Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 2

BKI Certification for

Offshore
Floating offshore including F(P)SO, FPU, MODU, FS(R)U, FLNG, Tank Barge, Single
Point Mooring, Platform, Rig, Jacket, Pipeline and other support facilities. All of that
facilities in BKI will be handled by he special division that call Offshore Division.
Forerunner to the establishment of Offshore Division originated from some of client
requests and BKI stackholder who asked to BKI to establish a special team that
handles floating facilities in the oil and gas environment.
At the end of 2011, formed a special working group that handles offshore ship
classification under the coordination of Head of Statutory. Then on April, 24th 2013,
Oil & Gas Unit was formed which took over the duties of the special working group. In
February 2014, BKI make the organizations improvement perfection and changes
Unit Oil & Gas Offshore Division into.

Scope of work Offshore Division


Give proposals to client that asked for calsification/survey
service, include technical and price proposal before the
implementation of classification/survey.

Meetings with the client to discuss the technical implementation



of the classification / survey and price.

Come to ship owner who has not been classify the offshore ship
to BKI to classify the ship to BKI, especially offshore ship tht
operated in Indonesia.

If qualified, then BKI will issued Audit Report and temoporary



DOC certificate that occured until 5 mounth.

As the surevey executive coordinator that assigned to briefing


about survey implementation, monitoring survey
implementation , verify survey report, issued permananet
certificate and registed the offshore ship that have classed in
BKI.
Clasification Procedure
The classification procedure that performed by BKI as shown below.

Process to get BKI certification


1. Direct or Indirect Certification
2. Type approval
3. Inspection on manufacturing
4. Review equipment specification: GA, Datasheet and etc
Supporting Document
1. Company Profile
2. Product Specification
3. Quality Plan and Quality System Procedure
4. Vendor List
5. Testing Facility

You might also like