Parametric Studies About Three Basic Upgrading Methods On Slope Stability
Parametric Studies About Three Basic Upgrading Methods On Slope Stability
Parametric Studies About Three Basic Upgrading Methods On Slope Stability
22
S1 S2 S3 S4 S5 S6 S7 S8
20
18
Elevation (mPD)
16
14
12
The FOS are calculated with 10
1
4
Cohesion: 15
Phi: 0
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70
Distance (m)
Example 1: Cohesive soil SLIP FOS Example 1: Cohesive soil SLIP FOS
Toe Weighting S1 1.223 Trimming slope crest S1 1.713
S2 1.178 S2 1.703
S3 1.170 S3 1.607
S4 1.186 S4 1.446
S5 1.188 S5 1.309
S6 1.196 S6 1.225
S7 1.207 Trim back of slope crest S7 1.175
24 Toe Weighting S8 1.212 24 S8 1.147
22 22
S1 S2 S3 S4 S5 S6 S7 S8 S1 S2 S3 S4 S5 S6 S7 S8
20 20
18 18
10kPa
Elevation (mPD)
Elevation (mPD)
16 16
14 14
12 12
10 10
Description: Cohesive Soil
1
8 8
Wt: 16 Wt: 16
6 Cohesion: 15 6 Cohesion: 15
Phi: 0 Phi: 0
4 4
2 2
0 0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70
QT9-1
Example 1: Cohesive soil
Example 1: Cohesive soil Slope stability increased by:
1.8
Trim back of slope crest
1.7 Toe weighting
Example 1: Cohesive soil SLIP FOS
Soil Improvement at mid slope S1 1.379 Soil improvement at mid-slope
S2 1.261 1.6
S3 1.202
22
S1 S2 S3 S4 S5 S6 S7 S8
20 1.3
1
18
Elevation (mPD)
16 1.2
14 Description: Improved soil
12 Wt: 17
Cohesion: 50 1.1
10 Phi: 0
8 3
1.0
6 Description: Cohesive Soil S1 S2 S3 S4 S5 S6 S7 S8
Wt: 16 Existing Slope 1.168 1.102 1.080 1.084 1.077 1.079 1.083 1.086
4 Cohesion: 15
Phi: 0 Trim back 1.713 1.703 1.607 1.446 1.309 1.225 1.175 1.147
2
Toe weighting 1.223 1.178 1.170 1.186 1.188 1.196 1.207 1.212
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 Soil improvement 1.379 1.261 1.202 1.198 1.174 1.165 1.155 1.142
Slip Surface no.
Distance (m)
14 14
S1
S2
S3
S4 S5 S6 Toe Weighting S1
S2
S3
S4 S5 S6
12 12
Elevation (mPD)
Elevation (mPD)
10 10
8 8 10 kPa
6 6
1 1
14 S1 S3 14 S1 S3
S2 S4 S5 S6 S2 S4 S5 S6
12 12
Elevation (mPD)
Elevation (mPD)
10 10 2
Wt: 18
Wt: 18
Cohesion: 0 Cohesion: 0
2 2
Phi: 30 Phi: 30
0 0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30
QT9-2
Example 2: Frictional soil
Example 3: General soil slope
Slope stability increased by: Trim back of slope crest
Toe weighting
1.9
Soil improvement at mid-slope
1.8
Example 3: Cohesive Frictional Soil SLIP FOS
1.7 Original Slope S1 1.161
S2 1.158
Factor of safety (Morgenstern-Price)
S3 1.310
1.6 Existing Condition S4 1.480
S5 1.688
1.5 16 S6 1.886
1.4
14
S1 S2 S3 S4 S5 S6
12
Elevation (mPD)
1.3
10
1.2
8
1.1
6 1
Example 3: Cohesive Frictional Soil SLIP FOS Example 3: Cohesive Frictional Soil SLIP FOS
Toe Weighting S1 1.216 Trim back of slope crest S1 1.231
S2 1.203 S2 1.303
S3 1.347 S3 1.526
S4
S5
1.515
1.722
Trim back of slope crest S4
S5
1.711
1.805
16
Toe Weighting S6 1.920 16 S6 1.938
14 14
S1 S2 S3 S4 S5 S6 S1 S2 S3 S4 S5 S6
12 12
Elevation (mPD)
Elevation (mPD)
10 10
8 10kPa 8
6 1
6
1
1.7
S3 1.332
Soil Improvement at mid slope S4 1.501
1.6
S5 1.708
16 S6 1.908
1.5
14
S1 S2 S3 S4 S5 S6 1.4
12
Elevation (mPD)
1.3
10 2
Description: Improved soil
Wt: 18 1.2
8
Cohesion: 5
Phi: 36 1.1
6
Description: CDG 1.0
4 3
Wt: 18 S1 S2 S3 S4 S5 S6
Cohesion: 3 Existing Slope 1.161 1.158 1.310 1.480 1.688 1.886
2 Phi: 32
Trim back 1.231 1.303 1.526 1.711 1.805 1.938
0 Toe weighting 1.216 1.203 1.347 1.515 1.722 1.920
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 Soil improvement 1.187 1.183 1.332 1.501 1.708 1.908
Slip Surface no.
Distance (m)
QT9-3