Professional Documents
Culture Documents
Case Study Thesis
Case Study Thesis
Case Study Thesis
Guided By:
Prof. Sujay Sengupta
Submitted By:
Samanyu Bhatnagar
31/09
ICRISAT
Services
Service corridor for each side
Supplements installed in them
Ducts flow through ground and exhale
the air outside
Non electric air turbines used in crop
work area
Inferences
Positive
Effective Planning
Climate Responsive
Interior Services
HVAC Systems
Natural Sources
Negative
Energy Wastage
Drawback of Concrete
CRIDA
Workspace
Multiple Units in two
blocks
3 Greenhouses in total
Special equipment
that is kept outside
2 Workshops and 1
Supply unit
Administration
Director and senior
scientist offices
Auditorium of 350 seat
capacity
Residential
185 sqm Directors
residence
International Guest
house has 32 rooms of
2 different variants
Parking of 70 cars and
150 two-wheelers
Features
Auditorium is new and all the
workshops and seminars are held there
Separate balcony with 60 seats
Wooden battens used as acoustical
treatment
Hard wood stage
Double storey admin block
Plaster finish on exterior with use of
louvers in labs
15m wide access road
Polycarbonate covering on
greenhouses with steel frame to
support
Roof of thin plastic like breathable
mesh for air to pass through; no
external air support
Rainout Shelter, a special mobile
equipment that is present on campus
Features
The Guest house has 20 Deluxe and
12 Premium rooms
A dining hall for 30 pax
Beside the guest house is essential
staff houses
130-150 sqm flats
Surrounding the site is the crop
research fields
Parking shelters are provided but the
institute promotes eco-friendly nature
thus only limited amount of vehicles are
allowed inside
Inferences
Positive
Connectivity
Auditorium
Equipment Space
Finishing
Eco-friendly
Circulation
Negative
Lighting
Ventilation
Material Quality
Maintenance
comparative analysis
ICRISAT CRIDA
Provision of services to
Concealed HVAC
laboratories is effective
Ambient lighting
Admin block had dark
Services Perfect combination of
unlit corners
service movement and
Wash-rooms were with
zone segregation
no ventilation
mlfo facility
Type: Production, energy and recycling
Location: Goshen, United States of America
Architect: De Leon & Primmer Architecture Workshop
Completed in 2009
coa
Surroundings
NCC Headquarters
College Main Building
Railway line that
connect to the main
station
Proposed Metro Depot
requirements
Administrative Block
Office of 25 sqm each
Cafeteria 1000 sqm
Conference Hall
Floor height of not less than 6.5 m
Library
4 sets of wash-rooms
Commercial Centre
Shops of size 30 sqm minimum
1000 sqm exhibition area
1500 sqm open public space
6 Sets of wash-rooms
Laboratories
15 sqm workspace per scientist
80 sqm equipment room
20 sqm storage space
As per laws, 2 exits for each lab
Air wash system of 12 sqm
2 sets of wash-rooms
Greenhouses
Others
Crop Work Area of 800 sqm
30 sqm offices for processing
500 sqm packaging and supplies
130-180 sqm suites for guest house
200 sqm dining hall