OWNER LSTK

PROJECT: DOCUMENT NO.:


CLIENT: ONGC TAG NO. : S - 907
CONTRACTOR : SAVAIR ENERGY LIMITED. SHEET NO. : 1 OF 4
DATA SHEET OF GCI STORAGE TANK
1 OPERATING/MECHANICAL DATA
2 DESCRIPTION GCI STORAGE TANK Units
3 CONTENTS GAS CORROSION INHIBITOR
4 WORKING TEMPERATURE, NORMAL AMBIENT 0
C
5 WORKING PRESSURE, NORMAL ATM kg/cm2g
6 NOR/MIN. VAC. COND. - kg/cm2g
7 DESIGN TEMPERATURE, UPPER/LOWER 60/ - oC
8 DESIGN PRESSURE , INTERNAL/EXTERNAL (FULL WATER + 150mm WC) / 50mm WC VACUUM kg/cm2g
9 TEST PRESSURE , HYDROSTATIC/PNEUMATIC AS PER CODE kg/cm2g
10 OPERATING CONDITIONS , FLOW - m3/hr
11 DENSITY AT WORKG. TEMP. - kg/m3
12 DENSITY AT 15oC - kg/m3
13 VISCOSITY - cP
14 LENGTH OF TANK 1000 mm
15 WIDTH OF TANK 1500 mm
16 HEIGHT OF TANK 3500 mm
17 JOINT EFFICIENCY, SHELL/HEAD 1.0/1.0
18 CORROSION ALLOWANCE, TOP COVER N/A mm
19 SIDE WALLS N/A mm
20 BOTTOM PLATE N/A mm
21 SURFACE PREPARATION/PAINTING AS PER FS 2005
22 PLATE THICKNESS, OTTOM / STRUCTURE * mm
23 PLATE JOINTS, SHELL / ROOF * mm
24
25 BOTTOM *
26 FOUNDATION *
27 CONE ROOF NO
28 TOP ANGLE N/A
29
30
31 TOTAL VOLUME * m3
32 MAX LIQUID VOLUME * m3
33 WIND PRESSURE (NOTE-1)
34 EARTH QUAKE FACTOR (NOTE-2)
35 GENERAL NOTES:
36 " * " INDICATE VENDOR TO ADVICE.
37 1) WIND FORCE CALCULATION SHALL BE CARRIED OUT AS PER API RP 2A WSD (MAX WIND SPEED191 Km/hr).
38 2) EARTHQUAKE FACTOR SHALL BE AS PER SECTION 3.4.6.1 OF "3.4 STRUCTURAL DESIGN CRITERIA PART-I REV-3"
39 3) PAINTING SHALL BE AS PER CLIENT "SPEC.2005", REV.3 PROTECTIVE COATING FOR OFFSHORE STRUCTURES AND
40 FACILITIES.
4) REINFORCING PADS SHALL HAVE A MINIMUM WIDTH OF 50 mm OR THREE TIMES THE PAD THICK NESS, WHICHEVER
41
IS
42 GREATER. EACH PAD SHALL CONTAIN AT LEAST ONE 1/2" NPT TAPPED TELL TALEHOLE.
5) ALL RECTANGULAR REINFORCING PADS WHEN USED FOR EXTERNAL OR INTERNAL ATTACHMENTS SHALL HAVE 25
43
mm MINIMUM
44 RADIUS AT CORNERS.
45 6) THE NOZZLE ELEVATION, PROJECTION AND ORIENTATION WILL BE FINALIZED DURING DETAILED ENGINEERING.
7) NOZZLE PROJECTION SHALL BE A MINIMUM OF 200mm FOR SIZES LESS THAN OR EQUAL TO 12" AND 250 mm FOR
46
SIZES
47 GREATER THAN 12" FROM OUTER MOST LAYER OF SHELL OR INSULATION WHICHEVER IS APPLICABLE.
48 8) HATCH AND CLEANOUT OPENINNG SHALL BE PROVIDED AS PER API 12F.
9) ALL ALLOY STEEL STUD BOLTS AND NUTS SHALL BE HOT DIP GALVANIZED OR ELECTROGALVANIZED WITH MINIMUM
49
COATING
50 AS PER SPEC 2005,FS FOR PROTECTIVE COATING.
51
52
53
A 14/01/2013 ISSUED FOR ENQUITY AC MK MK
REV. DATE PURPOSE PRPD BY CHKD BY APPRD BY
OWNER LSTK

PROJECT: DOCUMENT NO.:


CLIENT: ONGC TAG NO. : S - 907
CONTRACTOR : SAVAIR ENERGY LIMITED. SHEET NO. : 2 OF 4
DATA SHEET OF GCI STORAGE TANK
1 MANUFACTURER * 56 SERIAL No. * No. OF: 1
2 SERVICE GAS CORROSION INHIBITO 57 CONSTRUCTION MATERIALS
3 ORIENTATION RECTANGULAR 58 PART MATERIAL SPECIFICATION
4 LOCATION OFF SHORE, MUMBAI 59 TOP / BOTTOM COVER SA 240 Gr.316L
5 DESIGN CODE API 12F 60 SIDES SA 240 Gr.316L
6 SPECIFICATIONS 5601 61 REINFORCING PAD SA 240 Gr.316L (NOTE - 4 & 5
7 CONSTRUCTION CATEGORY N/A 62 NOZZLE NECK PLATE SA 240 Gr.316L
8 QUANTITY 1 63 NOZZLE NECK PIPE SA 312 TP 316L
9 64 FORGED NOZZLES SA 182 F316L
10 65 FORGED FLANGES SA 182 F316L
11 DESIGN DATA 66 WELDING ELBOWS SA 403 Gr.316L
12 PARAMETER UNITS 67 INTERNAL COATING AS PER FS 2005
13 GROSS CAPACITY m3 * 68 NOZZLE PIPE-EXTERNAL SA 312 TP 316L
14 SPECIAL SERVICE NO 69 SUPPORT SS 316L / SA 516 Gr 70 N
15 CODE STAMP NO 70 SADDLES N/A
16 JOINT EFFICIENCY, SHELL/HEAD 1/1 71 WRAPPER PLATES N/A
17 RADIOGRAPHY 100% 72 STIFFENING RINGS N/A
18 ULTRASONIC AS PER CODE 73 BASE PLATE N/A
19 MAGNETIC PARTICLE AS PER CODE 74 EXTERNAL ATTACHMENTS SS 316L
20 DYE PENETRANT AS PER CODE 75 INTERNAL ATTACHMENTS SS 316L
21 POST WELD HEAT TREATMENT AS PER CODE 76 BOLTED INTERNALS SS 316L
22 INSULATION NO 77 EXTERNAL BOLTS ASTM A193 Gr.B7 (NOTE - 9)
23 - THICKNESS mm N/A 78 NUTS ASTM A194 Gr.2H (NOTE - 9)
24 - TYPE N/A 79 GASKETS (NOTE - 10)
25 FIRE-PROOFING mm N/A 80 INTERNAL BOLTS SS 316L (NOTE - 9)
26 PAINTING (NOTE - 3) 81 NUTS SS 316L (NOTE - 9)
27 CERTIFYING AUTHORITY CLIENT/TPI 82 MATERIAL IMPACT TEST REQUIRED AS PER CODE
28 83 CERTIFIED ELEVATED TEMP. TESTS REQDNO
29 84 CONSTRUCTION
30 85 TYPE OF HEADS N/A
31 86 PLATFORM/LADDER/PIPE CLIPS YES
32 87 INSULATION SUPPORTS N/A
33 88 HATCH & CLEANOUT YES
34 89 EARTHING BOSS YES ( 2 NO.) (NOTE - 11)
35 90 LIFTING LUGS YES (NOTE - 12)
36 91 NAME PLATE YES - SS 316 (NOTE - 13)
37 92 WEIGHTS AND OVERALL DIMENSIONS
38 93 EMPTY WEIGHT, kg *
39 94 OPERATING WEIGHT, kg *
40 95 TEST WEIGHT, kg *
41 96 O'ALL DIMENSIONS OF TANK, mm 1000(L) x 1500(W) x 3500(H)
42 97
43 GENERAL NOTES:(CONT.)
44 10) GASKETS FOR FLANGES SHALL BE ASME B 16.21, FLAT RING,1.58mm, CNAF.
45 11) VESSEL
12) SHALL
ALL VESSEL BE PROVIDED
SHALL WITH WITH
BE FURNISHED MINIMUM OF TWOOF
A MINIMUM EARTHING BOSSES.
TWO LIFTING LUGS, WHICH SHALL BE DESIGNED FOR A LOAD EQUAL
46 TO TWO
47 TIMES THE SHIPPING WEIGHT.
48 13) NAME PLATE SHALL BE IN ACCORDANCE WITH API OR FUNC. SPECIFICATION "5601-UNFIRED-PRESSURE-VESSEL", Rev. 2.
49 14) NECESSARY CONSIDERATION SHALL BE FOLLOWED TO AVOID GALVANIC CORROSION OF STUD AND NUT.
50 15) TANK SHALL BE DESIGNED FOR A DESIGN LIFE OF 25 YEARS.
51 16) WELDING AND NDT SHALL BE AS PER SPEC 2009F, "FUNCTIONAL SPECIFICATION FOR WELDING AND NDT".
52 17) "*" VENDOR TO CONFIRM
53 18) FLANGE FACE SHALL BE SETRATED FINISH TYPE.
54 19) NOZZLE SIZES TO BE CONFIRMED BY VENDOR.
55
A 16/01/2013 ISSUED FOR ENQUIRY AC MK MK
REV DATE PURPOSE PRPD BY CHKD BY APPD BY
OWNER LSTK

PROJECT: DOCUMENT NO.:


CLIENT: ONGC TAG NO. : S - 907
CONTRACTOR : SAVAIR ENERGY LIMITED. SHEET NO. : 3 OF 4
DATA SHEET OF GCI STORAGE TANK
NOM FLANGE R.F. PAD ELEVATION &
SCH / PROJECTION
Sl. No MARK No.OFF SIZE O/D THK SERVICE ORIENTATIO BLIND FLANGE
THK RATING TYPE FACE FROM C.L
(Inches ) mm mm N
1 N1 1 1" 40S/- 150# SW RF - - GCI INLET (NOTE-6) (NOTE-7)
2 N2 1 1" 40S/- 150# SW RF - - GCI OUTLET
3 N3 1 1" 40S/- 150# SW RF - - PSV CONNECTION
4 V 1 4" 10S/- 150# WN RF * * VENT C/W GOOSE NECK
5 N4 1 2" 10S/- 150# WN RF - - DRAIN
6 N5 1 2" 10S/- 150# WN RF - - OVER FLOW CONNECTION
7 N6 1 2" 10S/- 150# WN RF - - LEVEL INDICATOR
8 LS 2 1" 40S/- 150# SW RF - - LEVEL SWITCH
9 LT 1 3" 10S/- 150# WN RF * * LEVEL TRANSMITTER
10 H 1 8" 150# WN RF * * HATCH
11 CL 1 20" 150# WN RF * * CLEANOUT OPENING
12
13
14 APPLICABLE CODES AND STANDARDS REFERENCE DOCUMENT / DRAWING LIST
15 Sl.No. DESCRIPTION SI.No. SPEC. DESCRIPTION
16 1 ASME B 16.5 FOR PIPE FLANGES 1 P&ID CHEMICAL INJECTION SYSTEM
17 2 ASME SEC V FOR NDE
18 3 ASME SEC-II MATERIAL SPECIFICATIONS
19 4 API 12F
20
21
22
23
24 APPLICABLE STANDARD SPECIFICATIONS
25 Sl.No. DESCRIPTION DOC. NO. REV
26 1 FS-UNFIRED PRESSURE VESSELS 5601 2
27 2 FS-PROTECTIVE COATING & ADDENDUM 2005 3
28 3 FS-WELDING & NDT 2009F 6
29
30
31
32
33
34 GENERAL NOTES:
20) HAZARDOUS AREA CLASSIFICATION OF THE EQUIPMENT SHALL BE MIN. CLASS I, DIV 2 / ZONE 2 OR AS PER ELECTRICAL
35
36 DESIGN CRITERIA VOL II SEC 3.5 .
37 21) REFER P&ID's LEGENDS FOR NOTES AND DETAILS.
38 22) PIPE AND PIPING COMPONENT SHALL COMPLY WITH PIPING MATERIAL SPECIFICATION, FS 2008.
39
40
41
42
43 HOLD : TANK SIZE SHALL BE CONFIRMED DURING DETAILED ENGINEERING.
44
45
46

A 16/01/2013 ISSUED FOR ENQUIRY AC MK MK


REV DATE PURPOSE PRPD BY CHKD BY APPRD BY
OWNER LSTK

PROJECT: DOCUMENT NO.:


CLIENT: ONGC TAG NO. : S - 907
CONTRACTOR : SAVAIR ENERGY LIMITED. SHEET NO. : 4 OF 4
DATA SHEET OF GCI STORAGE TANK
Sl. No
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36 NOTES
37 1) ALL NOZZLES ORIENTATION, SIZE, ELEVATION ARE
38 ONLY INDICATIVE AND UNDER HOLD
39 2) PLATE THICKNESS SHALL BE CALCULATED BY VENDOR
40 AS PER API 12F
41
42
43
44
45
46

A 16/01/2013 ISSUED FOR ENQUIRY AC MK MK