Tabla 1 - Dimensionamiento Del Sistema

You might also like

Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 8

TABLA 1 - DIMENSIONAMIENTO DEL SISTEMA

Dia Mximo + Incendio


Start Diam. Length Velocity
Label Stop Node Material HW Flow (L/s)
Node (mm) (m) (m/s)
P-1 82: J-1 89: J-2 500 Ductile Iron 130 1,192.6 142.45 0.73
P-2 89: J-2 86: J-3 500 Ductile Iron 130 1,151.4 104.65 0.53
P-3 86: J-3 91: J-4 150 Ductile Iron 130 448.8 23.85 1.35
P-4 91: J-4 93: J-5 150 Ductile Iron 130 301.4 -13.2 0.75
P-5 93: J-5 90: J-6 150 Ductile Iron 130 500.5 -13.2 0.75
P-6 90: J-6 95: J-7 200 Ductile Iron 130 274.9 -37.97 1.21
P-7 95: J-7 99: J-8 250 Ductile Iron 130 421.9 -47.47 0.97
P-8 99: J-8 97: J-9 200 Ductile Iron 130 521.3 45.99 1.46
P-9 97: J-9 87: J-10 150 Ductile Iron 130 577.8 17.89 1.01
P-10 87: J-10 85: J-11 300 Ductile Iron 130 467.7 -107.09 1.51
P-11 85: J-11 82: J-1 300 Ductile Iron 130 855.6 -116.59 1.65
P-12 86: J-3 94: J-12 150 Ductile Iron 130 325.7 43 2.43
P-13 94: J-12 100: J-13 200 Ductile Iron 130 194.2 54.02 1.72
P-14 100: J-13 87: J-10 300 Ductile Iron 130 820.7 -115.48 1.63
P-15 100: J-13 92: J-14 300 Ductile Iron 130 218.6 160 2.26
P-16 94: J-12 96: J-15 150 Ductile Iron 130 418.2 -20.52 1.16
P-17 96: J-15 88: J-16 150 Ductile Iron 130 339.2 -21.27 1.2
P-18 88: J-16 97: J-9 200 Ductile Iron 130 461.8 -15.5 0.49
P-19 88: J-16 90: J-6 150 Ductile Iron 130 454.1 -15.27 0.86
P-20 96: J-15 91: J-4 150 Ductile Iron 130 340.3 -18.15 1.03
P-28 84: J-17 98: J-19 600 Ductile Iron 130 706.8 -144.9 0.51
P-29* 101: R-3 82: J-1 1200 Ductile Iron 130 3,048.0 774.6 0.68
P-30 98: J-19 82: J-1 1200 Ductile Iron 130 1,209.4 -477.76 0.42
P-31 98: J-19 99: J-8 900 Ductile Iron 130 1,203.3 332.86 0.52
P-32 99: J-8 83: J-18 900 Ductile Iron 130 481.8 220.5 0.35
COSTO TOTAL ($)
Notas: 0.49
(1) La tubera P-29 tiene na longitud definida por usuario (no escalada) de 3,048 m.
(2) La longitud total del sistema propuesto (tuberas nuevas) debe ser de 10,286.6 m (Solo tuberias propuestas).
(3) Diligencie las columnas sombreadas incluyendo los Dimetros propuestos y las columnas de Caudal (L/s) y Veloc
(4) La funcin costos a utilizar para las tuberas de Fundicin Ductil ser la siguiente:

Diamet
Unit Cost
Material er
($/m)
(mm)
Ductile Iron 150 200.0
Ductile Iron 200 302.0
Ductile Iron 250 413.0
Ductile Iron 300 531.0
Ductile Iron 350 659.0
Ductile Iron 400 797.0
Ductile Iron 500 1086.0
Ductile Iron 600 1404.0
Ductile Iron 750 1919.0
Ductile Iron 900 2477.0
EMA

Funcion
Valor Tramo ($)
Costo ($/m)
$ 1,086.00 $ 1,295,163.6
$ 1,086.00 $ 1,250,420.4
$ 200.00 $ 89,760.0
$ 200.00 $ 60,280.0
$ 200.00 $ 100,100.0
$ 302.00 $ 83,019.8
$ 413.00 $ 174,244.7
$ 302.00 $ 157,432.6
$ 200.00 $ 115,560.0
$ 531.00 $ 248,348.7
$ 531.00 $ 454,323.6
$ 200.00 $ 65,140.0
$ 302.00 $ 58,648.4
$ 531.00 $ 435,791.7
$ 531.00 $ 116,076.6
$ 200.00 $ 83,640.0
$ 200.00 $ 67,840.0
$ 302.00 $ 139,463.6
$ 200.00 $ 90,820.0
$ 200.00 $ 68,060.0
$ 1,404.00 $ -
$ 2,477.00 $ -
$ 2,477.00 $ -
$ 2,477.00 $ -
$ 2,477.00 $ -
COSTO TOTAL ($) $ 5,154,133.7

(Solo tuberias propuestas).


lumnas de Caudal (L/s) y Velocidad (m/s) que arroja su modelo.
TABLA 1 - DIMENSIONAMIENTO DEL SISTEMA
velocidad 0.40-4.50
Dia Mximo + Incendio
Start Diam. Length Velocity Funcion
Label Stop Node Material HW Flow (L/s) Valor Tramo ($)
Node (mm) (m) (m/s) Costo ($/m)
P-1 82: J-1 89: J-2 500 Ductile Iron 130 1,192.6 142.45 0.73 $ 1,086.00 $ 1,295,163.6
P-2 89: J-2 86: J-3 500 Ductile Iron 130 1,151.4 104.65 0.53 $ 1,086.00 $ 1,250,420.4
P-3 86: J-3 91: J-4 150 Ductile Iron 130 448.8 23.85 1.35 $ 200.00 $ 89,760.0
P-4 91: J-4 93: J-5 150 Ductile Iron 130 301.4 -13.2 0.75 $ 200.00 $ 60,280.0
P-5 93: J-5 90: J-6 150 Ductile Iron 130 500.5 -13.2 0.75 $ 200.00 $ 100,100.0
P-6 90: J-6 95: J-7 200 Ductile Iron 130 274.9 -37.97 1.21 $ 302.00 $ 83,019.8
P-7 95: J-7 99: J-8 250 Ductile Iron 130 421.9 -47.47 0.97 $ 413.00 $ 174,244.7
P-8 99: J-8 97: J-9 200 Ductile Iron 130 521.3 45.99 1.46 $ 302.00 $ 157,432.6
P-9 97: J-9 87: J-10 150 Ductile Iron 130 577.8 17.89 1.01 $ 200.00 $ 115,560.0
P-10 87: J-10 85: J-11 300 Ductile Iron 130 467.7 -107.09 1.51 $ 531.00 $ 248,348.7
P-11 85: J-11 82: J-1 300 Ductile Iron 130 855.6 -116.59 1.65 $ 531.00 $ 454,323.6
P-12 86: J-3 94: J-12 150 Ductile Iron 130 325.7 43 2.43 $ 200.00 $ 65,140.0
P-13 94: J-12 100: J-13 200 Ductile Iron 130 194.2 54.02 1.72 $ 302.00 $ 58,648.4
P-14 100: J-13 87: J-10 300 Ductile Iron 130 820.7 -115.48 1.63 $ 531.00 $ 435,791.7
P-15 100: J-13 92: J-14 300 Ductile Iron 130 218.6 160 2.26 $ 531.00 $ 116,076.6
P-16 94: J-12 96: J-15 150 Ductile Iron 130 418.2 -20.52 1.16 $ 200.00 $ 83,640.0
P-17 96: J-15 88: J-16 150 Ductile Iron 130 339.2 -21.27 1.2 $ 200.00 $ 67,840.0
P-18 88: J-16 97: J-9 200 Ductile Iron 130 461.8 -15.5 0.49 $ 302.00 $ 139,463.6
P-19 88: J-16 90: J-6 150 Ductile Iron 130 454.1 -15.27 0.86 $ 200.00 $ 90,820.0
P-20 96: J-15 91: J-4 150 Ductile Iron 130 340.3 -18.15 1.03 $ 200.00 $ 68,060.0
P-28 84: J-17 98: J-19 600 Ductile Iron 130 706.8 -144.9 0.51 $ 1,404.00 $ -
P-29* 101: R-3 82: J-1 1200 Ductile Iron 130 3,048.0 774.6 0.68 $ 2,477.00 $ -
P-30 98: J-19 82: J-1 1200 Ductile Iron 130 1,209.4 -477.76 0.42 $ 2,477.00 $ -
P-31 98: J-19 99: J-8 900 Ductile Iron 130 1,203.3 332.86 0.52 $ 2,477.00 $ -
P-32 99: J-8 83: J-18 900 Ductile Iron 130 481.8 220.5 0.35 $ 2,477.00 $ -
COSTO TOTAL ($) $ 5,154,133.7
Notas: 0.49
(1) La tubera P-29 tiene na longitud definida por usuario (no escalada) de 3,048 m.
(2) La longitud total del sistema propuesto (tuberas nuevas) debe ser de 10,286.6 m (Solo tuberias propuestas).
Diligencie las columnas sombreadas incluyendo los Dimetros propuestos y las columnas de Caudal (L/s) y Velocidad (m/s) que arroja su modelo.
(4) La funcin costos a utilizar para las tuberas de Fundicin Ductil ser la siguiente:

Diamet
Unit Cost
Material er
($/m)
(mm)
Ductile Iron 150 200.0
Ductile Iron 200 302.0
Ductile Iron 250 413.0
Ductile Iron 300 531.0
Ductile Iron 350 659.0
Ductile Iron 400 797.0
Ductile Iron 500 1086.0
Ductile Iron 600 1404.0
Ductile Iron 750 1919.0
Ductile Iron 900 2477.0
TABLA 1 - DIMENSIONAMIENTO DEL SISTEMA
velocidad 0.40-4.50 velocidad No determinado
Hora pico promedio
Start Velocity Funcion Velocity Funcion
Label Stop Node Diam. (mm) Length (m) Flow (L/s) Valor Tramo ($) Diam. (mm) Length (m) Flow (L/s) Valor Tramo ($)
Node (m/s) Costo ($/m) (m/s) Costo ($/m)
P-1 82: J-1 89: J-2 700 1,192.6 176.34 0.46 $ 1,404.00 $ 1,674,410.4 400 1192.6 66.46 0.53 $ 797.00 $ 950,502.2
P-2 89: J-2 86: J-3 500 1,151.4 113.34 0.58 $ 1,086.00 $ 1,250,420.4 350 1151.4 41.26 0.43 $ 659.00 $ 758,772.6
P-3 86: J-3 91: J-4 200 448.8 30.02 0.96 $ 302.00 $ 135,537.6 150 448.8 6.13 0.35 $ 200.00 $ 89,760.0
P-4 91: J-4 93: J-5 150 301.4 -8.59 0.49 $ 200.00 $ 60,280.0 200 301.4 -12.23 0.39 $ 302.00 $ 91,022.8
P-5 93: J-5 90: J-6 150 500.5 -8.59 0.49 $ 200.00 $ 100,100.0 200 500.5 -12.23 0.39 $ 302.00 $ 151,151.0
P-6 90: J-6 95: J-7 300 274.9 -34.36 0.49 $ 531.00 $ 145,971.9 250 274.9 -24.05 0.49 $ 413.00 $ 113,533.7
P-7 95: J-7 99: J-8 300 421.9 -50.16 0.71 $ 531.00 $ 224,028.9 250 421.9 -30.35 0.62 $ 413.00 $ 174,244.7
P-8 99: J-8 97: J-9 300 521.3 65.96 0.93 $ 531.00 $ 276,810.3 300 521.3 29.1 0.41 $ 531.00 $ 276,810.3
P-9 97: J-9 87: J-10 150 577.8 -9.39 0.53 $ 200.00 $ 115,560.0 150 577.8 7.1 0.4 $ 200.00 $ 115,560.0
P-10 87: J-10 85: J-11 300 467.7 -38.64 0.55 $ 531.00 $ 248,348.7 150 467.7 -6.38 0.36 $ 200.00 $ 93,540.0
P-11 85: J-11 82: J-1 400 855.6 -54.44 0.43 $ 797.00 $ 681,913.2 200 855.6 -12.68 0.4 $ 302.00 $ 258,391.2
P-12 86: J-3 94: J-12 150 325.7 20.32 1.15 $ 200.00 $ 65,140.0 150 325.7 9.93 0.56 $ 200.00 $ 65,140.0
P-13 94: J-12 100: J-13 200 194.2 18.15 0.58 $ 302.00 $ 58,648.4 150 194.2 5.42 0.31 $ 200.00 $ 38,840.0
P-14 100: J-13 87: J-10 150 820.7 -13.45 0.76 $ 200.00 $ 164,140.0 150 820.7 -7.18 0.41 $ 200.00 $ 164,140.0
P-15 100: J-13 92: J-14 150 218.6 15.8 0.89 $ 200.00 $ 43,720.0 150 218.6 6.3 0.36 $ 200.00 $ 43,720.0
P-16 94: J-12 96: J-15 200 418.2 -13.64 0.43 $ 302.00 $ 126,296.4 150 418.2 -1.79 0.4 $ 200.00 $ 83,640.0
P-17 96: J-15 88: J-16 250 339.2 -38.03 0.77 $ 413.00 $ 140,089.6 150 339.2 -8.63 0.49 $ 200.00 $ 67,840.0
P-18 88: J-16 97: J-9 300 461.8 -43.85 0.62 $ 531.00 $ 245,215.8 150 461.8 -9.41 0.53 $ 200.00 $ 92,360.0
P-19 88: J-16 90: J-6 150 454.1 -9.97 0.56 $ 200.00 $ 90,820.0 150 454.1 -5.52 0.31 $ 200.00 $ 90,820.0
P-20 96: J-15 91: J-4 150 340.3 -7.11 0.4 $ 200.00 $ 68,060.0 150 340.3 -5.76 0.33 $ 200.00 $ 68,060.0
P-28 84: J-17 98: J-19 600 706.8 -189 0.67 $ 1,404.00 $ - 600 706.8 -126 0.45 $ 1,404.00 $ -
P-29* 101: R-3 82: J-1 1200 3,048.0 898.2 0.79 $ 2,477.00 $ - 1200 3048 453.6 0.4 $ 2,477.00 $ -
P-30 98: J-19 82: J-1 1200 1,209.4 -604.42 0.53 $ 2,477.00 $ - 1200 1209.4 -349.25 0.31 $ 2,477.00 $ -
P-31 98: J-19 99: J-8 900 1,203.3 415.42 0.65 $ 2,477.00 $ - 900 1203.3 223.25 0.35 $ 2,477.00 $ -
P-32 99: J-8 83: J-18 900 481.8 283.5 0.45 $ 2,477.00 $ - 900 481.8 157.5 0.25 $ 2,477.00 $ -
COSTO TOTAL ($) $ 5,915,511.6 COSTO TOTAL ($) $ 3,787,848.5
Notas: 0.40 0.31
ubera P-29 tiene na longitud definida por usuario (no escalada) de
el sistema propuesto (tuberas nuevas) debe ser de 10,286.6 m
incluyendo los Dimetros propuestos y las columnas de Caudal (L/s) y Velocidad (m/s) que arroja su modelo.
uncin costos a utilizar para las tuberas de Fundicin Ductil ser la siguiente:

Material

Ductile Iron
Ductile Iron
Ductile Iron
Ductile Iron
Ductile Iron
Ductile Iron
Ductile Iron
Ductile Iron
Ductile Iron
Ductile Iron
TABLA 2 - PRESIONES RESULTANTES (Restricciones)
min 14.0 - max 56.2 min 14.0 - max 56.2
hora pico Escenario Dia Mximo + Incendio
Hydraulic Hydraulic
Elevation Demand Pressure Demand Pressure
Label Grade Grade
(m) (L/s) (m H2O) (L/s) (m H2O)
(m) (m)
J-1 294.67 63 243.84 50.72 37.8 243.84 51.04
J-2 294.31 63 252.984 41.25 37.8 252.984 40.7
J-3 293.54 63 262.128 31.35 37.8 262.128 30.9
J-4 291.3 31.5 265.176 26.07 18.9 265.176 21.94
J-5 291.9 0 260.604 31.23 0 260.604 27.83
J-6 292.9 15.8 256.032 36.79 9.5 256.032 34.6
J-7 293.14 15.8 252.984 40.08 9.5 252.984 39.76
J-8 293.9 15.8 249.936 43.88 18.9 249.936 44.46
J-9 292.35 31.5 248.412 43.85 12.6 248.412 40.26
J-10 293.71 15.8 246.888 46.73 243.84 246.888 37.31
J-11 294.23 15.8 245.364 48.77 243.84 245.364 42.23
J-12 290.34 15.8 257.556 32.72 243.84 257.556 22.66
J-13 289.96 15.8 256.032 33.86 243.84 256.032 21.31
J-14 288.61 15.8 259.08 29.47 243.84 259.08 14.92
J-15 290.82 31.5 262.6 28.16 243.84 262.6 21.8
J-16 291.71 15.8 254.508 37.12 243.84 254.508 33.5
J-17 293.91 189 240.792 53.01 243.84 240.792 53.61
J-18 293.8 283.5 249.936 43.78 243.84 249.936 44.39
J-19 294.41 0 246.888 47.43 243.84 246.888 47.84
TOTALES 898.2 P minima = 26.07 2621.2 P minima = 14.92
P maxima = 53.01 P maxima = 53.61
ES (Restricciones)
min 24.6 - max 56.2
Dia promedio
Hydraulic
Demand Pressure
Grade
(L/s) (m H2O)
(m)
25.2 243.84 51.68
25.2 252.984 41.67
25.2 262.128 31.87
12.6 265.176 28.35
0 260.604 33.19
6.3 256.032 38.23
6.3 252.984 41.58
6.3 249.936 45.34
12.6 248.412 46.52
6.3 246.888 47.24
6.3 245.364 49.3
6.3 257.556 35.58
6.3 256.032 36.94
6.3 259.08 33.65
12.6 262.6 30.59
6.3 254.508 39.35
126 240.792 54.39
157.5 249.936 45.31
0 246.888 48.55
453.6 P minima = 28.35
P maxima = 54.39