Assignment 1 Traffic Study

You might also like

Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 1

KA 6563 Assignment 1

A proposed development will be constructed near the Putrajaya-Kajang highway


as shown in Figure 1.

Proposed
Development

To Putrajaya To Kajang

Figure 1

The development consists of an office building with 120,000 square meter floor
area and a 395 units condominium tower.

It is expected will attract 3.3 person-trips per 100 square meter floor area per hour
in the morning, whereas the condominium will produce 1.45 person-trips per unit
per hour. It is estimated that only 16% of the generated trip by the condominium
destine to the office building in the development area.

Mode Split Average


Capacity
Car 55% 1.9
Motorcycle 9% 1.15
Bus 36% 50

You are required to:

(a) Compute production and attraction.


(b) Compute the number of persons entering and exiting the development area per
hour in the morning.
(c) Compute the number of each transport mode entering and exiting the
development in the morning.
(d) If 80% of the attraction is from Kajang, determine the minimum width of the
bridge.

You might also like