Matindok Gas Development Project (MGDP) Check List Potable Water Treatment

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

MATINDOK GAS DEVELOPMENT PROJECT

(MGDP)

CHECK LIST POTABLE WATER TREATMENT

No Check List System Water Treatment /x Remarks


Execution Potable Water System
1 Close outlet valve from Potable Water Tank (374-TK-
1003) to Potable Water Distribution Pump (374-P-
1006A/B)
374-GAT-2234 (374-PID-1004)
374-GAT-2239 (374-PID-1004)
374-GAT-2231 (374-PID-1004)
374-GAT-2238 (374-PID-1004)
2 Open all manual valves at inlet & outlet line going through
Potable Water Treatment Package.
374-XV-1001B (374-PID-1002) push button
374-GAT-2234 (374-PID-1004)
374-GAT-2237 (374-PID-1004)
374-GAT-2238 (374-PID-1004)
374-BAF-8038 (374-PID-1003)
374-BAF-8042 (374-PID-1003)
374-BAF-8040 (374-PID-1003)
374-BAF-8039 (374-PID-1003)
374-BAF-8046 (374-PID-1003)
374-BAF-8050 (374-PID-1003)
374-BAF-8049 (374-PID-1003)
374-BAF-8048 (374-PID-1003)
3 Close all manual valves that normally in closed position
374-GAT-2231 (374-PID-1004)
374-GAT 2232 (374-PID-1004)
4 Turn on Local Control Panel (LCP) for Potable Water
Package
5 NaOCl Dosing Pump 374-P-1014A/B shall start
6 Check flow by
7 Check common alarm, if it is not triggered, Potable Water
Package shall run automtically
8 Ensure to check level at Potable Water Storage Tank.

Page 1 of 1