Gandhinagar - UIdetails

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 5

JobNo ProjectName Segments

Surat-Dahisar(6L,NHDP-V,239 km ,BOT/
233 DBFOT - Toll)

Gandhidham (Kandla) - Mundra(4L,NHDP-


237 IV,71 km ,BOT/ DBFOT - Toll)
Bhavanagar-Talaja(4L,NHDP-IV,48 km ,Hybrid
41998 Annuity)
Talaja - Mahuva(4L,NHDP-IV,45 km ,Hybrid
41999 Annuity) Slow Mobilization
Mahuva - Kagavadar(4L,NHDP-IV,40 km
42000 ,Hybrid Annuity) Slow Mobilization
Kagvadar - Una(4L,NHDP-IV,41 km ,Hybrid
42001 Annuity)
Una - Kodinar(6L,NHDP-IV,41 km ,Hybrid
42002 Annuity)
Kodinar - Veraval(4L,NHDP-IV,41 km ,Hybrid
42003 Annuity) Slow Mobilization
Gadu-Porbandar(2L,NHDP-IV,94 km ,BOT/
42004 DBFOT - Toll)

42007 Kamrej - Chalthan(6L,NHDP-V,17 km ,EPC)

New Bridge across Varsova Creek(4L,NHDP-


42008 V,2 km ,Hybrid Annuity)
Construction of four lanning Extra Dosed
42009 Bridge ov(6L,NHDP-V,7 km ,EPC)
7 Black spots in Jetpur-Gondal(4L,Others,0
42020 km ,EPC) Slow Mobilization
PiuName Mode Stage LOADate

PIU-Surat Expressway BOT/ DBFOT - Toll PCOD 21-Feb-08

PIU-Gandhidham BOT/ DBFOT - Toll PCOD 10-Mar-10

Somnath Hybrid Annuity Under Const. 26-May-16

Somnath Hybrid Annuity Awarded, not Appointed 26-May-16

Somnath Hybrid Annuity Awarded, not Appointed 25-Jun-16

Somnath Hybrid Annuity Under Const. 26-May-16

Somnath Hybrid Annuity Under Const. 26-May-16

Somnath Hybrid Annuity Awarded, not Appointed 26-Jul-16

Somnath BOT/ DBFOT - Toll Awarded, not Appointed

PIU-Surat Expressway EPC Under Const. 23-May-16

PIU-Surat Expressway Hybrid Annuity Awarded, not Appointed

Bharuch EPC Under Const. 7-Feb-14

PIU-Rajkot EPC Awarded, not Appointed 27-Jun-16


ContractorAppointmentDate TotalLength LengthPending LengthCompleted

20-Feb-09 239 1.5 238

19-Jan-11 71 7 64

7-Feb-17 48 48 0

45 45 0

40 40 0

20-Mar-17 41 41 0

9-Feb-17 41 41 0

41 41 0

94 94

21-Mar-17 17 17 0

2 2

3-Mar-14 7 3 4

18-Aug-16 0 0 0
686 380.5
KmInLastMonth PhysicalProg PhysicalProgTarget ScheduledCompletionDate

99 100

0 89 100 16-Jul-13

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0

0 94.3 100 28-Aug-16

34 42 17-Feb-18
MonthDelay WorkFrontAvail

45 7

43

34

35

17

8 3

0 0