FORM NO.

E-021

TOYO ENGINEERING INDIA LTD.

FIELD INSPECTION REPORT


FIR NO : DATE : JOB NO : 6261
DESCRIPTION CLIENT PMC SUBCONTRACTOR
Inspector
Signature
Date

INSPECTION CHECKLIST FOR LT. PANELS.


TYPE (PCC, PMCC, MCC, PDB and MLDB)
Test Date : Weather : Temp :
TAG NO.
Sr Points To Ensure Confirmation

1 Check for any physical breakage / damage Yes / No


2 Cubicals bolted in position. Yes / No
3 Position of busbars and spacing checked and found within acceptable limit. Yes / No
4 All the insulators are in good condition. Yes / No
4 Inter-changing of all size of Motor, Power and ACB Feeders checked. Yes / No
5 Operation of shutter mechanism checked and satisfied. Yes / No
6 Panel wiring checked and found as per scheme. Yes / No
Motor Feeders.
Motor feeder interlock with Control Room Panels
Incomer interlocks scheme.
7 All meters tested and CT / PT. Ratio checked as per the ITP. And CTs have been Yes / No
put in service.
8 All protection relays tested and tripping through relays checked.. Yes / No
9 BUSBAR IR checked. Yes / No
10 Auxiliary power supply made available. Yes / No
DC Supply for protection & interlocks.
Auxiliary supply for Space Heaters.
Control Power supply.
11 Check all the Main & Control fuses of recommended ratings Yes / No
12 Check Feeder Yes / No