Kode Nama Mesin/Meja Jumlah Total Mesin Teoritis Jumlah Mesin Sebenarnya
1 Mesin Metal Melting 47.6896 47
2 Mesin Casting 38.8785 38
3 Mesin Cooling 45.2985 45
4 Mesin Cylinder head 2.1015 2
5 Mesin Cylinder body 1.6812 2
6 Mesin Parkerizing 1.2609 2
7 Mesin Crankshaft 2.2121 3
8 Mesin Camshaft 2.3536 3
9 Mesin CNC 24.3770 24
10 Meja Rakit 1 8.3234 8
11 Meja Rakit 2 2.3781 3
12 Meja Rakit 3 3.9635 4
13 Meja Inspeksi 1 3.7532 4
14 Meja Inspeksi 2 3.5935 4
15 Meja Pengecatan 11.7682 11
L-4
TABEL PERHITUNGAN RENCANA LUAS LANTAI GUDANG BARANG J ADI PT INMAJ AYA 17239
KAPASITAS PRODUKSI =1900 UNIT/HARI
EFISIENSI =94%
Dimensi Material
Produk Produk Per Unit Per Kemasan Kemasan J umlah J umlah Luas Kelonggaran Luas
No. Part Nama Produk
Dimensi Produk Dimensi Kemasan Per Hari Periode Kemasan Per Periode Per Pallet Pallet Tumpukan Pallet Pallet Gang Total
p p
l (m) t (m) l (m) t (m)
(m) (m)
Mesin Diesel
10000 0.745 0.595 0.570 0.745 0.595 0.570 1900 3800 1 3800 12 317 32 384 544.0238 928.0238
4JA1
Hub
1.1 3679.2751 2.1 12877.46281 1.20 6914.0909 2.20 24199.31823
1.2 2498.7590 2.2 8745.656563 1.21 5733.5749 2.21 20067.51198
1.3 1318.2429 2.3 4613.850313 1.22 5733.5749 2.22 20067.51198
1.4 1318.2429 2.4 4613.850313 1.23 6914.0909 2.23 24199.31823
L-7
1.5 2498.7590 2.5 8745.656563 1.24 8094.6070 2.24 28331.12448
1.6 3679.2751 2.6 12877.46281 1.25 9275.1231 2.25 32462.93073
1.7 5296.6830 2.7 18538.39052 1.26 8094.6070 2.26 28331.12448
1.8 4116.1669 2.8 14406.58427 1.27 6914.0909 2.27 24199.31823
1.9 2935.6509 2.9 10274.77802 1.28 6914.0909 2.28 24199.31823
1.1 2935.6509 2.1 10274.77802 1.29 8094.6070 2.29 28331.12448
1.11 4116.1669 2.11 14406.58427 1.30 9275.1231 2.30 32462.93073
1.12 5296.6830 2.12 18538.39052 1.31 10892.5310 2.31 38123.85844
1.13 6477.1991 2.13 22670.19677 1.32 9712.0149 2.32 33992.05219
1.14 5296.6830 2.14 18538.39052 1.33 8531.4988 2.33 29860.24594
1.15 4116.1669 2.15 14406.58427 1.34 8531.4988 2.34 29860.24594
1.16 4116.1669 2.16 14406.58427 1.35 9712.0149 2.35 33992.05219
1.17 5296.6830 2.17 18538.39052 1.36 10892.5310 2.36 38123.85844
1.18 6477.1991 2.18 22670.19677 Min 1318.242946 4613.850313
31 32 33 34 35 36
25 26 27 28 29 30
19 20 21 22 23 24
13 14 15 16 17 18
7 8 9 10 11 12
1 2 K-1 4 5 6
31 32 33 34 35 36
25 26 27 28 29 30
19 20 21 22 23 24
13 14 15 16 17 18
7 8 9 10 11 12
1 2 K-1 K-1 5 6
31 32 33 34 35 36
25 26 27 28 29 30
19 20 21 22 23 24
13 14 15 16 17 18
7 8 9 10 11 12
31 32 33 34 35 36
25 26 27 28 29 30
19 20 21 22 23 24
13 14 15 16 17 18
7 8 K-1 K-1 11 12
31 32 33 34 35 36
25 26 27 28 29 30
19 20 21 22 23 24
13 14 15 16 17 18
7 8 K-1 K-1 11 12
L-11G
31 32 33 34 35 36
25 26 27 28 29 30
19 20 21 22 23 24
13 14 K-1 K-1 17 18
7 K-1 K-1 K-1 K-1 12
31 32 33 34 35 36
25 26 27 28 29 30
19 20 21 22 23 24
13 14 K-1 K-1 17 18
K-1 K-1 K-1 K-1 K-1 12
31 32 33 34 35 36
25 26 27 28 29 30
19 20 21 22 23 24
31 32 33 34 35 36
25 26 27 28 29 30
19 20 21 22 23 24
31 32 33 34 35 36
25 26 27 28 29 30
19 20 21 22 23 24
31 32 33 34 35 36
25 26 27 28 29 30
19 20 K-1 22 23 24
31 32 33 34 35 36
25 26 27 28 29 30
19 20 K-1 K-1 23 24
31 32 33 34 35 36
25 26 27 28 29 30
19 20 K-1 K-1 23 24
31 32 33 34 35 36
25 26 27 28 29 30
19 20 K-1 K-1 23 24
31 32 33 34 35 36
25 26 27 28 29 30
19 K-1 K-1 K-1 23 24
31 32 33 34 35 36
25 26 27 28 29 30
19 K-1 K-1 K-1 K-1 24
31 32 33 34 35 36
25 26 K-1 28 29 30
19 K-1 K-1 K-1 K-1 24
31 32 33 34 35 36
25 26 K-1 K-1 29 30
19 K-1 K-1 K-1 K-1 24
Hub Wij
2.25 32462.93073
2.30 32462.93073
2.31 38123.85844
2.32 33992.05219
2.33 29860.24594
2.34 29860.24594
2.35 33992.05219
2.36 38123.85844
Min. 29860.24594
31 32 K-2 34 35 36
Hub Wij
2.25 32462.93073
2.30 32462.93073
2.31 38123.85844
2.32 33992.05219
2.34 29860.24594
2.35 33992.05219
2.36 38123.85844
Min. 29860.24594
31 32 K-2 K-2 35 36
Hub Wij
2.25 32462.93073
2.30 32462.93073
2.31 38123.85844
2.32 33992.05219
2.35 33992.05219
2.36 38123.85844
Min. 32462.93073
31 32 K-2 K-2 35 36
Hub Wij
2.30 32462.93073
2.31 38123.85844
2.32 33992.05219
2.35 33992.05219
2.36 38123.85844
Min. 32462.93073
31 32 K-2 K-2 35 36
Hub Wij
2.31 38123.85844
2.32 33992.05219
2.35 33992.05219
2.36 38123.85844
Min. 33992.05219
L-11S
Hub Wij
2.31 38123.85844
2.35 33992.05219
2.36 38123.85844
Min. 33992.05219
Hub Wij
2.31 38123.85844
2.36 38123.85844
Min. 38123.85844
Mesin
[aij]
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
1 1 1 1 0 1 0 0 0 0 0 0 0 0 0 1
Part 2 1 1 1 1 0 0 0 0 0 0 0 0 0 0 1
3 1 1 1 0 0 0 0 0 1 0 0 0 0 0 1
4 1 1 1 0 0 0 0 0 1 0 0 0 0 0 1
5 1 1 1 0 0 0 0 0 1 0 0 0 0 0 1
6 1 1 1 0 0 0 0 0 1 0 0 0 0 0 1
7 1 1 1 0 0 0 0 0 1 0 0 0 0 0 1
8 1 1 1 0 0 0 0 0 1 0 0 0 0 0 0
9 1 1 1 0 0 0 0 0 1 0 0 0 0 0 1
10 1 1 1 0 0 0 0 1 0 0 0 0 0 0 1
11 1 1 1 0 0 1 1 0 0 0 0 0 0 0 0
12 1 1 1 0 0 0 0 0 1 0 0 0 0 0 0
13 1 1 1 0 0 0 0 0 1 0 0 0 0 0 1
14 1 1 1 0 0 0 0 0 1 0 0 0 0 0 1
15 1 1 1 0 0 0 0 0 1 0 0 0 0 0 1
16 1 1 1 0 0 0 0 0 1 0 0 0 0 0 1
17 1 1 1 0 0 0 0 0 1 0 0 0 0 0 1
18 0 0 0 0 0 0 0 0 0 1 0 0 1 0 0
19 0 0 0 0 0 0 0 0 0 0 1 0 1 0 0
20 0 0 0 0 0 0 0 0 0 0 0 1 0 1 0
Mesin
[aij]
M1 M2 M3 M4 M5 M6 M7 M8 M9 M10 M11 M12 M13 M14 M15
20 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
19 12 14 1 2 3 4 5 6 7 8 9 10 11 13 15
18 12 14 1 2 3 4 5 6 7 8 9 10 15
11 13
17 13 10 11 12 14 1 2 3 4 5 6 7 8 9 15
16 1 2 3 9 15 13 10 11 12 14 4 5 6 7 8
15 1 2 3 9 15 13 10 11 12 14 4 5 6 7 8
14 1 2 3 9 15 13 10 11 12 14 4 5 6 7 8
13 1 2 3 9 15 13 10 11 12 14 4 5 6 7 8
12 1 2 3 9 15 13 10 11 12 14 4 5 6 7 8
11 1 2 3 9 15 13 10 11 12 14 4 5 6 7 8
Part
10 1 2 3 6 7 9 15 13 10 11 12 14 4 5 8
9 1 2 3 15 8 6 7 9 13 10 11 12 14 4 5
8 1 2 3 15 9 8 6 7 13 10 11 12 14 4 5
7 1 2 3 9 15 8 6 7 13 10 11 12 14 4 5
6 1 2 3 9 15 8 6 7 13 10 11 12 14 4 5
5 1 2 3 9 15 8 6 7 13 10 11 12 14 4 5
4 1 2 3 9 15 8 6 7 13 10 11 12 14 4 5
3 1 2 3 9 15 8 6 7 13 10 11 12 14 4 5
2 1 2 3 9 15 8 6 7 13 10 11 12 14 4 5
1 1 2 3 15 4 9 8 6 7 13 10 11 12 14 5
L-27I
[aij] Mesin
1 2 3 15 4 9 8 6 7 13 10 11 12 14 5
1 1 1 1 1 0 0 0 0 0 0 0 0 0 0 1
2 1 1 1 1 1 0 0 0 0 0 0 0 0 0 0
3 1 1 1 1 0 1 0 0 0 0 0 0 0 0 0
4 1 1 1 1 0 1 0 0 0 0 0 0 0 0 0
5 1 1 1 1 0 1 0 0 0 0 0 0 0 0 0
6 1 1 1 1 0 1 0 0 0 0 0 0 0 0 0
7 1 1 1 1 0 1 0 0 0 0 0 0 0 0 0
8 1 1 1 0 0 1 0 0 0 0 0 0 0 0 0
9 1 1 1 1 0 1 0 0 0 0 0 0 0 0 0
10 1 1 1 1 0 0 1 0 0 0 0 0 0 0 0
Part
11 1 1 1 0 0 0 0 1 1 0 0 0 0 0 0
12 1 1 1 0 0 1 0 0 0 0 0 0 0 0 0
13 1 1 1 1 0 1 0 0 0 0 0 0 0 0 0
14 1 1 1 1 0 1 0 0 0 0 0 0 0 0 0
15 1 1 1 1 0 1 0 0 0 0 0 0 0 0 0
16 1 1 1 1 0 1 0 0 0 0 0 0 0 0 0
17 1 1 1 1 0 1 0 0 0 0 0 0 0 0 0
18 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0
19 0 0 0 0 0 0 0 0 0 1 0 1 0 0 0
20 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0
Komponen
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
5 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
14 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
12 20 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
11 20 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
10 19 20 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
13 18 19 20 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
7 18 19 20 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
Mesin 6 11 18 19 20 1 2 3 4 5 6 7 8 9 10 12 13 14 15 16 17
8 11 18 19 20 1 2 3 4 5 6 7 8 9 10 12 13 14 15 16 17
9 10 11 18 19 20 1 2 3 4 5 6 7 8 9 12 13 14 15 16 17
4 3 4 5 6 7 8 9 12 13 14 15 16 17 10 11 18 19 20 1 2
15 2 3 4 5 6 7 8 9 12 13 14 15 16 17 10 11 18 19 20 1
3 2 3 4 5 6 7 9 13 14 15 16 17 10 1 8 12 11 18 19 20
2 2 3 4 5 6 7 9 13 14 15 16 17 10 1 8 12 11 18 19 20
1 2 3 4 5 6 7 9 13 14 15 16 17 10 1 8 12 11 18 19 20
L-27C
Mesin 2 3 4 5 6 7 9 13 14 15 16 17 10 1 8 12 11 18 19 20
1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 0 0
2
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 0 0
3
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 0 0
15
1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 0 0 0 0 0
4
1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9
0 1 1 1 1 1 1 1 1 1 1 1 0 0 1 1 0 0 0 0
8
0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0
mesin 6
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0
7
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0
13
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0
10
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0
11
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0
12
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1
14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1
5
0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0
Komponen
3 4 5 6 7 9 13 14 15 16 17 10 1 2 8 12 11 18 19 20
14 3 4 5 6 7 9 13 14 15 16 17 10 1 2 8 12 11 18 19 20
12 20 3 4 5 6 7 9 13 14 15 16 17 10 1 2 8 12 11 18 19
11 20 3 4 5 6 7 9 13 14 15 16 17 10 1 2 8 12 11 18 19
10 19 20 3 4 5 6 7 9 13 14 15 16 17 10 1 2 8 12 11 18
13 18 19 20 3 4 5 6 7 9 13 14 15 16 17 10 1 2 8 12 11
7 18 19 20 3 4 5 6 7 9 13 14 15 16 17 10 1 2 8 12 11
6 11 18 19 20 3 4 5 6 7 9 13 14 15 16 17 10 1 2 8 12
Mesin 4 11 18 19 20 3 4 5 6 7 9 13 14 15 16 17 10 1 2 8 12
5 2 11 18 19 20 3 4 5 6 7 9 13 14 15 16 17 10 1 8 12
8 1 2 11 18 19 20 3 4 5 6 7 9 13 14 15 16 17 10 8 12
9 10 1 2 11 18 19 20 3 4 5 6 7 9 13 14 15 16 17 8 12
15 3 4 5 6 7 9 13 14 15 16 17 8 12 10 1 2 11 18 19 20
3 3 4 5 6 7 9 13 14 15 16 17 10 1 2 8 12 11 18 19 20
2 3 4 5 6 7 9 13 14 15 16 17 10 1 2 8 12 11 18 19 20
1 3 4 5 6 7 9 13 14 15 16 17 10 1 2 8 12 11 18 19 20
3 4 5 6 7 9 13 14 15 16 17 10 1 2 8 12 11 18 19 20
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 0 0
2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 0 0
3 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 0 0
15 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 0 0 0 0 0
9 1 1 1 1 1 1 1 1 1 1 1 0 0 0 1 1 0 0 0 0
8 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0
5 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0
Mesin 4 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0
6 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0
7 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0
13 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0
10 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0
11 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0
12 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1
14 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1
Jumlah Mesin
Sel Mesin Jumlah Mesin Teoritis
Sebenarnya
M1 29.8254 29
M2 24.6085 24
1 M3 27.1037 27
M15 9.1137 9
M9 20.8466 20
M1 9.0818 9
M2 7.2551 7
M3 10.2454 10
M15 3.5393 3
2
M9 6.1363 6
M8 2.3536 3
M5 1.6812 2
M4 2.1015 2
M1 8.7825 8
M2 7.0149 7
M3 7.9495 8
3
M9 3.5305 4
M6 1.2609 1
M7 2.2121 2
M13 3.7532 4
M10 8.3234 8
4 M11 2.3781 3
M12 3.9635 4
M14 3.5935 4
L-28A
FTC BIAYA, FTC, dan SKALA PRIORITAS SEL 1
Mesin Metal Melting Mesin Casting Mesin Cooling Meja Pengecatan Mesin CNC
M1 M2 M3 M15 M9
M1 Mesin Metal Melting 535.52 535.52
M2 Mesin Casting 514.43 514.43
M3 Mesin Cooling 501.78 501.78
M15 Meja Pengecatan 446.97 446.97
M9 Mesin CNC
0.00
Mesin Metal Melting Mesin Casting Mesin Cooling Meja Pengecatan Mesin CNC
M1 M2 M3 M15 M9
M1 Mesin Metal Melting 1 1
M2 Mesin Casting 1 1
M3 Mesin Cooling 1 1
M15 Meja Pengecatan 1 1
M9 Mesin CNC
0
0 1 1 1 1 4
HUBUNGAN
No. Nama Departemen
A E I O U
Mesin Casting
Mesin Metal Melting Mesin Cooling Meja Pengecatan Mesin Camshaft Mesin Cylinder body Mesin Cylinder head
M1 M2 M3 M15 M8 M5 M4 Total
M1
Mesin Metal Melting 122.28 122.28
M2
Mesin Casting 122.28 122.28
M3
Mesin Cooling 113.85 113.85
M15
Meja Pengecatan 42.17 42.17 16.87 101.2
M8
Mesin Camshaft 0
M5
Mesin Cylinder body 0
M4
Mesin Cylinder head 0
Mesin Casting
Mesin Metal Melting Mesin Cooling Meja Pengecatan Mesin Camshaft Mesin Cylinder body Mesin Cylinder head
M1 M2 M3 M15 M8 M5 M4 Total
M1
Mesin Metal Melting 1 1
M2
Mesin Casting 1 1
M3
Mesin Cooling 1 1
M15
Meja Pengecatan 0.42 0.42 0.17 1
M8
Mesin Camshaft 0
M5
Mesin Cylinder body 0
M4
Mesin Cylinder head 0
HUBUNGAN
No. Nama Departemen
A E I O U
Mesin Metal Melting Mesin Casting Mesin Cooling Mesin CNC Mesin Parkerizing Mesin Crankshaft
M1 M2 M3 M9 M6 M7
M9 Mesin CNC 0
M6 Mesin Parkerizing 0
Mesin Metal Melting Mesin Casting Mesin Cooling Mesin CNC Mesin Parkerizing Mesin Crankshaft
M1 M2 M3 M9 M6 M7
Mesin Casting
M2 1 1
Mesin Cooling
M3 1 1
Mesin CNC
M9 0
Mesin Parkerizing
M6 0
Mesin Crankshaft
M7 1 1
0 1 1 1 1 0 4
HUBUNGAN
No. Nama Departemen A E I O U
Mesin Metal Melting
M1 M2 1.00
M2 Mesin Casting M3 1.00
M3 Mesin Cooling M9 1.00
M9 Mesin CNC
M6 Mesin Parkerizing
M7 Mesin Crankshaft M6 1.00
L-28D
FTC BIAYA, FTC, dan SKALA PRIORITAS SEL 4
Meja Inspeksi 1 Meja Rakit 1 Meja Rakit 2 Meja Rakit 3 Meja Inspeksi 2
M13 M10 M11 M12 M14 Total
M13
Meja Inspeksi 1 202.40 202.40
M10
Meja Rakit 1 202.40 202.40
M11
Meja Rakit 2 202.40 202.40
M12
Meja Rakit 3 400.58 400.58
M14
Meja Inspeksi 2 0.00
Meja Inspeksi 1 Meja Rakit 1 Meja Rakit 2 Meja Rakit 3 Meja Inspeksi 2
M13 M10 M11 M12 M14 Total
M13
Meja Inspeksi 1 1 1.00
M10
Meja Rakit 1 1.00 1.00
M11
Meja Rakit 2 1.00 1.00
M12
Meja Rakit 3 1 1.00
M14
Meja Inspeksi 2 0.00
HUBUNGAN
No. Nama Departemen
A E I O U
M13 Meja Inspeksi 1 M12 1.00
M10 Meja Rakit 1 M13 1.00
M11 Meja Rakit 2 M13 1.00
M12 Meja Rakit 3 M14 1.00
M14 Meja Inspeksi 2
L-29
BLOCPLAN SEL 1
L-29
L-29
BLOCPLAN SEL 2
L-29
L-29
L-29
BLOCPLAN SEL 3
L-29
L-29
BLOCPLAN SEL 4
L-29
L-31
FTC BIAYA, FTC, dan SKALA PRIORITAS INTERSEL
Gudang Bahan Baku Gudang Bahan Pembantu Sel 1 Sel 2 Sel 3 Sel 4 Gudang Barang Jadi
Total
Sel 1 Sel 1 0
Sel 2 Sel 2 0
Sel 3 Sel 3 0
Sel 4 Sel 4 95.00 95
C Gudang Barang Jadi 0
0 0 62 27 15 1825 95 2024
Gudang Bahan Baku Gudang Bahan Pembantu Sel 1 Sel 2 Sel 3 Sel 4 Gudang Barang Jadi
Total
Sel 1 Sel 1 0
Sel 2 Sel 2 0
Sel 3 Sel 3 0
Sel 4 Sel 4 1 1
C Gudang Barang Jadi 0
0 0 0.60 0.26 0.14 1 1 3
HUBUNGAN
No. Nama Departemen
A E I O U
Sel 1 0.60 Sel 2 0.26 Sel 3 0.14
A Gudang Bahan Baku
Sel 4 1.00
B Gudang Bahan Pembantu
Sel 1 Sel 1
Sel 2 Sel 2
Sel 3 Sel 3
Sel 4 Sel 4 C 1.00
C Gudang Barang Jadi
L-32
BLOCPLAN INTERSEL
L-32
L-32
METODE GT
EFISIENSI = 94%
No N
Jumlah yang Unit
Luas Luas Dist o. Per Frekue Waktu Biaya Biaya Biay
F Komp Harus Load
S S From Asal To Tujua ance P Bahan alat nsi per Perpind Pemind Pemindaha a
r T onen Dipindahkan (kg,
e e (m2) n (m2) (m) ar an Hari ahan ahan n/hari Total
o o (kg, unit) unit)
l l t
m
Gudan Mesin
Cylind
- M g Metal 1550 K- Plat For 12993.9
A 2 er 4910.95 500 10 61.63
1 Bahan Meltin .82 1 Baja klift 0
body
Baku g
Gudan Mesin
Cylind
- M g Metal 1550 K- Plat 12921.2
A 2 er 4419.86 500 9 61.29 348873.59
1 Bahan Meltin .82 2 Baja 4
head
Baku g
Gudan Mesin
- M g Metal 1550 K- Plat Camsh 12830.4
A 2 3683.21 500 8 60.86
1 Bahan Meltin .82 10 Baja aft 2
Baku g
Gudan Mesin
- M g Metal 1508 K- Plat Rocker 11167.6
A 3 1399.62 500 3 52.97
1 Bahan Meltin .07 8 Baja arm 3
Baku g
Gudan Mesin
- M g Metal 1508 K- Plat Cranks 12378.8
A 3 3192.12 500 7 58.71 180232.52
1 Bahan Meltin .07 11 Baja haft 7
Baku g
Gudan Mesin
Conne
- M g Metal 1508 K- Plat 12015.5
A 3 cting 2332.70 500 5 56.99
1 Bahan Meltin .07 12 Baja 0
rod
Baku g
Gudan Mesin
- M g 6105. Metal 4825.2 786. K- Plat Timmin 9389
A 1 2455.48 500 5 31.00 6535.14
1 Bahan 88 Meltin 2 02 6 Baja g gear 25.04
Baku g
Gudan Mesin
- M g Metal 786. K- Plat
A 1 Piston 3683.21 500 8 32.18 6783.72
1 Bahan Meltin 02 13 Baja
Baku g
Gudan Mesin
- M g Metal 786. K- Plat Flywhe
A 1 2455.48 500 5 31.00 6535.14
1 Bahan Meltin 02 15 Baja el
Baku g
Gudan Mesin Flywhe
- M g Metal 786. K- Plat el
A 1 1473.29 500 3 28.90 6093.22 409818.93
1 Bahan Meltin 02 16 Baja housin
Baku g g
Gudan Mesin
- M g Metal 786. K- Plat Disk
A 1 3437.67 500 7 31.90 6724.54
1 Bahan Meltin 02 17 Baja clutch
Baku g
Gudan Mesin
Alumu Injecti
- M g Metal 786. K-
A 1 nium on 2946.57 400 8 32.18 6783.72
1 Bahan Meltin 02 3
Alloy pump
Baku g
Gudan Mesin
Alumu Turbo
- M g Metal 786. K-
A 1 nium charge 2455.48 400 7 31.90 6724.54
1 Bahan Meltin 02 4
Alloy r
Baku g
METODE GT
EFISIENSI = 94%
No N
Luas Jumlah yang Unit
Luas Dist o. Per Frekue Waktu Biaya Biaya
F Tujua Kompo Harus Load Biaya
S S From Asal To ance P Bahan alat nsi per Perpind Pemind Pemindaha
r T n nen Dipindahkan (kg, Total
e e (m2) (m) ar an Hari ahan ahan n/hari
o o (m2) (kg, unit) unit)
l l t
m
Mesin
Gudang Alumuni
M Metal 786. K Turbo
A 1 Bahan um 2455.48 400 7 31.90 6724.54
1 Meltin 02 -4 charger
Baku Alloy
g
Mesin
Gudang Alumuni
M Metal 786. K
A 1 Bahan um Oil pan 1964.38 400 5 31.00 6535.14
1 Meltin 02 -5
Baku Alloy
g
Mesin
Gudang 6105 4825. Alumuni 93892
M Metal 786. K Oil 409818.93
A 1 Bahan .88 22 um 1964.38 400 5 31.00 6535.14 5.04
1 Meltin 02 -7 pump
Baku Alloy
g
Mesin
Gudang Alumuni Timmin
M Metal 786. K
A 1 Bahan um g gear 1227.74 400 4 30.21 6369.42
1 Meltin 02 -9
Baku Alloy case
g
Mesin K
Gudang Alumuni
M Metal 786. - Water
A 1 Bahan um 1964.38 400 5 31.00 6535.14
1 Meltin 02 1 pump
Baku Alloy
g 4
MATERIAL HANDLING PLANNING SHEET PT INMAJAYA 17239
METODE GT
Mesin Me K
M - M Metal sin 568. -
1 1 Flywheel 2332.70 400 6 23.54 4962.91 29777.47
1 2 Meltin Cas 35 1
g ting 5
482 431
Mesin Me K 867819.52
5.22 1.51
M - M Metal sin 568. - Flywheel
L-32
No N
Jumlah yang Unit
Luas Luas Dist o. Per Frekue Waktu Biaya Biaya Biay
F Kompo Harus Load
S S From Asal To Tujua ance P Bahan alat nsi per Perpind Pemind Pemindaha a
r T nen Dipindahkan (kg,
e e (m2) n (m2) (m) a an Hari ahan ahan n/hari Total
o o (kg, unit) unit)
l l rt
m
K
M Mesin
M - 156.1 Meja 281.7 825. - Cranks 9442
3 1 4 Parkeri 1900.00 150 13 34.45 7263.61 94426.98
6 4 Rakit 1 4 55 1 haft 6.98
0 zing
1
K
Mesin Mesin
M - M 357.1 156.1 219. - Plat Cranks 3299
3 3 Cranks Parkeri 2000.00 150 14 11.18 2356.70 32993.73
7 6 6 4 80 1 Baja haft 3.73
haft zing
1
K
M Mesin
M - 362.9 Meja 281.7 976. - Camsh 8395
2 1 4 Camsh 1900.00 200 10 39.82 8395.93 83959.27
8 7 Rakit 1 4 91 1 aft 9.27
0 aft
0
M
M - Mesin Meja 1942 K Injectio 14906.1
1 1 4 1900.00 500 4 70.70 59624.64
9 CNC Rakit 1 .89 -3 n pump 6
0
M Alumu
M - Mesin Meja 1942 K 15930.2
1 1 4 nium Oil pan 1900.00 250 8 75.56 127441.79
9 CNC Rakit 1 .89 -5 2
0 Alloy
M
M - Mesin 3511. Meja 281.7 1942 K Oil 16523.1 9423
1 1 4 1900.00 100 19 78.37 313938.97
9 CNC 82 Rakit 1 4 .89 -7 pump 0 86.16
0
K
M
M - Mesin Meja 1942 - Plat 15930.2
1 1 4 Piston 1900.00 250 8 75.56 127441.79
9 CNC Rakit 1 .89 1 Baja 2
0
3
K
M Alumu
M - Mesin Meja 1942 - Water 16523.1
1 1 4 nium 1900.00 100 19 78.37 313938.97
9 CNC Rakit 1 .89 1 pump 0
0 Alloy
4
M Alumu
M - Mesin Meja 1713 K Turbo 13813.9
1 1 4 nium 1900.00 350 6 65.52 82883.60
9 CNC Rakit 2 .29 -4 charger 3
1 Alloy
M
M - Mesin Meja 1713 K Plat Timmin 13985.9
1 1 4 1900.00 300 7 66.34 97901.60
9 CNC Rakit 2 .29 -6 Baja g gear 4
1
M Alumu Timmin
M - Mesin Meja 1713 K 14462.2
1 1 4 nium g gear 1900.00 150 13 68.60 188009.57
9 CNC Rakit 2 .29 -9 7
1 Alloy case
K
M
M - Mesin Meja 1713 - Plat Flywhe 13573.1
1 1 4 1900.00 400 5 64.38 67865.61
9 CNC Rakit 2 .29 1 Baja el 2
1
5
3511. 124.4 K Flywhe 6733
M
M - Mesin 82 Meja 4 1713 - Plat el 13211.9 23.07
1 1 4 1900.00 500 4 62.67 52847.61
9 CNC Rakit 2 .29 1 Baja housin 0
1
6 g
K
M
M - Mesin Meja 1713 - Plat Disk 14295.5
1 1 4 1900.00 200 10 67.81 142955.58
9 CNC Rakit 2 .29 1 Baja clutch 6
1
7
M
M - Mesin Meja 123. K Plat Rocker
3 1 4 1900.00 100 19 7.51 1584.18 30099.41
9 CNC Rakit 2 60 -8 Baja arm
1
K
M Connec
M - Mesin Meja 123. - Plat
3 1 4 ting 1900.00 300 7 7.29 1537.16 10760.09
9 CNC Rakit 2 60 1 Baja
1 rod
2
METODE GT
EFISIENSI = 94%
MOVE MATERIAL HANDLING COST
Un
Lu Jumlah it
Lua N
as Dist yang Lo Frek
s o. Per Waktu Biaya Biaya
As anc Komp Harus ad uensi Biaya
No From To Tuj P Bahan alat Perpin Pemin Pemindah
al e onen Dipindah (kg per Total
uan a an dahan dahan an/hari
(m2 (m) kan (kg, , Hari
(m2) rt
) unit) uni
t)
F
S S
r T
e e
o o
l l
m
Mesi
M Meja 57 n K Cylin
M 254. 310. 50 2863.8 11455.
1 2 2 Penge 0.9 Cylin - Plat Baja der 2000.00 4 13.58 11455.21
4 80 95 0 0 21
5 catan 7 der 2 head
head
Mesi
M Meja 57 n K Cylin
M 231. 111. 20 1464.9 14649.
1 2 2 Penge 0.9 Cylin - Plat Baja der 2000.00 10 6.95 14649.54
5 66 80 0 5 54
5 catan 7 der 1 body
body
Mesi K
M Meja 57
M n 362. 444. - Cams 20 4132.4 41324.
1 2 2 Penge 0.9 Plat Baja 2000.00 10 19.60 41324.39
8 Cam 97 75 1 haft 0 4 39
5 catan 7
shaft 0
M Meja 57 Mesi K Timmi
M 351 463. 30 4196.8 452959
1 1 1 Penge 0.9 n - Plat Baja ng 2000.00 7 19.91 29378.02
9 1.82 24 0 6 .56
5 catan 7 CNC 6 gear
L-32
K
M Meja Mesi
M 463. - 25 4231.7
1 1 1 Penge n Plat Baja Piston 2000.00 8 20.07 33853.93
9 24 1 0 4
5 catan CNC
3
K
M Meja Mesi
M 463. - Flywh 40 4085.2
1 1 1 Penge n Plat Baja 2000.00 5 19.38 20426.21
9 24 1 eel 0 4
5 catan CNC
5
K Flywh
M Meja Mesi
M 463. - eel 50 3987.5
1 1 1 Penge n Plat Baja 2000.00 4 18.91 15950.30
9 24 1 housi 0 8
5 catan CNC
6 ng
K
M Meja Mesi
M 463. - Disk 20 4280.5
1 1 1 Penge n Plat Baja 2000.00 10 20.30 42805.74
9 24 1 clutch 0 7
5 catan CNC
7
M Meja Mesi K Injecti
M 463. 50 3987.5
1 1 1 Penge n - Alumunium Alloy on 2000.00 4 18.91 15950.30
9 24 0 8
5 catan CNC 3 pump
M Meja Mesi K Turbo
M 463. 35 4150.3
1 1 1 Penge n - Alumunium Alloy charg 2000.00 6 19.69 24902.12
9 24 0 5
5 catan CNC 4 er
M Meja Mesi K
M 463. Oil 25 4231.7
1 1 1 Penge n - Alumunium Alloy 2000.00 8 20.07 33853.93
9 24 pan 0 4
5 catan CNC 5
M Meja Mesi K
M 463. Oil 10 4378.2
1 1 1 Penge n - Alumunium Alloy 2000.00 20 20.77 87564.82
9 24 pump 0 4
5 catan CNC 7
Timmi
M Meja Mesi K
M 463. ng 15 4336.3
1 1 1 Penge n - Alumunium Alloy 2000.00 14 20.57 60709.37
9 24 gear 0 8
5 catan CNC 9
case
K
M Meja Mesi
M 463. - Water 10 4378.2
1 1 1 Penge n Alumunium Alloy 2000.00 20 20.77 87564.82
9 24 1 pump 0 4
5 catan CNC
4
cylinder body, injection
pump, oil pan, oil pump,
S camshaft, piston, water
M M Meja 28 Meja
162. 133. A pump, crankshaft oil filter, 1681.7 80721.
1 4 1 4 Rakit 1.7 Inspe SA-1 1900.00 40 48 7.98 80721.76
16 30 - fuel filter, oil level gage, 0 76
0 3 1 4 ksi 1
1 water hose, oil hose, oil
guide tube, screw, loctite,
threebond
cylinder head, turbocharger,
S timing gear, timing gear case,
M M Meja 12 Meja
162. 96.3 A flywheel, flywheel housing, 1372.9 65900.
1 4 1 4 Rakit 4.4 Inspe SA-2 1900.00 40 48 6.51 65900.18
16 0 - disk clutch, rocker arm, 2 18
1 3 2 4 ksi 1
2 connecting rod, fuel
pipe,thermostat
S
A
-
M M Meja 16 Meja
159. 198. 1, SA-1, 2229.5 107020
1 4 1 4 Inspe 2.1 Rakit SA-1, SA-2 1900.00 40 48 10.58 107020.05
77 95 S SA-2 8 .05
3 2 ksi 1 6 3
A
-
2
Guda
M Meja 15 ng
928. 367 F Mesin 31413. 2984304.5 298430
1 4 C Inspe 0.6 Bara Mesin Diesel 1900.00 20 95 149.00
02 6.80 A Diesel 73 1 4.51
4 ksi 2 0 ng
Jadi
22,550
TOTAL BIAYA MATERIAL HANDLING
,522.20
L-35
Perhitungan Unit of Area Mesin
Keterangan:
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 A A A A A A A A D D D D D D D
2 A A A A A A A A D D D D D D D D
3 A A A A A A A A D D D D D D D D
4 A A A A A A A A D D D D D D D D
5 A A A A A A A A D D D D D D D D
6 A A A A A A A A E E E E E E E E
7 A A K I J J J E E E E E E E E E
8 B B K I L L L E E E E E E E E E
9 B B K H L L L E E E E E E E E E
10 B B M H L L L R F F F F F F F F
11 B B M G L L L R F F F F F F F F
12 B B M G L L L R F F F F F F F F
13 C C P G L L L R F F F F F F F F
14 C C P N L L L R F F F F F F F F
15 C C Q O L L L L F F F F F F F F
16 C C Q O L L L L F F F F F F F F
L-38A
L-38A
L-38A
L-38A
EFISIENSI = 94%
No
Luas
Luas Asal Distance No. Peralata Jumlah yang Harus Jumlah yang Harus Unit Load Frekuensi Waktu Biaya Biaya Biaya
From To Tujuan Bahan Komponen
Fro (m2) (m) Part n Dipindahkan Dipindahkan (kg, unit) (kg, unit) per Hari Perpindahan Pemindahan Pemindahan/hari Total
- To (m2)
m
Mesin
M Gudang Cylinder
A - 6105.88 Metal 4825.22 1070.84 K-1 Plat Baja Forklift
1 Bahan Baku body
Melting
Mesin
M Gudang Cylinder
A - Metal 1070.84 K-2
1 Bahan Baku head
Melting
Mesin
M Gudang Timming
A - Metal 1070.84 K-6
1 Bahan Baku gear
Melting
Mesin
M Gudang
A - Metal 1070.84 K-8 Rocker arm
1 Bahan Baku
Melting
Mesin
M Gudang 3344.36 33443.57 500 67 45.21 9532.61 638684.67
A - Metal 1070.84 K-10 Camshaft
1 Bahan Baku
Melting
941369.32
Mesin
M Gudang
A - Metal 1070.84 K-11 Crankshaft
1 Bahan Baku
Melting
Mesin
M Gudang Connecting
A - Metal 1070.84 K-12
1 Bahan Baku rod
Melting
Mesin
M Gudang
A - Metal 1070.84 K-13 Piston
1 Bahan Baku
Melting
Mesin
M Gudang
A - Metal 1070.84 K-15 Flywheel
1 Bahan Baku
Melting
Mesin
M Gudang Flywheel
A - Metal 1070.84 K-16
1 Bahan Baku housing
Melting
Mesin
M Gudang
A - Metal 1070.84 K-17 Disk clutch
1 Bahan Baku
Melting
Mesin
M Gudang Alumunium Injection
A - Metal 1070.84 K-3 1252.29 12522.92 400 32 44.86 9458.90 302684.65
1 Bahan Baku Alloy pump
Melting
L-38A
EFISIENSI = 94%
No
Luas Unit
Luas Asal Distance No. Peralata Jumlah yang Harus Jumlah yang Harus Frekuensi Waktu Biaya Biaya
From To Tujuan Bahan Komponen Load (kg, Biaya Total
Fro (m2) (m) Part n Dipindahkan Dipindahkan (kg, unit) per Hari Perpindahan Pemindahan Pemindahan/hari
- To (m2) unit)
m
Mesin
Gudang Bahan
A - M1 Metal 1070.84 K-4 Turbo charger
Baku
Melting
Mesin
Gudang Bahan
A - M1 Metal 1070.84 K-5 Oil pan
Baku
Melting
Mesin
Gudang Bahan
A - M1 Metal 1070.84 K-7 Oil pump
Baku
Melting
Mesin
Gudang Bahan Timming gear
A - M1 Metal 1070.84 K-9
Baku case
Melting
Mesin
Gudang Bahan
A - M1 Metal 1070.84 K-14 Water pump
Baku
Melting
EFISIENSI = 94%
No
Unit
Luas Jumlah yang Jumlah yang Harus
Luas Distance No. Peralata Load Frekuensi Waktu Biaya Biaya
From To Tujuan Bahan Komponen Harus Dipindahkan (kg, Biaya Total
Fro Asal (m2) (m) Part n (kg, per Hari Perpindahan Pemindahan Pemindahan/hari
- To (m2) Dipindahkan unit)
m unit)
Gudang
M1 Meja
B - Bahan 510.94 P-15 Threebond Threebond 1900.00 19000.00 400 48 22.92 4833.29 231998.05 231998.05
0 Rakit 1
Pembantu
Gudang
M1 Meja
B - Bahan 1145.33 124.44 949.18 P-5 Fuel pipe Fuel pipe 1900.00 19000.00 250 76 40.42 8521.34 647621.73 647621.73
1 Rakit 2
Pembantu
Gudang
M1 Meja
B - Bahan 949.18 P-6 Thermostat Thermostat 1900.00 19000.00 300 64 40.37 8511.46 544733.71 544733.71
1 Rakit 2
Pembantu
Gudang
M1 Meja
B - Bahan 1145.33 643.58 P-1 Cooling fan Cooling fan 1900.00 19000.00 200 95 28.31 5968.21 566979.83 566979.83
2 Rakit 3
Pembantu
Gudang
M1 Meja
B - Bahan 643.58 P-9 Nozzle Injection Nozzle injection 1900.00 19000.00 150 127 28.34 5975.41 758876.62 758876.62
2 Rakit 3
Pembantu
Gudang
M1 Meja Pump Power Pump power
B - Bahan 643.58 P-11 1900.00 19000.00 150 127 28.34 5975.41 758876.62 758876.62
2 Rakit 3 Steering steering
Pembantu
159.77
Gudang
M1 Meja
B - Bahan 643.58 P-12 Bearing cam Bearing cam 1900.00 19000.00 300 64 28.24 5954.37 381079.82 381079.82
2 Rakit 3
Pembantu
Gudang
M1 Meja
B - Bahan 643.58 P-13 Liner Liner 1900.00 19000.00 250 76 28.27 5961.07 453041.11 453041.11
2 Rakit 3
Pembantu
Gudang
M1 Meja
B - Bahan 643.58 P-17 Plastik Pipak Plastik Pipak 950.00 9500.00 200 48 28.18 5940.24 285131.42 285131.42
2 Rakit 3
Pembantu
EFISIENSI = 94%
No
Luas
Luas Asal Distance No. Peralata Jumlah yang Harus Jumlah yang Harus Unit Load Frekuensi Waktu Biaya Biaya
From To Tujuan Bahan Komponen Biaya Total
Fro (m2) (m) Part n Dipindahkan Dipindahkan (kg, unit) (kg, unit) per Hari Perpindahan Pemindahan Pemindahan/hari
- To (m2)
m
Plat Baja
EFISIENSI = 94%
No
Luas
Luas Asal Distance No. Peralata Jumlah yang Harus Jumlah yang Harus Unit Load Frekuensi Waktu Biaya Biaya Biaya
From To Tujuan Bahan Komponen
Fro (m2) (m) Part n Dipindahkan Dipindahkan (kg, unit) (kg, unit) per Hari Perpindahan Pemindahan Pemindahan/hari Total
- To (m2)
m
M Mesin Mesin
M2 - 939.94 K-1 Cylinder body 2216.07 200 12 38.73 8165.79 97989.51
3 Casting Cooling
M Mesin Mesin
M2 - 939.94 K-2 Cylinder head 2216.07 500 5 36.54 7703.39 38516.97
3 Casting Cooling
M Mesin Mesin
M2 - 939.94 K-6 Timming gear 2216.07 300 8 37.95 8000.65 64005.21
3 Casting Cooling
M Mesin Mesin
M2 - 939.94 K-8 Rocker arm 2105.26 100 22 39.44 8315.92 182950.29
3 Casting Cooling
M Mesin Mesin
M2 - 939.94 K-10 Camshaft 2216.07 200 12 38.73 8165.79 97989.51
3 Casting Cooling
M Mesin Mesin
M2 - 939.94 K-11 Plat Baja Crankshaft 2216.07 150 15 39.04 8231.85 123477.75
3 Casting Cooling
M Mesin Mesin Connecting
M2 - 939.94 K-12 2105.26 300 8 37.95 8000.65 64005.21
3 Casting Cooling rod
M Mesin Mesin
M2 - 939.94 K-13 Piston 2216.07 250 9 38.21 8055.70 72501.28
3 Casting Cooling
M Mesin Mesin
M2 - 4311.51 6927.15 939.94 K-15 Flywheel 2216.07 400 6 37.16 7835.51 47013.05 1597853.13
3 Casting Cooling
M Mesin Mesin Flywheel
M2 - 939.94 K-16 2216.07 500 5 36.54 7703.39 38516.97
3 Casting Cooling housing
M Mesin Mesin
M2 - 939.94 K-17 Disk clutch 2216.07 200 12 38.73 8165.79 97989.51
3 Casting Cooling
M Mesin Mesin Injection
M2 - 939.94 K-3 2216.07 500 5 36.54 7703.39 38516.97
3 Casting Cooling pump
M Mesin Mesin Turbo
M2 - 939.94 K-4 2216.07 350 7 37.61 7929.88 55509.13
3 Casting Cooling charger
M Mesin Mesin
M2 - 939.94 K-5 Oil pan 2216.07 250 9 38.21 8055.70 72501.28
3 Casting Cooling Alumunium
M Mesin Mesin Alloy
M2 - 939.94 K-7 Oil pump 2216.07 100 23 39.48 8323.76 191446.37
3 Casting Cooling
M Mesin Mesin Timming gear
M2 - 939.94 K-9 2216.07 150 15 39.04 8231.85 123477.75
3 Casting Cooling case
M Mesin Mesin
M2 - 939.94 K-14 Water pump 2216.07 100 23 39.48 8323.76 191446.37
3 Casting Cooling
EFISIENSI = 94%
No
Jumlah yang Unit
Luas Luas Jumlah yang
Distance No. Harus Load Frekuensi Waktu Biaya Biaya
From Asal To Tujuan Bahan Komponen Peralatan Harus Biaya Total
Fro (m) Part Dipindahkan (kg, per Hari Perpindahan Pemindahan Pemindahan/hari
- To (m2) (m2) Dipindahkan
m (kg, unit) unit)
Mesin
M3 - M7 Mesin Cooling 6927.15 357.16 1611.74 K-11 Crankshaft 2105.26 150 15 65.02 13708.51 205627.69 205627.69
Crankshaft
M3 - M9 Mesin Cooling Mesin CNC 1211.79 K-8 Rocker arm 2000.00 100 20 49.96 10533.19 210663.87
6927.15 3511.82 281074.90
Connecting
M3 - M9 Mesin Cooling Mesin CNC 1211.79 K-12 2000.00 300 7 47.71 10058.72 70411.04
rod
Meja Cylinder
M3 - M15 Mesin Cooling 889.65 K-1 2105.26 200 11 36.67 7730.93 85040.26
Pengecatan body
Meja
M3 - M15 Mesin Cooling 889.65 K-14 Water pump 2105.26 100 22 37.48 7901.45 173831.87
Pengecatan
Mesin Cylinder
M4 - M11 254.80 Meja Rakit 2 124.44 516.05 K-2 1900.00 500 4 20.76 4377.27 17509.08 17509.08
Cylinder head head
Plat Baja
Mesin Cylinder
M5 - M10 231.66 Meja Rakit 1 281.74 159.15 K-1 1900.00 200 10 8.75 1844.31 18443.07 18443.07
Cylinder body body
EFISIENSI = 94%
No
Luas
Luas Asal Distance No. Peralata Jumlah yang Harus Jumlah yang Harus Unit Load Frekuensi Waktu Biaya Biaya Biaya
From To Tujuan Bahan Komponen
Fro (m2) (m) Part n Dipindahkan Dipindahkan (kg, unit) (kg, unit) per Hari Perpindahan Pemindahan Pemindahan/hari Total
- To (m2)
m
M1 Mesin
M6 - 156.14 Meja Rakit 1 281.74 260.60 K-11 Crankshaft 1900.00 150 13 12.72 2682.45 34871.83 34871.83
0 Parkerizing
Mesin Mesin
M7 - M6 357.16 156.14 319.45 K-11 Plat Baja Crankshaft 2000.00 150 14 15.02 3167.06 44338.88 44338.88
Crankshaft Parkerizing
M1 Mesin
M8 - 362.97 Meja Rakit 1 281.74 291.95 K-10 Camshaft 1900.00 200 10 13.79 2908.26 29082.56 29082.56
0 Camshaft
M1 Injection
M9 - Mesin CNC Meja Rakit 1 1345.00 K-3 1900.00 500 4 49.78 10494.23 41976.92
0 pump
M1 Alumunium
M9 - Mesin CNC Meja Rakit 1 1345.00 K-5 Oil pan 1900.00 250 8 53.14 11203.16 89625.25
0 Alloy
M1
M9 - Mesin CNC 3511.82 Meja Rakit 1 281.74 1345.00 K-7 Oil pump 1900.00 100 19 55.08 11613.59 220658.17 662543.75
0
M1
M9 - Mesin CNC Meja Rakit 1 1345.00 K-13 Plat Baja Piston 1900.00 250 8 53.14 11203.16 89625.25
0
M1 Alumunium
M9 - Mesin CNC Meja Rakit 1 1345.00 K-14 Water pump 1900.00 100 19 55.08 11613.59 220658.17
0 Alloy
M1 Alumunium Turbo
M9 - Mesin CNC Meja Rakit 2 906.76 K-4 1900.00 350 6 35.95 7579.01 45474.05
1 Alloy charger
M1
M9 - Mesin CNC Meja Rakit 2 906.76 K-6 Plat Baja Timming gear 1900.00 300 7 36.38 7670.04 53690.31
1
M1 Alumunium Timming gear
M9 - Mesin CNC Meja Rakit 2 906.76 K-9 1900.00 150 13 37.58 7922.14 102987.87
1 Alloy case
M1
M9 - Mesin CNC 3511.82 Meja Rakit 2 124.44 906.76 K-15 Plat Baja Flywheel 1900.00 400 5 35.34 7451.56 37257.79 552766.38
1
M1 Flywheel
M9 - Mesin CNC Meja Rakit 2 906.76 K-16 Plat Baja 1900.00 500 4 34.44 7260.38 29041.53
1 housing
M1
M9 - Mesin CNC Meja Rakit 2 906.76 K-17 Plat Baja Disk clutch 1900.00 200 10 37.16 7833.91 78339.09
1
M1
M9 - Mesin CNC Meja Rakit 2 906.76 K-8 Plat Baja Rocker arm 1900.00 100 19 38.02 8015.02 152285.42
1
EFISIENSI = 94%
L-38A
No
Luas
Luas Asal Distance No. Peralata Jumlah yang Harus Jumlah yang Harus Unit Load Frekuensi Waktu Biaya Biaya Biaya
From To Tujuan Bahan Komponen
Fro (m2) (m) Part n Dipindahkan Dipindahkan (kg, unit) (kg, unit) per Hari Perpindahan Pemindahan Pemindahan/hari Total
- To (m2)
m
M1 Connecting
M9 - Mesin CNC 3511.82 Meja Rakit 2 124.44 906.76 K-12 Plat Baja 1900.00 300 7 36.38 7670.04 53690.31 552766.38
1 rod
Mesin
Meja Cylinder
M15 - M4 570.97 Cylinder 254.80 1727.55 K-2 Plat Baja 2000.00 500 4 63.16 13317.13 53268.52 53268.52
Pengecatan head
head
Mesin
Meja Cylinder
M15 - M5 570.97 Cylinder 231.66 2231.09 K-1 Plat Baja 2000.00 200 10 87.48 18444.00 184439.99 184439.99
Pengecatan body
body
Meja Mesin
M15 - M8 570.97 362.97 2355.89 K-10 Plat Baja Camshaft 2000.00 200 10 92.22 19443.86 194438.55 194438.55
Pengecatan Camshaft
Meja Timming
M15 - M9 570.97 Mesin CNC 3511.82 726.94 K-6 Plat Baja 2000.00 300 7 29.70 6261.88 43833.18
Pengecatan gear
Meja
M15 - M9 Mesin CNC 726.94 K-13 Plat Baja Piston 2000.00 250 8 29.96 6316.62 50532.96
Pengecatan
Meja
M15 - M9 Mesin CNC 726.94 K-15 Plat Baja Flywheel 2000.00 400 5 28.87 6086.72 30433.62
Pengecatan
676458.50
Meja Flywheel
M15 - M9 Mesin CNC 726.94 K-16 Plat Baja 2000.00 500 4 28.14 5933.46 23733.85
Pengecatan housing
Meja
M15 - M9 Mesin CNC 726.94 K-17 Plat Baja Disk clutch 2000.00 200 10 30.32 6393.25 63932.51
Pengecatan
EFISIENSI = 94%
No
Jumlah yang Unit
Luas Luas Jumlah yang
Distance No. Peralata Harus Load Frekuensi Waktu Biaya Biaya
From Asal To Tujuan Bahan Komponen Harus Biaya Total
Fro (m) Part n Dipindahkan (kg, (kg, per Hari Perpindahan Pemindahan Pemindahan/hari
- To (m2) (m2) Dipindahkan
m unit) unit)
Meja Mesin
M15 - M9 726.94 K-5 Alumunium Alloy Oil pan 2000.00 250 8 29.96 6316.62 50532.96
Pengecatan CNC
Meja Mesin
M15 - M9 726.94 K-7 Alumunium Alloy Oil pump 2000.00 100 20 31.05 6546.51 130930.28 676458.50
Pengecatan CNC
Meja Mesin
M15 - M9 726.94 K-14 Alumunium Alloy Water pump 2000.00 100 20 31.05 6546.51 130930.28
Pengecatan CNC
SA-
M1 Meja Meja
M13 - 162.16 159.77 438.90 1, SA-1, SA-2 SA-1, SA-2 1900.00 40 48 20.07 4232.08 203140.03 203140.03
2 Inspeksi 1 Rakit 3
SA-2
Meja
M1 Meja Rakit SA-1, SA-2, cooling fan, nozzle injection, Mesin
M12 - 159.77 Inspeksi 150.60 97.80 FA 1900.00 20 95 6.59 1389.69 132020.46 132020.46
4 3 pump power steering, bearing cam, liner Diesel
2
Gudang
Meja Mesin
M14 - C 150.60 Barang 928.02 377.97 FA Mesin Diesel 1900.00 20 95 17.74 3740.02 355301.94 355301.94
Inspeksi 2 Diesel
Jadi
18,680,972.1
TOTAL BIAYA MATERIAL HANDLING