Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

Lanes, Volumes, Timings

Av. Gullman

Lane Group EBL EBT EBR WBL WBT WBR NEL NET NER SWL SWT SWR
Lane Configurations
Volume (vph) 177 789 159 36 398 72 249 617 87 144 381 55
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width (m) 3.7 3.7 3.7 3.7 3.7 3.7 3.7 3.7 3.7 3.7 3.7 3.7
Grade (%) 0% 0% 0% 0%
Storage Length (m) 30.0 0.0 0.0 0.0 30.0 0.0 30.0 0.0
Storage Lanes 1 0 0 0 1 0 1 0
Taper Length (m) 2.5 2.5 2.5 2.5
Satd. Flow (prot) 1628 3339 0 0 3489 0 1628 3356 0 1628 3349 0
Flt Permitted 0.360 0.939 0.719 0.349 0.857 0.211 0.687
Satd. Flow (perm) 617 3138 0 0 2519 0 598 2888 0 362 2317 0
Right Turn on Red Yes Yes Yes Yes
Satd. Flow (RTOR) 57 50 36 34
Link Speed (k/h) 48 48 48 48
Link Distance (m) 67.4 85.4 61.0 41.7
Travel Time (s) 5.1 6.4 4.6 3.1
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Growth Factor 116% 116% 116% 116% 116% 116% 116% 116% 116% 116% 116% 116%
Heavy Vehicles (%) 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2%
Bus Blockages (#/hr) 0 0 0 0 0 0 0 0 0 0 0 0
Parking (#/hr)
Mid-Block Traffic (%) 0% 0% 0% 0%
Shared Lane Traffic (%) 10% 24% 50%
Lane Group Flow (vph) 201 1217 0 0 638 0 239 963 0 91 640 0
Turn Type Perm NA Perm NA Perm NA Perm NA
Protected Phases 4 8 2 6
Permitted Phases 4 8 2 6
Total Split (s) 22.0 22.0 22.0 22.0 23.0 23.0 23.0 23.0
Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0
Act Effct Green (s) 18.0 18.0 18.0 19.0 19.0 19.0 19.0
Actuated g/C Ratio 0.40 0.40 0.40 0.42 0.42 0.42 0.42
v/c Ratio 0.81 0.94 0.61 0.95 0.78 0.59 0.64
Control Delay 43.6 30.2 13.0 65.9 16.7 32.3 13.3
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 43.6 30.2 13.0 65.9 16.7 32.3 13.3
LOS D C B E B C B
Approach Delay 32.1 13.0 26.4 15.7
Approach LOS C B C B
Intersection Summary
Area Type: Other
Cycle Length: 45
Actuated Cycle Length: 45
Offset: 0 (0%), Referenced to phase 2:NETL and 6:SWTL, Start of Green
Control Type: Pretimed
Maximum v/c Ratio: 0.95
Intersection Signal Delay: 24.3 Intersection LOS: C
Intersection Capacity Utilization 89.6% ICU Level of Service E
Analysis Period (min) 15

Piura Synchro 8 Report


Page 1
Lanes, Volumes, Timings
Av. Gullman
Splits and Phases: 13:

Piura Synchro 8 Report


Page 2

You might also like