Professional Documents
Culture Documents
Agenda: Date: Time: Location: Facilitator: Expected Number of Participants: Workshop/Training Title
Agenda: Date: Time: Location: Facilitator: Expected Number of Participants: Workshop/Training Title
Agenda: Date: Time: Location: Facilitator: Expected Number of Participants: Workshop/Training Title
Agenda
Workshop/Training Title: Training for Installation & Maintenance of WC Flush Tank Date: 24.10.2016 Time: 2:00 PM - 3:30 PM
Location: ISO Building (Inspection Shed 1 G/F) & LCT Building (LCL Shed 2 G/F) Facilitator: Richard C. Acupan (Manufacturer's Representative - Grohe)
Expected Number of Participants: 20 (maximum)
Learning objectives:
1. Determine the correct installation by proper frame
positioning & fixing. Live Discussion Instructions for Grohe Rapid SL Flush Tank in
2. Determine the proper sewer & water connections. 5 min. Wall Flushing Conditions.
3. Determine how to do maintenance inside the Flush
Tank.
Warm-up
Ice-breaker: Introduction on the trainer's 5 min. Live Discussion N/A
background
Content As indicated in the attached Grohe As indicated in the attached Instructions for Grohe Rapid SL Flush Tank in
Manual for Fixing the Grohe Cistern N/A Method Statement from the Wall Flushing Conditions.
Main points: Tank. manufacturer.
6/16/10 1
Using the Independent Living Curriculum and Planning Volunteer Training