TENDER DOCUMENT
TENDER NO
KAPS/CTC/3-4/PIPING/2017/ET-R/434
-12 -34
, , ! "
% ( ) +, ", .,
01 , 56, 7, 8, ! (
9, :, . , ;7 ; (
7. On registration as above, LOG-IN USER ID & PASS WORD will be activated for the TENDER
WIZARD site.
8. Log-in to the TENDER WIZARD portal of DAE by using digital signature certificate (DSC / e-
token) as per details given in (B) below, for downloading / uploading documents and other
tendering activities.
b- PROCEDURE FOR OBTAINING DIGITAL SIGNATURE CERTIFICATE:
1. For logging the tender wizard e-tendering website contractor to possess class-III digital
signature certificate (DSC / e-Token) from any one of the authorized agency viz. e-Mudhra, TCS,
GNFC, MTNL. N-Code, C1 India etc.
2. For convinces of the contractors, arrangements have been made as an option, to provide DSC of
e- Mudhra from Unit Help Desk OR Prospective contractors may contact - 09969395522 (Mr.
Rudresh, Mumbai) or Help Desk Personnel of M/s ITI Ltd posted at KAPS - 09408165978 (Mr.
Brijesh Patel).
NOTE:
1. The names and address in the supporting document and in the application form should
be the same.
2. Supporting documents should be attested by any Gazetted office or Bank Manager.
3. Please refer DSC application form for supporting documents required.
GENERAL DETAILS
1 Tender no. KAPS/CTC/3-4/PIPING/2017/ET-R/434
2 Name of work Supply, Handling, Transportation, Fabrication, Erection,
Welding, Cement mortar gunniting, Surface preparation,
Painting, inspection and testing of underground and above
ground CS Piping, Pipe supports including associated Civil
works of plant water Piping from KAPS-1&2 to KAPP-3&4.
3 Estimated cost of the work inclusive Rs. 3,53,60,968/-
of all taxes but excluding service tax
4 Bid security @ 2% of estimated cost Rs. 7,07,219/-
excluding Service tax subject to
maximum of ten lakh
5 Mode of tender Public
Type of tender One Part - Two bid
6 Mode of bid security submission 1) Credit / debit card
2) RTGS / NEFT
3) Online payment
7 Completion period 09 (Nine) Months (including monsoon period)
8 Tender processing fee including Rs.5,750/-in favour of M/s. ITI Limited through on-line
taxes payment, debit /credit card
9 Availability of tender documents for The links of website www.tenderwizard.com/DAE is also
free view only available on websites www.npcil.nic.in & http://e-
procure.gov.in
10 Dates of availability of tender On website www.tenderwizard.com/DAE From 15.04.2017
documents for downloading after (10:00 Hrs.) up to 26.04.2017 (17:00 Hrs.)
paying processing fee
11 Last date and time of submitting 27.04.2017 (up to 17.00 hours)
online queries/questions for
clarification in both cases whether
pre- bid meeting is envisaged or not
12 Pre-bid meeting Not applicable
13 Last date and time of closing of 04.05.2017 (17:00 Hrs.)
online submission of tenders:
14 Date and time of online opening of 08.05.2017 (11:00 Hrs.)
technical bid.
15 Date and time of online opening of Will be notified on the website at a later date.
financial bids
16 Competent authority inviting tender Chief Construction Engineer, KAPP-3&4
17 Authority & place for seeking Shri Y.J. Shah, SO/E
clarification on tender conditions, Centralised Tendering Cell, KAPS, NPCIL.
pre- bid meeting, opening of tender Phone no. 02626-233729, M-09428821815
1. The contractors, who are not enrolled on www.tenderwizard.com/DAE website, are required to
get enrolled.
2. The intending bidder must have valid class-III digital signature (DSC) to participate in
tendering/purchase/submit the bid.
3. Steps for downloading, uploading and free view:
4. The intending bidder must read the terms and conditions in the notice inviting tender & pre-
qualification criteria carefully. He should only submit his bid if he considers himself eligible and
he is in possession of all the documents required.
Tender no:- KAPS/CTC/3-4/PIPING/2017/ET-R/434 IN:- 836 Page 6 of 112
Nuclear Power Corporation of India Limited
(A Govt. of India Enterprises)
Kakrapar Atomic Power Project -3&4
5. Submission of bid shall mean acceptance of undertaking to be furnished online by bidder as per
format enclosed as annexure-10.
6. Information and Instructions for bidders posted on website shall form part of tender document.
The tender is to be downloaded and uploaded only on www.tenderwizard.com/DAE after
paying requisite processing fee.
7. The bid can only be submitted after uploading the mandatory scanned documents, payment of
processing fee in favour of ITI LIMITED, NEW DELHI, bid security in favour of NPCIL and other
documents as specified. Processing fee shall not be refunded in any case.
8. After submitting bids the contractor can re-submit revised bid any number of times but before
stipulated closing time and date of online submission of bid as notified. The bidder can
withdraw the bid before stipulated closing date and time of online submission. But, once the
bidder withdraws the bid, it cannot be resubmitted.
9. Contractor must ensure to quote rate of each item. The column meant for quoting rate in
figures appears in YELLOW colour and the moment rate is entered, it turns SKY BLUE. In
addition to this, while selecting any of the cells a warning appears that if any cell is left blank
the same shall be treated as 0. Therefore, if any cell is Left blank and no rate is quoted by the
bidder, rate of such item shall be treated as 0 (ZERO). The bidder shall be required to execute
such items at his quoted rate of zero as per specifications, bill of quantity and GCC provisions.
10. In case of bids in three stage system and if it is desired to submit revised financial bid then it
shall be mandatory to submit revised financial bid. If not submitted then the bid submitted
earlier shall become invalid.
11. The bidders are solely responsible to keep their email and bank account active and to update
their profile in case of change. This is essential as communication shall preferably be done by e-
mail by corporation. Moreover, all the auto generated mail by e-tendering portal shall be sent
on this e-mail address.
12. Contractor can upload documents in the form of JPG format and PDF format.
13. Bidders are advised to open bank account with core banking solution branch (with NEFT / RTGS)
in order to facilitate online payment of tender processing fee and bid security for their own
benefit. IFSC is an 11 digit code with the first 4 alpha characters representing the bank, and the
last 6 characters representing the branch. The 5th character is 0 (zero). The bidder shall fill IFSC
code correctly i.e. upper case of alphabets, spacing and all eleven alpha-numerics. The bid
security shall be refunded online to the bank as per the details submitted. In case of erroneous
details it will not be possible to refund the bid security online and bidder shall be responsible for
consequent delays.
14. Bidder shall read the GCC and NIT before submission of bid. Submission of bid shall imply that
the bidder has seen and understood the GCC & NIT and shall abide by the same without any
deviations/conditions. The detailed NIT and GCC shall be part of agreement. If the bidder at any
stage refuses to accept the same, the bid shall be rejected and bid security shall be forfeited.
Further disciplinary action is liable to be taken including debarring from participation in re-
tendering of the same work or other works as deemed appropriate by the competent authority.
Sr. DESCRIPTION
No
.
1 Power of attorney of the signatory of bid as per relevant clause of NIT
2 Registration of company defining constitution, legal status, place of registration
3 Certificate of registration with MSME; uploading is mandatory if bidder wishes to avail
benefit of clause-25 and 10.2 of NIT
4 PAN card
5 Registration of EPF
6 Registration of service tax certificate
7 Registration of sales tax/VAT/WCT certificate
8 Registration of TIN certificate
9 Registration of ESIC for areas under coverage of ESIC
10 Work experience 1: As per annexure - 1 of NIT
11 Work experience - 2: As per annexure - 1 of NIT
12 Work experience - 3: As per annexure - 1 of NIT
13 Work experience - 4: As per annexure - 1 of NIT
14 If work experience is for private body other than government / government bodies / public
sector units, TDS amount & TDS certificate for works executed are to be submitted.
15 Certificate of annual turnover of last 3 years stamped & signed by Chartered Accountant as
per annexure - 2 of NIT
16 Statement of value of work executed during last five financial years stamped and signed by
Chartered Accountant as per annexure - 3A of NIT
17 Statement of existing commitments and on-going works and value of bid capacity stamped
and signed by Chartered Accountant as per annexure - 3B of NIT
18 Annexure 7 Tax Information
19 Memorandum of Agreement (Section II)
20 UNDERTAKING BY THE BIDDER As per annexure-10 of NIT
21 Annexure - 4 black listing De-registration Detail
22 Annexure - 5 Litigation history
23 Annexure - 6 MSME Registration
NOTES:
1. The bidder shall upload scanned copy of originals in JPG format or PDF format. The submission
of documents is deemed as undertaking by bidder that all the documents are true and genuine.
If it is found, at any time during bidding or execution of work, that the information / documents
submitted by the bidder are in variance / forged / bogus, they shall be legally held responsible
for the same. Their offer shall be summarily rejected or termination of contract, if awarded,
forfeiting of the bid security, performance guarantees, security deposit, if any. The bidder /
contractor shall be blacklisted / debarred for further works in NPCIL for a period of five years.
2. By submission, the bidder undertakes and confirms that eligible similar works have been
executed as prime contractor and the same have not been got executed through another
contractor on back to back basis or as a subcontractor. Any violation of this shall result in panel
action as per point-1 above.
3. It is essential to upload all the mandatory documents. If some document is not applicable /
available the status shall be printed on a paper and same shall be uploaded. Uploading of any
Tender no:- KAPS/CTC/3-4/PIPING/2017/ET-R/434 IN:- 836 Page 8 of 112
Nuclear Power Corporation of India Limited
(A Govt. of India Enterprises)
Kakrapar Atomic Power Project -3&4
blank / irrelevant documents in connection to mandatory documents will lead to rejection of
the offer.
4. At the time of submission of bid, contractor shall upload certificate from CA mentioning
financial turnover of last 3 years, value of work done during last five audited financial years (A)
and existing commitments (B) for calculation of bid capacity. The bidders are requested to
submit details of all existing commitments. Concealment of information in this regard shall
result in rejection of bid and forfeiture of bid security along with debarring for a year from
participation in any of the tender of corporation. Further financial details and related
supporting documents, if required may be asked from contractor after opening of technical bid.
There is no need to upload entire voluminous balance sheet.
5. It is binding on the bidder to fill the data required for assessment of pre-qualification criteria in
the excel sheet uploaded for the purpose. The technical evaluation shall be done based on the
data provided in excel sheet and the relevant document uploaded to support the same. In case
where the relevant information is not filled in the uploaded excel sheets while commensurate
supporting documents are uploaded, the supporting documents shall not be considered in
evaluation as the technical evaluation sheet is auto generated by system.
6. Therefore the bidders in their own interest shall fill all the relevant information in excel sheets
and upload commensurate supporting documents. The bidders shall not write in the excel sheet
that information is as per enclosure, as it will be treated as no information is submitted. The
corporation shall not accept any new document for pre-qualification after bid opening.
Corporation may ask for clarification and submission of documents in support of documents
already submitted.
7. In case of single / nomination / limited tenders the bidders are not required to upload
information and documents for prequalification.
PRE-QUALIFICATION CRITERIA
1. MINIMUM REQUIREMENT:-
1.1 Work Experience:
The intending bidder must have in its name as prime contractor Experience of having
successfully completed similar works during last 5 years ending last day of month previous
to the one in which NIT has been published on e-tendering portal should be either of the
following:
a) Three similar completed works, each costing not less than the amount equal to 40%
of the estimated cost
or
b) Two similar completed works, each costing not less than the amount equal to 50%
of the estimated cost
or
c) One similar completed work costing not less than the amount equal to 80% of the
estimated cost.
Note: Work executed for private body will be considered only if contractor / firm produce
tax deduction at source certificate.
or
d) (Not applicable) On going work of similar nature in any Central Government/State
Government/PSU bodies in which the value of work completed up to last day of
month previous to the one in which tender is being opened shall not be less than the
amount equal to 60% of the estimated cost. Certificate in this regard by Engineer-In-
Charge shall be considered.
Similar work for the purpose of this contract is Supply, Fabrication and erection of CS Piping.
1. The cost of completed work shall mean gross value of the completed work including all the
taxes and levies, cost of material supplied by the client on chargeable basis, but excluding those
supplied free of cost. The cost of chargeable material shall be the fixed value at which the client
had supplied the material.
2. The work experience of the bidder for those works only shall be considered for evaluation
purposes, which are completed before the last date of month previous to one in which NIT has
been published on e-tendering portal. Hence, the works which are incomplete / on-going, as on
the last date of month previous to one in which NIT has been published on e-tendering portal,
shall not be considered against eligibility.
3. In case the work is started prior to the eligibility period of 5 years (counted backwards starting
from the last day of month previous to the e- publication date of NIT) and completed within the
said eligibility period of 5 years, then the full value of work shall be considered against eligibility.
4. In case the experience has been earned by the bidder as an individual or proprietorship firm or
partner of a partnership firm, then 100 % value of experience will be considered against
eligibility. But if the experience has been earned by the bidder as a partner in a Joint Venture /
Consortium, then the proportionate value of experience in proportion to the actual share of
bidder in the joint venture / consortium will be considered against eligibility. The bidder shall
furnish information regarding the actual percentage of share and value of experience
accordingly. In case of joint venture / consortia, full value of work, if done by the same joint
venture shall be considered.
5. The bidder shall submit details of work executed by them in the Performa of Annexure-1 of NIT
for the works to be considered for qualification of work experience criteria. Documentary proof
such as work order/ purchase order/ agreement, completion certificate from client clearly
indicating the name of work, actual completion cost and actual date of completion for such
work should be submitted. The offers submitted without the documentary proof shall not be
evaluated. The work done for all companies except government / government bodies / public
sector units, which has been completed after extension, will not be accepted without
documentary proof of extension.
a) Work order with bill of quantities and rates
b) Extension letter, if the work has been completed beyond stipulated completion date in work
order/agreement
c) Completion certificate issued by client with final / last bill mentioning the gross value of
work done. The completion certificate shall be for individual work order. The completion
certificate clubbing two or more work orders shall be rejected.
d) Stamped and signed certificate by chartered accountant giving details of bill wise payment
received, TDS amount & TDS certificate number for works executed for all companies except
government / government bodies / public sector units.
6. The value of work done meeting pre-qualification criteria shall be brought to current costing
level by enhancing the actual value of work at simple rate of 7 % per annum, calculated from
the date of completion to the last day of month previous to the one in which NIT has been
published on e- tendering portal. Both the date of completion and last date of month previous
to the one in which NIT has been published on e-tendering portal shall be excluded for the
purpose of calculating escalation.
a. In the case of joint venture / consortia, bid capacity of each member will be computed
applying above formula and combined bid capacity of the joint venture / consortia will be
weighted average of the individual bid capacity of the members as per their percentage
share in the joint venture / consortia.
b. If it is found at any stage that the bidder has submitted incorrect data for assessment of bid
capacity the bid or if the work is awarded the work order shall be rejected / cancelled and
other penal action as per NIT and GCC shall be taken.
1.4 Copy of registration of EPF shall be submitted as part of mandatory document as per schedule
-A.
Tender no:- KAPS/CTC/3-4/PIPING/2017/ET-R/434 IN:- 836 Page 11 of 112
Nuclear Power Corporation of India Limited
(A Govt. of India Enterprises)
Kakrapar Atomic Power Project -3&4
2.1 A Bidder may be a natural person, private entity, government-owned entity, or any
combination of such entities supported by a letter of intent to enter into an agreement or
under an existing agreement in the form of a Joint Venture of Association (JVA) or
Consortium. Bids from JVA or Consortium shall not be accepted for works with estimated cost
below Rs. 100 crores. JVA are not permitted for service & maintenance contract of all values.
2.2 A bidder shall not have a conflict of interest. In case of JV / consortium none of the partner
shall have a conflict of interest. All bidders found to have a conflict of interest shall be
disqualified. A bidder may be considered to have a conflict of interest with one or more
parties in this bidding process, if:
a) A bidder participated as a consultant in the preparation of the design or technical
specifications of the works that are the subject of the bid; or
b) A bidder was affiliated with a firm or entity that has been hired (or is proposed to be
hired) by the corporation or as engineer-in-charge for the contract.
c) One firm applies for tender both as an individual firm and in a group.
d) If bidders in two different applications have controlling shareholders in common.
e) Submit more than one application of the tender.
2.3 Government-owned entities in the corporations country shall be eligible only if they can
establish that they are legally and financially autonomous and operate under commercial
law. Also, they shall not be dependent agencies of the corporation.
2.4 Bidders shall provide such evidence of their continued eligibility, satisfactory to the
corporation, as the corporation shall reasonably request any time within the currency of the
contract (including defect liability period).
3.1 Documentary evidence of adequate financial standing, certified by bankers, audited profit
& loss a/c and balance sheet, access to adequate working capital.
3.2 Construction equipment proposed to be deployed for the project and proof of its
availability; equipment proposed to be purchased or leased.
3.3 Key personnel available and proposed to be engaged for management and supervision of
the Project, their qualifications and experience. Valid certificates by a recognized University,
technical Board, or Ministry of Government of India would only be taken cognizance of.
3.5 The bidder has to obtain ESIC registrations after award of work in the areas covered by ESIC.
2.2 Incomplete bids and bidders not meeting the minimum qualification criteria shall be summarily
rejected. It may be noted that mere submission of bid does not imply that your offer shall be
considered. Tenders are considered only after NPCIL themselves assess the document
submitted along with the bid by the bidder meets the pre-qualification criteria as specified in
notice inviting e-tender during evaluation of bid.
2.3 The bidder who has been blacklisted / de-registered / holiday at any of the sites of NPCIL, DAE,
any other government department or PSU shall not be eligible for participation in tenders of
NPCIL for that period.
5.2 The bidder should inform the corporation at Least three days in advance about the proposed
site visit.
5.3 The bidder, at his own responsibility and risk is encouraged to visit, inspect and survey the site
and its surroundings and satisfy himself before submitting his bid as to the form and nature of
the site, the means of access to the site, the accommodation he may require, etc.
5.4 In general, bidders shall themselves obtain all necessary information as to risks, contingencies
and other circumstances which may influence or affect their bid. A bidder shall be deemed to
have full knowledge of the site, whether he inspects it or not and no extra claims due to any
misunderstanding or otherwise shall be allowed.
5.6 The bidders are requested to bring photo identification like passport, voters identity card, and
driving license, PAN card, identity card issued by employer etc. for security regulations. Any
electronic devices like mobiles, radio, transistors, camera etc. are not allowed inside NPCIL
premises and the same shall be left at security gate at the risk of bidders. The bidders are
requested to e-mail the details of authorized representative in the prescribed format
(annexure-11).
5.7 The bidder shall forward any query / question by e-mail within the stipulated date and time
given in NIT. The clarification given by the corporation shall be visible to all the bidders without
disclosing the identity of the bidder raising the query. The questions / query received after
stipulated date and time shall not be entertained and no response shall be forwarded. The
submission of bid shall mean that the bidder has seen the response and accepts the content.
6.2 The bidder shall submit the bid, which satisfies each and every condition laid down in the bid
documents, failing which, the bid is liable to be rejected.
6.3 The documents listed below comprise one set of bid document:
a) Notice Inviting tender (Including Pre-qualification criteria), e-tender notice
b) Memorandum of Agreement
c) Special Conditions of Contract
d) General Conditions of Contract
e) Technical Specifications / Datasheets
f) Drawings, if any
g) Schedule of Material to be supplied by the Corporation
&
Formats of various contractual documents as applicable viz: Security Deposit, Memorandum of
Understanding / Consortium Agreement, Lump sum Advance, Form of Hypothecation Deed,
Disputes Resolution Board, agreement, format of completion certificate, and format of
Performance Guarantee.
h) Bill of quantities
7.2 The purpose of the pre-bid meeting is to clarify issues and to answer questions on matters that
may be raised at that stage. The bidder is requested to submit their questions / queries
7.3 Attending the pre-bid meetings is in the interest of bidders to understand the scope of work of
the tender. It is insisted upon that bidders shall attend the pre-bid meetings. However, in case
the bidders do not attend the pre-bid meetings, it would be presumed that they have
understood the scope of work. NPCIL has to finalize the award within a limited time schedule.
Therefore, NPCIL will not seek any clarification in respect of incomplete offers. Any doubt, may
be cleared, if required by the bidder before filling the bid. No request for extension of bid
submission dates shall be entertained.
7.4 Minutes of the meeting, including the text of the questions (without identifying the source of
enquiry) and the responses given will be displayed on web site. Any modifications of the
bidding documents which may become necessary as a result of the pre-bid meeting shall be
made by the corporation exclusively through the issue of an addendum only and not through
the minutes of the pre-bid meeting. The addendum shall be binding on all the bidders.
Submission of bid shall imply the acceptance of addendum by the bidder.
8.2 Any addendum so issued shall be part of the bid document as well as contract document.
8.3 To give prospective bidders reasonable time to take an addendum into account in preparing
their bids, the corporation may extend the date for submission of bids, if necessary.
8.4 Corrigendum, addendum or any other information regarding tender shall be uploaded only on
web site. Hence, the bidders are requested to visit the web site (www.tenderwizard.com/DAE)
regularly. The above documents shall become part of bid and agreement. Submission of bid
shall imply that bidder has noted and accepted content of all the corrigendum / addendum /
clarifications and effect of same has been included in price bid.
10.2 MSEs (and not their dealers/distributors) registered with District Industry Centres or Khadi
and Village Industries Commission or Khadi and Village Industries Board or Coir board or
National Small Industries Corporation or Directorate of Handicrafts and Handloom or any
other body specified by Ministry of MSME are exempted from payment of bid security for the
items/services they are registered with District Industry Centres or Khadi and Village
Industries Commission or Khadi and Village Industries Board or Coir Board or National Small
Industries Corporation or Directorate of Handicrafts and Handloom or any other body
specified by Ministry of MSME. But, all the bidders have to pay tender processing fee to M/s.
ITI. The bidders are requested to ensure that they are registered for relevant service as
stipulated in similar nature of work. In case of mismatch between the service registered with
MSME and service for which bid is called, the bid shall be treated as without bid security and
hence rejected.
10.3 (a) in case of two part bid, the bid security of technically unqualified bidders after technical
evaluation shall be returned.
(b) Bid security of qualified unsuccessful bidders will be returned to them within a month (30
days) from the date of acceptance of bid of the successful bidder.
(c) Bid security of successful bidder will be returned after submission of the performance
guarantee amount.
(d) Bid security of the bidder who has withdrawn the bid shall be returned after opening of
the bid.
10.5 The corporation at its discretion shall refund the bid security by online / RTGS / NEFT or
through any other electronic mode to the account number as registered by the bidder himself
on e-tending portal.
11.3 The bid price / rates / total bid price shall be quoted in the prescribed format with the
required break-up as specified therein.
11.4 Service tax as applicable will be paid extra as per the prevailing rate on presentation of tax
invoice as prescribed in the relevant service tax rules. The statutory deductions of income
tax or works contract tax or other taxes / dues (Wherever applicable) shall be made from
the payments due to the contractor. For details on taxes, the bidders are advised to refer to
relevant clauses of General Conditions of Contract (GCC) forming part of this tender.
11.6 Tax information - The bidder has to compulsorily fill up Annexure-7 along with BOQ during
submission of bid. Annexure-8 & 9 is to be submitted during execution of work after award.
Bidders shall substantiate the Information provided herein if called for to do so.
11.7 The security deposit and insurance shall be on contract value excluding service tax.
13.2 In exceptional circumstances, prior to expiry of the original bid validity period, NPCIL may
request the bidders to extend the period of validity for a specified additional period. The
request and the responses thereto shall be made in writing. A bidder may refuse the request
without forfeiting its bid security but his bid will not be considered. A bidder agreeing to the
request will not be required or permitted to modify its bid, but will be required to extend the
validity of its bid security for the period of the extension.
15.2 The corporation may extend the deadline for submission of bids by issuing an amendment, in
which case, all rights and obligations of the corporation and the bidders previously subject to
the original deadline will then be subject to the new deadline.
15.3 Any bid received by the corporation after the deadline prescribed above will be rejected.
15.4 The bidders shall note the following before submission of bid
(a) If the digital signature certificate (DSC) holder is sole proprietor of the firm, power of
attorney need not be submitted.
(b) In case DSC holder is bidding on behalf of partnership firm, joint venture, consortium etc.
power of attorney or any other legally acceptable document viz. partnership deed, board
resolution etc. authorizing DSC holder to bid on behalf of the bidder is to be uploaded. In
case of non-submission the bid shall be summarily rejected.
16.0 Bid opening
16.1 Tender opening shall be done on-line only. If the date of opening is declared as holiday then
bid will be opened on next working day. In exceptional cases opening of tenders can be done
on any day or time after scheduled date and time of opening. Corrigendum issued for opening
of tender shall be uploaded on website.
16.2 The bids without stipulated bid security amount and other mandatory documents as per NIT
shall be summarily rejected.
16.3 In two part tenders financial bid of only qualified bidder shall be opened.
17.2 Bidder shall not contact the corporation on any matter relating to his bid from the time of the
bid opening to the time the contract is awarded.
17.3 Any effort by the bidder to influence the corporations bid evaluation, bid comparison or
contract award decisions, may result in the rejection of his bid.
18.2 A responsive bid is one which conforms to all the terms, conditions and specification of the
bidding documents, without material deviation or reservation. A material deviation or
reservation is one (a) which affects in any substantial change in scope, quality or performance
of the works; (b) which limits in any substantial way, the corporations rights or the bidders
obligations under the contract; or (c) whose rectification would affect unfairly the competitive
position of other bidders presenting responsive bids.
19.2 The estimated effect of the price adjustment conditions under variations and deviations of
the conditions of contract, during the period of implementation of the contract, will not be
taken into account in bid evaluation.
19.3 If the bid of the successful bidder is seriously unbalanced in relation to the engineer-in-charge
or his representatives estimate of the cost of work to be executed under the contract, the
corporation may require the bidder to produce detailed rate analyses for any or all items of
the bill of quantities, to demonstrate the internal consistency of those rates with the
implementation / construction methods and schedule proposed. The unbalanced bids are
liable to be rejected.
19.4 Any deviation in the commercial terms shall be shall be suitably loaded before evaluation.
20.2 L-1 bidder will be required to produce the original documents in support of the information
furnished by him on line for verification and submit photo copy of documents attested by
notary as specified in NIT / e-tender notice. The bidder shall submit the same on any working
day within specified period after issue of letter to this effect. In case the L-1 bidder fails to
produce the documents within the specified period or if any of the information furnished by
L-1 bidder on-line is found to be false during verification of original document, which changes
the eligibility status of the bidder, then the bid shall be disqualified with forfeiture of bid
security and banning of the concerned bidder for participation in future tenders for five years.
The next financial lowest qualified bidder shall be awarded the work subject to producing
original document and photocopies attested by notary.
20.3 Submission of illegible or blank document may render the bid non-responsive and liable for
rejection. Submission of bid will be recognized and accepted as a certificate regarding
authentication of all information provided in the bid and acceptance of all terms & conditions,
general condition of contract, notice inviting tender etc., since such acceptance by bidder
with digital signature is legally tenable.
20.4 The corporation reserves the right not to award the work without assigning reason and
without incurring any liability to the bidder or bidders.
21.3 The work order will constitute the formation of the contract subject only to the furnishing of a
performance guarantee within 30 days of issue of work order.
21.4 An agreement shall be made and signed by both the parties. The agreement will incorporate
all correspondence between the corporation and the successful bidder, bid documents etc.
The bid document as uploaded on website www.tenderwizard.com/DAE shall be forming
part of agreement. The successful bidder shall be responsible for compliance at his own cost
with the stamp duty act of the state where the agreement is being executed. The non-judicial
stamp paper of appropriate value after adjudication shall be submitted by the successful
bidder at his own cost.
22.2 The bidder may make representation in connection with processing of tender directly and
only to the competent authority (calling tender) as mentioned in the tender document.
However, if such representation is found to be un-sustentative and / or frivolous and if the
tender has to be closed because of the delays / disruptions caused by such representations
and the job has to be re-tendered, then such bidder will not be allowed to participate in the
re-invited tender.
22.3 In case, any bidder while making such representation to competent authority also involves
other officials of corporation and /or solicits / invokes external intervention other than as
may be permitted under the law and if the tender has to be closed because of the delays /
disruptions caused by such interventions and has to be re-tendered, then the particular
bidder will not be allowed to participate in the re-invited tender.
24.2 Nuclear Power Project of capacity 440 MW or more has been notified as Mega Power
Project. As such, goods required for setting up these projects are subjected to Nil customs
duty as per the extent policy of Government of India (vide customs notification no.12/2012
customs dated 17-3-2012 at Sr. no. 511 and as amended from time to time) Similarly, as per
the foreign trade policy 2015-2020 of Government of India, domestic contractors supplying
goods for these projects under the procedures of national competitive bidding or
international competitive bidding shall be eligible for benefits of Deemed Export, which
include refund of terminal excise duty (presently given under paragraph 7.02(h) and 7.04 of
the policy and paragraphs 7.02 (d), 7.03 (g) and 7.05 (b) of Handbook of procedures) issued by
the Director General of Foreign Trade, Department of Commerce, Ministry of Commerce and
Industry, Government of India. Hence, no customs duty and / or excise duty on goods shall,
therefore, be payable / reimbursable by the purchaser to the contractor. The purchaser, shall,
however, make available only the requisite documents or certifications as per the extant rules
and procedures for availing the above exemptions / concessions by the contractor.
24.3 The bidders may like to ascertain the availability of deemed export benefits mentioned as
above. They shall be solely responsible for obtaining such benefits, which they have
considered in their bid, and in case of failure to receive such benefits the purchaser will not
compensate the bidder. However, the bidder must give all information required for issue of
project authority/ payment certificate in terms of Foreign Trade Policy 2015-2020 of the
Government of India along with the bid. The project authority / payment certificate will be
issued on this basis only and no subsequent change will be permitted. In this regards chapter
7 - deemed export in the Foreign Trade Policy 2015-2020 and handbook of procedures shall
be referred to for ascertaining the above.
25.0 Purchase Preference for supply of goods or services as per new Public Procurement Policy
for Micro a Small Enterprises (MSEs) under Micro, Small and Medium Enterprises
Development Act, 2006.
25.1 As per the provision of MSEs Policy, the participating bidder registered under MSEs Act in a
tender for supply of goods or services, quoting price within the band of L1+15% would be
allowed to supply a portion of the requirement by bringing down their price to the L1 price, in
a situation where L1 price is from someone other than an MSE. Such MSEs would be allowed
to supply up to 20 % of the total tendered value. In case of more than one such eligible MSE,
the supply will be shared proportionately. Further, out of 20% allocation, a sub- target of 4%
(i.e. 20% out of 20%) will be earmarked for procurement from MSEs owned by SC / ST
entrepreneurs. However, in the event of failure of such MSEs to participate in the tender
process or meet the tender requirements and the L1 price, the 4 % sub-target for
procurement earmarked for MSEs owned by SC/ST entrepreneurs will be met from other
MSEs proportionately. MSME registered with the agencies listed below for the tendered
service only will be exempted from payment of bid security.
25.2 MSEs who are interested in availing themselves of these benefits shall enclose with their
offer the proof of their being MSE registered with any of the agencies mentioned in the
notification of Ministry of MSME indicated below:
(i) District Industries Centres
(ii) Khadi and Village Industries Commission
(iii) Khadi and Village Industries Board
(iv) Coir Board
(v) National Small Industries Corporation
(vi) Directorate of Handicraft and Handloom
(vii) Any other body specified by Ministry of MSME.
Failing above, such offers will not be eligible for consideration of benefits detailed in MSE
notification of Government of India dated 23.03.2012.
25.3 The operational part of this clause shall be as defined in schedule -A.
Sd/-
Chief Construction Engineer,
KAPP-3&4
COMPETENT AUTHORITY
For and on and behalf of NPCIL
3. Annual turnover
NOTES :
1. Separate Performa shall be used for each member in case of JV / Consortium. All such documents
reflect the financial data of the bidder or member in case of JV/ Consortium, and not that of sister
of parent company.
2. The financial data in above format shall be certified by Chartered Accountant / Company Auditor
under his signature and seal having membership no. and firm no.
3. In case audited turnover of the last financial year is not made available by the bidder, he has to
submit a certificate by a CA certifying that the balance sheet has actually not been audited so
far. The certificate shall be signed by bidder also. In such case the financial data of previous
three audited financial shall be taken into consideration for evaluation.
We have obtained all the information which to best of our knowledge and belief was necessary for
the purpose of certification. The certification process involves examining the supporting
documents.
ANNEXURE 3B
FINANCIAL DATA
(EXISTING COMMITMENTS & ONGOING WORKS FOR CALCULATING BID CAPACITY)
(Rs. In lacs)
No. & Date
to be done
Address of
Anticipate
Stipulated
Descriptio
remaining
completio
completio
n of Work
period of
d date of
Contract
Contract
Remarks
Value of
Value of
Name &
Place &
Client
State
work
n
NOTE :
1. Separate Performa shall be used for each member in case of JV / Consortium.
2. Bidder or member in case of JV / Consortium should provide information on their current
commitments for all contracts that have been awarded or for which a letter of intent or
acceptance has been received or for contracts approaching completion but for which a
completion certificate is yet to be issued even if completion of such works spills over beyond
completion period of this contract.
NOTES:
1. The bidder shall submit the details of black listing /de-registration / holiday by any central / state
government department or public sector undertaking. The relevant letter shall be scanned and
uploaded,
2. In case of JV / Consortium, the undertaking shall be submitted by each member of JV /
Consortium.
3. The undertaking shall be signed by authorized signatory of the bidder or constituent member in
case of JV / Consortium.
ANNEXURE 5
Client & Work Order Name of Work Cause of Amount Remarks and
Address No. dispute the present
status
ANNEXURE 6
ANNEXURE-8
Certificate to be furnished by the Contractor along with the Invoice/bills where Value Added
Tax/Central Sales Tax is claimed in the quoted rates.
Certified that:
1. Goods on which Value Added Tax / Central Sales Tax claimed are not exempted from
payment of VAT / CST under the provisions of respective statutes.
2. I/We, as a Registered Dealer, is/are being assessed to VAT/CST and our VAT TIN is
___________________ and CST TIN is __________________
3. I/We, hereby certify that my/our Registration Certificate is in force on the date on which the
sale of the goods included in this invoice is made by me/us and that the transaction of sale
covered by this invoice has been effected by me/us and it shall be accounted for in the
turnover of sales while filing of return and the due tax, if any, payable on the sale has been
paid or shall be paid.
Certificate to be furnished by the Contractor along with the Invoice/bills where Service Tax is
claimed
Certified that:
1. Services on which Service Tax claimed are taxable under category
________________________ (name of service) and not exempted from payment of Service
Tax under the provisions of extant Rules.
2. I/We, are registered with Central Excise Department and our Registration Number is
_______________________
3. I/We, hereby certify that my/our Registration Certificate is in force as on date and that the
transaction covered by this invoice has been effected by me/us and it shall be accounted for
in the turnover while filing of return and the due tax payable has been paid or shall be paid
to the Government Account.
I DO HEREBY UNDERTAKE
1. That all the information being submitted by me is genuine, authentic, true and valid on the date
of submission of tender and if any information is found to be false at any stage of tendering or
contract period I will be liable to the penal actions as prescribed in NIT.
2. That in the preparation and submission of the bid, we have not acted in concert or in collusion
with any bidder or other persons and not done any act, deed or thing which is or could be
regarded as anti-competitive.
3. That I accept all terms and conditions of NIT, including general terms and condition, special /
additional terms and conditions, addendum, corrigendum, clarifications as stated there in the
tender document as available on the website.
5. That I do authorize corporation for seeking information / clarification from by bankers, clients
having reference in this bid.
6. That I have uploaded photo copies of all relevant documents as prescribed in the tender
document in support of the information and data furnished by me online.
7. That I accept all the undertakings as specified elsewhere in the tender document.
8. That this online agreement will be a part of my bid and if the work is awarded to me /us, this
will be a part of our agreement with corporation.
(Bidder)
*Photo ID Proof in any form of PAN Card, Voters ID, Bank Pass Book, Ration Card, Driving
License, any other ID card issued by Government etc. shall be produced at CISF Main gate
for entry. Mobile phones, laptop and any other electronic device are not permitted.
SECTION - II
MEMORANDUM OF AGREEMENT
I/We hereby tender for the execution for the Nuclear Power Corporation of India Limited of the work
specified in the underwritten Memorandum within the time specified in such memorandum at the
rates specified therein and in accordance in all respect with the specification, designs, and
instruction in writing referred to in Rule - 1 here of and in clause 6 of the General conditions of the
contract and with materials as are provided for, by and in all respects in accordance with such
conditions as far as applicable.
MEMORANDUM
(a) General Description of work Supply, Handling, Transportation, Fabrication, Erection,
Welding, Cement mortar gunniting, Surface preparation,
Painting, inspection and testing of underground and above
ground CS Piping, Pipe supports including associated Civil
works of plant water Piping from KAPS-1&2 to KAPP-3&4.
(b) Time for completion of the 09 (Nine) Months (including monsoon period)
work
(c) Estimated Cost Rs. 3,53,60,968/-
(d) Bid Security Amount Rs. 7,07,219/-
(e) Security Deposit 10 % of Contract Value (Pl. refer Clause 4.2 of GCC)
RULE: 1: Should this tender be accepted in whole or in part, I / we hereby agree to abide and fulfil all
terms and provisions of the said conditions annexed hereto and all the terms and provisions contained
in the e-tender notice & standard notice inviting tender so far as applicable, and / or in default thereof
to forfeit and pay to Nuclear Power Corporation of India Limited or his successors in office, the sum of
money mentioned in the said conditions. Bid Security in the form of e-payment is deposited in NPCIL
account.
If I/we fail to furnish the prescribed Performance Guarantee within prescribed period, I / We agree
that said NPCIL or his successors in office shall without prejudice to any other right or remedy, be at
liberty to forfeit the said Bid Security absolutely. Further I/We fail to commence the work specified in
the above memorandum, I / We agree that the said NPCIL or his successors in office shall without
prejudice to any other right or remedy, be at liberty to forfeit the said Bid Security absolutely and
cancel the award of work.
I / We agree to execute all the work referred to the tender documents upon the terms and conditions
contained or referred to there in and to carry out such deviations as may be ordered, up to maximum
of percentage mentioned in clause 11.2.1 of General Conditions of Contract and those in excess of that
limit at the rates to be determined in accordance with the provisions contained in General Conditions
of Contract. I / We hereby declare that I / We have been debarred / not debarred and / or de-listed /
not de-listed by any Govt./PSU*.
Occupation: __________________
The above tender is hereby accepted by me for and on behalf of the Nuclear Power Corporation of
India Limited.
Dated the: ____________ day of___________ 2017. ****__________________
*Bidder is advised to read carefully and strike out which ever is not applicable and furnish detail
wherever applicable.
** Signature of the contractor before submission of Tender.
*** Signature of witnesses of contractors signature.
**** Signature of the officer by whom accepted.
Note: Bidder is requested to download this page separately, fill it, sign, put companys seal with
witness signature and upload.
1. GENERAL:
1.1. Where conditions/ instructions given in this section are at variance with the conditions,
stipulations, specifications etc. elsewhere in the tender document, conditions/ instructions given
in this section prevails.
1.2. Contact Centralized Tendering Cell for any clarifications regarding tender document before
submission of Tender. No claim on account of any ambiguity in any respect shall be entertained
later on.
2. Location:
The Plant Site is located in the state of Gujarat in Tapi district, about 80 Kms. East of Surat. The
nearest Railway Station is Vyara on Surat-Bhusaval route (Tapti line).
The plant site is approximately 18 Kms. away from Vyara on Vyara-Mandvi/Kim Road. Similarly
KAPS Township is approximately 10 Kms. away from Vyara on Vyara-Mandvi/Kim Road ( N.H.
56)
Vyara is accessible on Surat-Dhulia Road (NH-6), about 62 Kms. from Surat, 180 Kms from Dhulia
and about 50 Kms. from Kadodara junction.
4. Bidders Details:
Bidder shall submit the information given in Annexure-11 of section I (NIT) on his companys letterhead.
The Contractor shall produce Power of Attorney in original in favour of his Representative who shall deal
with all the matters relating to the Contract.
9. Coordination of work:
The work shall be carried out by the contractor in close coordination with Corporation and other
agencies who may be working in the same premises as well as in the vicinity of other works. In
this regard the decision of the Engineer in charge regarding any dispute shall be final and binding
on the contractor. The contractor shall plan his work in such a way so as to avoid interference
with the other works and any other contractor or sub contractors at the site.
Copy of the AERB Safety Guide for works contract is a part of General Condition of
Contract (Section-IV).
11.2 Contractor is required to set up an independent safety group as per clause No. 1.0 of project
instruction No. P1/ 001/R2 for execution of this work mandatorily.
NOTE :- In case contractor fails to deploy minimum number of safety professionals in work as
per clause No. 1.0 of project instruction, the penalty shall be regulated/ imposed as
per Annexure-I of Project instruction.
11.3 All safety precautions as advised by the Engineer-in-charge are to be taken while at work. All
the deployed persons of the contractor shall have relevant qualification and required
experience of the concerned job. NPC standing orders with respect to safety as per AERB
safety guide for works contract and Project Instruction PI/001/R2 shall be applicable to
contractors workmen also.
11.4 In case of violation of safety norms including non-use of personal protective equipment by
the contractors employee, the contractor shall be levied a penalty as given in schedule A of
GCC & mentioned in Annexure-1 of Project Instruction PI/001/R2. The penalty amount shall
be deducted by Engineer-In charge of the work contact based on safety violation observed by
him or any safety violation brought to his notice by Safety Section. In case the contractor is
not taking effective steps to improve his safety performance as directed by Engineer In charge
based on advice given by Head, Industrial Safety & Fire, the contractor shall be further
penalized including termination of his contract.
11.5 The contractor shall be required to prepare and submit safe work procedures /Job Safety
Analysis of all hazardous jobs before taking up jobs.
11.6(a) The normal working hours shall be of 9 (Nine) hours per day for workmen and supervisors
including intervals (As per GCC Clause No.19, Sub clause 2 (i)). However, due to exigencies in
work, normal duty hours can be extended up to maximum limit of 12 (twelve) hours
(including normal duty hours).
11.6(b) It is considered necessary at some occasions to carry out work round the clock, permission of
head of the unit/Engineer-in-charge shall have to be obtained.
11.7 The contractor shall be required to arrange all required Personal Protective Equipments (PPE)
for their employees like Hand gloves, Safety shoes, Apron, Helmet, Fall Protector like Safety
belts, Self retracting system, Safety net, etc. for protection against hazards.
11.8 All the electrical power extension boards used by the contractor shall be provided with ELCB.
11.9 Contractors persons shall undergo medical check-up by any MBBS Doctor before taking up
the work above 2.5 M. elevation from ground level and submit the certificate in the
prescribed form at the time of enrolment of workers in KAPP 3&4. Contractor shall replace
workers if he is found unfit.
11.10 In case of complaint by any person working at height with respect to giddiness/other
disability such person shall be advised to sit/rest and assistance provided to bring him down.
11.11 Responsibility of safety and security of the contractors employees when they are working in
the plant site is rests with the contractor.
11.12 Contractors persons shall undergo medical check-up by any MBBS doctor and have to take
safety training from safety section before preparing permanent gate passes mandatorily.
12. Security:
All security measure as advised by the Plant / Township authority shall be followed strictly. Entry
permit, token pass, Identity Cards etc. shall be obtained by the contractors from concerned
Plant/ Township authority.
The contractor has to arrange for Identity cards of his employees as well as supervisors to his
own cost and it has to be produced to competent authority for final issue of I. Cards with
individuals bio-data with full address and other backgrounds required by KAPS.
Security photo pass for each employee for the job must be accompanied during work and
necessary police verification is the responsibility of the contractor and must be complied with.
The Contractor will be responsible for the integrity, conduct and character for each
workman/individual to be employed by the Contractor for the plant and personnel safety during
their work at KAPP.
The contractor shall employ on the work adequate number of qualified and competent staff to
ensure the execution of work in time and the numbers will have to be augmented as per
the requirement and direction of the EIC to ensure completion of work in time.
All materials to be used on the work shall conform to the relevant specifications. The contractor
shall supply free samples of materials to be used on the work, whenever asked, for testing and
In the event the contractor is provided with any material or equipment belonging to KAPS /
KAPP, the Contractor undertakes to return the same in good condition, failing which the
Contractor shall be responsible for the cost of the same.
On completion of work, contractor has to retain the data storage devices like Hard disk etc. at
station / project and hand over to EIC if contractor is using personal computers for execution of
work. These data storage devices will not be given back to contractor.
Any damage / breakage of NPCIL equipment / property / tools / material due to working of
contract workers shall be made good by the Contractor at his own cost.
All tools & machinery to be used by the contractor for execution of the work shall be checked by
Engineer in Charge for fitness as well to meet the requirement. Then only contractor shall be
allowed to start the work at site.
15. Notices:
Any notice, order direction or other communication to be given to the contractor under any of
the provision of the work order shall without limitation be conclusively deemed to have been
received by the contractor if delivered or mailed to the contractor at the address mentioned by
the bidder in the annexure 11 of section -1 of NIT.
17. Insurance:
You are required to take following In the joint name of Corporation up to defect liability period
and documents in this regard should be submitted to Engineer-in-Charge before start of work
(refer clause no 15.1.1 of GCC and its Addendum i.e. Section # iv -general condition of contract )
a) Workmen compensation policy in respect of all your workmen engaged in the work shall
be on the basis of minimum wage of respective category of workers prevailing at the time
of issue of work order.
b) Contractor should take Contractor all risk policy (CAR) for the whole contract value. Apart
from Contractors all risk policy, also take insurance policy to cover third party liability for
10% of the contract value subject to a maximum of Rs 50 lakhs.
Note: The contractor shall take all Insurance policies before commencement of the work.
Quoted rate shall be including the premium amount of insurance policies. In case of
delay in submission of insurance policies as per tender condition shall result in levy of
non-returnable penalty equivalent to 3 times the Premium required to be paid for each
type of insurance i.e. Comprehensive policy, Workmen Compensation Policy separately.
Levy of penalty does not abrogate contractor from his responsibility regarding
Insurance and risk cover. NPCIL shall not be liable for or in respect of any damage
or compensation payable. The work order is liable for cancellation in case or repeated /
continuous non-compliance.
(a) Monthly Bonus component @ 8.33% of monthly minimum wages for the
scheduled employment (irrespective of work period) or of Rs. 7000/-month
whichever is higher. (The eligibility of employee for payment of bonus shall be limited to
drawing wages up to Rupees Twenty One Thousands Rupees (21,000/-) per month).
Note:
i. Revision in rates will be communicated to contractor from time to time by EIC.
ii. Format of wage slip is attached in at Annexure 3 of Section III and shall be issued to all
workers.
19. Payments to contract workers through Bank only
a. Contractors shall make the payments to their contract workers through Bank only. For this
purpose, the contractor shall ensure that all the contract workers are having a bank
account and also facilitate workers for opening the account. The Engineer-in-Charge /
Officer-In-Charge shall ensure that the Contractors are making payments to their contract
workers through Bank only.
b. In isolated cases, if it is not possible to make payments to any contract workers through
Bank Account, the approval of the Unit Head shall be obtained for making the payment by
cash. In the event of cash payment to any contract workers the same shall be witnessed by
an official of HR duly authorized by the Head of HR Group of the unit.
c. Every month the contractor shall submit bank statement of deposit of amount in each
workers bank account/ documentary evidence to Engineer-In-Charge/Officer-In-Charge.
d. The contractor shall make the payment of prescribed minimum wages notified from time
to time to all its workmen, on or before 7th of succeeding month. In case, payment of
minimum wages to all workmen is not made on or before 7th of succeeding month, then a
penalty @ Rs. 1000/- per day of default will be imposed. Levy of penalty does not abrogate
the contractor from his responsibility for disbursement of wages as per the Payment of
Wages Act. NPCIL shall not be liable for any damage or compensation payable.
26. Agreement:
A formal agreement of the work shall be executed by the Contractor with NPCIL immediately
after issue of work order. Until such an agreement is executed, the work order together with
Contractors offer and related letters shall be a governing/binding document.
For all the works payment shall be released for the quantum of supply made/works
completed ( on pro rata basis) and accepted by the Engineer In Charge.
Schedule A of sec-VIII
i) 75% of the payment shall be released to the contractor after receipt of the materials
and acceptance of the same by the Engineer in charge.
ii) 15% of the payment shall be released after completion of erection and acceptance by
the Engineer in charge.
iii) 5% payment shall be released on completion of testing, handing over of the system and
acceptance of the same by the Engineer in charge.
iv) Balance 5% payment shall be released on completion of material accounting,
submission of CCC and acceptance of the same by the Engineer in charge.
Schedule B of sec-VIII
i) 90% payment shall be released to the contractor after completion of work and
acceptance by the Engineer in charge.
ii) 5% payment shall be released after completion of testing and handing over of the same
to Engineer in charge.
iii) Balance 5% shall be released after completion of material accounting and submission of
CCC and acceptance of the same by Engineer In Charge.
The contractor has to submit all inspection reports/ daily log books duly signed by the Engineer
in charge or his authorized representative for acceptance of the work along with the bills.
30. Electricity
Electricity shall be provided to the contractor at one point with in KAPP 3&4 and KAPP 1&2 inner
boundary area. For erection works contractor shall arrange his own power supply. Contractor
shall have his own electrical panel which shall be approved by engineer in charge. The contractor
shall install energy meter with valid calibration certificate. The prevailing procedure at KAPP 3&4
and KAPP 1&2 for obtaining electrical supply connection shall be followed. The electricity
charges @Rs 4.74/KWh shall be recovered from the contractor.
i) Contractor may note that welding work of pipe includes taking delivery of free issue materials
if any, handling, transportation of materials, storage, cleaning, taking site measurement,
ii) The erection work of pipe includes handling, transportation of materials, cleaning, erection at
trenches/ pipe pedestals/ supports, fit up, alignment, visual inspection, hydro testing, and
measured in inch meter. One inch meter. = dia. of pipe (NB) in inches x length of pipe in meter.
The erection of fittings, valves and flanges shall be paid in inch meter. The fittings like elbows,
TEEs and flanges shall be considered equal to 0.5 inch meter. Valves shall be considered equal
to 1 inch meter.
iii) Support fabrication and erection work including U bolts, hardwares shall be measured in metric
tonne (MT). The work includes supply of required materials, taking site measurement,
handling, marking, cutting, grinding, edge preparation, drilling, welding, surface preparation by
shot blasting, painting of primer and finish paint, erection, fixing of EPs with anchor fasteners
etc. as per specification.
iv) Surface preparation and painting work includes supply of paints, thinner, handling, surface
preparation by grit blasting of pipes, cleaning, painting of primer coats, intermediate coats and
finish coats of paint as per the specification and measured in square metre.
v) Dye penetrant inspection inspection shall be measured in inch dia. The work includes supply of
required materials, arranging equipments, consumables, conducting DP/RT examination in situ
with qualified persons, cleaning after inspection. Inch dia. = diameter of pipe (NB) in inches
vi) The Earth work in excavation for foundations/pipe pedestals , trenches shall be measured in
cubic meter. Excavation work also includes clearing of jungles, vegetation, grass, brush wood,
trees and saplings and disposal of the same in safe way to prevent fire hazard to faraway place
from working area and stacking of serviceable material and disposal of unserviceable material,
dressing of sides, watering, rolling, compaction, testing of proctor density for required value
and making good for PCC or laying of Pipeline and pipe pedestal including taking out the
excavated soil and disposal of soil as directed by Engineer, within a lead of 500 m.
vii) The laying of PCC work includes supply of cement, sand, aggregate, arranging required quantity
of potable water, mixing and laying. Curing for 7 days as per specification, Shuttering and de-
shuttering also included in the work. The work is measured in cubic meter.
viii) The laying of RCC work ( casting of pipe pedestal) includes supply of cement, sand,
aggregate, admixture, form work, laying of reinforcement, arranging required quantity of
potable water, mixing, laying, curing for 7 days period, shuttering and deshuttering as per
specification and measured in cubic meter.
ix) Gunniting of pipe work includes handling of pipes, supply of ordinary Portland cement, sand, 3
mm dia. 50 x 100 welded MS wire mesh for reinforcement, potable water, coating of external
surface of pipes with 25mm thick cement mortar and measured in Square metre.
x) Reinforcement work includes Supply of reinforced / TMT bars, 18 guage GI binding wires,
fabrication and placing of reinforcements for Pedestals, including cutting, bending, hooks etc.
assembling with 18 gauge G.I. binding wires, if required welding, supporting in position to
ensure line and levels during concreting, maintaining proper cover /spacing etc., providing
adequate lap lengths all as per drawing, technical specifications and measured in metric tonne
( MT).
xi) Erection of rotary equipment work consists of taking delivery of the material from NPCIL stores,
handling, transportation, erection on foundation, alignment, grouting, dry packing, providing
assistance for commissioning as described in the technical specification and is measured in
metric tonne ( MT).
xii) Design, Engineering, preparation of the drawing work consists of survey of the pipeline routing,
design of RCC pipe pedestal, Thrust block, pump foundation, embedded parts, preparation of
piping layout between the terminal points, preparation general layout and isometric drawings,
33.2 The bidder may note that police verification of all workmen and staff deployed for the works in
KAPS 1&2 should be submitted for obtaining entry pass to KAPS 1&2.
33.3 The bidder may note that all the procedure in place at KAPS 1&2 should be followed for
carrying out the work. KAPS 1&2 being operating plant, the contractor will have to participate
in the emergency exercise which will be carried out from time to time, while working at KAPP
1&2 and KAPP 3&4.
33.4 In addition to the safety measures outlined at various sections, the contractor shall follow all
the safety guidelines/ procedures which are prevailing at KAPS 1&2, while working in KAPS 1&2
premises.
33.5 The bidder has to follow instruction and security rules prevailing at KAPS-1&2 for entry passes
for materials, machineries, and staff. As the security coverage is provided by CISF in KAPS-1&2.
34.2 Paints
I) M/s Asian Paints Ltd
II) M/s Berger paints Ltd.
III) M/s Kansai Nerolac paints Ltd.
34.3 Pipes
I) M/s SAIL
II) M/s MANN Ind. Indore
III) M/s Ratnamani, Ahmedabad
IV) M/s PSL, Daman
34.4 Pipe fittings ( Elbows, Tees, Bends, Reducers, Caps, Couplings, Treadolets, Sockolets)
I) M/s DEE Development, Faridabad, Delhi
II) M/s Tubeline Fab, Mumbai
III) M/s Swastik, Mumbai
IV) M/s Arvind pipes & fittings, Baroda
V) M/s Steel Samrat, Boisar
VI) M/s Supertech, Mumbai
VII) M/s Gujrat Infra, Baroda
VIII) M/s M.S. Fittings, Kolkata
IX) M/s EBY Engineers, Mumbai
X) M/s TEEKAY Tubes, Mumbai
XI) M/s Alliance fittings & forgings, NaviMumbai
XII) M/s TOPSI, Baroda
XIII) M/s Sawan Fittings, Baroda
34.5 Flanges
I) M/s Paramount Forge, Mumbai
II) M/s Jai Ambe, Mumbai
III) M/s Arvind Pipes & Fittings, Baroda
IV) M/s Punjab steel works, New Delhi
V) M/s Metal Forge, Mumbai
VI) M/s J K Forgings, New Delhi
VII) M/s Sanghvi Forgings, Baroda
VIII) M/s Golden Iron, New Delhi
IX) M/s TechnoForge, Ankleshwar
X) M/s ECHJAY steel, Rajkot
XI) M/s TOPSI, Baroda
XII) M/s Sawan Fittings, Baroda
34.11Gaskets
I) M/s Starflex, Goa
II) M/s IGP, Chennai
III) M/s Flexitellic, UK
34.12 Cement
I) M/s Ultrtech cement
II) M/s ACC
III) M/s Grasim
IV) M/s Ambuja
V) M/s Binani
VI) vi) M/s Jaypee cement
The contractor may note that if the materials are to be sourced from the vendors other than
the list given above, the specific approval of the Engineer In charge shall be taken before
supply of material. All the required documents for qualification of the vendor shall be
submitted by the contractor.
FORM FOR INITIAL MEDICAL EXAMINATION (FOR CONTRACTOR PERSONAL) AT KAPP-3&4 PROJECT
SITE.
Name: Date:
General Exam. Pulse Resp. B.P.
Pallor Oedema Tongue
Throat Lymphnodes Nose
Skin Ear Weight
Nails Height
Eyes Vision Rt. Lt.
Genito Urinary
system
Colour vision
Lecomotor system
Memogram HB Gr. %
TLC/Cumm %
DLC polymorph %
Lymphocyte %
Monocyte %
Esinophil %
Urin analysis Albumin
Suger
Remarks: X-Rays/Screening (if necessary)
Special attention may please be given to the following:
1. Presence of any skin disease such as :
a) Acute or chronic eczema.
b) Contagious skin diseases such as scabies, extensive fungal infection or lineal vesicular.
c) Ulcers on the skin i.e. post traumatic or inflammatory on exposed parts.
8. Any other gross physical handicap likely to interfere with work in plant.
9. Overall nutritional status, weight and general physical fitness and mental soundness.
10. The latest medical exam should be done before and with in two months period of assignment in
DAE Unit.
Name: ____________________
Reg. No. ___________________
Date: ______________
Note: Strike out which ever is not applicable.
FORM FOR MEDICAL CHECK UP FOR THE WORKMAN ENGAGED BY THE CONTRACTOR
_______________________
Signature of the workmen
Date:
__________________________
Note: This certificate is to be given on the letter head of the registered medical practitioner who is
possessing allopathic qualification as recognized by the Indian medical council. Below the signature,
the rubber stamp of the medical practitioner should be affixed. The letter head normally should
contain the following.
ANNEXURE-3
WAGE SLIP
Category of employee
Wage period
Bank Name
Branch
Whereas, M/s. (Name of the contractor)__________ has been awarded the contract for
(Name of the contractor) ___________ vide Work Order No. __________ dated ______________ by
NPCIL Kakrapar Gujarat Site, Unit - _______ to execute the job/ work on the terms and conditions as
stipulated therein and as per the agreement.
That the provisions of the Employees Provident Fund & Miscellaneous Provisions Act, 1952 have been
complied and it is undertaken that all the liabilities on account of EPF contribution/ dues for the
employees/ workers deployed by M/s. ________(Name of the contractor)________ for the work and
indemnify NPCIL of any future liabilities on these account. I shall be stand responsible for any such
future claim and action/ proceeding if any, with regard to EPF dues / outstanding received through
concerned authorities.
Further, I shall keep NPCIL fully indemnified and free from all such EPF dues / outstanding claims /
demands, actions / proceedings if any, against NPCIL in respect of aforesaid contract and NPCIL shall
have no liabilities on this account.
(Signature of Contractor) /
Authorized Representative of Contractor
With Companys Seal
Witness:
1. Signature
Name :
Address :
2. Signature
Name :
Address :
SECTION IV
GCC with Addendum is attached separately AND is also available on Web site
www.tenderwizard.com/DAE/Downloads which will form part of this Tender Document.
1.1 This tender specification covers the Design, Engineering, preparation of drawing for
cross country piping works, Supply, Erection / Construction, welding, gunniting of pipes,
inspection, testing, surface preparation & painting, construction of RCC pipe pedestals,
pump foundations and Thrust blocks including excavation, backfilling etc. for piping of
plant water system, from KAPS 1&2 to KAPP 3&4 for Nuclear Power Corporation of
India limited at Kakrapara, atomic power project 3&4. The following works are covered
under the scope of this contract.
1.1.1 Design, preparation of drawings for pipeline routing, supports, RCC pedestals, thrust
blocks, pump foundation etc. and getting approval from Engineer In Charge or his
authorized representative.
1.1.2 Preparation of work procedures, QAPs, inspection and testing procedures, QA manual,
Safety manual, JHAs, SWPs and getting approved from Engineer In Charge.
1.1.3 Supply of CS pipes, valves, pipe fittings, pipe support materials, U clamps, foundation
bolts, structural steels and CS plates, reinforcement steel, cement, sand, admixture,
aggregate, hardwares, gaskets, RCC pipes etc. as per the schedule of quantities of the
tender.
1.1.4 Taking delivery, transportation and storage of free issue materials from Engineers stores.
1.1.5 Cement mortar gunniting of pipes.
1.1.6 Fabrication, erection (at below and above ground) and welding of pipes, fittings, valves
and pipe supports, inspection/ NDT, hydro testing of pipes, draining of pipes.
1.1.7 Excavation and back filling of trenches for underground pipelines in soil and rock surfaces
including bed preparation etc.
1.1.8 Excavation for pipe pedestals, pump foundations and backfilling.
1.1.9 Construction of RCC pipe pedestals, pump foundations and Thrust blocks.
1.1.10 Cutting and disposal of trees, bushes etc.
1.1.11 Erection, alignment, grouting and drypacking of rotary equipments like centrifugal pumps.
1.1.12 Surface preparation and painting of pipelines and supports
1.1.13 Submission of construction completion certificate and handing over.
1.1.14 Identification and establishing QA program for site works in line with Engineers QA
program, preparation of QA documents, QA Plans, work procedures for erection &
construction.
1.2 It is not the intent to specify completely herein all aspects of Supply, Erection /
Construction, welding, inspection, testing, surface preparation and painting nevertheless
cross country piping shall conform in all respects to high standard of workmanship and
shall be capable of performing in continuous operation in a manner acceptable to the
ENGINEER who will interpret the meaning of the specifications, drawings and shall have the
right to reject any work or material which in his assessment is not complete to meet the
requirements of this specification and /or applicable National and / or International codes
and standards mentioned elsewhere in this specification.
The TENDERER shall read all the sections of this specification for completely
understanding the scope of this package.
3 TERMINAL POINTS
Terminal points for piping are as given below :
The terminal point at KAPS 1&2 area is from line no. KAPS 1&2-1300-W-7112-1001 to line no.
1000-RW-0-7112-3001. The terminal point at KAPS 3&4 area is from 1000-RW-0-7112-3001 to
line no. 1000-RW-0-7112-2010 and 450-RW-0-7112-2021.
4.2.2 Supply of materials: The following materials as per the relevant specifications shall be
supplied.
4.2.1.1 CS pipes and pipe fittings, flanges as per Piping Materials Specification (PMS) No.: KAPP-3&4/
71120/1/PMS.
4.2.2.2 Gate valves, Butterfly valves, and Check valves as per Valve Specification Sheet (VSS) No.:
KAPP 3&4/71003/5001/VSS, KAPP 3&4/71003/ 5002/VSS, KAPP 3&4/71003/5011/VSS , KAPP
3&4/71123/2021/VSS, KAPP 3&4/71123/2017/VSS , KAPP 3&4/71120/2024/VSS, KAPP
3&4/71003/5041 /VSS, KAPP 3&4/71853/2002/VSS.
4.2.2.3 Structural steel and plates conforming to IS 2062, E 250 grade A and grade BR.
4.2.2.4 Various sizes of Pipe support U- Clamps ( U-bolts) as per the drawings.
4.2.2.5 Supply of Inorganic Zinc Silicate Primer, High Build Epoxy MIO Paint and Aliphatic PU Paint
for CS Pipes and pipe supports saddle.
4.2.2.6 Supply of M30x 400mm long foundation bolts with 50mm x 50mm x 10mm thick plate welded
(material conforming to IS 2062 E 410 Gr. B) with nuts, washers and nuts conforming to SA 194
gr 2H as per the drawing.
4.2.2.7 Supply of various sizes of EPDM gaskets of 3.18mmand 1.5mm thick with durameter hardness,
Shore A 60 5, AWWA-C-207, SOFF and ANSI-B-16.21 SORF.
4.2.2.8 Supply of various sizes of bolts conforming to SA 193 gr B7, nuts conforming to SA 194 gr. 2H
and washers.
4.2.2.9 Supply of reinforcement steels conforming to IS 1786 gr. Fe 500
4.2.2.10 Supply of cement of 53 grade, river sand, aggregate, admixture, and all other consumables.
4.2.2.11 Consumables required for fabrication, welding, surface preparation, painting, gunniting of
pipelines, erection, inspection/ NDT, testing etc.
The paint shall be procured from NPCIL approved vendors only. Co-relatable batch test
certificate shall be supplied along with the material. The paint shall have sufficient shelf life so
that it can be used with the expiry of the same.
The scope of the supply also includes receipt and proper storage of materials as per the
procedure and instruction of engineer in charge. The contractor shall unload the materials in
proper way so that no damage occurs to the materials. The material received shall be stored
and preserved properly. The pipes, structural steels and plates shall be stored minimum 150
mm above the ground level using suitable wooden sleepers. All the pipe fittings and valves
shall be stored in closed storage area. The instrumentation material shall be stored in dust free
closed storage area. Paints shall be stored separately in closed but ventilated area. After
receipt and proper storage the materials, same shall be offered to the Engineer-in-charge for
inspection at site. The contractor shall prepare site inspection report in the prescribed format
based on which the payment against supply items will be released to the contractor.
Note: The cross country piping from KAPS 1&2 to KAPP 3&4 is to be laid from KAPS 1&2 cooling
water intake to KAPP 3&4 NDCT. Part of the erection work is to be carried out inside KAPS 1&2
which is a commissioned plant. While working at KAPS 1&2, all norms applicable and inforce are to
be followed. The work is to be carried out in close coordination with KAPS 1&2 staff and all the
works can be started only after obtaining proper permit. The contractor and his workmen will have
to participate in plant emergency training and periodic exercises. All the men and materials to KAPS
1&2 should be routed through KAPS 1&2 security gate only. Contractor shall assess this implication
properly. No claim will be entertained towards this.
BUREAU OF INDIAN STANDARDS (BIS) IS 1477, IS 3589, IS 808, IS 2062, IS 2002, 2720, 3764,
1786, 12269, 383, 9103
ANSI /IEEE
ANSI-NEMA
ATOMIC ENERGY REGULATORY BOARD (AERB) SAFETY GUIDE FOR WORKS CONTRACT (NO.
AERB / SG / IS-1).
4.3.5 Apart from the above following specification of NPCIL are also applicable.
I. PC-P-285 Rev-1
II. PC-P-344
In the event of conflicts between different standard codes, CONTRACTOR shall refer the
conflict to Engineer in charge for written resolution.
5 WELDING
5.1 All welding involved in the construction and fabrication of plant and items covered under
the contract shall be carried out in accordance with ASME section IX. All welding shall be
carried out with SMAW/GTAW process using either welding generators or welding rectifiers
with NPCIL approved welding consumables. Before welding all the gas cut edges shall be
ground smooth to 1.6mm of deepest indentation. The weld edges shall be prepared as per
ASME section IX. The welding electrodes / filler wire used shall conform to E-7018 for SMAW
process and ER 70 S2 for GTAW process .
5.2 Welding procedures and welder's qualifications shall be carried out in accordance with
ASME section IX and the same shall be got approved from the Engineer in charge before start
of welding. Where applicable, welders shall be tested as detailed in ASME section IX and
appropriate to the corresponding weld position using test pieces of appropriate parent
metal to be used on the job. The Engineer in charge shall have the right to have any welder
re-tested at any time during the contract.
The Engineer in charge or his authorized representative shall at all working hours have access
to all parts of the CONTRACTOR'S works and shall be provided with all reasonable
inspection facilities by the CONTRACTOR. The inspection facilities shall include all
necessary tools, instruments, equipment and qualified operators to facilitate inspection.
This includes access necessary to verify the implementation of all aspects of QA program.
The CONTRACTOR shall deploy necessary personnel, tools & tackles and infrastructure at
site to the satisfaction of Engineer in charge for carrying out all erection, testing,
inspection and quality surveillance activities who shall check the performance of erected
equipment / systems and confirm that the erection quality meets the requirements of the
Engineers specification, regulations etc.
IS : 1477 Code of practice for painting of ferrous metals in building Part I&II
8.6.2 CONTRACTOR shall satisfy himself, availability of all information in the specifications for
proper selection of the paints and ensure their applications as per Codes.
8.7.3 Any equipment, pipeline, which has been given the shop coat of primer after its erection in the
field, shall be carefully examined and where ever the primer coat is damaged shall be
recoated with primer. However over the field welds, bolts and nuts ( excluding threaded
portion), etc. two primer coats shall be applied.
8.8.1 After the primer coats have dried out, the surface shall be cleaned of dust or loosely
held particles without scratching or in any way damaging the primer coats. For the pipe
surfaces HB Epoxy MIO Paint in two coats to minimum 100 mocrons DFT of required shade
shall be applied. The minimum DFT per coat of finish paint shall be 50 microns. The pipes shall
8.8.2 All the pipe supports shall be applied with HB Chlorinated Rubber finish Paint in two coats to
60 microns DFT.
8.8.3 Finish painting of all exposed, uninsulated, air side surfaces shall be carried out as per
Engineers colour coding scheme. The technical particulars of the paints and
accessories employed by CONTRACTOR shall be furnished to Engineer in charge for
prior approval.
8.8.4 Paint shall be applied either by brushing or spraying. It shall be ensured that brush marks
are a minimum and the requirements of workmanship are as specified in IS: 1477(for
site painting works on systems, structures and components). The colour band and letter
size shall be got approved from the Engineer in charge.
8.8.5 Paint used shall be stirred frequently to keep the pigment in suspension. Paint shall be of the
ready mixed type in original sealed containers as packed by the paint manufacturer. Addition
of thinners shall not be permitted.
8.8.6 No painting shall be done in frost / foggy weather or when the relative humidity is more than
85%, enough to cause condensation on the surface to be painted. Paint shall not be applied
when the temperature of the surface to be painted is 5 Deg. C or below.
8.8.7 Batch test certificate for the primer and finish paints shall be submitted to the Engineer in
charge for acceptance. The painting shall be carried out only after acceptance of the paint by
the Engineer in charge.
9.1.1 The scope of this part of the specification shall be for erection, inspection, testing of piping,
structures and equipment up to the terminal points covered under the scope of contract.
9.1.2 It is to be understood and agreed by CONTRACTOR, that the work described shall be complete
in detail, even though every item necessarily involved is not particularly mentioned.
CONTRACTOR shall be required to provide all resources necessary for the completion of
the entire work described and shall not avail himself of any unintentional error, omission or
inconsistency that may exist.
9.2.2.1 The Contactor shall be responsible for taking delivery of free issue materials from Engineers
stores located at KAPS 1-4 premises including preparation of issue vouchers, gate passes etc.
10 Cleaning of Pipes : All pipes, pipe fittings and other piping components shall be cleaned
prior to erection as per technical specification.
It should be ensured that ends of all pipe fitting are kept in closed condition using metallic /
plastic caps during all stages of erection..
10.1 CONTRACTOR shall also carryout cleaning operations after erection and hydro static test. All
piping shall be drained after testing.
10.2 CONTRACTORs scope of work includes supply, erection of temporary pipework including
hangers and supports, valves and specialities and other associated equipment (viz.
Pumps, blowers, tanks etc.) for carrying out the cleaning/testing operations wherever
required as described above.
10.3 After successful completion of these operations, CONTRACTOR shall dismantle all
temporary pipework and structures, restore the permanent piping to their design condition
and render the area free of debris and all other foreign matter.
13.1 CONTRACTOR shall ensure the use of latest version of internationally accepted and widely
used Project Management Software for planning, scheduling and monitoring of all the
activities under the scope of this specification. Contractor shall regularly update the status on
13.2.2 The contractor shall submit the daily and weekly progress report as required by engineer in
charge. The monthly progress report shall be submitted for the work.
13.2.3 The work progress will be reviewed daily/ weekly basis by the engineer in charge. The
contractor shall attend progress review meetings along with his key persons and sign the
minutes of meeting.
14.1 The contractor shall submit the material accounting after completion of work for acceptance of
engineer in charge. The surplus materials and scrap shall be deposited to engineers store
located at either KAPS 1&2 or at KAPS 3&4. The details regarding scrap limit, permissible
wastage etc. are given in the following table.
Maximum invisible Maximum permissible
Sl.
Particulars wastage (Non-Returnable) wastage (Returnable)
No.
% %
1 Pipes 2% 4%
Structural steel, plates
2 3% 4%
etc.
14.2.1 CS/GI pipes 50 mm dia. and below pipe pieces less than 2 meters in length shall be treated
as scrap.
14.2.2 SS pipes 50 mm dia. and below SS pipe pieces less than 0.5 meter in length shall be treated
as scrap.
14.2.3 Structural Steel less than 1 meter in length shall be treated as scrap.
14.2.4 In respect of plates having thickness 20 mm & below, the size of plate having dimension 1mtr x
1mtr & below will be considered as scrap. In case of plates having thickness of above 20 mm,
the size of plate having dimension 1mtr x 0.5 mtr & below will be considered as scrap.
14.2.5 CS/GI/SS pipes, all sizes above 50 mm dia. Pipe pieces less than 0.5 meter in length shall be
treated as scrap.
Contractor may note that final bill shall be released only after satisfactory completion of
material accounting, submission of CCC and as built drawings.
16 DOCUMENTS TO BE SUBMITTED
The contractor shall submit the following documents after completion of the works and
commissioning of the system.
i) Construction completion certificate (CCC) consists of all the material test certificates,
inspection records, as built drawings, erection reports, trial run and commissioning reports if
any, flow sheets, calibration records, work specification etc.
In addition to the above the contractor shall submit the following documents and get approved
from the Engineer in charge before commencement of the works / activities.
I. Quality assurance plans (QAPs) for various works/ activities.
II. NDT procedures.
III. Hydro testing procedures.
IV. Rotary equipment erection, alignment and grouting procedure.
V. Fabrication and erection procedure.
VI. Surface preparation and painting procedure.
VII. Excavation and backfilling procedure.
VIII. PCC & RCC procedure.
IX. Welding procedure specification (WPS) and PQR.
X. Welder qualification records
SECTION V PART B
SPECIFIC TECHNICAL REQUIREMENTS
1.2 Pipe support materials : The support materials for piping shall conform to IS 2062 E-250 Gr. A.
The structural materials and plate shall be supplied with material test certificate. The materials
shall be procured form the authorized vendors whose details are given in section-III of this
tender. As per the discretion of the Engineer in charge the material will have to be tested at
NPCIL approved laboratory to confirm the quality. The U bolts required for the piping shall be
fabricated from MS rounds conforming to IS 2062 E-250 Gr. A. The U bolts shall be supplied
with 2 nos of nuts washer and one no. of lock nut conforming IS 1363. The pipe support
materials shall be procured from approved vendors only whose details are given in section-III
of this tender.
1.3 Valves: The detailed specification for the valves is given in the valve specification sheet (VSS)
no. KAPP 3&4/71003/5001/VSS, KAPP 3&4/71003/ 5002/VSS, KAPP 3&4/71003/5011/VSS ,
KAPP 3&4/71123/2021/VSS, KAPP 3&4/71123/2017/VSS , KAPP 3&4/71120/2024/VSS, KAPP
3&4/71003/5041 /VSS, KAPP 3&4/71853/2002/VSS. The valves shall conform to the
specification given in the VSS and control valve shall also meet NPCIL specification PC-E-541.
The testing shall be carried out as per the relevant standard. The pre-despatch inspection will
be carried out as per the discretion of the Engineer in charge. All the testing facilities shall be
provided for pre-despatch inspection. If any leakage is observed during testing at site the same
shall be repaired and the valve shall be retested in the presence of Engineer in charge. The
valves shall be procured from approved vendors only whose details are given in section-III of
this tender.
1.4 Hardwares and Gaskets: The bolts shall conform to SA 193 grade B7. The nuts shall conform to
SA 194 grade 2H and compatible with the bolts. All the bolts, nuts and washers shall be black
anodised. All the bolts shall be supplied with minimum one washer and nut.
1.6 Flanges : Flanges of 300NB and above sizes shall conform to AWWA C-207 class-B, SOFF,
serrated finish, material conforming to IS 2002 Gr.-2/ SA 515 Gr. 60, made of single plate.
Flanges of below 300NB shall conform to SA 105, ANSI B 16.5, 150#, SORF, serrated finish. The
flanges shall be procured from approved vendors only whose details are given in section-III of
this tender.
The erection work includes but not limited to taking delivery of free issue materials, storage,
handling, transportation, internal cleaning of pipe lines, marking, cutting, grinding, edge
preparation and fitup of pipes, structurals, welding, conducting inspection on weld joints,
hydro testing and draining of pipelines, surface preparation to SA2.5 and application of two
coats of primer and 2 coats of finish paints on pipelines and structural, valves which are
exposed to atmosphere, erection of valves, drains & vents on pipelines etc.
2.1 Storage : The pipes, structural steels and reinforcement steels shall be stored minimum 150
mm above the ground using wooden or concrete sleepers. The pipe ends shall be covered with
PVC/metallic end caps. At no point of time during fabrication and erection the ends of the
pipes / fabricated pipe spools shall be without end caps. The fittings upto 300 NB shall be
stored in closed storage area and above 300 NB shall be stored in closed or semi closed storage
area. The valves, hard wares, gaskets, electrical materials, C&I materials shall be stored in
closed storage area. The sand, bricks, steels, aggregate shall be stored in open storage area.
The cement shall be stored in closed or semi closed storage area. The pumps and motors shall
be stored in closed storage area. The electrical motors, electrical panel etc. shall be protected
from moisture. The paints and thinners shall be stored separately in closed storage area.
2.2 Taking delivery of free issue materials, Handling and transportation: Taking delivery of free
issue materials from NPCILs stores including preparation of issue vouchers, getting approval,
co-ordination with NPCIL stores, security etc., handling, transportation of materials from
NPCILs stores, proper storage and preservation of free issue materials are in the scope of
Contractor. Apart from free issue materials, complete handling and transportation of materials
covered in the supply scope of Contractor, such as pipes, fittings, valves, structural materials,
CS plates, bolts, nuts, gaskets, reinforcement steel, cement, sand, aggregate and all other
required materials and consumables etc., to fabrication, erection site and till completion of
erection are in the scope of the contractor. The RCC coated pipes shall be handled carefully to
prevent damage to the coating. The pipes shall be lifted using canvass slings and at no point of
time the wire ropes shall be used. The RCC coated pipes shall not be dragged pulled on the
floor with pipe rollers and crow bars to prevent damage to the coating. The coated pipes shall
be handled using crane and chain pulley and canvass slings only. All care shall be taken while
handling and transportation of the coated pipes to prevent any damage to the coating. If any
damage occurs to the RCC coating of pipes during handling and transportation the same shall
be repaired or recoated as per the procedure got approved from the Engineer in charge.
2.4 Marking, cutting, grinding, edge preparation and fitup: The pipes and structural steels shall be
marked as per the required length. The cutting shall be carried out using mechanical means or
using oxy acetylene gases. All the cut edges shall be ground smooth to minimum 1.6mm of
deepest indentation. The cut edges shall be free from burrs, sharp edges etc. The weld joint
shall be prepared as per the approved drawing / procedure. The mating members shall be
aligned properly. The axial mismatch shall be within 1.6 mm. If there is mismatch between wall
thickness of mating members the same shall be tapered gradually in the ratio of 1:3. The
fabrication shall conform to NPCIL specification PC-P-344.
2.5 Welding : All the welding shall be carried out using SMAW or GTAW process using E-7018
electrodes for SMAW and ER 70S2 for GTAW of NPCIL approved make and brand. The welding
shall be carried out using either welding generator or rectifier only. The weld joints and 50 mm
from either side of joint shall be clean, free from dust, rust, oil, grease, paint, dirt or any
foreign particles. The welding shall be carried out using NPCIL approved welding procedure
specification (WPS) by NPCIL qualified welder as per ASME sec IX. The welding shall not be
carried out in wet and humid condition. The welding shall be carried out as per NPCIL
specification PC-P-285 rev.1.
2.6 Gunniting of pipes : All the pipes which are to be laid underground shall be coated ( gunniting)
with cement mortar of 25mm thick with 3 mm dia. 50 x 100 welded MS wire mesh
reinforcement. The coating shall be uniform and surface shall be finished smooth. 100mm on
both ends of the pipes shall left uncoated till welding and testing is completed. This portion of
the pipe also shall be gunnited on external surface after hydro testing of pipelines. The
gunniting shall conform to IS 3589.
2.7 Erection of cross country pipeline: The cross country piping shall be laid from intake of KAPS
1&2 which is taken from Moticher lake to KAPP 3&4. The top of the pipe shall be 1.5 mtr. deep
from the ground level. RCC Pipe pedestals and thrust blocks shall be casted for the pipes to be
routed above the ground. The cross country piping shall be as per the NPCIL specification PC-E-
550. After excavation the pipe bead shall be prepared by compacting. The pipe shall not be
erected on hard surface like rock. On rocky surface pipe bead shall be prepared by 150 mm
thick sand bead of minimum 200 mm width using good quality of river sand. The vent and drain
shall be provided at suitable places in cross country piping. The erected pipes shall be hydro
tested after completion of welding. The pipe lines shall be drained completely and system shall
be normalized. While conducting hydro test the line mounted instruments shall be removed
from the lines and the same shall be installed after completion of testing.
2.8 Erection of pipe supports: The work involves handling, transportation, cleaning, fabrication,
erection at required location, welding, surface preparation by shot blasting and painting of pipe
supports. The pipe supports shall be fabricated from structural steel materials, plates and
erected as per the drawing got approved from the Engineer in charge. The supports shall be
welded with embedded parts. All welding shall conform to NPCIL specification PC-P-285 rev.-1.
Wherever required the U bolts of required sizes shall be supplied by the contractor. The U bolts
Note: The piping works shall conform to NPCIL specification PC-P-285-Rev-1, PC-P-344 and
PC-P-345
2.9 Erection of valves : The different sizes of gate valves, butterfly valves, non return valves (check
valves), vent valves are to be erected. All the valves supplied shall be tested and test
certificates shall be supplied along with the valves. If any valve is found leaking / passing the
same shall be removed from the system and shall be either repaired and hydraulically retested
or replaced with the new valve. If required by the Engineer In charge 20% of all the gate valves,
butterfly valves and 100% the check valves/ non return valves etc. supplied by Contractor and
also issued on free issue basis shall be tested for seat leakage before installation at contractors
valve testing facility, at no extra cost to the Engineer. Procedure for valve testing at site shall be
got approved from the Engineer before carrying out the seat leak test.
3.0 Inspection
The contractor shall perform all tests and inspections necessary to ensure that the material
and workmanship conform to the requirement of the contract including fabrication and
construction. The following inspection/ NDT shall be carried out on weld joints of pipes and
supports.
3.1 Burried piping : 100% visual inspection and 10% dye penetrant testing shall be conducted
after root pass of all the butt welded joints. 100% visual inspection followed by 10% dye
penetrant testing shall be conducted after final pass of butt welded joints. Visual inspection
of 100% followed by 100% dye penetrant testing shall be conducted on all the fillet welds
after root pass and again after final pass.
3.2 Above ground piping: All butt welds shall be inspected 100% visually after root pass and
final pass. After final pass 10% dye penetrant testing shall be conducted on butt welds. All
fillet weld joints shall be inspected visually 100% after root pass and final pass.
3.3 Pipe supports : The supports shall be inspected 100% visually after root and final pass.
3.4 The Engineer-in-charge or his authorised representative shall have access to the
contractors or suppliers works at all reasonable time to determine compliance with the
provisions of this specification and / or to witness the tests and inspection.
3.5 All tests covered by this specification shall be subject to inspection and approval by the
Engineer-in-charge.
3.6 The contractor shall maintain records of all inspection work carried out in his works or in
his suppliers works. Copies of such records shall be made available to NPCIL. A procedure
for the repair of defects shall be submitted to the Engineer-in-charge for approval prior to
any repair being made. If the previous quality tests and inspection and impaired by the
subsequent repairs, the work shall be re-inspected and re-tested to the satisfaction of the
Engineer or his authorised representative. Equipment found unsatisfactory with regard to
the workmanship of material shall be removed by the contractor and replaced to the
satisfaction of Engineer-in-charge at no extra cost.
3.7 All materials and components, castings, forging, piping, instrument etc., shall be tested and
inspected in the presence of Engineer-in-charge or his authorised representative. Test
certificates of all components shall be made available for approval by the Corporation.
4.0 Testing
All pipelines, drain pipes, or any other liquid containers shall be tested for integrity and leak
tightness at a pressure of 6.75 kg/sq.cm (g) as per the procedure approved by the Engineer in
charge in accordance with ANSI B 31.1. The Contractor shall give hydraulic tests scheme by
making his own arrangements for water filling and disposal of water after the test and shall
repeat the test, if necessary until the requisite test results are obtained without any claim for
extra cost or compensation. The quoted rates shall include all costs to be incurred by the
Contractor for water tightness test. If any such structure or fixture is found to be unsatisfactory
during test, the Contractor shall demolish, undo and repair or reconstruct the same as directed,
such that the structure or fixture is made absolutely watertight, retested and declared as
satisfactory by the Engineer. After the successful testing, the pipelines shall be drained
completely.
5.1 The scope of the work is supply of required quantity of primer, intermediate coat paint, finish
paints, thinner, etc., along with required tools and tackles, air compressor, wire brushes, lint
free cotton cloth, and all other required materials, tools & tackles, consumables for surface
preparation and painting. The contractor shall carryout the work in accordance with approved
work procedure and QAP.
5.1.1 Surface preparation and painting of pipes : The uncoated ( without RCC coating) pipes which
are to be laid above ground level and pipe saddle supports shall be shot blasted using metallic
grits to remove rust, mill scale, dust and loosely held particles to SA 2.5 surface finish. If the
pipes are found contaminated with oil, grease etc., the same shall be removed using suitable
approved solvents. The cleaned pipes and top portion of the saddle support where the pipe
rests shall be applied with Inorganic Zinc Silicate Primer to minimum 75 microns DFT. The
primer shall be applied within 4 hours of surface preparation. The primer shall be applied
before erection of pipes leaving 50mm unpainted on both ends of the pipes. Over the primer
intermediate coat of HB Epoxy MIO paint shall be applied in two coats to minimum 100
microns DFT. Over the MIO intermediate coat, the finish paint of Aliphatic PU Paint shall be
applied in two coats to minimum 80 microns DFT. Touchup primer painting shall be done over
the damaged paint surfaces which may occur during erection before proceeding with next coat
of paint.
5.1.2 Surface preparation and painting of pipe supports : The fabricated pipe supports shall be shot
blasted using metallic grits to remove rust, mill scale, dust and loosely held particles, to SA 2.5
surface finish. The cleaned surface shall be applied with HB Chlorinated Rubber Zinc Phospate
Primer paint in two coats to minimum 100 micron DFT. Over the primer HB Chlorinated
Rubber finish Paint shall be applied in two coats to 60 microns DFT. The primer shall be
applied within 4 hours of surface preparation. Touchup primer painting shall be done over the
damaged paint surfaces which may occur during erection of supports.
6.1 The work includes taking delivery of free issue materials, transportation, storage erection on
permanent foundation, alignment, grouting of foundation bolts and dry packing of pump units
and providing assistance in commissioning in the form of skilled and unskilled manpower, tools
and tackles etc.
6.2 The pumps shall be drawn from the NPCIL stores by raising issue voucher, getting clearance
from Engineer In Charge etc. The pump and motor units shall be transported to the erection
site and erected. The proper alignment of the pump and motor shall be done including
coupling alignment using dial gauges to the required tolerance as per manufacturers
instructions. The pump foundation bolts shall be grouted using CONBEXTRA GP2 ready mix
grout. The pump unit base frame shall be dry packed using cement and sand in the ratio of
1:2.5 by weight. The water cement ratio shall not exceed 0.2.
Survey of the entire pipeline route, identification of area for construction of pipe pedestals,
thrust blocks, pump foundation, clearing of the bushes, cutting and disposal of trees,
excavation in all strata for pipe trenches including dewatering, backfilling and disposal of
surplus earth & debris. Providing PCC of M 15 grade for bed concrete to the required thickness
as per the design, Construction of RCC pedestals and thrust blocks as per the design/ drawing
with M 35 concrete including form work of ply wood, steel centering and scaffolding as per IS
456-(2000), Providing and laying TMT reinforcement conforming to IS 1786 Fe 500, as per
design requirements, Providing sand bed of 150 mm thick x 200 mm wide on rock surfaces,
providing, transportation and filling selected yellow soil or murrum, watering, rolling,
compaction and making good for PCC or laying of Pipeline.
The trees of girth above 30 cm. measured at a height of one meter above ground, shall only be
cut after permission of the Engineer-in-charge and from the concerned state government
authorities are obtained in writing. The trees falling on pipeline route shall be cut and disposed
off as directed by the Engineer in charge in line with the prevailing rules and regulations of the
state government/ local bodies. The roots shall also be removed. The trees on the pipeline
route shall be marked and before cutting the trees necessary approval from the respective
state government authorities shall be obtained and produced to the Engineer in charge.
Sufficient care shall be taken so that falling of trees does not damage the property of adjacent
areas. The tree cutting shall be carried out under strict supervision. The cut trees shall be
Any material obtained from the site will be the property of the Corporation and the useful
materials as decided by the Engineer will be conveyed and properly stacked as directed within
the lead specified. No separate payment shall be made for clearing of bushes, cutting and
disposal. The cost shall be included in the earthwork/ excavation cost.
7.2 EARTHWORK
The scope of work covered under this specifications pertains to excavation of earth for pipe
laying, RCC pipe pedestals & thrust blocks, pump foundation etc., to achieve various levels as
required in all sorts of soils, soft and hard rock, including shoring, protections of existing
underground utilities if any, such as water lines, electric cables etc., dewatering , stacking the
useful materials as directed within the lead of 500 mtr., refilling with selected useful excavated
earth (muram soil ) and disposing off the surplus earth / materials within specified lead and
finishing the surface to proper levels. Proper slope shall be maintained on side walls of
excavated trenches. Backfilling shall be done layers of 200mm and compacted at each layer.
7.5 Excavation
The excavation under all classifications in areas in trenches or in pits or any other areas shall be
carried out systematically. Cutting shall be done from top to bottom and no under-pining or
undercutting will be allowed. The bottom and sides of excavation shall be dressed to proper
level, slopes, steps, camber etc. by removing high spots and ramming thoroughly as directed by
the Engineer-in-charge.
All the excavation shall be carried out strictly to the dimensions given in the approved drawing.
The width and depth as shown in drawing or as directed by the Engineer-in-Charge. In case of
deeper foundation the contractor will have to make the excavation pits safer for providing
working slopes not flatten than 1:1.5 in foundation in consultation with Engineer and same
may be measured and paid for. Any excavation if taken below the specified depths and levels,
the contractor shall at his own cost fill up such overcut to the specified level.
7.6 Shoring
Unless separately provided for in the schedule of quantities, the quoted rate for excavation
shall include excavation of slopes to prevent falling in soil by providing and/or fixing,
maintaining and removing of shoring, bracing etc. The contractor would be responsible for the
design of shoring for proper retaining of sides of trenches, pits etc. with due consideration to
the traffic, superimposed loads etc. Shoring shall be of sufficient strength to resist the pressure
and ensure safety from slips and to prevent damage to work and property and injury to
persons. It shall be removed as directed after items for which it is required are completed.
Should the slips occur, the slipped material shall be removed and slope dressed to a modified
stable slope.
7.7 Dewatering
Dewatering shall be done to pump out all water which may accumulate in the excavation
during the progress of excavation either due to seepage, springs, rain or any other cause and
diverting surface flow by bunds or other means. Care shall be taken to ensure that the water
discharged sufficiently away to keep it free from nuisance to other works in the neighborhood.
No separate payment will be paid for dewatering. The quoted rate for excavation shall include
the cost of dewatering.
Materials suitable and useful for backfilling or other use shall be stacked at convenient place
but not in such a way as to obstruct free movement of materials, workers and vehicles or
encroach on the area required for constructional purposes. It shall be used to the extent
required to completely backfill the structure to original ground level or other elevation shown
on the plan or as directed by the Engineer-in-Charge. Materials not useful in anyway shall be
disposed off, leveled and compacted as directed by the Engineer within a specified lead of 0.5
Kms. The site shall be left, clean of all debris and leveled on completion.
7.9 Backfilling
The back filling shall be done at low lying areas of pipeline route. Where suitable excavated
material is to be used for back filling, it shall be brought from the place where it was
temporarily deposited and shall be used in backfilling.
All timber shoring and form work left in the trenches, pits, floors etc. shall be removed after
their necessity ceases and trash of any sort shall be cleared out from the excavation. All the
backfilled surface shall be watered and well consolidated by means of hand or mechanical
tamper or other compaction arrangement and made good for laying pipelines. Areas un-
accessible to mechanical equipment. etc. shall be tampered by hand rammer or by hand held
8 CEMENT CONCRETE (REINFORCED AND PLAIN) WORKS FOR CASTING OF PIPE PEDESTALS
The pipe pedestals and pipe thrust blocks shall be constructed with reinforced cement
concrete (RCC). The RCC shall be of M 20 grade. The pumps pedestal/ foundation shall be
constructed with RCC of M 35 grade. Contractor shall use good quality of ingredients like
aggregate, sand, cement etc., for producing concrete and got approved from Engineer In
Charge.
All surfaces upon or against which concrete will be placed shall be suitably prepared by
thoroughly cleaning, washing and dewatering, as may be indicated in the plans or as engineer-
in-charge may direct, to meet the various situations encountered in the work.
All the earth surfaces upon which or against which concrete is to be placed, shall be well
compacted and free from standing water, mud, slush or debris. Soft, yielding soil shall be
removed and replaced with suitable earth and well compacted as directed by engineer-in-
charge. Where specified, lean concrete shall be provided on the earth for receiving concrete.
The surface of absorptive soils against which concrete is to be placed shall be moistened
thoroughly so that no moisture will be drawn from the freshly placed concrete and later shall
help to cure the concrete.
Fresh concrete shall be kept continuously wet for a minimum period of 7 days from the date of
placing of concrete, following a lapse of 12 to 24 hours after lying concrete. The curing of
horizontal surfaces exposed to the drying winds shall however begin immediately the concrete
has hardened. Water shall be applied to unformed concrete surfaces within 1 hour after
concrete has set. Water shall be applied to formed surfaces immediately upon removal of
forms.
All reinforcement shall be clean, free from grease, oil, paint, dirt, loose mill scale, loose rust,
dust, bituminous material or any other substances that will destroy or reduce the bond. All
rods shall be thoroughly cleaned before being fabricated. Pitted and defective rods shall not be
used. All bars shall be rigidly held in position before concreting. No welding of rods to obtain
continuity shall be allowed unless approved by the Engineer-in-Charge. If welding is approved,
the work shall be carried out as per IS-2751 according to best modern practices and as directed
by the Engineer. In all cases of important connections, strength of bars welded, Special
precautions, as specified by the Engineer-in-Charge shall be taken in the welding of cold
worked reinforcing bars and bars other than mild steel.
All bars shall be accurately bent according to the sizes and shapes shown on the detailed
working drawings / bar bending schedules. They shall be bent gradually by machine or other
approved means. Reinforcing bars shall not be straightened and rebend in a manner that will
injure the bars containing cracks or splits shall be rejected. They shall be bent cold.
8.2 Cement
8.2.1 Unless otherwise specified or called for by the Engineer cement shall be Portland Cement of
53 grade in 50 kg. bags. The cement shall conform to IS 12269 The use of bulk cement will be
permitted only with the approval of the Engineer-in Charge. Changing of type of cement within
the same structure will not be permitted unless otherwise necessitated and approved by
Engineer. Cement manufactured approved vendors conforming to IS specifications shall be
procured and used on the work. The batch test certificates shall be submitted to the Engineer
in charge.
8.2.2 Contractor will have to make his own arrangements for the storage of adequate quantity of
cement. Consignments of cement shall be stored as received and shall be consumed in the
order of this delivery. Cement held in storage for a period of ninety (90) days or longer shall be
tested before usage. Should at any time the Engineer have reasons to consider that any
cement is defective, then irrespective of its origin and / or manufacturers test certificate such
cement shall be tested immediately at a National Test Laboratory / approved laboratory and
until the results of such tests are found satisfactory, it shall not be used in any work. Cost of
testing shall be born by the contractor.
8. 3 Aggregates
8.3.1 Aggregate in general designates both fine and coarse inert materials used in the manufacturing
of concrete as per IS 383.
8.3.2 All fine and coarse aggregates proposed for use in the work shall be subject to the Engineer-in
Charges approval and after specific materials have been accepted, the source of supply of such
materials shall not be changed without prior approval of the Engineer-in Charge.
8.3.3 Aggregates shall except as noted above, consist of natural sands, crushed stone and gravel
from source known to produce satisfactory aggregate for concrete and shall be chemically
inert, strong, hard, durable against weathering and free from deleterious materials that may
cause corrosion of the reinforcement or may impair the strength and / or durability of
concrete. The grading of aggregate shall be such as to produce a dense concrete of specified
strength and consistency that will work readily into position without segregation and shall be
based on the mix design.
The coarse aggregate and fine aggregate shall be visually inspected from time to time as
required by the Engineer- in-Charge to ascertain its suitability for use in construction and the
charges for testing aggregate shall be born by the contractor.
8.4 Water
Water to be used in concrete works and curing shall be clean water. Water used for both
mixing and curing shall be free from injurious amounts of deleterious materials. Clean Potable
waters are generally satisfactory for mixing and curing concrete. The water for construction
and testing shall be arranged by the contractor at his cost.
The test blocks shall be prepared and tested in accordance with the requirements of I.S. 4031
(Part 5)
8.7 Frequency
The minimum frequency of sampling of concrete of each grade shall be in accordance with
following:
Prior to concrete placement all work shall be inspected and approved by Engineer-in-charge
and if found unsatisfactory, concrete shall not be poured until after all defects have been
corrected at Contractor's cost.
Approval by Engineer-in-Charge of any and all materials and work as required herein shall not
relieve Contractor from his obligation to produce finished concrete in accordance with the
drawings and specifications.
8.16 Compaction
Concrete shall be compacted during placing, with approved vibration equipment until the
concrete has been consolidated to the maximum practicable density, is free of pockets of
coarse aggregate and fits tightly against all form surfaces, reinforcement and embedded
fixtures. Particular care shall be taken to ensure that all concrete placed against the form faces
and into corners of forms or against hardened concrete at joints is free from voids or cavities is
If, reinforcement is exposed or the honey combing occur at vulnerable positions it may be
necessary to cut out the members completely or in part and reconstruct. The decision of
Engineer-in-Charge shall be final in this regard. If only patching is " necessary the defective
concrete shall be cut out till solid concrete is reached (or to a minimum depth of 25 mm) the
edges being cut perpendicular to the affected surface; or with a small under cut if possible.
Anchor, tees or dovetail slots shall be provided whenever necessary to attach the new concrete
securely in place. An area extending several centimeters beyond the edges and the surfaces of
the prepared voids shall be saturated with water for 24 hours immediately before the patching
material is placed.
9.1 General
For plain cement concrete work, the specifications for materials viz. cement, fine and coarse
aggregates and water shall be the same as that specified in reinforced concrete work
specifications.
But the proportion of mix will be nominal and the ratio of fine and coarse aggregate may be
slightly adjusted within limits keeping the total volume of aggregates to a given volume of
cement constant, to suit the sieve analysis of both the aggregates. Cement shall on no account
be measured by volume, but it shall always be used directly from the bags (i.e. 50 kgs/bag).
10.2 The quantity of water used shall be such as to produce concrete of consistency required by the
particular class of work and shall be decided by the use of a slump cone. Sufficient care should
be taken to see that no excess quantity of water is used. The final proportion of the aggregate
and the quantity of water shall be decided by the engineer on the basis of test in each case.
All plain concrete shall be preferably mixed in a drum type power driven machine with a
loading hooper which will permit the accurate measure of various ingredients. If hand mixing is
authorized, it should be done on a water tight platform and with the approval of the Engineer.
The mixing of each batch in the concrete mixer shall continue for not less than 1 minutes
after the materials and water are in the mixer. The volume of mixed materials per batch shall
not exceed the manufacturers rated capacity of the mixer. The mixer shall rotate at a
peripheral speed of about 60 meters per minute.
Concrete shall be poured and consolidated in its final position within half an hour of mixing.
The retempering of concrete which has partially hardened, that is remixing with or without
additional cement, aggregate or water shall not be permitted. Concrete in C.C. 1:3:6 and C.C.
1:2:4 will be required to be vibrates if specified and directed by the Engineer. In case if the
thickness of concrete is more than 150 mm, it may be vibrated if directed by Engineer.
Measurements for the work done shall be exact length. breadth and depth shown or figured on
the drawings or as instructed by the engineer and after the concrete is consolidated. No extra
shall be paid for excess quantity resulting from faulty workmanship
10 Reinforcement
Reinforcement bars shall be plain round mild steel bars Grade-1 as per I.S. 432 (Part 1) and
High Yield Strength Deformed TMT bars conforming to Fe-500, IS-1786, as shown and specified
on the drawing. Wire mesh shall be in accordance with IS-1566. Substitution of reinforcement
will not be permitted except upon written approval from the Engineer-in-Charge.
10.1 Quality
11.1.1 All steel shall be of Grade I quality unless specifically permitted by the Engineer-In-Charge. No
rerolled material will be accepted. Contractor shall submit the manufacturer's test certificate
for steel. Random tests on steel supplied by Contractor may be performed by owner as per
relevant Indian Standards. All cost incidentals to such tests shall be at Contractors Expense ".
Steel not conforming to specification shall be rejected.
10.1.2 All reinforcement shall be clean, free from grease, oil, paint, dirt, loose mill scale, loose rust,
dust, bituminous material or any other substances that will destroy or reduce the bond. All
rods shall be thoroughly cleaned before being fabricated. Pitted and defective rods shall not be
used. All bars shall be rigidly held in position before concreting. No welding of rods to obtain
continuity shall allowed unless approved by the Engineer-in-Charge. If welding is approved, the
work shall be carried out as per IS-2751 according to best modern practices and as directed by
the Engineer. In all cases of important connections, strength of bars welded, Special
precautions, as specified by the Engineer-in-Charge shall be taken in the welding of cold
worked reinforcing bars and bars other than mild steel.
10.2 Laps
Laps and splices for reinforcement shall be as shown on the drawings. Splices in adjacent bars
shall be staggered and the locations of all splices, except those specified on the drawings, shall
be approved by the Engineer-in-Charge. The bars shall not be lapped unless the length required
exceeds the maximum available lengths of bars.
10.3 Bending.
All bars shall be accurately bent according to the sizes and shapes shown on the detailed
working drawings / bar bending schedules. They shall be bent gradually by machine or other
approved means. Reinforcing bars shall not be straightened and rebend in a manner that will
injure the bars containing cracks or splits shall be rejected. They shall be bent cold. Bars which
depend for their strength on cold working shall not be bent hot. Bars bent hot if required and
approved by Engineer shall not be heated beyond red cherry colour (not exceeding 645c) and
after bending shall be allowed to cool slowly without quenching. No reinforcement shall be
bent when in position in the work without approval, whether or not it is partially embedded in
hardened concrete. Bars having kinks or bends other than those required by design shall not be
used.
11 FOR MWORK
11.1 General
The formwork shall consist of shores, bracings, sides of beams and columns, bottom of slabs
etc. including ties, anchors, hangers, inserts etc. complete, which shall be properly designed
and planned for the work. False work shall be so constructed that vertical adjustments can be
made to compensate for take up and settlements. Wedges may be used at the top or bottom
of timber shores, but not at high ends, to facilitate vertical adjustment or dismantling of the
formwork.
11.2 Type of Formwork
Formwork may be of plywood, metal, or concrete. For special finishes the formwork may be
lined with plywood, steel sheets, oil tempered hard board, etc. Sliding forms and slip forms
may be used with the approval of engineer-in-charge.
11.3 Formwork Requirement
Forms shall conform to the shapes, lines, grades and dimensions including camber of the
concrete as called for on the drawings. Ample studs, walers braces, ties, straps, shores etc.
shall be used to hold the forms in proper position without any distortion whatsoever until the
concrete has set sufficiently to permit removal of forms. Forms shall be strong enough to
permit the use of immersion vibrators. In special cases form vibrators may also be used. The
shuttering shall be close boarded and shall be sufficiently tight to prevent loss of water and
fine material from concrete.
Plywood or M.S. Plates shall generally be used for all concrete surfaces; Sawn and wrought
timber may be used with the approval of the Engineer
All new and used form lumber shall be maintained in a good condition with respect of shape,
strength, rigidity, water tightness, smoothness and cleanliness of surfaces. Form lumber
unsatisfactory in any respect shall not be used and if rejected by Engineer shall be removed
from the site.
SECTION V Part C
SECTION V Part D
Piping Material Specification (PMS) no. KAPP-3&4/ 71120/1/PMS and valve specification sheet
(VSS) no. KAPP 3&4/ 71003/5001/VSS, KAPP 3&4/71003/5002/VSS, KAPP 3&4/71003/5011 /VSS ,
KAPP 3&4/71123/2021/VSS, KAPP 3&4/71123/2017/VSS , KAPP 3&4/ 71120/2024/VSS, KAPP
3&4/71003/5041 /VSS, KAPP 3&4/71853/2002/VSS.
Note:- Section V-Part-C and Part-D Attachment is Tender notification public tender document
SECTION VI
SCHEDULE OF DRAWINGS
The following drawings enclosed with this tender are given for information to the tenderer. However
the work shall be carried out as per the latest drawing issued for construction.
Sr. Drawing No. Description of the Drawing Rev No.
No
1. KAPP-3&4/71129/6002/GA 0
GA of Composite Piping.
Sheet 1 to 7
2. KAPP-3&4/71129/6004/GA 0
L- Section for NDCT- 1&2 Pipeline.
Sheet 1 & 2
3. Marked Drawing of Composite Site Layout 1
KAPP-3&4/10000/7002/GA
of KAPS-1 &2 and KAPP- 3&4.
4. KAPP-1&2/71129/7001/GA KAPS- 1&2 Plant Piping- Plan and Sections. 2
NOTE:-
Drawings are available in pdf format for reference is a mandatory part of tender
document and placed separately in tender notification, available on website. Bidder
is requested to go through the same before submitting the offer.
SECTION VII
SCHEDULE OF MATERIAL TO BE SUPPLIED BY THE CORPORATION & FORMATS OF VARIOUS
CONTRACTUAL DOCUMENTS
SCHEDULE- A (As per GCC clause 18)
Sr. Clause No. of Description Stipulation
No. NIT/GCC
1 NIT-PQC/1.4 Applicability of Registration of EPF Yes
2 NIT- 24 Applicability of Mega Power Project Concession Yes
3 NIT- 25 Purchase preference to MSE registered bidders:
a) Waivel of submitting bid security Yes
b) Splitting of quantity for award to MSE No
4 1.1.1 Accepting authority Chief Construction
Engineer, KAPP-3&4.
5 2.1.3 Time by which possession of site will be given Available Progressively.
6 4.14.1 Availability of electricity Yes (With in KAPP-3&4
plant boundary premises)
7 4.14.1 The rate at which electricity will be charged Prevailing rate at site is
Rs.4.74/-per KWH
8 4. 19. 2 Number of trees to be planted by the contractor As per Pl/001/R2
9 4. 22. 1 Number apprentices to be trained by the Contractor NA
10 4. 23. 2 Availability of water supply by corporation Yes (With in KAPP-3&4
plant boundary premises)
11 4.23.2(i) Water charges Rs. 21.43/1000 ltrs.
12 4.24.2 Land availability for contractors colony Yes
13 5. 6. 3 Penalty, for not providing arrangements and As per Pl/001/R2
facilities as per safety guidelines.
14 5. 6. 4 Industrial safety training to be provided by No
corporation
15 5.6.14 Minimum number of safety professionals to be As per Pl/001/R2
deployed by contractor.
16 5. 6 .15 Penalty, for not deploying the minimum number of As per Pl/001/R2
safety professionals.
17 7.8.1 Applicability of the incentive clause Not applicable
18 7. 8.2 Maximum percentage of the contract value, which NA
shall be paid as incentive
19 9.1.1 Defect Liability Period:
For contracts other than maintenance Contracts 12 Months
mentioned below
For contracts such as housekeeping, annual repairs, NA
dismantling roads, horticulture, service contracts
etc.
20 9.1.6 Applicability of liability towards latent defect. NA
21 11.3.4 Various components expressed as a percentage of
contract value.
Unskilled labour component (lu) 10%
Skilled labour component (ls) 23%
Material component
(On Non Judicial Stamp paper to be stamped in accordance with stamp act, the stamp paper to be in
name of Executing Bank)
Ref.............. Date................
____________________________________________________
____________________________________________________
____________________________________________________
Dear Sir,
In accordance with your Notice Inviting Tender for ____________________under your tender
No_________dated ________________M/s _______________________ (hereinafter called the
Tenderer) with following directors on their Board of Directors/Partners of the firm.
1________________________ 2________________________
3________________________ 4________________________
5________________________ 6________________________
7________________________ 8________________________
9________________________ 10________________________
1__________________________________________________________________________
2__________________________________________________________________________
3__________________________________________________________________________
Whereas it is a condition in the tender documents that the tenderer has to deposit Bid Security
with respect to the tender, with Nuclear Power Corporation of India Ltd (hereinafter referred to
1. NOW THEREFORE, we the ...................... Bank, a body corporate constituted under the
Banking Companies (Acquisition and Transfer of undertakings) Act 1969 and having a branch
office at............ (hereinafter referred to as the Bank") do hereby undertake and agree to pay
on demand in writing by the Corporation, the amount of Rs.......(Rupees............) to the
Nuclear Power Corporation of India Ltd without any demur, reservation or recourse.
2. We, the aforesaid Bank, further agree that the Corporation shall be the sole judge of and as to
whether the tenderer has committed any breach or breaches of any of the terms and conditions
of the tender and the extent of loss, damage, costs, charges and expenses caused to or suffered
by or that may be caused to or suffered by the Corporation on account thereof the extent of
the bid security required to be deposited by the Tenderer in respect of the said Tender
document and the decision of the Corporation that the Tenderer has committed such breach
or breaches and as to the amount or amounts of loss, damage, costs, charges and expenses
caused to or suffered by or that may be caused to or suffered by the Corporation shall be final and
binding on us.
3. We, the said Bank further agree that the Guarantee herein contained shall remain in full force
and effect until it is released by the Corporation and change in the constitution, liquidation or
dissolution of the Tenderer, shall not discharge our liability guaranteed herein.
4. It is further declared that it shall not be necessary for the Corporation to proceed against the
Contractor before proceeding against the Bank and the Guarantee herein contained shall
be enforceable against the Bank notwithstanding any security which the Corporation may
have obtained or shall obtain from the Contractor at the time when proceedings are taken
against the Bank for whatever amount may be outstanding or unrealized under the Guarantee.
5. The right of the Corporation to recover the said amount of Rs...........(Rupees ......................) from
us in manner aforesaid will not be affected or suspended by reason of the fact that any dispute
or disputes have been raised by the said M/s................... (Tenderer) and/or that any dispute
or disputes are pending before any authority, officer, tribunal or arbitrator(s) etc.
6. Notwithstanding anything stated above, our liability under this guarantee shall be restricted
to Rs........(Rupees....... ....)and our guarantee shall remain in force upto.......... and unless a
demand or claim under the guarantee is made on us in writing within three months after the
Date......................
Place....................
(Signature)___________________________________________
(Printed Name)_______________________________________
(Designation)_________________________________________
(Authorisation No.)_____________________________________
Witness
1)_______________________
2)_______________________
Accepted
To
Nuclear Power Corporation of India Ltd.
_______________________________________
________________________________________
1. We, the ........ Bank (hereinafter referred to as "the said Bank" and having our registered office
at....... do hereby undertake and agree to indemnify and keep indemnified the Corporation
from time to time to the extent of Rs..........(Rupees ................Only) against any loss or
damage, costs, charges and expenses caused to or suffered by or that may be caused to or
suffered by the Corporation by reason of any breach or breaches by the said Contractor of any
of the terms and conditions contained in the said Contract and to unconditionally pay the
amount claimed by the Corporation on demand and without demur to the extent aforesaid.
2. We.................... Bank, further agree that the Corporation shall be the sole judge of and as to
whether the said Contractor has committed any breach or breaches of any of the terms and
conditions of the said Contract and the extent of loss, damage, costs, charges and expenses
caused to or suffered by or that may be caused to or suffered by the Corporation on account
thereof and the decision of the corporation that the said Contractor has committed such
breach or breaches and as to the amount or amounts of loss, damage, costs charges and
expenses caused to or suffered by or that may be caused to or suffered by the Corporation from
time to time shall be final and binding on us.
3. We, the said Bank further agree that the Guarantee herein contained shall remain in full force
and effect during the period that would be taken for the performance of the said Contract and
till all the dues of the Corporation under the said Contract or by virtue of any of the terms
and conditions governing the said Contract have been fully paid and its claims satisfied or
discharged and till the owner certifies that the terms and conditions of the said Contract have
been fully and properly carried out by the said Contractor and accordingly discharges this
WITNESS
1.________________ Signature _________________________________
Accepted
NOTES
*For Proprietary Concerns
Shri _______________________________________ son of__________________ resident of
_____________________________________carrying on business under the name and style of
_________ at_____________(herein after called " the said Contractor" which expression shall unless
the context requires otherwise include his heirs, executors, administrators and legal
representatives.
*For Companies
M/s................ a company registered under the Companies Act, 1956 and having its registered
office at .........in the State of............... (Hereinafter called "the said Contractor which expression shall
unless the context requires otherwise include its administrators, successors and assigns).
To
Nuclear Power Corporation of India Ltd.
.........................
.........................
5. It shall not be necessary for the Owner to proceed against the Contractor before proceeding
against the Bank and the Guarantee herein contained shall be enforceable against the Bank
notwithstanding any security, which the Owner may have obtained or obtain from the Contractor
shall at the time when proceedings are taken against the Bank hereunder, be outstanding or
unrealized.
6. We, the said Bank, lastly undertake not to revoke this Guarantee during its currency except
with the previous consent of the Owner in writing and agree that any change in the Constitution
of the said Contractor or the said Bank shall not discharge our liability hereunder.
If any further extension of this Guarantee is required the same shall be extended to such
required periods on receiving instructions from M/s........................................ on whose behalf
this Guarantee is issued. Notwithstanding anything contained herein before our liability under
this Guarantee is restricted to Rs,......... (Rupees ..............Only) together with interest. Our
undertaking shall commence from the date of execution and shall remain in force up to
.......................
WITNESS
1.________________ Signature _________________________________
Authorization No:___________________________
Accepted
NOTES
*For Proprietary Concerns
*For Companies
M/s. ________________ a company under the Companies Act, 1956 and having its
registered office at______________ in the State of_________________(hereinafter called "the
said Contractor" which expression shall unless the context requires otherwise include its
administrators, successors and assigns).
WHEREAS under sub-clause12.1 of the General Conditions of Contract relating to the terms and
conditions of its Award letter No....................dated .............which have been unequivocally
accepted by the Contractor, the Contractor has applied to the Corporation for a loan of Rs..............
(Rupees) ...............................................Only) for plant and equipment described in the Schedule
here to specifically acquired by the Contractor for the works and brought to site.
AND WHEREAS one of the conditions on which the said loan of Rs........./- granted by the Corporation
to the Contractor is that the Contractor shall hypothecate the plant and equipment described in the
Schedule hereto in favour of the Corporation as security for the due repayment of the said loan.
AND WHEREAS the Contractor has represented that he is the Owner of the plant and equipment
described in the Schedule hereto and the same is free from encumbrances.
NOW THIS INDENTURE WITNESSTH THAT in pursuance of the said agreement and in consideration of
the premises the Contractor doth hereby hypothecate, assign and transfer to the Corporation the
Plant and equipment described in the Schedule hereto the intent that the same shall remain and
form security for repayment to the Corporation of the said loan of Rs........... together with the interest
thereon at ........ % per annum.
1. The Contractor hereby agrees, declares and convenants with the Corporation as follows:-
(a) The Contractor shall repay to the Corporation the said loan of Rs........(Rupees.......................
Only) together with interest thereon as aforesaid by and agrees that the said loan be recovered
by the Corporation by making deductions in the manner provided in sub-clause12.1 of the
General Conditions of Contract and other conditions of the Award letter from the claims
made by the Contractor against the Corporation of "on account payment".
(b) The Contractor has paid in full the purchase price of the Plant & Equipment described in the
Schedule hereto and each and every one of them and that the same are the absolute property
of the Contractor and that the same have not been sold, pledged, mortgaged or transferred or
in any way dealt with by the Contractor.
(c) So long as any amount remains payable to the Corporation by the Contractor in respect of
the said loan of Rs.__________ the Contractor shall not sell, pledge, hypothecate, transfer, part
with or in any way deal with the Plant and Equipment described in the Schedule hereto.
(d) If the said loan of Rs.___________shall not be repaid by the Contractor or recovered in the
manner described above by the said ..........day of ..... due to any reasons whatsoever or the said
Contract has been determined earlier or cancelled or if the Contractor shall sell, pledge,
mortgage, transfer, part with or in any way deal with the said plant and equipment or any
(e) The Corporation may on the happening of any of the events mentioned in the preceding clause
(d) or in the event of the said loan or any part thereof becoming due and payable and has
not been paid or recovered or cannot be recovered as provided in the said conditions, seize
and take possession of the said plant and equipment (and either remain in possession thereof
without removing the same or else may remove the same) and sell the said plant and
equipment or any of them either by public auction or private contract and may out of the sale
proceeds retain the balance of the said loan and interest thereon remaining unpaid and
unrecovered and all costs, charges and expenses and payments incurred or made in
maintaining, defending or protecting the rights of the Corporation hereunder and shall pay
over the surplus, if any, to the Contractor.
(f) The Contractor shall at all times during the continuance of the security and at the
expense of the Contractor insure and keep insured and plant and equipment
described in the Schedule hereto for the value thereof in the joint names of the Contractor
and the Corporation with an insurance company to be approved by the Engineer-in-charge
against the risk of loss or damage from whatever cause arising other than the Excepted Risks
not covered under the insurance. During the continuance of the security the Contractor shall
pay all premia and sums of money necessary for keeping such insurance on foot and the
insurance policy and receipts in original for premia paid shall be deposited with the Engineer-
in-charge. The Contractor shall assign all his rights, title and interest in the policy to the
Corporation.
(g) The Contractor shall not permit or suffer the said plant and equipment or any part thereof
to be destroyed or damaged or used or to be used or to deteriorate in a greater degree
than it would deteriorate by reasonable wear and tear thereof in the performance of the
Contract.
(h) In the event of any damage or loss happening to the said plant and equipment or any part
thereof from whatever cause other than the Excepted Risk [not covered under insurance] the
Contractor shall forthwith have the same repaired or replaced as the case may be or arrange
form payment of the entire amount recovered or to be recovered from the insurance company
to the Corporation towards the payment of the said loan of Rs............
2. Upon repayment or recovery in full of the amount secured on account of this hypothecation
deed the said plant and equipment secured hereunder shall stand released from
hypothecation but this is without prejudice to the right of the Corporation under any other
conditions of the Contract
Sr. No. Particulars of Plant Nos. Purchase price/ considered Total Advance(75%
and Equipment reasonable by Engineer-in- price of Col.5)
Charge
1. 2. 3. 4. 5. 6.
IN WITNESS WHEREOF the parties hereto have executed these presents on the day and your first
above written
in the presence of :
(1)__________________________ (1)______________________________
(2)__________________________ (2)______________________________
*NOTES
*For Companies
M/s................ a company registered under the Companies Act, 1956 and having its registered office at
............... in the State of ............... (hereinafter called "the said Contractor" which said Contractor"
which expression shall unless the context requires otherwise include its administrators,
successors and assigns).
AGREEMENT FOR THE WORK OF __________________." Agreement made this day ________
between the Nuclear power Corporation of India limited, (A government of India enterprise), acting
through the _____, KAPS/KAPP (hereinafter called the Corporation) of the one part and
M/s________, (hereinafter referred to as the contractor) of the other part.
Whereas the aforesaid on behalf of the Corporation invited tenders for the work of _____________
And whereas the tender of the Contractor was accepted and work awarded to the Contractor by the
Corporation under their letter no. _________ Dated ________.
And whereas the Tenderer has accepted the work order for the work aforesaid in their letter No.
______ Dtd. ________.
Now the agreement, witness and it is hereby agreed by and between the parties hereto as follows:
1. This agreement, inter alia the contract consisting of hereto annexed contains the entire
agreement between the parties. All other previous and collateral arrangement,
representations, promises and conditions are superseded by the contract and shall not be
binding on either party. All the work executed by the Contractor under the work order and
undertakings given under the terms and conditions of the agreement.
In witness whereof Mr. / Mrs. _______________ the contractor and Mr. / Mrs.
______________ for and behalf of the Corporation, have hereunto affixed their seals and
signatures the day, month and year here in above written.
(______________)
Witness: Name & Signature ___________________, KAPS/KAPP
For and on behalf of NPCIL
Sr. Nature of Date of Date of Period Overla Net Dated Dated Rema
No hindrance occurre remova of p ping exte sign of sign of rks
nce l hindra period nsio Contracto Engr. with
nce if any n r with name
name
THIS AGREEMENT, made and entered into this ............................ Day of ....20
...........................Between ........................... ( the Corporation ) and
.......................................................................................................................................
.............................................................................................................. ( the Contractor
), and the Disputes resolution Board ( the Board ) consisting of three Board Members,
(1).
(2).
(3)..
WITNESSETH, that
WHEREAS, the Corporation and the Contractor have contracted for the construction of the
...
(Project name) (the Contract ) and WHEREAS, the contract provides for the
establishment and operation of the Board NOW THEREFORE, the parties hereto agree as follows :
1. The parties agree to the establishment and operation of the Board in accordance with this Board
Agreement.
2. Except for providing the services required hereunder, the Board Members should not give any
advice to either party concerning conduct of the Works.
(a) shall have no financial interest in any party to the contract, or a financial interest in the contract,
except for payment for services on the Board.
(b) shall have had no previous employment by, or financial ties to, any party to the contract, except
for fee based consulting services on other projects, all of which must be disclosed prior to
appointment to the Board.
(c) shall have disclosed in writing to the parties prior to signature of this Agreement any and all
recent or close professional or personal or personal relationships with any director, officer, or
employee of any party to the contract, and any and all prior involvement in the project to which
the contract relates;
(d) shall not, while a Board Member, be employed whether as a consultant or otherwise by
either party to the contract, except as a Board Member.
(e) shall not, while a Board Member, engage in discussion or make any agreement with any party to
the contract, regarding employment whether as a consultant or otherwise either after the
contract is completed or after services as a Board Member is completed;
(f) shall be and remain impartial and independent of the parties and shall disclose in writing to the
Corporation, the Contractor, and one another any fact or circumstances which might be such to
3. Except for its participation in the Board s activities as provided in the contract and in this
Agreement none of the Employer, the Contractor, the Nodal Officer or his nominee, and one
another any fact or circumstances which might be such to cause either the Employer or the
Contractor to question the continued existence of the impartiality and independence required of
Board Members.
(a) furnish to each Board Members one copy of all documents which the Board may request
including contract documents, progress reports, variation orders, and other documents,
pertinent to the performance of the Contract.
(b) in co-operation with the Employer, co-ordinate the Site visits of the Board, including conference
facilities, and secretarial and copying services.
5. The Board shall serve throughout the operation of the contract. It shall begin operation
following execution of this Agreement, and shall terminate its activities after issuance of
the taking over Certificate and the Board s issuance of its Recommendations on all disputes
referred to it.
6. Board Member, shall not assign or subcontract any of their work under this Agreement.
7. The Board Members are independent and not employees or agents of either the Employer or the
Contractor.
8. The Board Members are absolved of any personal or professional liability arising from the
activities and the Recommendations of the Board.
9. Fees and expenses of the Board Member[s] shall be agreed to and shared equally by the
Employer and the Contractor. If the Board requires special services, such as accounting, data
research, and the like, both parties must agree and the costs shall be shared by them as mutually
agreed.
(a) The Board shall visit the Site and meet with representatives of the Employer and the Contractor
and at regular intervals, at times of critical construction events, and at the written request of
either party. The timing of Site visit, failing agreement shall be fixed by the Board.
(b) Site meetings shall consist of an informal discussion of the status of the construction of the
works followed by an inspection of the works, both attended by personnel from the Employer,
the Contractor .
(c) If requested by either party or the Board, the Employer will prepare minutes of the meetings and
circulate them for comments of the parties.
(b) The party receiving the Notice of Dispute will consider it and respond in writing within 7 days
after receipt.
(c) This response shall be final and conclusive on the subject, unless a written appeal to the
response is filed with the responding party within 7 days of receiving the response. Both parties
are encouraged to pursue the matter further to attempt to settle the dispute. When it appears
that the dispute cannot be resolved without the assistance of the Board either party may refer
the dispute to the Board by written Request for Recommendation to the Board, and the other
party stating that it is made pursuant to relevant Clause.
(d) The Request for recommendation shall state clearly and in full detail the specific issues of the
dispute to be considered by the Board.
(e) When a dispute is referred to the Board, and the Board is satisfied that the dispute requires the
Board s assistance, the Board shall decide when to conduct a hearing on the dispute. The Board
may request that written documentation and arguments from both parties be submitted to each
Board Members before the hearing begins. The parties shall submit insofar as possible agreed
statements of the relevant facts.
(f) During the hearing, the Contractor and the Employer, shall each have ample opportunity to be
heard and to offer evidence. The Board s Recommendations for resolution of the dispute will be
given in writing, to the Employer and the Contractor as soon as possible, and in any event not
more than 28 days after the Board s final hearing on the dispute.
(a) Normally hearing will be conducted at the Site, but any location that would be more convenient
and still provide all required facilities and access to necessary documentation may be utilized by
the Board. Private sessions of the Board may be held at any location convenient to the Board.
(b) The Employer and the Contractor shall have representatives at all hearings.
(c) During the hearings, no Board Member shall express any opinion concerning the merit of any
facet of the case.
(d) After the hearing are concluded, the Board shall meet privately to formulate its
Recommendations. All Board deliberations shall be conducted in private, with all individual
views kept strictly confidential. The Board s Recommendations, together with an explanation of
its reasoning shall be submitted in writing to both parties. The Recommendations shall be based
on the pertinent contract provisions, applicable laws and regulations, and the facts and
circumstances involved in the dispute.
13. If during the contract period, the Corporation and the Contractor are of the opinion that the
Dispute Resolution Board is not performing its functions properly, the Corporation and the
Contractor may together disband the Disputes Resolution Board. In such an event, the disputes
shall referred to Arbitration straightaway. The Corporation and the Contractor shall jointly sign a
notice specifying that the Board shall stand disbanded with effect from the date specified in the
notice. The notice shall be posted by a registered letter with AD or delivery of the letter, even if
he refuses to do so.
COMPLETION CERTIFICATE
Name of Work :
Tender No. :
Name of Contractor:
Estimated Amount :
Completion Value:
Escalation Value :
Certified that the work has been completed in all respect as per the specification.
(Signature of Engineer-In-Charge)
Seal
SECTION VIII
Rate Per
Total
It No. Description Unit Quantity Unit
Amount
Quantity
1 Schedule-A Supply of materials
1.1 MS Pipe, 1000 NB, IS 3589, Gr. Fe. Mtr 720
410, 10 mm thick, BW Ends, SAW
Spirally welded.
1.2 MS Pipe, 700 NB, IS 3589, Gr. Fe. Mtr 72
410, 9.53 mm thick, BW Ends, SAW
Spirally welded.
1.3 MS Pipe, 600 NB, IS 3589, Gr. Fe. Mtr 24
410, 9.53 mm thick, BW Ends, SAW
Spirally welded.
1.4 MS Pipe, 450 NB, IS 3589, Gr. Fe. Mtr 48
410, 9.53 mm thick, BW Ends, SAW
Spirally welded.
1.5 MS Pipe, 200 NB, 8.18 mm thk., SA- Mtr 114
53 Gr-B, ANSI B 36.10, ERW, Butt
weld ends.
1.6 MS Pipe, 25 NB, 3.8 mm thk., SA-53 Mtr 12
Gr-B, ANSI B 36.10, seamless plain
ends.
1.7 MS Pipe, 15 NB, 2.77 mm thk., SA- Mtr 12
53 Gr-B, ANSI B 36.10, seamless
plain ends.
1.8 90 Degree Elbow, 200 NB, SA 234 Nos 7
Gr. WPB, ANSI B 16.9, LR, SMLS, BW
Ends, Sch. To match 8.18 mm thk.
Pipe.
1.9 Gate Valve, 200 NB , Mannually Nos 2
operated, confirming to ANSI B
16.34, SA 216, Gr-WCB, 150#, Ends
SORF flanged, serrated finish to
ANSI B 16.5 as per VSS No.: KAPP
3&4/71003/5011/VSS.
Note:
a. Above SOQR is for information only. Bidders are required to fill the downloaded excel
sheet and same is to be uploaded on web site.
b. The Schedule of Quantity and Rates is to be read for the purpose of pricing in
conjunction with all sections of tender document.
c. The bid price/rates/total bid price quoted shall be inclusive of all statutory liabilities, all
taxes, duties, levies or any other similar taxes as applicable under the existing statutes or
levy by the statuary authorities/State/ Central Government and payable by the bidder
under the contract or any other cause except the statutory service tax.
d. Before quoting the price, bidder is requested to go through all the sections of tender