The demand (q) and saturation flows (S) for a three-phase signalised T-intersection is given
in the table below. Each approach has two lanes. Amber time (a) is 3 sec, all red period (R) is
2 sec and driver reaction time (l) is 3 sec.
(b) Take the cycle time (C) as the optimum cycle time calculated above. Determine the
controller setting time (k) for each phase.