The document is a field inspection report template for light panels that includes an 11 point checklist to ensure panels meet specifications. The checklist includes confirming that cubicles are bolted properly, busbars have acceptable spacing, insulators and wiring are in good condition, interlocks and metering operate correctly, protection relays and trip tests pass, auxiliary power is available, and fuses meet requirements. The inspector is to check each item and confirm compliance.
The document is a field inspection report template for light panels that includes an 11 point checklist to ensure panels meet specifications. The checklist includes confirming that cubicles are bolted properly, busbars have acceptable spacing, insulators and wiring are in good condition, interlocks and metering operate correctly, protection relays and trip tests pass, auxiliary power is available, and fuses meet requirements. The inspector is to check each item and confirm compliance.
The document is a field inspection report template for light panels that includes an 11 point checklist to ensure panels meet specifications. The checklist includes confirming that cubicles are bolted properly, busbars have acceptable spacing, insulators and wiring are in good condition, interlocks and metering operate correctly, protection relays and trip tests pass, auxiliary power is available, and fuses meet requirements. The inspector is to check each item and confirm compliance.
FIR NO : DATE : JOB NO : 6261 DESCRIPTION CLIENT PMC SUBCONTRACTOR Inspector Signature Date
INSPECTION CHECKLIST FOR LT. PANELS.
TYPE (PCC, PMCC, MCC, PDB and MLDB) Test Date : Weather : Temp : TAG NO. Sr Points To Ensure Confirmation
1 Check for any physical breakage / damage Yes / No
2 Cubicals bolted in position. Yes / No 3 Position of busbars and spacing checked and found within acceptable limit. Yes / No 4 All the insulators are in good condition. Yes / No 4 Inter-changing of all size of Motor, Power and ACB Feeders checked. Yes / No 5 Operation of shutter mechanism checked and satisfied. Yes / No 6 Panel wiring checked and found as per scheme. Yes / No Motor Feeders. Motor feeder interlock with Control Room Panels Incomer interlocks scheme. 7 All meters tested and CT / PT. Ratio checked as per the ITP. And CTs have been Yes / No put in service. 8 All protection relays tested and tripping through relays checked.. Yes / No 9 BUSBAR IR checked. Yes / No 10 Auxiliary power supply made available. Yes / No DC Supply for protection & interlocks. Auxiliary supply for Space Heaters. Control Power supply. 11 Check all the Main & Control fuses of recommended ratings Yes / No 12 Check Feeder Yes / No