warranty as defined in the tender contract; Guarantee shall cover repair and
replacement of defective material and workmanship.
21.2.1 DESCRIPTION
Glazed curtain wall for elevator facade consists of a glazed envelope on aluminium mullion
and transom as described in detailed drawings, with dot fritted pattern (custom pattern).
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
21.2.1.1 Glass
The double pane glazing is a solar control glass that offers a good level of natural lighting (Lt
value 0.48), high thermal insulation (Ug value 1.10 W m K), low values of solar gain (solar
factor g value 0.30).
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
All structural bolts to carry an S.A.E. grade or A.S.T.M. specification as defined on the
drawings.
Light Energy
Light Transmission 48 Solar factor 30
Light Reflection 8 Reflection 20
Thermal properties EN 673 1.1
Ug (W/m2K)
W/m2K
Light properties (EN 410)
Light Transmission - v (%) 48
Light Reflection - v (%) 8
Internal light reflection - vi (%) 11
Colour Rendering - RD65 - Ra (%) 92
Energy properties (EN 410 / ISO 9050) EN 410
Solar factor - g (%) 30
Energy Reflection - e (%) 20
Direct Energy Transmission - e(%) 22
Glass 1 - Energy absorption - e (%) 56
Glass 2 - Energy absorption - e (%) 2
Shading coefficient - SC 0.34
UV Transmission - UV (%) 0
Selectivity
Other properties
Resistance to fire - EN 13501-2 NPD
Reaction to fire - EN 13501-1 NPD
Bullet Resistance - EN 1063 NPD
Burglar Resistance - EN 356 NPD
Pendulum body impact resistance - EN 12600 NPD
Standard sealing
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
Component Component
Properties
A B
Chemical base 2-C silicone
White / Light Black / Dark
Colour (CQP1 001-1)
grey grey
Colour mixed
Black / grey S6
Cure mechanism Polycondensation
Cure type Neutral
Density (uncured) (CQP 006-4) 1.42 kg/l 1.09 kg/l
Density mixed 1.4 kg/l
A:B by volume 10:1
Mixing ratio
A:B By weight 13:1
Viscosity 900 Pa*s 500 Pa*s
Consistency Paste
Application temperature 5-40C
Snap time 90 minutes
Tack-free time 150 minutes
Shore A-hardness (ISO 868) 60
Tensile strength ( ISO 37) 2.5 MPa
Elongation at break (ISO 37) 150 %
Tear propagation resistance (ISO 34) 3 N/mm
100% modulus ( ISO 37) 2.1 MPa
4 hours 200 C
Thermal resistance short term
1 hour 220 C
Service temperature - 40 - 150 C
Shelf life (storage below 25 C) 15 months 12 months
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
21.2.3 TOLERANCE
Erection Tolerances:
Otherwise specified in shop-drawings, installed system shall be less than the limits specified
herein.
Limit variations from plumb, level, or dimensional angle to the following:
1. Not more than 3 mm (1/8 inch) deviation in 1 story height, in 3 m (10 foot) vertical,
angular run, or in 6 m (20 foot) horizontal run.
2. Not more than 6 mm (1/4 inch) deviation in 12 m (40 foot) run, in any direction.
3. At battered wall areas, plumb is defined to match indicated slope.
Limit variations from location (theoretical calculated position in plan or elevation based on
established floor lines and column lines), including variations from plumb and level, to the
following:
1. Not more than 9.5 mm (3/8 inch) total deviation for member at any location.
2. Not more than 3 mm (1/8 inch) change in deviation for member for 3 m (10 foot) run.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
21.3.1 GENERAL
A. Examine areas and conditions, with Installer present, for compliance with installation
requirements for installation tolerances, true and level bearing surfaces, and identify
conditions detrimental to proper and or timely completion or other conditions affecting
performance of the Work.
1. Prior to erection:
a. Dimensional verification measurements
b. Verify structural support system is within tolerances and proper alignment.
B. Coordinate with other related installation works, particularly with Structural Glass Fin,
Shelters cladding, Mechanical & Electrical Plants and drainage systems.
21.3.2 INSTALLATION
A. Install curtain wall system to comply with manufacturer's instructions and comply with
AISC "Manual of Standard Practice" for installation of steel elements.
B. Plate to plate joints of glass are sealed with silicone sealant or according to shop
drawings. Joint dimensions shall be designed to be compatible with sealant properties
and live load movement of the structure.
C. Fixing materials as specified on shop drawings. Use calibrated tools to lock bolts into
position to prevent back-off. Reset calibrations regularly to ensure accurate
torqueing.
D. Coordinate installation work with erection tolerances and Fin installation works. Also
coordinate installation with Mechanical & Electrical Plant involved and drainage
system involved.
E. Coordinate installation work with other related works.
21.3.2.1 Sealants:
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
C. Do not proceed with sealing during the hottest hours of the day.
D. Surfaces must clean dry and free from oil, grease and dust.
F. Clean and prime joints as recommended by sealant manufacturer. Install sealant and
related backing material around perimeter of frames or supporting system.
G. Apply sealant filling joint and tool smooth to insure full contact with adjacent surfaces.
Strike off excess material.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
time of acceptance and Substantial Completion. Use protective methods and materials
approved by Engineer, including temporary covering.
C. At the end of the installation, the Subcontractor shall provide the following administrative
and procedural requirements for Operation and Maintenance (O&M) Manuals, including
preparing and submitting Instruction Manuals covering the care, preservation, and
maintenance of the mechanical and architectural products and related finishes.
END OF SECTION
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
This Section includes Exterior Glass Elevator Type 2 and accessories to be installed in
secondary shelters as elevator cladding and where indicated.
Location:
The fire alarm system contractor shall be registered with, and on the approved list of, the Civil
Defence Department.
H. Section 1 General
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
12. BS 6469 Power organic coatings for application and and stoving to
aluminium alloy extrusion, sheet and pre-formed sections for
external architectural purposes and for the finish on
aluminium alloy extrusions, sheet and preformed sections
coated with powder organic coatings.
13. BS 6497 Powder organic coatings for application and stoving to hot-
dipped galvanized hot-rolled sections and steel sheet for
windows and associated with external architectural purposes
and for the finish on galvanized steel sections and sheet
coated with powder organic coatings.
4.13.1.2 Safety: Non-combustible and Non-Toxic conforming to all applicable standards and
codes to meet or exceed the appropriate standards
4.13.1.3 Economy: Cost-effective and, to a consistent level of quality, commonly available and
not restricted to a few suppliers based on current industry levels of technology and
local building practice. Proven in use, they will not require new research, designs or
manufacturing techniques.
4.13.1.4 Durability: Materials shall be carefully selected for their wear, strength and weathering
qualities. They are to be resistant to abrasion, impact, vandalism, humidity,
temperature change, sunlight and the marine atmosphere. Colour and appearance
shall remain unchanged during the life cycle of the material.
4.13.1.5 Aesthetics: Emphasis shall be laid on clear, simple use of materials and avoidance of
overstatement in design. Also to be avoided are short-lived or ephemeral design
fashions or fads, pastiche and applied ornamentation. Stations are to provide a
comfortable and controlled environment and are to be bright, colorful and welcoming.
Attempts shall be made where possible to introduce natural lighting to enhance
internal spaces.
4.13.1.6 Maintainability: Materials shall be easily cleaned, in a single operation with standard
cleaning equipment and agents. repair and replacement with regards to the availability
of material in the region shall be considered in the selection of materials
4.13.9.1 For facade areas with extensive fenestration, a proprietary unitized system shall be
installed.
4.13.9.2 Glazing shall be composed of double glazed units. The glass shall have a low-
emissivity coating delivering a minimal G-Value (SHGC value) of between 0.20 to 0.30,
2
U-value 1.1 W/m K, acoustic isolation ca. 40 dB.
4.13.9.3 The glazing shall withstand the design wind loads created at wind speeds of 160 km/h
a wind of 180 km/h for 3 seconds.
4.13.9.4 For glazing where there i risk of collision, manifestartions are to be provided on the
glass elements in suitable intervals so as to minimize this risk.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
8
22.1.2.5 Global Sustainability Assessment System (Gsas)
8
Each material will be submit with complete assessment sheet Template. Refer section 01 61 05.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
B. 01 00 00 General requirements
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
- UNI EN 1279-2 Glass in building. Insulating glass units. Long term test method and
requirements for moisture penetration
- UNI EN 1279-3 Glass in building. Insulating glass units. Long term test method and
requirements for gas leakage rate and for gas concentration tolerances.
- UNI EN 1279-4 Glass in building.Test method for the physical properties of the
sealing edge.
- UNI EN 1279-6 Glass in building. Factory production control and periodic test.
- EN 15434 Glass in building. Product standard for structural and/or ultra-violet
resistant sealant (for use with structural sealant glazing and/or insulating glass units
with exposed seals)
- EN 13022 Glass in building. Structural sealant glazing. Assembly rules
- EN 11925-2 Reaction to fire tests. Ignitability of products subjected to direct
impingement of flame. Single-flame source test
- DIN 4102-B1 Fire Test to Building material - Classification
- EN 356 Safety glass. Testing and classification against manual attack.
- UNI EN 673:2011 Glass In Building - Determination Of Thermal Transmittance
(U Value) - Calculation Method
- EN 410 Determination of luminous and solar characteristics of glazing.
- ISO 9050 Glass in building - Determination of light transmittance, solar direct
transmittance, total solar energy transmittance, ultraviolet transmittance and related
glazing factors
- EN 13501-2 Fire classification of construction products and building elements.
Classification using data from fire resistance tests, excluding ventilation services
- EN 13501-1 Fire classification of construction products and building elements.
Classification using test data from reaction to fire tests
- UNI EN 1063 Classification and strength tests to the bullets
- EN 12758 Glazing and sound insulation by air. Product descriptions and
determination of properties.
- UNI EN 12600 Pendulum test. Impact test method and classification for flat glass.
UNI EN 13541 safety glass. Testing and classification of resistance against
explosion pressure.
- ISO 868 Plastics and ebonite. Determination of indentation hardness by means of a
durometer (Shore hardness)
- ISO 37 Rubber, vulcanized or thermoplastic. Determination of tensile stress-strain
properties
- ISO 34 General requirements for the competence of reference material producers
- ISO 9001-2000 Quality management systems Requirements ;
- ISO 14000-2004 Environmental management systems - Requirements with guidance
for use;
22.1.3 SUBMITTALS
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
b.
Documentation outlining all applicable materials and the percent of the
recycle content.
c. Full representative panel assembly / quality sample;
d. Mock up.
e. QCD certification
f. Material / Component technical data with Health and Safety
requirements;
g. Material / Component / Assembly calculation.
h. Method statement for construction / installation.
i. O&M manual and as built BIM and drawings
2. For final Review leading to final Design Certification, submit the Regional
Materials Calculator and the following supporting documents:
a. Bill of Quantities
b. List of materials
c. Specifications listing manufactures and locations
d. Cost estimates
e. Description of the material
f. Description of how the material has been reused
g. Report providing distances of manufacturers
h. Any documentation from manufacturers outlining third party sourcing
standards such as FSC Chain of Custody Certification or ISO
Certification
C. Shop Drawings ( BIM model and dwgs ): Show fabrication, assembly and
installation details for glazed curtain wall panels, including the following:
1. Structural analysis data signed and sealed by the qualified professional
engineer responsible for their preparation.
2. Glazed curtain wall and openings elevations, sections, dimensions.
3. Relationship to adjacent materials, conditions at adjacent and dissimilar
construction, corners, terminations, parapets, soffits, sills, etc.
4. Anchorage and connection details, including dimensioning for sizing and
setting embedded items, expansion joints both vertically and horizontally.
Locations and details of connection hardware attached to structure
5. Glass types, sizes, and edge clearances.
6. Jamb, head, sill, and corner conditions and specific anchorage details for
each situation.
8. Installation procedures or erection sequence for
special conditions.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
E. Set of sample and array shall be delivered within 90 days before installation
F. Qualification Data: For firms and persons specified in "Quality Assurance" Article to
demonstrate their capabilities and experience. Include lists of completed projects with
project names and addresses, names and addresses of architects/engineers and
owners, and any other information required by Contractor.
G. Test submittals:
a. Glass certifications on required glass properties
b. Fitting materials test report
c. Source quality control test reports.
d. Sealant adhesion field tests.
e. Field quality control test report
A. Manufacturer Qualifications: A firm that complies with the following requirements and
is experienced in manufacturing Glazed Curtain Wall and products similar to those
indicated for this Project and with a record of successful in-service performance.
1. Assumes responsibility for engineering Glazed Curtain Wall to comply with
performance requirements. This responsibility includes preparation of Shop
Drawings and comprehensive engineering analysis by a qualified professional
engineer.
2. Has sufficient production capacity to produce required units without delaying the
Work.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
I. Mock-ups: Before installing Glazed Curtain Wall, build mock-ups for each form of
construction and finish required to verify selections made under sample Submittals
and to demonstrate finished joints, aesthetic effects and qualities of materials and
execution. Build mock-ups to comply with the following requirements, using materials
indicated for the completed Work:
A. Deliver materials in original packages and containers, with seals unbroken, bearing
manufacturer's labels indicating brand name and directions for storage, mixing with
other components, and application.
Handle and transport Glazed Curtain Wall components to avoid excessive stresses or
damage.
1. Lift or support packaged materials only at points indicated by manufacturer or
on Shop Drawings.
2. Place non-staining resilient spacers of even thickness between packaged
materials units.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
B. Store materials in manufacturer's unopened packaging until ready for installation and
to comply with manufacturer's written instructions to prevent deterioration from
moisture or other detrimental effects. Particularly, protect materials from contact with
soil, staining, and physical damage.
1. Store packaged materials units with non-staining resilient supports in same
positions as when transported.
2. Store packaged materials units on firm, level and smooth surfaces.
3. Place stored packaged materials units so identification marks are clearly
visible.
4. Store and dispose of solvent-based materials and materials used with solvent-
based materials, in accordance with requirements of local authorities having
jurisdiction.
B. Close areas to traffic during Glazed Curtain Wall installation and for appropriate time
period after installation as recommended in writing by manufacturer.
22.1.7 WARRANTY
Product Warranty as defined in the tender contract; Guarantee shall cover repair and
replacement of defective material and workmanship.
22.2.1 DESCRIPTION
Glazed curtain wall for elevator facade consists of a glazed envelope on aluminium mullion
and transom as described in detailed drawings, with dot fritted pattern (52%-80% opacity) .
The Material / component is required to match the look & feel agreed benchmark sample.
The look & feel benchmark samples is available in the QR samples room.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
22.2.1.1 Glass
The double pane glazing is a solar control glass that offers a good level of natural lighting (Lt
value 0.48), high thermal insulation (Ug value 1.10 W m K), low values of solar gain (solar
factor g value 0.30).
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
All structural bolts to carry an S.A.E. grade or A.S.T.M. specification as defined on the
drawings.
Light Energy
Light Transmission 48 Solar factor 30
Light Reflection 8 Reflection 20
Thermal properties EN 673 1.1
Ug (W/m2K)
W/m2K
Light properties (EN 410)
Light Transmission - v (%) 48
Light Reflection - v (%) 8
Internal light reflection - vi (%) 11
Colour Rendering - RD65 - Ra (%) 92
Energy properties (EN 410 / ISO 9050) EN 410
Solar factor - g (%) 30
Energy Reflection - e (%) 20
Direct Energy Transmission - e(%) 22
Glass 1 - Energy absorption - e (%) 56
Glass 2 - Energy absorption - e (%) 2
Shading coefficient - SC 0.34
UV Transmission - UV (%) 0
Selectivity
Other properties
Resistance to fire - EN 13501-2 NPD
Reaction to fire - EN 13501-1 NPD
Bullet Resistance - EN 1063 NPD
Burglar Resistance - EN 356 NPD
Pendulum body impact resistance - EN 12600 NPD
Standard sealing
Properties Component A Component B
Chemical base 2-C silicone
Colour (CQP1 001-1) White / Light Black / Dark
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
grey grey
Colour mixed
Black / grey S6
Cure mechanism Polycondensation
Cure type Neutral
Density (uncured) (CQP 006-4) 1.42 kg/l 1.09 kg/l
Density mixed 1.4 kg/l
A:B by volume 10:1
Mixing ratio
A:B By weight 13:1
Viscosity 900 Pa*s 500 Pa*s
Consistency Paste
Application temperature 5-40C
Snap time 90 minutes
Tack-free time 150 minutes
Shore A-hardness (ISO 868) 60
Tensile strength ( ISO 37) 2.5 MPa
Elongation at break (ISO 37) 150 %
Tear propagation resistance (ISO 34) 3 N/mm
100% modulus ( ISO 37) 2.1 MPa
4 hours 200 C
Thermal resistance short term
1 hour 220 C
Service temperature - 40 - 150 C
Shelf life (storage below 25 C) 15 months 12 months
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
22.2.3 TOLERANCE
22.3.1 GENERAL
A. Examine areas and conditions, with Installer present, for compliance with installation
requirements for installation tolerances, true and level bearing surfaces, and identify
conditions detrimental to proper and or timely completion or other conditions affecting
performance of the Work.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
1. Prior to erection:
a. Dimensional verification measurements
b. Verify structural support system is within tolerances and proper alignment.
2. Proceed with application only after unsatisfactory conditions have been
corrected.
B. Coordinate with other related installation works, particularly with Structural Glass Fin,
Shelters cladding, Mechanical & Electrical Plants and drainage systems.
22.3.2 INSTALLATION
A. Install curtain wall system to comply with manufacturer's instructions and comply with
AISC "Manual of Standard Practice" for installation of steel elements.
B. Plate to plate joints of glass are sealed with silicone sealant or according to shop
drawings. Joint dimensions shall be designed to be compatible with sealant properties
and live load movement of the structure.
C. Fixing materials as specified on shop drawings. Use calibrated tools to lock bolts into
position to prevent back-off. Reset calibrations regularly to ensure accurate torqueing.
D. Coordinate installation work with erection tolerances and Fin installation works. Also
coordinate installation with Mechanical & Electrical Plant involved and drainage system
involved.
E. Coordinate installation work with other related works.
22.3.2.1 Sealants:
A. Install sealants as indicated in shop drawings as required to achieve water and airtight
assembly, complying with requirements and instructions of curtain wall manufacturer.
B. Respect the application temperature (from 5 to 40 degrees C). At higher temperatures,
the crosslinking agents / catalysts may evaporate too quickly, thus disturbing the correct
silicone vulcanization.
C. Do not proceed with sealing during the hottest hours of the day.
D. Surfaces must clean dry and free from oil, grease and dust.
E. Follow manufacturers instruction to prepare two-components products.
F. Clean and prime joints as recommended by sealant manufacturer. Install sealant and
related backing material around perimeter of frames or supporting system.
G. Apply sealant filling joint and tool smooth to insure full contact with adjacent surfaces.
Strike off excess material.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
2. Structural Glazing Sealant Adhesion: After sealant is fully cured, perform not less
than 2 adhesion tests for structural silicone sealant complying with AAMA Structural
Sealant Glazing Systems Design Guide
B. Manufacturer's Field Services: Field engineer from curtain wall manufacturer shall
visually inspect the system at the following stages to ensure compliance with
manufacturer's recommendation for installation.
1. Prior to erection, verify structural support system is within tolerances and proper
alignment.
2. During installation: Provide periodic inspection during installation at critical stages of
each curtain wall system.
3. Upon completion of installation: Inspect entire system for areas of non-conformance
to either manufacturer's recommendations or mock-up test report recommendation.
4. Issue written report within 48 hours of each Site inspection to Contractor and
Architect.
B. Provide final protection and maintain protection and other precautions required to ensure
that system will be without damage or deterioration (other than normal weathering) at
time of acceptance and Substantial Completion. Use protective methods and materials
approved by Engineer, including temporary covering.
C. At the end of the installation, the Subcontractor shall provide the following administrative
and procedural requirements for Operation and Maintenance (O&M) Manuals, including
preparing and submitting Instruction Manuals covering the care, preservation, and
maintenance of the mechanical and architectural products and related finishes.
END OF SECTION
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
This Section includes substructure glazing system - Elevator and accessories to be installed
in secondary shelters for elevator faade and where indicated.
Location:
The fire alarm system contractor shall be registered with, and on the approved list of, the Civil
Defence Department.
A. Section 1 General
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
4.13.1.2 Safety: Non-combustible and Non-Toxic conforming to all applicable standards and
codes to meet or exceed the appropriate standards
4.13.1.3 Economy: Cost-effective and, to a consistent level of quality, commonly available and
not restricted to a few suppliers based on current industry levels of technology and
local building practice. Proven in use, they will not require new research, designs or
manufacturing techniques.
4.13.1.4 Durability: Materials shall be carefully selected for their wear, strength and weathering
qualities. They are to be resistant to abrasion, impact, vandalism, humidity,
temperature change, sunlight and the marine atmosphere. Colour and appearance
shall remain unchanged during the life cycle of the material.
4.13.1.5 Aesthetics: Emphasis shall be laid on clear, simple use of materials and avoidance of
overstatement in design. Also to be avoided are short-lived or ephemeral design
fashions or fads, pastiche and applied ornamentation. Stations are to provide a
comfortable and controlled environment and are to be bright, colorful and welcoming.
Attempts shall be made where possible to introduce natural lighting to enhance
internal spaces.
4.13.1.6 Maintainability: Materials shall be easily cleaned, in a single operation with standard
cleaning equipment and agents. repair and replacement with regards to the availability
of material in the region shall be considered in the selection of materials
4.13.9.1 For facade areas with extensive fenestration, a proprietary unitized system shall be
installed.
4.13.9.2 Glazing shall be composed of double glazed units. The glass shall have a low-
emissivity coating delivering a minimal G-Value (SHGC value) of between 0.20 to 0.30,
2
U-value 1.1 W/m K, acoustic isolation ca. 40 dB.
4.13.9.3 The glazing shall withstand the design wind loads created at wind speeds of 160 km/h
a wind of 180 km/h for 3 seconds.
4.13.9.4 For glazing where there i risk of collision, manifestartions are to be provided on the
glass elements in suitable intervals so as to minimize this risk.
9
23.1.2.5 Global Sustainability Assessment System (Gsas)
9
Each material will be submit with complete assessment sheet Template. Refer section 01 61 05.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
B. 01 00 00 General requirements
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
23.1.4 SUBMITTALS
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
C. Shop Drawings ( BIM model and dwgs ): Show fabrication, assembly and
installation details for substructure system for glazed curtain wall, including the
following:
1. Structural analysis data signed and sealed by the qualified professional
engineer responsible for their preparation.
2. Glazed curtain wall and openings substructure elevations, sections,
dimensions.
3. Relationship to adjacent materials, conditions at adjacent and dissimilar
construction, corners, terminations, parapets, soffits, sills, etc.
4. Anchorage and connection details, including dimensioning for sizing and
setting embedded items, expansion joints both vertically and horizontally.
Locations and details of connection hardware attached to structure
5. Substructure details and dimensions.
6. Fitting materials.
7. Installation procedures or erection sequence for special conditions.
I. Set of sample and array shall be delivered within 90 days before installation
J. Qualification Data: For firms and persons specified in "Quality Assurance" Article to
demonstrate their capabilities and experience. Include lists of completed projects with
project names and addresses, names and addresses of architects/engineers and
owners, and any other information required by Contractor.
K. Test submittals:
a. Substructures materials
b. Fitting materials test report
c. Source quality control test reports.
d. Sealant adhesion field tests.
e. Field quality control test report
A. Manufacturer Qualifications: A firm that complies with the following requirements and
is experienced in manufacturing substructure glazing system and products similar to
those indicated for this Project and with a record of successful in-service
performance.
1. Assumes responsibility for engineering substructure glazing system to comply
with performance requirements. This responsibility includes preparation of Shop
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
2. Has sufficient production capacity to produce required units without delaying the
Work.
E. Mock-ups: Before installing substructure glazing system, build mock-ups for each
form of construction and finish required to verify selections made under sample
Submittals and to demonstrate finished joints, aesthetic effects and qualities of
materials and execution. Build mock-ups to comply with the following requirements,
using materials indicated for the completed Work:
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
A. Deliver materials in original packages and containers, with seals unbroken, bearing
manufacturer's labels indicating brand name and directions for storage, mixing with
other components, and application.
Handle and transport substructure system materials to avoid any damage. Protect
packaged materials from dirt and damage during handling and transport.
B. Store materials in manufacturer's unopened packaging until ready for installation and
to comply with manufacturer's written instructions to prevent deterioration from
moisture or other detrimental effects. Protect materials from contact with soil, staining,
and physical damage.
B. Close areas to traffic during substructure system materials installation and for
appropriate time period after installation as recommended in writing by manufacturer.
23.1.8 WARRANTY
Product Warranty as defined in the tender contract; Guarantee shall cover repair and
replacement of defective material and workmanship.
23.2.1 DESCRIPTION
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
23.2.1.1 Approval:
Planning, calculation and design must be in accordance with the conditions of the general
building authority approval, approval number Z-70.1-46, and/or European Technical Approval
(ETA), approval number ETA-05/0114. Designs that differ from the general building authority
approval / ETA require project-specific approval from the respective supreme building
authority.
4. The transom profiles are notched and overlap the mullions where they intersect, so that
any moisture is reliably drained away.
5. All horizontal joints must be constructed using the joint connectors and joint tolerance
seals belonging to the system. Appropriate system-based aluminium insert profiles and
half profiles, as well as expansion joint seals, must be used for vertical expansion and
assembly joints.
2. The maximum distances between supports of the clips are calculated in accordance
with the tables and fabrication information provided by the system manufacturer.
3. Depending on the pane composition and when using reinforced glazing supports in
conjunction with aluminium or steel insert profiles and heavy duty T-cleats, glass loads
can be transferred per pane field (see the fabrication documentation from the system
manufacturer).
5. The remaining 20 mm wide joint between the glass edges is closed with a PE filling
tape and sealed with silicone sealant: DOW CORNING, DC 795/DC 797 - SIKA AG,
Elastosil 600/605.
23.2.1.4 Ventilation:
1. The faades must be designed according to the principle of overall ventilation. For
transom lengths > 1500 mm, there must be additional ventilation in the centre of the
field.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
Mullion, transom 60 mm
2. These fixings and fastenings may include, but are not limited to, bolts, anchors,
brackets, packers, screws, rivets, studs, nuts, washers and separators.
4. Any exposed fixings or fastenings within reach, shall be incapable of being undone by
hand or with the use of ordinary tools.
8. All brackets supporting the cladding shall transmit all loads to the structure evenly and
without hard point contact.
9. Shims under mounting brackets may be used where appropriate but they must be
mechanical secured to avoid migration due to building movement and other dynamic
effects.
23.2.1.6 Joints:
1. The Installation shall incorporate inconspicuous joints within and between components
which shall accommodate movement of the Installation and the adjacent structure and /
or construction, and which shall avoid distortion or damage of the Installation or
adjacent structure and / or construction.
Where movement joints are provided within the building structure or building elements
adjacent to the Installation, then the Installation shall incorporate joints coincident with
these.
2. All joints shall be plumb, true and square with the following specific tolerances:
Deviations in width shall be gradual and less than 10% of the nominal joint width.
Deviations between the flat faces of adjacent components shall be less than 10% of the
nominal joint width.
3. Joints between panels are to be strictly limited to those shown on the drawings.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
2. Gaskets Material:
- Non cellular rubber to BS 4255-1.
- Cellular rubber to ASTM-C509.
3. Continuity:
External gaskets of the flush faced curtain walling systems and inner gaskets of
drained and ventilated or pressure equalized curtain walling systems must be formed in
a complete frame with sealed joints. Vulcanized rubber gaskets must have factory
moulded corner joints.
23.2.1.8 TOLERANCE
A. Manufacturing Tolerances: data to be provided
B. Erection Tolerances:
Otherwise specified in shop-drawings or by manufacturer, installed system shall be
less than the limits specified herein.
Limit variations from plumb, level, or dimensional angle to the following:
1. Not more than 3 mm (1/8 inch) deviation in 1 story height, in 3 m (10 foot)
vertical, angular run, or in 6 m (20 foot) horizontal run.
2. Not more than 6 mm (1/4 inch) deviation in 12 m (40 foot) run, in any
direction.
3. At battered wall areas, plumb is defined to match indicated slope.
Limit variations from location (theoretical calculated position in plan or elevation
based on established floor lines and column lines), including variations from plumb
and level, to the following:
1. Not more than 9.5 mm (3/8 inch) total deviation for member at any location.
2. Not more than 3 mm (1/8 inch) change in deviation for member for 3 m (10
foot) run.
23.3.1 GENERAL
A. Examine areas and conditions, with Installer present, for compliance with
installation requirements for installation tolerances, true and level bearing
surfaces, and identify conditions detrimental to proper and or timely completion
or other conditions affecting performance of the Work.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
1. Prior to erection:
a. Dimensional verification measurementsprior to fabricating glass fin
structure components
b. Verify location of structural supports and roof anchoring and if their
position is within tolerances and proper alignment.
2. Proceed with application only after unsatisfactory conditions have been
corrected.
23.3.2 INSTALLATION
A. Site assemble and erect glass in accordance with approved shop drawings,
manufacturer's installation instructions and GANA Glazing Manual.
B. Particularly:
1. Do not install glass with edge damaged or other imperfections.
2. Allow for settling, expanding, and contracting to occur without breaking glass.
3. Do not field cut or alter structural framing without written approval from
manufacturer and Architect.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
A. Manufacturer's Field Services: Field engineer from glass manufacturer shall visually
inspect the system at the following stages to ensure compliance with manufacturer's
recommendation for installation.
1. Prior to erection, verify structural support system is within tolerances and proper
alignment.
4. Issue written report within 48 hours of each Site inspection to Contractor and
Architect.
D. Provide final protection and maintain protection and other precautions required to
ensure that system will be without damage or deterioration (other than normal
weathering) at time of acceptance and Substantial Completion. Use protective
methods and materials approved by Engineer, including temporary covering.
E. At the end of the installation, the Subcontractor shall provide the following
administrative and procedural requirements for Operation and Maintenance (O&M)
Manuals, including preparing and submitting Instruction Manuals covering the care,
preservation, and maintenance of the mechanical and architectural products and
related finishes.
END OF SECTION
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
This Section includes substructure glazing system Canopy and accessories to be installed
in secondary shelters and where indicated.
Location:
The fire alarm system contractor shall be registered with, and on the approved list of, the Civil
Defence Department.
E. Section 1 General
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
4.13.1.2 Safety: Non-combustible and Non-Toxic conforming to all applicable standards and
codes to meet or exceed the appropriate standards
4.13.1.3 Economy: Cost-effective and, to a consistent level of quality, commonly available and
not restricted to a few suppliers based on current industry levels of technology and
local building practice. Proven in use, they will not require new research, designs or
manufacturing techniques.
4.13.1.4 Durability: Materials shall be carefully selected for their wear, strength and weathering
qualities. They are to be resistant to abrasion, impact, vandalism, humidity,
temperature change, sunlight and the marine atmosphere. Colour and appearance
shall remain unchanged during the life cycle of the material.
4.13.1.5 Aesthetics: Emphasis shall be laid on clear, simple use of materials and avoidance of
overstatement in design. Also to be avoided are short-lived or ephemeral design
fashions or fads, pastiche and applied ornamentation. Stations are to provide a
comfortable and controlled environment and are to be bright, colorful and welcoming.
Attempts shall be made where possible to introduce natural lighting to enhance
internal spaces.
4.13.1.6 Maintainability: Materials shall be easily cleaned, in a single operation with standard
cleaning equipment and agents. repair and replacement with regards to the availability
of material in the region shall be considered in the selection of materials
4.13.9.1 For facade areas with extensive fenestration, a proprietary unitized system shall be
installed.
4.13.9.2 Glazing shall be composed of double glazed units. The glass shall have a low-
emissivity coating delivering a minimal G-Value (SHGC value) of between 0.20 to 0.30,
2
U-value 1.1 W/m K, acoustic isolation ca. 40 dB.
4.13.9.3 The glazing shall withstand the design wind loads created at wind speeds of 160 km/h
a wind of 180 km/h for 3 seconds.
4.13.9.4 For glazing where there i risk of collision, manifestartions are to be provided on the
glass elements in suitable intervals so as to minimize this risk.
10
24.1.2.5 Global Sustainability Assessment System (Gsas)
10
Each material will be submit with complete assessment sheet Template. Refer section 01 61 05.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
D. 01 00 00 General requirements
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
24.1.4 SUBMITTALS
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
F. Shop Drawings ( BIM model and dwgs ): Show fabrication, assembly and
installation details for substructure system for glazed curtain wall, including the
following:
3. Structural analysis data signed and sealed by the qualified professional
engineer responsible for their preparation.
4. Glazed curtain wall and openings substructure elevations, sections,
dimensions.
7. Relationship to adjacent materials, conditions at adjacent and dissimilar
construction, corners, terminations, parapets, soffits, sills, etc.
8. Anchorage and connection details, including dimensioning for sizing and
setting embedded items, expansion joints both vertically and horizontally.
Locations and details of connection hardware attached to structure
9. Substructure details and dimensions.
10. Fitting materials.
8. Installation procedures or erection sequence for special conditions.
M. Set of sample and array shall be delivered within 90 days before installation
N. Qualification Data: For firms and persons specified in "Quality Assurance" Article to
demonstrate their capabilities and experience. Include lists of completed projects with
project names and addresses, names and addresses of architects/engineers and
owners, and any other information required by Contractor.
O. Test submittals:
f. Substructures materials
g. Fitting materials test report
h. Source quality control test reports.
i. Sealant adhesion field tests.
j. Field quality control test report
C. Manufacturer Qualifications: A firm that complies with the following requirements and
is experienced in manufacturing substructure glazing system and products similar to
those indicated for this Project and with a record of successful in-service
performance.
3. Assumes responsibility for engineering substructure glazing system to comply
with performance requirements. This responsibility includes preparation of Shop
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
4. Has sufficient production capacity to produce required units without delaying the
Work.
I. Mock-ups: Before installing substructure glazing system, build mock-ups for each
form of construction and finish required to verify selections made under sample
Submittals and to demonstrate finished joints, aesthetic effects and qualities of
materials and execution. Build mock-ups to comply with the following requirements,
using materials indicated for the completed Work:
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
C. Deliver materials in original packages and containers, with seals unbroken, bearing
manufacturer's labels indicating brand name and directions for storage, mixing with
other components, and application.
Handle and transport substructure system materials to avoid any damage. Protect
packaged materials from dirt and damage during handling and transport.
D. Store materials in manufacturer's unopened packaging until ready for installation and
to comply with manufacturer's written instructions to prevent deterioration from
moisture or other detrimental effects. Protect materials from contact with soil, staining,
and physical damage.
D. Close areas to traffic during substructure system materials installation and for
appropriate time period after installation as recommended in writing by manufacturer.
24.1.8 WARRANTY
Product Warranty as defined in the tender contract; Guarantee shall cover repair and
replacement of defective material and workmanship.
24.2.1 DESCRIPTION
Aluminium-framed glazed roof, with vision glazing. Self-supporting aluminium faade system
"without external cover caps and glass pressure plates, option with gas-tight (EN 1279, Part
3) or airtight (EN 1279, Part 2) pane edge joint"
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
24.2.1.1 Approval:
Planning, calculation and design must be in accordance with the conditions of the general
building authority approval, approval number Z-70.1-46, and/or European Technical Approval
(ETA), approval number ETA-05/0114. Designs that differ from the general building authority
approval / ETA require project-specific approval from the respective supreme building
authority.
4. The transom profiles are notched and overlap the mullions where they
intersect, so that any moisture is reliably drained away.
5. All horizontal joints must be constructed using the joint connectors and joint
tolerance seals belonging to the system. Appropriate system-based
aluminium insert profiles and half profiles, as well as expansion joint seals,
must be used for vertical expansion and assembly joints.
5. The remaining 20 mm wide joint between the glass edges is closed with a PE
filling tape and sealed with silicone sealant: DOW CORNING, DC 795/DC 797
- SIKA AG, Elastosil 600/605.
24.2.1.4 Ventilation:
1. The faades must be designed according to the principle of overall ventilation.
For transom lengths > 1500 mm, there must be additional ventilation in the
centre of the field.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
2. These fixings and fastenings may include, but are not limited to, bolts,
anchors, brackets, packers, screws, rivets, studs, nuts, washers and
separators.
8. All brackets supporting the cladding shall transmit all loads to the structure
evenly and without hard point contact.
9. Shims under mounting brackets may be used where appropriate but they
must be mechanical secured to avoid migration due to building movement
and other dynamic effects.
24.2.1.6 Joints:
1. The Installation shall incorporate inconspicuous joints within and between
components which shall accommodate movement of the Installation and the
adjacent structure and / or construction, and which shall avoid distortion or
damage of the Installation or adjacent structure and / or construction.
Where movement joints are provided within the building structure or building
elements adjacent to the Installation, then the Installation shall incorporate
joints coincident with these.
2. All joints shall be plumb, true and square with the following specific
tolerances:
Deviations in width shall be gradual and less than 10% of the nominal joint
width.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
Deviations between the flat faces of adjacent components shall be less than
10% of the nominal joint width.
2. Gaskets Material:
- Non cellular rubber to BS 4255-1.
- Cellular rubber to ASTM-C509.
3. Continuity:
External gaskets of the system and inner gaskets of drained and
ventilatedsystem must be formed in a complete frame with sealed joints.
Vulcanized rubber gaskets must have factory moulded corner joints.
24.2.1.8 TOLERANCE
A. Manufacturing Tolerances: data to be provided
B. Erection Tolerances:
Otherwise specified in shop-drawings or by manufacturer, installed system shall be
less than the limits specified herein.
Limit variations from plumb, level, or dimensional angle to the following:
1. Not more than 3 mm (1/8 inch) deviation in 1 story height, in 3 m (10 foot)
vertical, angular run, or in 6 m (20 foot) horizontal run.
2. Not more than 6 mm (1/4 inch) deviation in 12 m (40 foot) run, in any
direction.
3. At battered wall areas, plumb is defined to match indicated slope.
Limit variations from location (theoretical calculated position in plan or elevation
based on established floor lines and column lines), including variations from plumb
and level, to the following:
1. Not more than 9.5 mm (3/8 inch) total deviation for member at any location.
2. Not more than 3 mm (1/8 inch) change in deviation for member for 3 m (10
foot) run.
24.3.1 GENERAL
A. Examine areas and conditions, with Installer present, for compliance with installation
requirements for installation tolerances, true and level bearing surfaces, and identify
conditions detrimental to proper and or timely completion or other conditions affecting
performance of the Work.
1. Prior to erection:
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
24.3.2 INSTALLATION
A. Site assemble and erect glass in accordance with approved shop drawings,
manufacturer's installation instructions and GANA Glazing Manual.
B. Particularly:
1. Do not install glass with edge damaged or other imperfections.
2. Allow for settling, expanding, and contracting to occur without breaking glass.
3. Do not field cut or alter structural framing without written approval from
manufacturer and Architect.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
A. Manufacturer's Field Services: Field engineer from glass manufacturer shall visually
inspect the system at the following stages to ensure compliance with manufacturer's
recommendation for installation.
4. Issue written report within 48 hours of each Site inspection to Contractor and
Architect.
D. Provide final protection and maintain protection and other precautions required to
ensure that system will be without damage or deterioration (other than normal
weathering) at time of acceptance and Substantial Completion. Use protective
methods and materials approved by Engineer, including temporary covering.
E. At the end of the installation, the Subcontractor shall provide the following
administrative and procedural requirements for Operation and Maintenance (O&M)
Manuals, including preparing and submitting Instruction Manuals covering the care,
preservation, and maintenance of the mechanical and architectural products and
related finishes.
END OF SECTION
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
This Section includes Exterior Glass Canopy and accessories to be installed in secondary
shelters and where indicated.
Location:
The fire alarm system contractor shall be registered with, and on the approved list of, the Civil
Defence Department.
I. Section 1 General
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
4. BS 6375 Performance
4.13.1.2 Safety: Non-combustible and Non-Toxic conforming to all applicable standards and
codes to meet or exceed the appropriate standards
4.13.1.3 Economy: Cost-effective and, to a consistent level of quality, commonly available and
not restricted to a few suppliers based on current industry levels of technology and
local building practice. Proven in use, they will not require new research, designs or
manufacturing techniques.
4.13.1.4 Durability: Materials shall be carefully selected for their wear, strength and weathering
qualities. They are to be resistant to abrasion, impact, vandalism, humidity,
temperature change, sunlight and the marine atmosphere. Colour and appearance
shall remain unchanged during the life cycle of the material.
4.13.1.5 Aesthetics: Emphasis shall be laid on clear, simple use of materials and avoidance of
overstatement in design. Also to be avoided are short-lived or ephemeral design
fashions or fads, pastiche and applied ornamentation. Stations are to provide a
comfortable and controlled environment and are to be bright, colorful and welcoming.
Attempts shall be made where possible to introduce natural lighting to enhance
internal spaces.
4.13.1.6 Maintainability: Materials shall be easily cleaned, in a single operation with standard
cleaning equipment and agents. repair and replacement with regards to the availability
of material in the region shall be considered in the selection of materials
4.13.9.1 For facade areas with extensive fenestration, a proprietary unitized system shall be
installed.
4.13.9.2 Glazing shall be composed of double glazed units. The glass shall have a low-
emissivity coating delivering a minimal G-Value (SHGC value) of between 0.20 to 0.30,
2
U-value 1.1 W/m K, acoustic isolation ca. 40 dB.
4.13.9.3 The glazing shall withstand the design wind loads created at wind speeds of 160 km/h
a wind of 180 km/h for 3 seconds.
4.13.9.4 For glazing where there i risk of collision, manifestartions are to be provided on the
glass elements in suitable intervals so as to minimize this risk.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
11
25.1.2.5 Global Sustainability Assessment System (Gsas)
11
Each material will be submit with complete assessment sheet Template. Refer section 01 61 05.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
20) product names, manufacturers names, costs, percentage postconsumer content, and
percentage preconsumer content.
21) list of actual materials costs, excluding labor and equipment for CSI Division 0310, 31
(Section 31.60.00 Foundations) and 32 (Sections 32.10.00 Paving, 32.30.00 Site
Improvements, and 32.90.00 Planting) only; including Division 12 is optional.
22) Cut sheets or manufacturers letters to document the listed products recycled content.
23) list of product purchases manufactured, extracted, or harvested regionally.
24) List of distances between the project and manufacturer,and distances between the project
and the extraction site.
25) cutsheets that document material origin and manufacture within a 500-mile radius of the
project site.
26) FSC certifications for all FSC certified wood products.
27) List of all new wood products (not reclaimed, salvaged, or recycled) on the project and
identifying which components are FSC certified and the cost of all new wood products as well.
F. 01 00 00 General requirements
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
- UNI EN 1279-2 Glass in building. Insulating glass units. Long term test method and
requirements for moisture penetration
- UNI EN 1279-3 Glass in building. Insulating glass units. Long term test method and
requirements for gas leakage rate and for gas concentration tolerances.
- UNI EN 1279-4 Glass in building.Test method for the physical properties of the
sealing edge.
- UNI EN 1279-6 Glass in building. Factory production control and periodic test.
- EN 15434 Glass in building. Product standard for structural and/or ultra-violet
resistant sealant (for use with structural sealant glazing and/or insulating glass units
with exposed seals)
- EN 13022 Glass in building. Structural sealant glazing. Assembly rules
- EN 11925-2 Reaction to fire tests. Ignitability of products subjected to direct
impingement of flame. Single-flame source test
- DIN 4102-B1 Fire Test to Building material - Classification
- EN 356 Safety glass. Testing and classification against manual attack.
- UNI EN 673:2011 Glass In Building - Determination Of Thermal Transmittance
(U Value) - Calculation Method
- EN 410 Determination of luminous and solar characteristics of glazing.
- ISO 9050 Glass in building - Determination of light transmittance, solar direct
transmittance, total solar energy transmittance, ultraviolet transmittance and related
glazing factors
- EN 13501-2 Fire classification of construction products and building elements.
Classification using data from fire resistance tests, excluding ventilation services
- EN 13501-1 Fire classification of construction products and building elements.
Classification using test data from reaction to fire tests
- UNI EN 1063 Classification and strength tests to the bullets
- EN 12758 Glazing and sound insulation by air. Product descriptions and
determination of properties.
- UNI EN 12600 Pendulum test. Impact test method and classification for flat glass.
UNI EN 13541 safety glass. Testing and classification of resistance against
explosion pressure.
- ISO 868 Plastics and ebonite. Determination of indentation hardness by means of a
durometer (Shore hardness)
- ISO 37 Rubber, vulcanized or thermoplastic. Determination of tensile stress-strain
properties
- ISO 34 General requirements for the competence of reference material producers
- ISO 9001-2000 Quality management systems Requirements ;
- ISO 14000-2004 Environmental management systems - Requirements with guidance
for use;
25.1.4 SUBMITTALS
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
t.
Documentation outlining all applicable materials and the percent of the
recycle content.
u. Full representative panel assembly / quality sample;
v. Mock up.
w. QCD certification
x. Material / Component technical data with Health and Safety
requirements;
y. Material / Component / Assembly calculation.
z. Method statement for construction / installation.
aa. O&M manual and as built BIM and drawings
6. For final Review leading to final Design Certification, submit the Regional
Materials Calculator and the following supporting documents:
q. Bill of Quantities
r. List of materials
s. Specifications listing manufactures and locations
t. Cost estimates
u. Description of the material
v. Description of how the material has been reused
w. Report providing distances of manufacturers
x. Any documentation from manufacturers outlining third party sourcing
standards such as FSC Chain of Custody Certification or ISO
Certification
I. Shop Drawings ( BIM model and dwgs ): Show fabrication, assembly and
installation details for glazed curtain wall panels, including the following:
5. Structural analysis data signed and sealed by the qualified professional
engineer responsible for their preparation.
6. Glazed curtain wall and openings elevations, sections, dimensions.
11. Relationship to adjacent materials, conditions at adjacent and dissimilar
construction, corners, terminations, parapets, soffits, sills, etc.
12. Anchorage and connection details, including dimensioning for sizing and
setting embedded items, expansion joints both vertically and horizontally.
Locations and details of connection hardware attached to structure
13. Glass types, sizes, and edge clearances.
14. Jamb, head, sill, and corner conditions and specific anchorage details for
each situation.
9. Installation procedures or erection sequence for
special conditions.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
Q. Set of sample and array shall be delivered within 90 days before installation
R. Qualification Data: For firms and persons specified in "Quality Assurance" Article to
demonstrate their capabilities and experience. Include lists of completed projects with
project names and addresses, names and addresses of architects/engineers and
owners, and any other information required by Contractor.
S. Test submittals:
k. Glass certifications on required glass properties
l. Fitting materials test report
m. Source quality control test reports.
n. Sealant adhesion field tests.
o. Field quality control test report
E. Manufacturer Qualifications: A firm that complies with the following requirements and
is experienced in manufacturing Glazed Curtain Wall and products similar to those
indicated for this Project and with a record of successful in-service performance.
5. Assumes responsibility for engineering Glazed Curtain Wall to comply with
performance requirements. This responsibility includes preparation of Shop
Drawings and comprehensive engineering analysis by a qualified professional
engineer.
6. Has sufficient production capacity to produce required units without delaying the
Work.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
M. Mock-ups: Before installing Glazed Curtain Wall, build mock-ups for each form of
construction and finish required to verify selections made under sample Submittals
and to demonstrate finished joints, aesthetic effects and qualities of materials and
execution. Build mock-ups to comply with the following requirements, using materials
indicated for the completed Work:
17. Build mockup of typical wall area as shown on Drawings as part of building.
18. Build mockups in the location and of the size indicated or, if not indicated, as
directed by Engineer. Include sealant-filled joints complying with requirements
in related Division
19. Notify Engineer seven days in advance of dates and times when mockups will
be constructed.
20. Demonstrate the proposed range of aesthetic effects and workmanship.
21. Obtain Engineer's approval of mockups before starting installation.
22. Maintain mockups during installation in an undisturbed condition as a
standard for judging the completed Work.
23. Demolish and remove mockups when directed.
24. Approved mockups may become part of the completed Work if undamaged or
undisturbed at time of Substantial Completion.
E. Deliver materials in original packages and containers, with seals unbroken, bearing
manufacturer's labels indicating brand name and directions for storage, mixing with
other components, and application.
Handle and transport Glazed Curtain Wall components to avoid excessive stresses or
damage.
1. Lift or support packaged materials only at points indicated by manufacturer or
on Shop Drawings.
2. Place non-staining resilient spacers of even thickness between packaged
materials units.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
F. Store materials in manufacturer's unopened packaging until ready for installation and
to comply with manufacturer's written instructions to prevent deterioration from
moisture or other detrimental effects. Particularly, protect materials from contact with
soil, staining, and physical damage.
1. Store packaged materials units with non-staining resilient supports in same
positions as when transported.
2. Store packaged materials units on firm, level and smooth surfaces.
3. Place stored packaged materials units so identification marks are clearly
visible.
4. Store and dispose of solvent-based materials and materials used with solvent-
based materials, in accordance with requirements of local authorities having
jurisdiction.
F. Close areas to traffic during Glazed Curtain Wall installation and for appropriate time
period after installation as recommended in writing by manufacturer.
25.1.8 WARRANTY
Product Warranty as defined in the tender contract; Guarantee shall cover repair and
replacement of defective material and workmanship.
25.2.1 DESCRIPTION
Laminated glass, installed horizontally on the canopy substructure is made of two layers of
8mm clear heat strengthened glass laminated with 1.52 PVB interlayers.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
25.2.1.1 Glass
Canopy laminated glass, is 8.8.4 heat strengthenedglass made of:
A. Two layers of heat strengthened 8 mm thick, clear glass (same colour of glazed
curtain wall), bevelled on edges.
B. Four polyvinyl butyral interlayer (PVB) between glass sheets ( 4 interlayers x 2).
25.2.1.2 Adhesives
A. Acceptable manufacturers and products whose formulation determined by glazing
system manufacturer.
B. Metal profiles and plates: metal profiles and plates for Structural Glass Fin Installation
shall comply specification as defined on the drawings and engineer calculation.
C. Anchorage devices: Clips, anchors, fasteners, and shims required for secure
installation of glass fin structure. Type, size, and spacing as recommended by glass
fin structure manufacturer and/or as defined on the drawings and Engineer
calculation.
25.2.2 TOLERANCE
B. Erection Tolerances:
Otherwise specified in shop-drawings or by manufacturer, installed system shall be less
than the limits specified herein.
Limit variations from plumb, level, or dimensional angle to the following:
1. Not more than 3 mm (1/8 inch) deviation in 1 story height, in 3 m (10 foot) vertical,
angular run, or in 6 m (20 foot) horizontal run.
2. Not more than 6 mm (1/4 inch) deviation in 12 m (40 foot) run, in any direction.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
25.3.1 GENERAL
A. Examine areas and conditions, with Installer present, for compliance with installation
requirements for installation tolerances, true and level bearing surfaces, and identify
conditions detrimental to proper and or timely completion or other conditions affecting
performance of the Work.
1. Prior to erection:
a. Dimensional verification measurements prior to fabricating glass fin structure
components
b. Verify location of structural supports and roof anchoring and if their position is
within tolerances and proper alignment.
2. Proceed with application only after unsatisfactory conditions have been corrected.
B. Coordination: Coordinate provision of glass fin structure with casting of concrete ( floor
slabs), structural steel frame (roof), shelters cladding, ventilation plant etc.
1. Structural steel frame: Ensure that metal profiles and plates, anchor bolts etc and
other structure components to be fixed to roof structures are provided, accurately
placed, and properly sized. Ensure that provision is made for attachments and
transfer of calculated loads.
25.3.2 INSTALLATION
A. Site assemble and erect glass in accordance with approved shop drawings,
manufacturer's installation instructions and GANA Glazing Manual.
B. Particularly:
1. Do not install glass with edge damaged or other imperfections.
2. Allow for settling, expanding, and contracting to occur without breaking glass.
C. Do not field cut or alter structural framing without written approval from manufacturer and
Architect.
D. Install structural glass in metal profiles and fittings as in manufacturers instructions and
in approved shop drawings.
E. Secure glass panels to fittings as in approved shop drawings.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
F. Coordinate installation work with erection tolerances, Glazed Curtain Wall installation
works and sealing. Also coordinate installation with Mechanical & Electrical Plant
involved.
G. Coordinate installation work with other related works.
25.3.2.1 Sealants:
A. Install sealants as indicated in shop drawings as required to achieve water and airtight
assembly, complying with requirements and instructions of curtain wall manufacturer.
C. Do not proceed with sealing during the hottest hours of the day.
D. Surfaces must clean dry and free from oil, grease and dust.
F. Clean and prime joints as recommended by sealant manufacturer. Install sealant and
related backing material around perimeter of frames or supporting system.
G. Apply sealant filling joint and tool smooth to insure full contact with adjacent surfaces.
Strike off excess material.
B. Clean metal and glass surfaces complying with manufacturer's recommendations prior to
Substantial Completion, exercising care to avoid damage to protective coatings and
finishes. Remove excess glazing and sealant compounds, dirt, and other substances.
Touch up factory finish if necessary and authorized by engineer.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
D. Provide final protection and maintain protection and other precautions required to ensure
that system will be without damage or deterioration (other than normal weathering) at
time of acceptance and Substantial Completion. Use protective methods and materials
approved by Engineer, including temporary covering.
E. At the end of the installation, the Subcontractor shall provide the following administrative
and procedural requirements for Operation and Maintenance (O&M) Manuals, including
preparing and submitting Instruction Manuals covering the care, preservation, and
maintenance of the mechanical and architectural products and related finishes.
END OF SECTION
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
This Section includes Exterior Glass Canopy and accessories to be installed in secondary
shelters as elevator cladding and where indicated.
Location:
The fire alarm system contractor shall be registered with, and on the approved list of, the Civil
Defence Department.
M. Section 1 General
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
12. BS 6469 Power organic coatings for application and and stoving to
aluminium alloy extrusion, sheet and pre-formed sections for
external architectural purposes and for the finish on
aluminium alloy extrusions, sheet and preformed sections
coated with powder organic coatings.
13. BS 6497 Powder organic coatings for application and stoving to hot-
dipped galvanized hot-rolled sections and steel sheet for
windows and associated with external architectural purposes
and for the finish on galvanized steel sections and sheet
coated with powder organic coatings.
4.13.1.2 Safety: Non-combustible and Non-Toxic conforming to all applicable standards and
codes to meet or exceed the appropriate standards
4.13.1.3 Economy: Cost-effective and, to a consistent level of quality, commonly available and
not restricted to a few suppliers based on current industry levels of technology and
local building practice. Proven in use, they will not require new research, designs or
manufacturing techniques.
4.13.1.4 Durability: Materials shall be carefully selected for their wear, strength and weathering
qualities. They are to be resistant to abrasion, impact, vandalism, humidity,
temperature change, sunlight and the marine atmosphere. Colour and appearance
shall remain unchanged during the life cycle of the material.
4.13.1.5 Aesthetics: Emphasis shall be laid on clear, simple use of materials and avoidance of
overstatement in design. Also to be avoided are short-lived or ephemeral design
fashions or fads, pastiche and applied ornamentation. Stations are to provide a
comfortable and controlled environment and are to be bright, colorful and welcoming.
Attempts shall be made where possible to introduce natural lighting to enhance
internal spaces.
4.13.1.6 Maintainability: Materials shall be easily cleaned, in a single operation with standard
cleaning equipment and agents. repair and replacement with regards to the availability
of material in the region shall be considered in the selection of materials
4.13.9.1 For facade areas with extensive fenestration, a proprietary unitized system shall be
installed.
4.13.9.2 Glazing shall be composed of double glazed units. The glass shall have a low-
emissivity coating delivering a minimal G-Value (SHGC value) of between 0.20 to 0.30,
2
U-value 1.1 W/m K, acoustic isolation ca. 40 dB.
4.13.9.3 The glazing shall withstand the design wind loads created at wind speeds of 160 km/h
a wind of 180 km/h for 3 seconds.
4.13.9.4 For glazing where there i risk of collision, manifestartions are to be provided on the
glass elements in suitable intervals so as to minimize this risk.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
12
26.1.2.5 Global Sustainability Assessment System (Gsas)
12
Each material will be submit with complete assessment sheet Template. Refer section 01 61 05.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
29) product names, manufacturers names, costs, percentage postconsumer content, and
percentage preconsumer content.
30) list of actual materials costs, excluding labor and equipment for CSI Division 0310, 31
(Section 31.60.00 Foundations) and 32 (Sections 32.10.00 Paving, 32.30.00 Site
Improvements, and 32.90.00 Planting) only; including Division 12 is optional.
31) Cut sheets or manufacturers letters to document the listed products recycled content.
32) list of product purchases manufactured, extracted, or harvested regionally.
33) List of distances between the project and manufacturer,and distances between the project
and the extraction site.
34) cutsheets that document material origin and manufacture within a 500-mile radius of the
project site.
35) FSC certifications for all FSC certified wood products.
36) List of all new wood products (not reclaimed, salvaged, or recycled) on the project and
identifying which components are FSC certified and the cost of all new wood products as well.
H. 01 00 00 General requirements
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
- UNI EN 1279-2 Glass in building. Insulating glass units. Long term test method and
requirements for moisture penetration
- UNI EN 1279-3 Glass in building. Insulating glass units. Long term test method and
requirements for gas leakage rate and for gas concentration tolerances.
- UNI EN 1279-4 Glass in building.Test method for the physical properties of the
sealing edge.
- UNI EN 1279-6 Glass in building. Factory production control and periodic test.
- EN 15434 Glass in building. Product standard for structural and/or ultra-violet
resistant sealant (for use with structural sealant glazing and/or insulating glass units
with exposed seals)
- EN 13022 Glass in building. Structural sealant glazing. Assembly rules
- EN 11925-2 Reaction to fire tests. Ignitability of products subjected to direct
impingement of flame. Single-flame source test
- DIN 4102-B1 Fire Test to Building material - Classification
- EN 356 Safety glass. Testing and classification against manual attack.
- UNI EN 673:2011 Glass In Building - Determination Of Thermal Transmittance
(U Value) - Calculation Method
- EN 410 Determination of luminous and solar characteristics of glazing.
- ISO 9050 Glass in building - Determination of light transmittance, solar direct
transmittance, total solar energy transmittance, ultraviolet transmittance and related
glazing factors
- EN 13501-2 Fire classification of construction products and building elements.
Classification using data from fire resistance tests, excluding ventilation services
- EN 13501-1 Fire classification of construction products and building elements.
Classification using test data from reaction to fire tests
- UNI EN 1063 Classification and strength tests to the bullets
- EN 12758 Glazing and sound insulation by air. Product descriptions and
determination of properties.
- UNI EN 12600 Pendulum test. Impact test method and classification for flat glass.
UNI EN 13541 safety glass. Testing and classification of resistance against
explosion pressure.
- ISO 868 Plastics and ebonite. Determination of indentation hardness by means of a
durometer (Shore hardness)
- ISO 37 Rubber, vulcanized or thermoplastic. Determination of tensile stress-strain
properties
- ISO 34 General requirements for the competence of reference material producers
- ISO 9001-2000 Quality management systems Requirements ;
- ISO 14000-2004 Environmental management systems - Requirements with guidance
for use;
26.1.4 SUBMITTALS
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
a.
Intended list of materials
b.
Documentation outlining all applicable materials and the percent of the
recycle content.
c. Full representative panel assembly / quality sample;
d. Mock up.
e. QCD certification
f. Material / Component technical data with Health and Safety
requirements;
g. Material / Component / Assembly calculation.
h. Method statement for construction / installation.
i. O&M manual and as built BIM and drawings
2. For final Review leading to final Design Certification, submit the Regional
Materials Calculator and the following supporting documents:
a. Bill of Quantities
b. List of materials
c. Specifications listing manufactures and locations
d. Cost estimates
e. Description of the material
f. Description of how the material has been reused
g. Report providing distances of manufacturers
h. Any documentation from manufacturers outlining third party sourcing
standards such as FSC Chain of Custody Certification or ISO
Certification
C. Shop Drawings ( BIM model and dwgs ): Show fabrication, assembly and
installation details for glazed curtain wall panels, including the following:
1. Structural analysis data signed and sealed by the qualified professional
engineer responsible for their preparation.
2. Glazed curtain wall and openings elevations, sections, dimensions.
3. Relationship to adjacent materials, conditions at adjacent and dissimilar
construction, corners, terminations, parapets, soffits, sills, etc.
4. Anchorage and connection details, including dimensioning for sizing and setting
embedded items, expansion joints both vertically and horizontally. Locations
and details of connection hardware attached to structure
5. Glass types, sizes, and edge clearances.
6. Jamb, head, sill, and corner conditions and specific anchorage details for each
situation.
7. Installation procedures or erection sequence for special conditions.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
U. Set of sample and array shall be delivered within 90 days before installation
V. Qualification Data: For firms and persons specified in "Quality Assurance" Article to
demonstrate their capabilities and experience. Include lists of completed projects with
project names and addresses, names and addresses of architects/engineers and
owners, and any other information required by Contractor.
W. Test submittals:
a. Glass certifications on required glass properties
b. Fitting materials test report
c. Source quality control test reports.
d. Sealant adhesion field tests.
e. Field quality control test report
A. Manufacturer Qualifications: A firm that complies with the following requirements and
is experienced in manufacturing Glazed Curtain Wall and products similar to those
indicated for this Project and with a record of successful in-service performance.
1. Assumes responsibility for engineering Glazed Curtain Wall to comply with
performance requirements. This responsibility includes preparation of Shop
Drawings and comprehensive engineering analysis by a qualified professional
engineer.
2. Has sufficient production capacity to produce required units without delaying the
Work.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
Q. Mock-ups: Before installing Glazed Curtain Wall, build mock-ups for each form of
construction and finish required to verify selections made under sample Submittals
and to demonstrate finished joints, aesthetic effects and qualities of materials and
execution. Build mock-ups to comply with the following requirements, using materials
indicated for the completed Work:
A. Deliver materials in original packages and containers, with seals unbroken, bearing
manufacturer's labels indicating brand name and directions for storage, mixing with
other components, and application.
Handle and transport Glazed Curtain Wall components to avoid excessive stresses or
damage.
1. Lift or support packaged materials only at points indicated by manufacturer or
on Shop Drawings.
2. Place non-staining resilient spacers of even thickness between packaged
materials units.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
B. Store materials in manufacturer's unopened packaging until ready for installation and
to comply with manufacturer's written instructions to prevent deterioration from
moisture or other detrimental effects. Particularly, protect materials from contact with
soil, staining, and physical damage.
1. Store packaged materials units with non-staining resilient supports in same
positions as when transported.
2. Store packaged materials units on firm, level and smooth surfaces.
3. Place stored packaged materials units so identification marks are clearly
visible.
4. Store and dispose of solvent-based materials and materials used with solvent-
based materials, in accordance with requirements of local authorities having
jurisdiction.
B. Close areas to traffic during Glazed Curtain Wall installation and for appropriate time
period after installation as recommended in writing by manufacturer.
26.1.8 WARRANTY
Product Warranty as defined in the tender contract; Guarantee shall cover repair and
replacement of defective material and workmanship.
The Material / component is required to match the look & feel agreed benchmark sample.
The look & feel benchmark samples is available in the QR samples room.
26.2.1 DESCRIPTION
Laminated glass, installed horizontally on the canopy substructure is made of two layers of
6mm clear heat strengthened glass laminated with 1.52 PVB interlayers.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
26.2.1.1 Glass
Canopy laminated glass, is 6.6.4 heat strengthenedglassmade of:
A. Two layers of heat strengthened6 mm thick, clear glass (same colour of glazed
curtain wall), bevelled on edges.
26.2.1.2 Adhesives
A. Acceptable manufacturers and products whose formulation determined by glazing
system manufacturer.
B. Metal profiles and plates: metal profiles and plates for Structural Glass Fin Installation
shall comply specification as defined on the drawings and engineer calculation.
C. Anchorage devices: Clips, anchors, fasteners, and shims required for secure
installation of glass fin structure. Type, size, and spacing as recommended by glass
fin structure manufacturer and/or as defined on the drawings and Engineer
calculation.
26.2.1.4 TOLERANCE
A. Manufacturing Tolerances: data to be provided
B. Erection Tolerances:
Otherwise specified in shop-drawings or by manufacturer, installed system shall be
less than the limits specified herein.
Limit variations from plumb, level, or dimensional angle to the following:
1. Not more than 3 mm (1/8 inch) deviation in 1 story height, in 3 m (10 foot)
vertical, angular run, or in 6 m (20 foot) horizontal run.
2. Not more than 6 mm (1/4 inch) deviation in 12 m (40 foot) run, in any
direction.
3. At battered wall areas, plumb is defined to match indicated slope.
Limit variations from location (theoretical calculated position in plan or elevation
based on established floor lines and column lines), including variations from plumb
and level, to the following:
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
1. Not more than 9.5 mm (3/8 inch) total deviation for member at any location.
2. Not more than 3 mm (1/8 inch) change in deviation for member for 3 m (10
foot) run.
26.3.1 GENERAL
A. Examine areas and conditions, with Installer present, for compliance with
installation requirements for installation tolerances, true and level bearing
surfaces, and identify conditions detrimental to proper and or timely completion
or other conditions affecting performance of the Work.
3. Prior to erection:
c. Dimensional verification measurementsprior to fabricating glass fin
structure components
d. Verify location of structural supports and roof anchoring and if their
position is within tolerances and proper alignment.
4. Proceed with application only after unsatisfactory conditions have been
corrected.
26.3.2 INSTALLATION
A. Site assemble and erect glass in accordance with approved shop drawings,
manufacturer's installation instructions and GANA Glazing Manual.
B. Particularly:
1. Do not install glass with edge damaged or other imperfections.
2. Allow for settling, expanding, and contracting to occur without breaking glass.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
C. Do not field cut or alter structural framing without written approval from manufacturer
and Architect.
26.3.2.1 Sealants:
C. Do not proceed with sealing during the hottest hours of the day.
D. Surfaces must clean dry and free from oil, grease and dust.
F. Clean and prime joints as recommended by sealant manufacturer. Install sealant and
related backing material around perimeter of frames or supporting system.
G. Apply sealant filling joint and tool smooth to insure full contact with adjacent surfaces.
Strike off excess material.
A. Manufacturer's Field Services: Field engineer from glass manufacturer shall visually
inspect the system at the following stages to ensure compliance with manufacturer's
recommendation for installation.
1. Prior to erection, verify structural support system is within tolerances and proper
alignment.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
4. Issue written report within 48 hours of each Site inspection to Contractor and
Architect.
D. Provide final protection and maintain protection and other precautions required to
ensure that system will be without damage or deterioration (other than normal
weathering) at time of acceptance and Substantial Completion. Use protective
methods and materials approved by Engineer, including temporary covering.
E. At the end of the installation, the Subcontractor shall provide the following
administrative and procedural requirements for Operation and Maintenance (O&M)
Manuals, including preparing and submitting Instruction Manuals covering the care,
preservation, and maintenance of the mechanical and architectural products and
related finishes.
END OF SECTION
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
27 SECTION 26 50 05 - LIGHTING
Furnishing, installing and connecting lighting and associated wiring and conduit. Drawings
and general provisions of the Contract, including General and Supplementary Conditions
apply to this Section.
C. Bollard Light
Location
The fire alarm system contractor shall be registered with, and on the approved list of, the Civil
Defence Department.
A. Section 1 General
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
4.13.1.2 Safety: Non-combustible and Non-Toxic conforming to all applicable standards and
codes to meet or exceed the appropriate standards
4.13.1.3 Economy: Cost-effective and, to a consistent level of quality, commonly available and
not restricted to a few suppliers based on current industry levels of technology and
local building practice. Proven in use, they will not require new research, designs or
manufacturing techniques.
4.13.1.4 Durability: Materials shall be carefully selected for their wear, strength and weathering
qualities. They are to be resistant to abrasion, impact, vandalism, humidity,
temperature change, sunlight and the marine atmosphere. Colour and appearance
shall remain unchanged during the life cycle of the material.
4.13.1.5 Aesthetics: Emphasis shall be laid on clear, simple use of materials and avoidance of
overstatement in design. Also to be avoided are short-lived or ephemeral design
fashions or fads, pastiche and applied ornamentation. Stations are to provide a
comfortable and controlled environment and are to be bright, colorful and welcoming.
Attempts shall be made where possible to introduce natural lighting to enhance internal
spaces.
4.13.1.6 Maintainability: Materials shall be easily cleaned, in a single operation with standard
cleaning equipment and agents. repair and replacement with regards to the availability
of material in the region shall be considered in the selection of materials
13
47.1.1.3 Global Sustainability Assessment System (Gsas)
13
Each material will be submitted with complete assessment sheet Template. Refer section 01 61 05
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
B. 01 00 00 General requirements
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
27.1.3 SUBMITTALS
Shop drawings - submit manufacturer's product data and installation instructions on each
type building light fixture and component. Data shall include, but not be limited to, catalogue
number, certified photo-metrics by an independent source, lens/louver type, power supply
data, lamp socket type if applicable, lamp data and any other information necessary to
indicate compliance with the contract documents.
Submit light fixture shop drawings in booklet form with separate sheet for each fixture,
assembled in "light fixture type" alphabetical and/or numerical order, with proposed light
fixture and accessories clearly indicated on each sheet. If initial submittals do not include all
information as specified, additional submittals shall be required until all have been approved
by the Architect
No variation from the general arrangement and details indicated on the contract document
drawings shall be made on the shop drawings unless required to suit the actual conditions on
the project, and then only with the written acceptance of the Architect. All variations must be
clearly indicated as such on the shop drawings submitted for approval.
For all light fixture types, and where shop drawings are not specifically indicated for
submission, submit standard drawings, or cut sheets, including product data and photometric
data.
Submit power manufacturers recommendations of maximum distance between lamps and
associated remote power supplies.
Maintenance data - Submit maintenance data and parts list for each light fixture and
accessory; Include that data, product data, and shop drawings in a maintenance manual; Also
to include recommended maintenance requirements from the manufacturers of each light
fixtures type, including:
A quantity of two (2) of any special tools required.
Types of cleaners to be used.
Replacement parts identification lists and local contacts for all light fixtures,
including all lamping.
Recommended maintenance schedule and procedures.
Final as-built shop drawings for all light fixtures that required shop drawing
submittals.
Installer statement: - With all submittals, provide a statement declaring that the contractor has
coordinated all lighting light fixtures and light fixtures drawings with the drawings and details
of the Architectural, Structural, Electrical, Mechanical, and other related trades to assure an
accurate and efficient installation.
Samples:
All samples should be supplied with the necessary equipment and power rating required for
operation and testing in the location of the project.
Upon approval of shop drawings and any other required submissions, the ontractor shall
submit fully complete samples of custom built products to the Employer and Lighting Designer
for final approval.
Alll samples and related componentry shall be submitted in accordance with this Specification and the
Luminaire Schedule.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
Mock-ups:
The Contractor shall allow to temporarily install, connect and adjust any mock-ups required
and agreed to by Employer and Lighting Designer. All arrangements, including ordering,
delivery, associated safety precautions, installation and removal of the mock up luminaires
and associated equipment shall be the responsibly of the Contractor
Installer is solely responsible for quality control of the work. Comply with the requirments as
per Contract documents.
Materials equipment and installation shall conform to the latest edition of all applicable codes
and the requirements of all authorities having jurisdiction. All work shall be performed in strict
accordance with the building standards and the requirements of the local utility company.
Quality - All light fixtures, lamping, accessories, and materials, shall be new, of good quality,
and free from defects which in any manner may impair their character, appearance, strength,
durability and function.
Approved alternate manufacturers - The lighting designated for this project is based on
light fixture types, and lamping, as specified. Identification of specified light fixtures by means
of manufacturers names and catalogue numbers is to establish basic features, aesthetics
and performance standards.
Where approved alternate manufacturers are listed for a particular light fixture type, an
alternate light fixture from that manufacturer may be submitted as a proposed alternate light
fixture to the one specified. The alternate light fixture must still meet all of the performance
requirements noted below in paragraph, Equality, and must be submitted for evaluation by the
Architect.
Where an approved alternate manufacturer and specific alternate light fixture catalog
numbers are listed for a particular light fixture type, the specified alternate light fixture from
that manufacturer may be submitted as an equal light fixture to the one specified. The light
fixture must still be submitted for review by the Architect.
Equality - Equality shall be determined by comparisons of actual light fixtures, and lamping,
and of the following light fixture and lamping characteristics. The Architect shall be the final
authority with respect to equality.
Performance:
Photometric data.
Distribution.
Utilization.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
Efficacy.
Efficiency.
Average brightness/maximum brightness.
Spacing to mounting height ratio.
Visual comfort probability.
Power supplies.
Heat dissipation.
Construction:
Engineering.
Workmanship.
Rigidity.
Types of materials
Thickness and gages of Light Fixture materials.
Light tightness, no light leaks will be accepted.
Permanence and quality of materials and finishes.
Physical Dimensions, both visible, and hidden from normal viewing.
Required clearance dimensions.
Maintenance:
Re-lamping ease
Replacement of transformers, ballasts, lamp sockets, and other components or
accessories.
Appearance.
Light Tightness
Aesthetic appearance.
Lamping:
Regulatory requirements - Installer to verify with light fixture manufacturer and assure all
light fixtures do comply with applicable requirements of the laws, codes, ordinances and
regulations as required by the project standards.
Light fixture components as plastic diffusers to be in compliance with the fire and safety
requirements NFPA130. Light fixture manufacturer to manufacture as per required NFPA130
fire and safety standards.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
Escape light fixtures to be reviewed and approved by QCD. Supplier to coordinate directly
with light fixture manufactures to grant this approval process
Assurance - The supplier / installer shall warrant each light fixture, its finishes, and all of its
component parts, to be free from defects for a period equal to the period offered by the light
fixture manufacturer for each specific light fixture; from the date of acceptance if operated
within the rated voltage range. Replacement of faulty materials, and the cost of labour
required to make the replacement shall be the responsibility of the supplier / installer.
Contractor shall be responsible for all necessary site storage for all luminaires and associated
equipment. Contractor shall ensure appropriate handling, transportation and handling
measures are in place to avoid any damage.
Exposed finishes shall be protected during manufacture, transport, storage and handling.
Delivered materials shall be identical to the approved samples.
All luminaires shall be tagged and/or marked with type number as per the Lighting
Designers' Luminaire Schedule and Drawings, and indicate general location of installation.
Delivered luminaires shall be supplied with all necessary wiring, sockets, drivers, ballasts,
shielding, channels, lenses and other parts and appurtenances necessary for installation of
each luminaire type.
Store light fixtures in original packaging. Store inside well-ventilated area protected from
weather, moisture, soiling, extreme temperatures, humidity, laid flat and blocked off ground.
Handle light fixtures carefully to prevent damage, breaking, and scoring of finishes. Do not
install damaged units or components; replace with new.
Coordinate with other work including ceiling type, wires/cables, electrical boxes and light
fixtures, and raceways, to properly interface installation of interior lighting fixtures with other
work.
Sequence lighting installation with other work to minimize possibility of damage and soiling
during remainder of construction.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
27.1.7 WARRANTY
Product Warranty as defined in the tender contract; Guarantee shall cover repair and
replacement of defective material and workmanship.
27.2.1 DESCRIPTION
Provide light fixtures as shown on the drawings and schedules complete with all specified
lamps, completely wired, controlled and securely attached to supports. Including:
a. Light Fixture Types: Type of light fixtures shall be as indicated on the drawings and
as specified below in the Light Fixture Type Schedule.
b. Lamp holders as indicated on the drawings and as specified in the Lighting
Schedule.
c. Reflectors and baffles, anosized finish as, indicated on the drawings and as specified
below in the Lighting Schedule.
d. Lamps for each type of light fixtures shall be as indicated on the drawings and as
specified in the Lighting Schedule.
e. LED Luminaires marked in accordance with the requirements of IEC 60598-2-1 for
general-purpose luminaires of IEC 60598-2-2 for recessed luminaires
Coordinate installation, connection, and securing of all lighting light fixtures with adjacent
construction and with all other applicable trades to provide a total system that is complete and
finished in appearance.
Minor details, not usually indicated on the drawings nor specified, but that are necessary for
the proper execution, completion and installation of the light fixtures, shall be included, as if
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
Where any light fixtures type or lamping designated has been omitted or cannot be
determined by the installer, request a clarification from the Architect and provide the light
fixture type as directed. Where an inconsistency in the specifications and/or the drawings is
determined by the installer, request a clarification from the Architect and provide as directed.
All fixture shall be provided with label indicating the lamp voltage and wattage. Labels shall
be provided that indicate this information.
Reflectors, cones or baffles shall be absolutely free of spinning lines, ripples or any marks or
indentations caused by riveting or other assembly techniques. No rivets or hardware shall be
visible after installation.
Where modified light fixtures are specified, fixtures shall be modified as required with lamp
sockets positioned to provide desired photometric performance.
Where custom colour is indicated on the schedule, a colour other than the manufacturer's
standard will be required for all parts and components visible after installation. The finish
material will be of the same type and process as applied to the standard catalogued item.
Custom colours shall be factory finished.
Light fixture trims shall be provided to coordinate with the ceiling material.
Ferrous mounting hardware and accessories shall be finished using either a galvanic or
phosphate primer backed paint process to prevent corrosion and discoloration of plaster
surfaces.
Hardware: For steel and aluminium light fixtures, all screws, bolts, nuts and other fastening
and latching hardware shall be: stainless steel; cadmium; or equivalent. For stainless steel
light fixtures, all hardware shall be stainless steel.
Light leaks: Light fixtures shall be free of light leaks.
Light leaks between trims of recessed Light Fixtures and the surfaces they are mounted upon
shall not be acceptable.
Heat dissipation: Light fixtures shall be designed to provide sufficient heat dissipation and
ventilation of lamps and ballasts including vent holes where required.
Lamping: Lamping for each type of Light Fixture shall be as indicated on the drawings and as
specified in the light fixture schedule.
Voltage: Voltages for each light fixture type shall be as indicated on the drawings and
schedules.
Where indicated recessed luminaries shall have housing accessible from below to provide
through access to power supplies where an accessible panel is not foreseen.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
d) Power Factor
The power factor of the LED luminaire circuit and self-ballasted LED lamp shall be a
minimum 0.9 and minimum 0.7 respectively.
Each model of LED luminaire of self-ballasted LED lamp shall be tested to comply with the
above performance requirements. The Contractor shall submit the test report from the
accredited laboratories to certify each model of LED luminaire or self-ballasted LED lamp
complying with the standards proposed by the Contractor and agreed by the Lighting
Designer.
27.3.1 GENERAL
Examine areas and conditions under which light fixtures are to be installed, and substrate for
supporting light fixtures. Do not proceed with work until unsatisfactory conditions have been
corrected.
27.3.2 INSTALLATION
Coordination - Refer to respective reflected ceiling plan for each area. Reflected ceiling plans
indicate proper light fixture location. Drawings and schedules indicate light fixture
characteristics type, quality, quantity, etc. Verify with the ceiling supplier the type and design
of actual ceiling installed in each area and coordinate compatible light fixture flange.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
Coordinate compatibility of lamp, power supplies , control systems, and associated start--
up/commissioning per manufacturers recommendations and warrantees. Be responsible for
any failures or premature lamp-life reductions resulting in correction of the same.
Store all luminaries and accessories in a secure, dry, heated location protected from dust, dirt
and moisture, in the original cartons.
All light fixtures in one room are the same type, unless otherwise indicated.
Make installation such that the light fixture is free of finger marks, flaws, scratches, dents or
other imperfections.
Install lighting Light Fixtures in strict accordance with the manufacturers recommendations
and instructions.
Provide adequate and sturdy support for each lighting light fixture. Provide all appurtenances
required for the proper, safe and distortion-free installation of all Light Fixtures in the various
surfaces in which they appear. Determine surface types from the architectural drawings.
All light fixture, once lamped and tested, shall remain off for the duration of construction.
Light Fixtures shall not be used as construction work lights by the installer for any duration of
time.
Do not install light fixture parts such as: finishing plates; trims; reflector cones; baffles;
aperture plates, light controlling elements for air-handling light fixture; or decorative elements,
until after plastering, painting, completions of ceiling tiles, other work that may mar light
fixture, and general clean up, has been completed.
Clean light fixtures of dirt and construction debris upon completion of installation. Clean
fingerprints and smudges from lenses, baffles and/or louvers.
Light Fixtures shall be left clean at the time of acceptance of the work with every lamp in
operation. If light fixtures are deemed dirty by the Architect at completion of the project, the
installer shall clean them at no additional cost to the Owner
Where possible protect installed light fixtures from damage during remainder of construction
period.
Locations of light fixtures are shown on drawings. Verify exact quantities, location and
spacing with the architectural drawings and other reference data before ordering of light
fixtures and during installation.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
drawings. The accuracy of the photocell device shall be within 5% with no moving parts. The
photocell unit shall be weatherproof constructed to IP54. Additional circuitry shall be provided
to achieve a delay, adjustable from 0-30 seconds so as to eliminate switching due to lightning
or other short period changes in illumination. The Photocell device shall be the fail-safe type
with a range of switch-on values between 50lux and 1000lux, and an ON/OFF ration of 1:1.5.
Building Automation & Control System (BACS) and Control Protocol
All required lighting controllers including: DALI, DMX, Leading & Lagging Edge Dimmers,
Relays and Contactors are to integrated with the Automation & Control System (BACS).
All luminaires are to be dimmable using the protocol specified in the luminaire schedule.
Where "tuneable" LED technology is specified, the appropriate protocol, including DALI &
DMX, and dimming technology shall be integrated and interfaced with the BACS
The BACS shall provide dedicated and programmable Timeclock control to all Front of House
(FOH) lighting.
The BACS/ lighting control system must provide an override function for all sensor-type
devices such as Passive Infrared (PIR), Sonic, Photocell, etc.
Zoned Lighting & Proposed Circuits
All FOH lighting shall be controlled in "zones" to allow individual control of specific areas.
Refer to Lighting Load and Control Intent Schedule for details
The lighting documentation, including drawings and schedules, indicate the proposed
grouping of lights to enable adequate control over certain areas, zones and lights. The
Contractor shall coordinate and verify all load requirements, proposed circuiting/grouping of
lights with the Electrical Engineer prior to bidding and installation.
Operation times
During the hours which the station is open and operational all lights shall be in 'ON' mode
(except those controlled by sensors) in order to comply with the lighting and uniformity levels
specified in the Employer's Requirements. Refer also to the 'Lighting Load and Control Intent
Schedule' for a more detailed summary of the control intent.
During the hours which the station is closed, it is intended that half of the total station FOH
lighting will be required. Refer to the Lighting Load and Control Intent Schedule for details.
Refer also to the 'Lighting Load and Control Intent Schedule' for a more detailed summary of
the control intent.
Dimming
All FOH zones and circuits shall be dimmable and connected to an appropriate controller with
dimming capability. Set dimmed levels and "scenes" may be required after installation to suit
site-specific characteristics. The lighting "scenes shall be programmed/ commissioned to
meet the requirements of the Employer and Lighting Designer prior to project completion.
Lighting Levels
Programming the light levels of certain zones may be required at the commissioning stage in
order to resolve any illumination levels which may appear inconsistent. The calculation
results, shown in the 'Lighting Design Report' indicate areas where this treatment may be
required. At the time of commissioning, the Contractor shall allow suitable manpower and
equipment necessary to adjust, test and set the lighting levels accordingly.
27.3.2.3 Adjustments
Under the supervision and direction of the Lighting Designer the Contractor shall provide
manpower and tools for final focusing and adjustment for all adjustable fixtures prior to
Substantial Completion. If the Lighting Designer requests additional adjustments after
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
27.3.2.4 Demonstration
Upon completion of installation of luminaries, and after building circuitry has been energized,
apply electrical energy to demonstrate capability and compliance with requirements. Where
possible, correct malfunctioning units at site, then retest to demonstrate compliance;
otherwise, remove and replace with new units, and proceed with retesting.
Escape Lighting Tests: After escape lighting units have been installed and building circuits
have been energized apply and interrupt electrical energy to demonstrate proper operation.
Replace malfunctioning units with new units and proceed with retesting. Give the Architect
advance notice of dates and time for all field tests. Provide instruments as required to make
positive observation of test results.
At the end of the installation, the Subcontractor shall provide the following administrative and
procedural requirements for Operation and Maintenance (O&M) Manuals, including preparing
and submitting Instruction Manuals covering the care, preservation, and maintenance of the
mechanical and architectural products and related finishes.
END OF SECTION
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
This section describes external grills at Elevator for buildings exterior and includes all
standards, material, equipment, labor and service necessary according with drawings.
Location
GRADE LEVEL - Public area - secondary shelters - Elevators
The fire alarm system contractor shall be registered with, and on the approved list of, the Civil
Defence Department.
A. Section 1 General
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
14
Each material will be submitted with complete assessment sheet Template. Refer section 01 61 05
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
B. 01 00 00 General requirements
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
28.1.3 SUBMITTALS
2. For final Review leading to final Design Certification, submit the Regional
Materials Calculator and the following supporting documents:
a. Bill of Quantities
b. List of materials
c. Specifications listing manufactures and locations
d. Cost estimates
e. Description of the material
f. Description of how the material has been reused
g. Report providing distances of manufacturers
h. Any documentation from manufacturers outlining thirdparty sourcing
standards such ISO Certification and other environmental certifications.
C. Product Data: For galvanized steel grills, accessories and installations materials.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
D. Shop Drawings ( BIM model and dwgs ) : Include plans, elevations, sections, all
framing, fixings, bracketry and support, detailed and attachments to other Work.
Set of samples and array shall be delivered within 90 days before installation
F. Qualification Data: For firms and persons specified in "Quality Assurance" Article to
demonstrate their capabilities and experience. Include lists of completed projects
with project names and addresses, names and addresses of architects/engineers
and owners, and any other information required by Contractor.
G. Manufacturer Qualifications: A firm that complies with the following requirements and
is experienced in manufacturing External grills indicated for this Project and with a
record of successful in-service performance.
D. Grilles and diffusers tested and rated in accordance with ASHRAE Standard 70-72,
ADC Test Code 1062-GRD and ISO 3741 or have ARI certification
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
B. Environmental Limitations:
3. For proprietary products, comply with manufacturer's written recommendations
for installation procedures.
4. Delimit and limit areas to traffic during installation.
28.1.7 WARRANTY
Product Warranty as defined in the tender contract; Guarantee shall cover repair and
replacement of defective material and workmanship.
28.2.1 DESCRIPTION
28.2.1.2 Frame:
Wall Thickness: 18 gage (1.3 mm), nominal.
Material:Roll formed galvanized steel.
28.2.1.3 Blades:
Style: Drainable. 37-1/2 degree angle on 4 3/4 inches (121 mm) centers.
Wall Thickness: 18 gage (1.3 mm), nominal.
Material:Roll formed galvanized steel.
Minimum assembly size: 12 inches wide by 12 inches high (305 mm x 305 mm).
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
Maximum Factory Assembly Size, 120w x 90h (3048 x 2286) or 90w x 120h 92286
x 3048)
.
PART 3 - EXECUTION
28.2.2 GENERAL
A. Inspect areas to receive louvers. Notify the Architect of conditions that would
adversely affect the installation or subsequent utilization of the louvers. Do not
proceed with installation until unsatisfactory conditions are corrected.
28.2.3 INSTALLATION
B. Install louvers plumb, level, in plane of wall, and in alignment with adjacent work.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
END OF SECTION
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
This section include floor stone tiles work, including trim, base and accessories are shown on
the Drawings. The Contractor shall furnish all labor, materials, tools, and equipment required
to complete the Work.
NFPA 130 Standard for Fixed Guideway Transit and Passenger Rail Systems
NFPA 101 Life Safety Code
D. Section 1 General
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
4.13.4.2 Due to economic grounds the coefficient of reflection within underground stations
shall be at least 0.25 measured according to the technical specifications; highly
reflective floor materials are however, to be avoided.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
15
47.1.3.4 Global Sustainability Assessment System (Gsas)
15
Each material will be submit with complete assessment sheet Template. Refer section 01 61 05
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
Use a minimum of 50% (based on cost) of wood-based materials and products that are certified in
accordance with the Forest Stewardship Councils principles and criteria, for wood building
components.
29.1.2 SUBMITTALS
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
2. For final Review leading to final Design Certification, submit the Regional
Materials Calculator and the following supporting documents:
a.Bill of Quantities
b.List of materials
c.Specifications listing manufactures and locations
d.Cost estimates
e.Description of the material
f.Description of how the material has been reused
g.Report providing distances of manufacturers
h.Any documentation from manufacturers outlining thirdparty sourcing
standards such as FSC Chain of Custody Certification or ISO
Certification
K. Set of sample and array shall be delivered within 90 days before installation.
L. Shop Drawing ( BIM model and dwgs ): Indicate tile layout, patterns, color
arrangement, perimeter conditions, and junctions with dissimilar materials, control
and expansion joints, thresholds, accessories, and setting details.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
N. Extra Materials:
2. Provide wrapped, packaged and labelled extra material consisting of three
pieces of each type, size and configuration of stone used ont the project.
F. The Contractor shall be responsible for the quality of work and shall develop and
propose programs and methods of construction and testing to achieve the specified
quality to the approval of Project owner & Engineer.
G. Quality assurance
6. Comply with the applicable provisions of the standards and specifications.
7. Provide materials obtained from only one source and from the same
manufactured lot for each type and color of tile.
8. Cut natural stone shall be standard grade, free of flaws, reeds, rifts,
laminations, cracks, seam, starts or other defects which may impair its
strength, durability, or function. Exposed surfaces shall be free from spots,
spalls, chips, stains, discoloration or other defects which are not within the
approved sample range and would affect its appearance.
9. Color texture and finish of the stone shall be within the range of approved
samples.
10. Source: Provide stone units, which are the products of one supplier and one
quarry as specified. Stone material shall comply with the relevant standards.
H. Allowable variations in finished work shall not exceed the following deviations from
level of plumb and elevations, locations, slopes, and alignments shown:
2. Floors: 3 mm in 3 m run, any direction, 3 mm at any location, 0.8 mm offset
at any location.
J. Mock-Up
3. The Contractor shall construct mock-up panel using materials specified for final
work.
4. The Contractor shall construct mock-up as directed, at location indicated or
directed, and of full thickness and obtain Project Owner & Engineer
acceptance of visual qualities of mock-up.
The Contractor shall deliver, handle and store equipment and material units in as the
following requirements:
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
F. Deliver packaged materials and store in a dry place in original containers with seals
unbroken and labels intact until time of use, in accordance with manufacturer's
directions.
F. Temperature shall not be less than 10C during the work and for 7 days after
completion.
H. The Contractor shall provide adequate ventilation when using organic grouts.
47.1.4 WARRANTY
Product Warranty as defined in the tender contract; Guarantee shall cover repair and
replacement of defective material and workmanship.
29.2.1 DESCRIPTION
E. Cut natural stone shall be of sound flat surface, free from foreign matter, veins, hair-
cracks and pits.
F. Cut natural stone shall have edges in good condition and without any broken
corners.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
15. Provide granite cut from sound stock with even texture, shade and marking,
and free from imperfections.
16. Finishes: As indicated on Drawings.
17. Provide granite to the shapes and sizes indicated on the Drawings with length
and width dimensions of each individual slab within plus or minus 1 mm and
thickness within 2 mm from those specified.
18. Granite for Stairs: Unless otherwise indicated on Drawings, marble shall be 40
mm thick for treads with non-slip inserts and 20 mm thick for risers and
landings. as shown on Drawings.
19. Granite for external paving shall be of dimensions and pattern as indicated on
Drawings, thickness not less than 30 mm unless otherwise noted on drawings.
20. Granite shall be laid with matching grain and color.
A. The Contractor shall provide portland cement mortar only where indicated or
detailed.
B. Cement shall be ordinary portland cement and shall comply with SSA 143.
C. Sand may be natural or manufactured. It shall comply with ASTM C144, and shall
be clear, sharp, and fine aggregate as per grading.
D. Water shall be clear and without deleterious substances which would impair
strength and durability of mortar or grout. All containers for water storage shall be
clean and sun protected.
47.1.4.1 Sealants
The following sealant material shall be used as specified by Project Owner & Engineer :
F. Polyurethane sealant.
G. Poly-sulphide sealant.
H. Silicone sealant.
47.1.4.2 Accessories
C. Division Strips
1. Division strips to separate floor tiles from other floor finishes shall be 13 mm
high by 40 mm wide; 3 mm cross section at top edge with integral provisions
for anchorage in mortar bed or to substrate and shall be made of:
a. Stainless steel.
b. Aluminum.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
SAMPLE TO BE PROVIDED
47.1.6 TOLERANCE
C. All arises shall be clean, plane and of uniform dimension. Wearing surface areas
shall not be less than 70% of the plan area.
3. Tolerances: Length& Width +/- 2mm
4. Thickness +/- 3mm
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
29.3.1 GENERAL
47.1.6.1 Inspection
G. The Contractor shall examine surfaces to receive tiles, setting beds, and
accessories before commencing tile work and make sure that the deviations are
within allowable tolerances for setting beds by portland cement mortar and dry-
sets methods.
J. Electrical and mechanical items, grounds, anchors, supports, plugs, hangers etc.
to be installed in coordination with the work of other trades shall be in correct
place before proceeding with the tile work.
K. Installer's Examination
3. The installer shall examine conditions under which construction activities of this
Section are to be performed, including but not limited to conditions specified in
paragraph above, and submit written notification if substrates or conditions are
unacceptable.
4. The Contractor shall transmit 2 copies of installer's report to Project Owner &
Engineer within 24 hours of receipt of report.
L. Beginning construction activities of this Section indicates the Contractors
acceptance of substrates and conditions under which construction activities of
this Section are to be performed.
47.1.6.2 Preparation
E. Neutralize, seal, and prepare substrates to receive tile in accordance with ANSI
A108.1 through A108.7 as applicable and in accordance with manufacturer's
recommendations of proprietary setting beds.
F. Seal substrate surface cracks with filler. Level existing substrate surfaces to
acceptable flatness tolerances.
G. Cementitious Substrates
1. Grind high spots of concrete slabs to achieve specified tolerances.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
29.3.2 INSTALLATION
A. Saturate concrete subfloor with clean water several hours before placing setting bed.
Remove surface water about one hour before placing setting bed.
B. Apply slush coat of cement grout over surface of concrete subfloor about 15 minutes
prior to placing of setting bed. Limit area to avoid its drying out prior to placing of
setting bed. Slush coat shall be properly mixed and shall not exceed the thickness of
1.5 mm.
C. Mix setting bed in proportions by volume of one part of cement to 3 parts of sand
(measured in damp loose condition) to the quantity of water to produce a stiff mixture
with a moist surface when setting bed is ready to receive flooring.
D. Spread and screed setting bed to uniform thickness indicated to produce sub-grade
elevations required for accurate setting of tiles to finished floor elevations shown. Mix
and place only the amount that can be covered with prior to initial set. Cut back, bevel
edge, remove and discard setting bed which has reached initial set prior to the
placing of tiles.
E. Butter backs of flooring units with skim coat of neat cement and water just prior to
placing it on bed.
F. Tamp flooring units until firmly bedded to proper finished floor elevations indicated
also set and level each unit in single operation. Do not return to areas already set and
disturb for leveling purposes prior to initial set of cement bed.
G. Where blocks/slabs do not fit at the edge, restraints or other obstructions such as
manholes or up-stands the gaps shall be filled using cut blocks/slabs. Blocks/slabs
shall only be cut using a saw - no guillotine cutters shall be allowed on this site. Any
damaged or broken blocks/slabs shall not be laid. Any blocks/slabs damaged during
compaction shall be replaced.
Grouting Floors
A. Mix grout in proportion, by volume of one part Portland cement to 2 parts fine
aggregate (measured in damp loose conditions). Except for thin joints with fine sand,
reduce fine aggregate proportion to one part. Add liquid admixtures in proportion and
concentration as per manufacturer's recommendations. Select grout materials to
match the approved samples.
B. Grout joints in flooring units, except at expansion and control joints indicated to be
filled with sealant. Fill all gaps to produce a finished joint which is uniform in color,
smooth and without voids, pinholes or low spots.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
D. Cure grout by maintaining in a moist condition for not less than 7 days.
B. Except where saw-cut cold expansion joints are indicated on the Contract Drawings,
provide expansion control joints where tile abuts vertical surfaces, dissimilar surfaces,
where structural joints or changes of materials occur in tile
E. The contractor shall clean grout and setting materials from face of tile while materials
are workable. Leave tile face clean and free of all foreign material. Clean sealer from
faces of tile. Except as specifically recommended by both tile manufacturer and
grout materials manufacturer, acid cleaning of tile and grout surfaces is prohibited.
F. The contractor shall unglazed tile may be cleaned with acid solutions only when
permitted by the tile and grout manufacturer's printed instructions, but not sooner
than 14 days after installation. Protect metal surfaces, cast iron and vitreous
plumbing fixtures from effects of acid cleaning. Flush the surface with clean water
before and after cleaning.
47.1.6.5 PROTECTION
D. The contractor shall apply to all clean completed tiled works a protective coat of
neutral cleaner solution, 1 part cleaner to 1 part water or as specified by the
manufacturer of the cleaner.
E. The contractor shall protect installed work with craft paper or other heavy covering
during the construction period to prevent damage.
F. The contractor shall remove protective coverings and rinse neutral cleaner from all tile
surfaces, before final inspection.
G. Prohibit foot and wheeled traffic from using tiled floors for at least 3 days, preferably 7
days.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
H. Where use of newly tiled floors with cement type grout is unavoidable, use shall be
permitted 3 days after the installation, only if minimum of 25 mm thick and 550 mm
wide flat boards are placed in walkways and wheel ways.
I. Leave finished installation clean and free of cracked, chipped, broken, unbonded, or
otherwise defective work.
END OF SECTION
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
Location
Secondary Shelter entrance
Subcontractor shall provide all documents, certifications, test result and other information in
order to give evidence of the compliance to the Employer Requirements and to the previous
Codes.
B. Section 5 Concrete
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
4.13.1.2 Safety: Non-combustible and Non-Toxic conforming to all applicable standards and
codes to meet or exceed the appropriate standards
4.13.1.3 Economy: Cost-effective and, to a consistent level of quality, commonly available and
not restricted to a few suppliers based on current industry levels of technology and local
building practice. Proven in use, they will not required new research, designs or
manufacturing techniques.
4.13.1.4 Durability: Materials shall be carefully selected for their wear, strength and weathering
qualities. They are to be resistant to abrasion, impact, vandalism, humidity, temperature
change, sunlight and the marine atmosphere. Colour and appearance shall remain
unchanged during the life cycle of the material.
4.13.1.5 Aesthetics: Emphasis shall be laid on clear, simple use of materials and
avoidance of overstatement in design. Also to be avoided are short-lived or
ephemeral design fashions or fads, pastiche and applied ornamentation.
Stations are to provide a comfortable and controlled environment and are to be
bright, colorful and welcoming. Attempts shall be made where possible to
introduce natural lighting to enhance internal spaces.
4.13.1.6 Maintainability: Materials shall be easily cleaned, in a single operation, with standard
cleaning equipment and agents. Repair and replacement with regards to the availability
of material in the region shall be considered in the selection of materials.
16
30.1.2.4 Global Sustainability Assessment System (Gsas)
[M.1] Regional Materials
a) Identify the products and materials that are available within region
( < 200 kilometers).
b) Materials & Products must be assembled as a finished product within the region to be considered
locally sourced.
[M.2] Responsible Sourcing of Materials
All materials must comply with the following standards.
a) Timber: FSC (Forest Stewardship Council) Chain of Custody Certification.
b) ISO 260000, ISO 9001, ISO 14001.
c) BS8902: 2009 or equivalent.
[M.3] Recycled Materials
Verify and document the post- and Pre-consumer content of recycled material through manufacturer or
supplier specifications.
[M.6] Design for Disassembly
a) Building elements and components-including structure, finishing materials and equipment-should
have the ability to be easily separated and disassembled.
b) To facilitate disassembly include the use of modular components, movable partitions and bolted
connections or fastening systems for the structure and/or building envelope.
[M.7] Life Cycle Assessment (LCA)
a) Provide approved Environmental Product Declarations (EPD) for materials from a Certification Body.
[IE.9] Low-Emitting Materials
a) All indoor materials and finishes shall be verified the VOC content (Refer to attached VOC Limit).
b) Material Safety Data Sheets or other documentation listing VOC content can be acceptable.
16
Each material will be submitted with complete assessment sheet Template. Refer section 01 61 05
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
30.1.3 SUBMITTALS
The sign subcontractor shall submit the below list of document prior to fabrication
A. GSAS Design assessment
1. For Initial Review, submit the Regional Materials Calculator and the
following supporting documents:
a. Intended list of materials
b. Documentation outlining all applicable materials and the percent of the
recycle content.
c. Full representative panel assembly / quality sample;
d. Mock up.
e. QCD certification
f. Material / Component technical data with Health and Safety
requirements;
g. Material / Component / Assembly calculation.
h. Method statement for construction / installation.
i. O&M manual and as built BIM and drawings
2. For final Review leading to final Design Certification, submit the Regional
Materials Calculator and the following supporting documents:
a. Bill of Quantities
b. List of materials
c. Specifications listing manufactures and locations
d. Cost estimates
e. Description of the material
f. Description of how the material has been reused
g. Report providing distances of manufacturers
h. Any documentation from manufacturers outlining thirdparty sourcing
standards such as FSC Chain of Custody Certification or ISO
Certification
B. Shop drawings indicating all dimensions of modules proposed for use, including
composition of the various elements.
C. Copies of all test reports indicating mix components and test results in compliance
with specification requirements.
D. The Contractor shall submit samples of stone curbs and stoppers for approval of
quality, color, finish and texture.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
C. Certification shall be maintained throughout the production of the stone curbs units.
Production shall immediately stop if at any time the fabricators certification is revoked,
regardless of the status of completion of contracted work. Production will not be
allowed to re-start until the necessary corrections are made and certification has been
re-established. In the event certification(s) cannot be re-established in a timely manner,
causing project delays, the fabricator, at no additional cost, will contract out the
remainder of the units to be manufactured at a PCI certified plant
E. Source Limitations:
1. Obtain natural stone curbs from single source from single quarry with
resources to provide materials of consistent quality in appearance and
physical properties.
2. Obtain mortar ingredients of uniform quality for each cementitious component
from a single manufacturer and each aggregate from one source or
producer.
3. Obtain each type of stone accessory, sealant, and other material from a
single manufacturer for each product.
F. Mock-ups: Before installing stone curbs, build mock-ups for each form of construction
and finish required to verify selections made under sample Submittals and to
demonstrate finished joints, aesthetic effects and qualities of materials and execution.
Build mock-ups to comply with the following requirements, using materials indicated
for the completed Work:
1. Build mock-up of typical flooring area as shown on Drawings as part of
building.
2. Build mock-ups in the location and of the size indicated or, if not indicated, as
directed by Engineer.
3. Notify Engineer seven days in advance of dates and times when mock-ups
will be constructed.
4. Demonstrate the proposed range of aesthetic effects and workmanship.
5. Obtain Engineer's approval of mock-ups before starting installation.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
B. Mark stone units, on surface that will be concealed after installation, with
designations used on Shop Drawings to identify individual stone units.
E. Handling: Handle stone curbs carefully to avoid distorting and damage to edges,
corners and finished surfaces.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
B. Close areas to traffic during natural stone cladding system installation and for
appropriate time period after installation as recommended in writing by
manufacturer.
30.1.7 WARRANTY
Product Warranty as defined in the tender contract; Guarantee shall cover repair and
replacement of defective material and workmanship.
30.2.1 DESCRIPTION
The natural stone in this section - DESERT BROWN GRANITE stone - shall be on sample
selection.
The look & feel benchmark samples is available in the QR samples room.
E. The Contractor shall provide portland cement mortar only where indicated or
detailed.
F. Cement shall be ordinary portland cement and shall comply with SSA 143.
G. Sand may be natural or manufactured. It shall comply with ASTM C144, and shall
be clear, sharp, and fine aggregate as per grading.
H. Water shall be clear and without deleterious substances which would impair
strength and durability of mortar or grout. All containers for water storage shall be
clean and sun protected.
30.2.1.3 Sealants
The following sealant material shall be used as specified by Project Owner & Engineer :
J. Polyurethane sealant.
K. Poly-sulphide sealant.
L. Silicone sealant.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
30.2.3 TOLERANCE
Laid to the lines and grades shown on Drawings with a tolerance of plus or minus 3 mm.
30.3.1 INSTALLATION
A. Elements shall be set out to lines and grades as x drawing. Under no circumstances
shall levels be set by direct measurement.
B. Foundation shall be excavated to the grades and sections shown and fully compacted
and rolled to a smooth surface. Concrete shall not be placed until the foundation has
been approved.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
C. Elements shall be laid either directly on a wet concrete base or on 1-3 cement-sand
mortar bed, 20 mm thick on a previously laid concrete base. Base shall be constructed
of Class 20 concrete.
D. After elements have been laid, continuous concrete backing shall be poured. Backing
concrete shall be of Class 20 conforming to the requirements .
E. Joints between curbs and paving tiles shall have a width of 4 mm, filled with 1-1
cement-sand mortar with one fifth hydrated lime and sufficient water to make the
mixture plastic and easily smoothed and finished.
F. A grooving tool shall be used to produce a smooth semi-circular groove not more than
3 mm deep in all joints.
For natural stone cleaning daily cleaning read and follows manufactures instructions. The use
of a scrubber dryer machine with natural bristles, ideal for sweeping fine dust on smooth
surfaces in outside areas with clean water added to neutral soap is recommended. Stricly
forbidden to use acid, metallic,hard brush or other cleaning components.
The Subcontractor shall provide at the end of installation the following administrative and
procedural requirements for Operation and Maintenance (O&M) Manuals, including the
following: Preparing and submitting Instruction Manuals covering the care, preservation, and
maintenance of the architectural products and finishes.
END OF SECTION
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
31 SECTION 32 39 10 - BOLLARDS
This section include Stainless Steel Bollards for Canopy and for external lighting elements
(Bollard Light) :
Subcontractor shall provide all documents, certifications, test result and other information in
order to give evidence of the compliance to the Employer Requirements and to the previous
Codes.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
4.13.1.2 Safety: Non-combustible and Non-Toxic conforming to all applicable standards and
codes to meet or exceed the appropriate standards
4.13.1.3 Economy: Cost-effective and, to a consistent level of quality, commonly available and
not restricted to a few suppliers based on current industry levels of technology and local
building practice. Proven in use, they will not required new research, designs or
manufacturing techniques.
4.13.1.4 Durability: Materials shall be carefully selected for their wear, strength and weathering
qualities. They are to be resistant to abrasion, impact, vandalism, humidity, temperature
change, sunlight and the marine atmosphere. Colour and appearance shall remain
unchanged during the life cycle of the material.
4.13.1.5 Aesthetics: Emphasis shall be laid on clear, simple use of materials and
avoidance of overstatement in design. Also to be avoided are short-lived or
ephemeral design fashions or fads, pastiche and applied ornamentation.
Stations are to provide a comfortable and controlled environment and are to be
bright, colorful and welcoming. Attempts shall be made where possible to
introduce natural lighting to enhance internal spaces.
4.13.1.6 Maintainability: Materials shall be easily cleaned, in a single operation, with standard
cleaning equipment and agents. Repair and replacement with regards to the availability
of material in the region shall be considered in the selection of materials.
17
31.1.2.5 Global Sustainability Assessment System (Gsas)
17
Each material will be submitted with complete assessment sheet Template. Refer section 01 61 05
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
A. 01 00 00 General requirements
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
31.1.3 SUBMITTALS
The sign subcontractor shall submit the below list of document prior to fabrication:
2. For final Review leading to final Design Certification, submit the Regional
Materials Calculator and the following supporting documents:
a. Bill of Quantities
b. List of materials
c. Specifications listing manufactures and locations
d. Cost estimates
e. Description of the material
f. Description of how the material has been reused
g. Report providing distances of manufacturers
h. Any documentation from manufacturers outlining thirdparty sourcing
standards such as FSC Chain of Custody Certification or ISO
Certification
C. Shop Drawings: Indicate plans for each unit or groups of units, elevations with
model number, overall dimensions; construction and anchorage details.
D. Samples: Submit two sets of manufacturers available Bollard model type for
finishes.
1. Each type of bollard in specified type and finish.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
A. Contractors Qualifications::
1. A specialist, who has at least 10 years successful experience performing
similar work.
2. Certification to ISO 9001 or operates an acceptable alternative quality
system.
C. Preconstruction Testing/Reports:
1. Submit reports of independent tests demonstrating that the products and
systems comply with the specified performance requirements.
2. Where test results for a material or product are not available, undertake
testing to show compliance with the Specification at an independent testing
laboratory acceptable to the Employer's Representative.
3. The provision of testing data or the carrying-out of tests does not relieve the
Contractor of his responsibilities regarding the durability or service life
requirements, etc.
4. Details of tests shall be provided to demonstrate the performance of
materials and finishes in resisting abrasion from pedestrian traffic (hands,
rings, luggage, cloth, shoes, etc.) and any other abrasion resulting from
adjacent traffic movements.
C. Handling: Handle materials carefully to avoid distorting and damage to edges and
finished surfaces.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
31.1.7 WARRANTY
Product Warranty as defined in the tender contract; Guarantee shall cover repair and
replacement of defective material and workmanship.
31.2.1 DESCRIPTION
The Material / component is required to match the look & feel agreed benchmark sample.
The look & feel benchmark samples is available in the QR samples room.
31.2.1.1 General
Bollards in this section are Stainless Steel bollards to install at Secondary Shelters' Canopies
and Stainless Steel Bollard Light as external Lighting.
Configuration as per drawings
Bollards shall include supports, brackets, fastenings, seals, sealants, compressible fills, clips,
spacers, isolators, gaskets, electrical devices and all other accessories/components
necessary to complete the installation.
Bollards and related works shall resist abrasion from agreed cleaning methods and
maintenance systems without any noticeable change in surface appearance. Generally,
surfaces shall be sufficiently hard to resist all reasonable impacts from hand-held objects.
The Contractor shall be responsible for all aspects of construction, fabrication, detailing and
installation in accordance with the Specification. This shall include ensuring that all interfacing
requirements relating to other systems are encompassed.
A. Fixed bollard with profile and configuration as indicated on the Design Drawings.
F. Option:
Fixed Bollard with Light for external Lighting, including electrical works and materials
as per manufacturer's instructions and as specified on the Electrical Plant Drawings and
reports.
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
a. Automatic:
Featuring a drive mechanism (pneumatic or hydraulic) that allows the bollard to
rise or lower through instructions relayed through a Programmable Logic
Controller (PLC).
b. Manual
This typically involves an operator lifting or lowering a retractable bollard by hand.
c. Removable
A bollard embedded to a particular depth by way of manual lifting trolley or by
merely removing it by hand. This type of bollard is secu secured in position byway
of a mechanical lock.
A. Active bollard with profile and configuration as indicated on the Design Drawings.
31.2.3 TOLERANCES
A. Installation Tolerances:
a. A high degree of accuracy shall be employed in the fabrication and
installation of the works and support structures.
b. At the time of completion, the visual requirements of the works are such that
within any planning grid section the allowable tolerances are achieved.
B. On-Site:
a. All dimensions and bollard position / configuration to be checked on Site.
b. The works shall be erected in proper alignment in relation to established
lines and grades as indicated on the Shop Drawings and account shall be
taken of the installation tolerance requirements
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
31.3.1 EXAMINATION
A. Examine areas and conditions, with Installer present, for compliance with
requirements for correct and level finished grade, mounting surfaces, installation
tolerances, and other conditions affecting performance of the Work.
B. Proceed with installation only after unsatisfactory conditions have been corrected.
31.3.2 INSTALLATION
B. Unless otherwise indicated, install site bollards after paving have been completed.
C. Install site bollards level, plumb, true and securely anchored at locations indicated
on Drawings.
E. For Retractable Bollard installation, reinforced concrete footing (min high 1600 mm)
include a steel cage and related added reinforcement and the hole back-filled with
30MPa concrete. In this case also a drainage hose to strormwater should be
realized
F. Keep clean site works during installations expeccially bollard steel cages from loose
material;
A. Cleaning: Upon completion remove debris and unused materials from the Site and
dispose of safely. Clean the work of dirt, splashes and excess material. Make good
adjacent surfaces marred by the execution of the work, to the acceptance of the
Employer's Representative.
B. Adjusting: Make good fastening holes and minor damage to the acceptance of the
Employer's Representative. Return items to the shop that cannot be satisfactorily
repaired on Site for refinishing or replacement.
C. Protection:
a. Do not deliver components to Site until required and do not remove
protective packaging/coverings until immediately before required for
fastening.
b. Keep components and completed work clean and dry, and adequately
protect from physical damage until Taking-Over.
D. The Subcontractor shall provide at the end of installation the following administrative
and procedural requirements for Operation and Maintenance (O&M) Manuals,
Major Stations
Msheireb and Education City
----------------------------------------------------------------------------------------------------------------------------
including the following: Preparing and submitting Instruction Manuals covering the
care, preservation, and maintenance of the architectural products and finishes.
END OF SECTION