One Blue Hill Plaza, 7th Floor

Post Office Box 1565


Pearl River, NY 10965
845.620.1300 Voice | 845.620.1320 Fax

March 6, 2017

Ms. Kimberly D. Bose, Secretary


Federal Energy Regulatory Commission
888 First Street, N.E.
Washington, D.C. 20426

Re: Millennium Pipeline Company, L.L.C.


Eastern System Upgrade, Docket No. CP16-486-000
Supplemental Information Workspace Revisions

Dear Ms. Bose:

On July 29, 2016, Millennium Pipeline Company, L.L.C. (Millennium) filed with the
Federal Energy Regulatory Commission (Commission) in Docket No. CP16-486-000 an
Abbreviated Application for a Certificate of Public Convenience and Necessity (Application)
for its proposed Eastern System Upgrade Project (Project). 1 Millennium submits for filing in
the above-captioned docket supplemental information to reflect modifications to the Project
workspace which have occurred subsequent to the submittal of Millenniums Application.
Specifically, the supplemental information includes information and updated Project drawings
associated with the combining of two horizontal directional drills (HDD) at Mountain Road
and Bedell Drive into a single, comprehensive HDD.

Additional changes to the Project workspace areas include the following:

slight modification of the alignment of TAR-0003 to the Neversink River HDD


workspace (southeast side of river);
combination of the Mountain Road and Bedell Drive HDDs into one comprehensive
HDD from milepost (MP) 2.8 to 3.8;
removal of Additional Temporary Workspace (ATWS) 5-01 and temporary workspace
at MP 3.5 (not required due to the combined HDD mentioned above);
addition of Additional Temporary Workspace 6-02 and 6-03 through Wetland W-16 for
staging of the pipeline pullback string associated with the Interstate 84 HDD;

1
Millennium Pipeline Company, L.L.C., Abbreviated Application for a Certificate of Public Convenience and
Necessity, Docket No. CP16-486-000 (July 29, 2016).

www.millenniumpipeline.com
change in discharge locations and amounts for hydrostatic test water; and
minor design changes at the Hancock Compressor Station extending workspace limits in
some areas, and reducing the disturbance limit in other areas.

No new landowners will be affected by the above-listed workspace modifications and all
modified workspace areas are within the previously surveyed area for the Project. The
combination of the Mountain Road and Bedell Drive HDDs into one single HDD minimizes
impacts on landowners and eliminates the need for ATWS 5-01 and temporary workspace at MP
3.5. The addition of ATWS 6-02 and 6-03 will increase temporary surface impacts on Wetland
W-16. Wetland W-16 will be matted during construction for laying of HDD pipe and will be
restored in accordance with the Project Environmental Construction Standards post-construction.
Millennium is requesting a variance from the Federal Energy Regulatory Commission for ATWS
within Wetland W-16 in this location. Wetland W-16 is a palustrine emergent wetland and is not
a New York State Department of Environmental Conservation (NYSDEC) Mapped or
NYSDEC Eligible wetland.

Description of Items Being Filed


Public:
ESU Revised Tables FEB 2017
ESU Revised Drawing Sheets FEB 2017

Critical Energy Infrastructure Information Non-Public:


Drawing HC-SOE Hancock Compressor Station

As indicated above, this filing contains critical energy infrastructure marked


CONTAINS CRITICAL ENERGY INFRASTRUCTURE INFORMATIONDO NOT
RELEASE and should be treated as confidential for use by Commission Staff only and should
not to be released to the public. Millennium is filing the additional information pursuant to the
Commissions guidelines for eFiling. Millennium is also providing complete copies of this filing
to the Office of Energy Projects. If you have any questions regarding this filing, please contact
me at 845-620-1300.

Respectfully submitted,

/s/ Georgia Carter


Georgia Carter
Vice President and General Counsel
Millennium Pipeline Company, L.L.C.

Attachments
cc: Eric Howard, FERC
CERTIFICATE OF SERVICE

Pursuant to Rule 2010 of the Commissions Rules of Practice and Procedure, 18

C.F.R. 385.2010 (2016), I hereby certify that I have this day served the foregoing

document upon each person designated on the official service list compiled by the

Secretary in this proceeding.

Dated at Washington, D.C., this 6th day of March, 2017.

/s/ Marco Bracamonte


Marco A. Bracamonte
Van Ness Feldman LLP
1050 Thomas Jefferson St., N.W.
Seventh Floor
Washington, D.C. 20007-3877
(202) 298-1800