Proposed operational plan of Boilers

Months Mar-17 Apr-17 May-17 Jun-17

Available Load Running Load Load Margin Available Load Running Load Load Margin Available Load Running Load Load Margin Available Load Running Load

Boiler No (Lb/hr) (Lb/hr) (Lb/hr) (Lb/hr) (Lb/hr) (Lb/hr) (Lb/hr) (Lb/hr) (Lb/hr) (Lb/hr) (Lb/hr)

3 27000 SB 27000 SB 27000 SB 27000 SB

5 27000 SB 27000 SB 27000 SB 27000 SB

8 70000 SB 70000 60,000 10,000 70000 SB 70000 SB

9 90000 66,000 24,000 90000 66,000 24,000 90000 66,000 24,000 90000 66,000

10 90000 70,000 20,000 90000 70,000 20,000 90000 70,000 20,000 90000 70,000

11 90000 66,000 24,000 90000 66,000 24,000 90000 66,000 24,000 90000 66,000

12 90000 OH 90000 OH 90000 OH 90000 OH

13 70000 60,500 9,500 70000 SB 70000 60,500 9,500 70000 60,500

14 120000 99,000 21,000 120000 99,000 21,000 120000 99,000 21,000 120000 99,000

15 120000 OH 120000 OH 120000 OH 120000 OH

Total 794000 361,500 98,500 794000 301,000 99,000 794000 361,500 98,500 794000 361,500
Jun-17 Jul-17 Aug-17

Load Margin Available Load Running Load Load Margin Available Load Running Load Load Margin
Remarks

(Lb/hr) (Lb/hr) (Lb/hr) (Lb/hr) (Lb/hr) (Lb/hr) (Lb/hr)

27000 SB 27000 SB

27000 SB 27000 SB

70000 SB 70000 SB

24,000 90000 66,000 24,000 90000 66,000 24,000

20,000 90000 70,000 20,000 90000 70,000 20,000

24,000 90000 66,000 24,000 90000 66,000 24,000

90000 OH 90000 OH

9,500 70000 60,500 9,500 70000 60,500 9,500

21,000 120000 99,000 21,000 120000 99,000 21,000

120000 OH 120000 OH

98,500 794000 361,500 98,500 794000 361,500 98,500