This document outlines the general schedule of design shop drawings for 5 bridges over 114 days. It is divided into two parts - calculation over 40 days and drawings over 114 days. For each bridge, the schedule allots time for drawings of piles, piers, abutments, superstructures, box culverts, and miscellaneous elements. The bridges included are Sangkae Bridge, Bridge 79, Bridge 80, Bridge 81 and Bridge 82.
This document outlines the general schedule of design shop drawings for 5 bridges over 114 days. It is divided into two parts - calculation over 40 days and drawings over 114 days. For each bridge, the schedule allots time for drawings of piles, piers, abutments, superstructures, box culverts, and miscellaneous elements. The bridges included are Sangkae Bridge, Bridge 79, Bridge 80, Bridge 81 and Bridge 82.
This document outlines the general schedule of design shop drawings for 5 bridges over 114 days. It is divided into two parts - calculation over 40 days and drawings over 114 days. For each bridge, the schedule allots time for drawings of piles, piers, abutments, superstructures, box culverts, and miscellaneous elements. The bridges included are Sangkae Bridge, Bridge 79, Bridge 80, Bridge 81 and Bridge 82.