Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 5

Original Sub Work

Agt item Item No.


No.
Sub Work:
Providing internal electrification for accommodating Engineering wing of Head office, APIIC at Vijaya
Residency, Vasavinagar, Vijayawada.

Description of Work
Qnty.
Original Sub Work
Agt item Item No.
No.

Installation of 10 pair telephone tag block with lockable cover


20 a 15 a
Installation of following modular switch/socket on the existing modular
21 a 16 a plate & switch box . [Make: Legrand].
Installation for approved make 3 Nos 3pin 6A modular socket with 2Nos.
30 20 6A modular switch [Make: Legrand Arteor]

Installation of 8 Way SPN Distribution board with IP-43 protection


(Metal Door) suitable for 1 No 40A DP MCB as incomer and 6 Nos-
35 22 10kA 6-32A SP MCBs as outgoers (Make: Legrand). RAW/UPS

Installation of 6U floor mounting net work rack with power spike


56 31 [Make: Vall]
Installation of approved make of plug - in type LAN RJ-45 socket outlet
51 26 with G.I outlet box and cover plate. [Make: Legrand]

52 27 Installation of 24 Port switches [Make : D Link]


53 28 Installation of 24 Port patch panel [Make: D link]
Supplemental Items
Installation of 40 A - Triple Pole MCB in existing Distribution Board, .
SP1 [Make: Legrand]
Installation of 40 A - Single Pole MCB in existing Distribution Board,
SP2 [Make: Legrand]
Installation of 5-Port 10/100 Mbps Unmanaged Switch to existing table
SP3 [Make: D-Link (DES-1005C)]
SP4 Installation of Remote Bell [Make: Gold Medal]
1 No.

10 Nos.

42 Nos.

4 Nos.

2 Nos.

39 Nos.

2 Nos.
2 Nos.

1 No.

2 Nos.

3 Nos.

4 Nos.

You might also like