Minarwa Warper Machine Creel Maintenance Report


Date: - 22/02/10 Department:- Projects,

Created by:- Darpan Patel, Verified By:- Mr.Sachin

Details:-

Time Period: - 16 hours,

Parts name Status Need to be Change Change Pending

Creel Spindle All Check 2 2 Nil


Ceramic All Check 24 24 Nil
Pipe Rollers All Check 25 25 Nil
Warp Guiders All Check 33 33 Nil
Spring All Check 1200 800 400
Spring Strip All Check 200 200 Nil
Bearing All Check 34 34 Nil
Break Pad All Check 78 78 Nil
Dead Weight All Check 2 2 Nil
Dancing Lever All Check 7 7 Nil
Fitting Pice All Check 4 4 Nil
Break Disc All Check 3 3 Nil
O-ring All Check 350 250 100
Flat Ring All Check 500 Nil 500

All Creel Row Checking are Completed ,

But Last Row some Parts we Can not be Change ,Because We have not Enough
time for That,

Parts Need to be Change:- in Last Creel.

O-Ring,
Flat Washer
Spring
Over All Conclusion: - Now Creel is ready For the Bobbin Loading & Beaming,