In this Section
Placing Geometric Data of Foundation.
1/62
Placing Geometric
Data of Foundation
In this activity you will;
Before you start this activity, you must be in the ACI_IMP project.
2/62
Making New Structure
1. Select the Create New Structure command from Icon menu or
Menu bar.
3/62
2. Enter sample1 at the text box.
4/62
Adding New Node
1. Select Geometry command.
& Selecting Add button once made it possible to add one node.
5/62
The form will show array of 6 node according to entering users input.
6/62
Setting Foundation
Group
In this activity you will;
Before you start this activity, you must have 6 nodes with geometry
data .
7/62
Making Group of Isolated without Pile.
7. Select 1 node in the Using node list and then select 2 node pressing
Ctrl key.
& Using mouse drag , enter first point and second point.
8/62
First
Point
Second
Point
A button
9/62
Making Group of Block without Pile.
10/62
Making Group of Octagonal with Pile.
11/62
Setting Load Case and
Load Combination
In this activity you will;
Before you start this activity, you must make 3 types of foundation
group.
12/62
Setting Load Case to Foundation Group
13/62
4. Select the option as Unassigned Load Case.
14/62
17. Enter the values of wind load as following picture.;
15/62
24. Select Save button on the form.
16/62
Making Load Combination for Stability.
4. Select SW case and then click pressing Ctrl key Empty and WL case.
You should select three load cases simultaneously.
17/62
& All load combination are included with self-weight certainly.
& When you set default at the Setting of Constant, above options are
applied sliding ratio = 1.5, overturning ratio = 1.5 and factor of
allowable increase = 33.33%
18/62
10. Select SW, Operation and WL case
& When you set default at the Setting of Constant, above options are
applied sliding ratio = 1.7, overturning ratio = 1.8 and factor of
allowable increase = 33.33%
19/62
16. Select SW and Test case
& When you set default at the Setting of Constant, above options are
applied sliding ratio = 1.6, overturning ratio = 1.7 and factor of
allowable increase = 20%
20/62
21/62
Making Load Combination for Reinforcement.
1. Select New button on the form to make first L/C for Reinforcement.
4. . Select button.
22/62
13. Select Options of Ultimate Strength.
23/62
24/62
Importing/Exporting Load Combination
25/62
8. Select Load Combination button on the form of
Loads & Combination.
26/62
11. Select Open button.
15. Enter values of empty, operation, test and wind load as following
picture.
27/62
16. Select group3 in the Group Name.
22. Select Close button and Load Case button button on the form of
Loads & Combination.
23. Enter values of empty, operation, test and wind load as following
picture.
28/62
Modifying Size of Footing,
Pier and Re-Bar.
In this activity you will;
Before you start this activity, you must make 3 types of foundation
group.
29/62
Modifying size of footing and pier.
30/62
9. Select Save button.
31/62
17. Select Feature Data button.
32/62
22. Select Save button.
25. Select 3 (F3) in the Pier and then Select Feature Data button.
33/62
27. Select Save button and the Pier tab.
28. Enter 0.1 at the Grout Thickness and then select Save button.
30. Select 4 (F4) in the Pier and then Select Feature Data button.
34/62
32. Select Save button and the Pier tab.
33. Enter 0.1 at the Grout Thickness and then select Save button.
35. Select group3 in the Group Name and 5 (F5) in the Pier.
37. Enter values at the footing and pier tab as following picture.
35/62
39. Select 6 (F6) in the Pier
40. Enter values at the footing and pier tab as following picture.
36/62
37/62
Modifying reinforcement of footing and pier.
38/62
6. Select only bottom re-bar of footing.
39/62
8. Select Save button.
40/62
16. Enter values of pier re-bar as following picture.
41/62
42/62
Placing Pile Data.
In this activity you will;
Before you start this activity, you must make pile type of foundation
group.
43/62
Placing Circular Pattern of piles.
1. Select group3 in the Group Name and then 5 (F5) in the Pier.
44/62
4. Select option of Circle Array.
5. Enter 2 ea of pile circle and then input pile circle diameter, number
in PCD and pile of start angle as following picture.
45/62
6. Select Save button.
46/62
14. Select Save button.
47/62
15. Select Save button on the pile array form.
48/62
Running Auto-Design
of Footing.
In this activity you will;
Before you start this activity, you must make foundation group with the
values of load and combination. And fix the height of pier.
49/62
Setting parameters of auto-design.
50/62
4. Select Default button.
51/62
7. Select Save to DB button.
52/62
Run Analysis of Footing.
In this activity you will;
Before you start this activity, you must make foundation group with the
values of load and combination. And fix all information of foundation.
If you would enter a wrong value, you wouldnt get a right report.
53/62
& Check the result of stability and reinforcement. If you have
N.G(=No Good), you should have the result to O.K or
N/A as changing footing size, pier size, pile ea. and
reinforcement. When you get all O.K, you should select
Show Detail Report button.
54/62
Viewing Detail Report.
55/62
Run BOM of Foundation
In this activity you will;
Before you start this activity, you must get the right result of
foundation design. Suggest not to select BOM button until design of
foundation is finished.
56/62
4. Select OK button and then Close button.
57/62
58/62
Export PDS Model file.
In this activity you will;
2. Select OK button.
59/62
3. Enter file name and then select Save button.
4. Select OK button.
Multi Icon
60/62
6. Select file made by AFES.
7. Select OK button.
61/62
62/62