Professional Documents
Culture Documents
Found กำแพงกันดิน 2BW PDF
Found กำแพงกันดิน 2BW PDF
203352
..
www.eng.ku.ac.th/~ce
22 2553 4 1
Cantilever
2-8
15 Cantilever
. (Stem)
. (Base)
(Key)
22 2553 4 2
.. 1
203352
0.30
EL. +8.50
t = 1.80 T/cu.m.
7.00
c = 0.0 T/sq.m..
= 30o
4.00
1.00 2.10
EL.+1.50
0.80 c = 2.0 oT/sq.m..
t = 1.60 T/cu.m. = 25
EL. 0.00
t = 2.00 T/cu.m.
c = 5.0 T/sq.m.. = 35 o
.. 2
203352
(1-2)
1.
2. (Base Sliding)
22 2553 4 5
R
F .S . =
(Pa Pp )
R = = c.B. + V. tan
V =
F.S. > 1.5
> 2.0
22 2553 4 6
.. 3
203352
(3)
3. (Overtuning)
22 2553 4 7
M R Pp h p + x v
F .S . = =
M o Pa ha
MR = A ,
,
MO = A
F.S. > 1.5
> 2.0
22 2553 4 8
.. 4
203352
4
4. (Bearing Stress)
(Toe) (Heel)
22 2553 4 9
5
5. (Overall Sliding)
Method of Slices
1.5
F.S. > 1.5
22 2553 4 10
.. 5
203352
(6-7)
6.
7.
22 2553 4 11
()
1. R.W
2. /
R.W.
3.
4.
5.
22 2553 4 12
.. 6
203352
fc = 165 ./ ..
fc = 2.4 / ...
fs = 1800 ./ ..
n = 10
k = 0.292
j = 0.903
R = 9.79
22 2553 4 13
()
1.
1 sin 25
Ka = = 0.406
1 + sin 25
1
Kp = = 2.464
k1
2.
t2 = t4 = 0.1 H = 0.7 .
22 2553 4 14
.. 7
203352
()
22 2553 4 15
()
3. (12)
19.905
F .S . =
9.287
= 2.143 > 1.5
22 2553 4 16
.. 8
203352
()
4. (3) (A)
= 107.22 -.
Mo = 18.403(2.33)
= 42.94 -.
107.22
F .S . =
42.94
= 2.497 > 1.5
22 2553 4 17
()
5.
B
qu = qNq + N
2
= 25 N = 7.0, Nq = 10
1.85(4.0)(7)
qu = 1.85(2)(10) + = 62.90 / ..
2
62.90
qa = = 25.16 / ..
2.5
22 2553 4 18
.. 9
203352
()
< qa
V 6 M
qmin =
BL BL2
= 2.79 / ..
> 0
: qu Correction
Factors
22 2553 4 19
6.
MA-A = 3.379 - .
VA-A = 3.379
MB-B = 31.302 - 1.699
= 29.633 -.
VB-B = 11.055
22 2553 4 20
.. 10
203352
3379
section A-A d = = 18.58 42 . Covering 8 .
9.79 1
3379
As = = 4.95 .. At
1800 0.903 0.42
section B-B d =
29633
= 55.02 62 . Covering 8 .
9.79 1
29633
As = = 29.41 ..
1800 0.903 0.62
section B-B
11055
v = = 1.783
62 100
7.
Section C-C
MC-C = 7.819 / .
VC-C = 13.420
7819
d = = 28.26 . 60 .
9.75 1
7819
AS = = 8.02 .. At
1800 0.903 0.60
At = 0.0025(60x100) = 15.0 ..
13420
v = = 2.24 < 3.75
60 100
22 2553 4 22
.. 11
203352
section D-D
M DD = 19.173 / ..
VDD = 13.673
19,173
d = = 44.34 60 .
9.75 1
19173
As = = 19.66 ..
1800 0.903 60
13673
v = = 2.279 < 3.75
60 100
22 2553 4 23
1. Cantilever Retaining Wall
2. F.S.
3. (Stem)
EL. +7.00
5.00
sat = 2.00 T/cu.m.
c = 0.0 T/sq.m..
= 30
EL.+2.00
2.00
EL. 0.00
.. 12
203352
3.00
A A
Backfill Soil
5.80 t
= 2.00 t/cu.m.
= 33
c = 0.00 t/sq.m.
Backfill Soil
= 2.00 t/cu.m. 1.50
t
= 33
Foundation Soil
t
= 2.10 t/cu.m.
L
= 35
c = 2.00 t/sq.m.
Key wall
Counterfort Wall
22 2553 4 26
.. 13
203352
Counterfort Wall
Counterfort Wall
8 Counterfort
Cantilever
,
Counterfort
22 2553 4 28
.. 14
203352
Counterfort
22 2553 4 29
Buttress Wall
22 2553 4 30
.. 15
203352
T-Beam Assumption
22 2553 4 31
Counterfort Wall
22 2553 4 32
.. 16
203352
Counterfort Wall
22 2553 4 33
Slurry Wall
22 2553 4 34
.. 17
203352
22 2553 4 36
.. 18
203352
22 2553 4 38
.. 19
203352
1.
2.
3.
1. Section Modulus
2.
3.
22 2553 4 39
.. 20
203352
kg./m of kg./m2 of
( mm.) (mm.) (mm.) (cm2/m.) (cm4/m.) (cm3/m.) (m2/m.)
single pile wall
PAL 30 30 660 89 3 37.5 19.4 29.4 500 112 0.80
PAL 30 40 660 90 4 49.9 25.8 39.2 666 147 0.80
PAL 30 50 660 91 5 62.2 32.2 48.8 831 181 0.80
.. 21
203352
22 2553 4 44
.. 22
203352
22 2553 4 45
1. = (H) + (D)
2. = Section Modulus
3. (Ap)
L
Ap
H H
D D
.. 23
203352
Cantilever
Cantilever
1
Pa = K a . ( H + D )2 ---( 1 )
2
1 ---( 2 )
Pp = K p .D 2
M @ E = 0 ; 2
D ( H + D) H 3 Ka / K p
Pp . - Pa =0 D= ---( 3 )
3 3
1 3 Ka / K p
1
Kp = (3) K 2/3
Ka D = H a 2/3 ---( 4 )
1 K a
FH = 0 PE = P p Pa ---( 5 )
D 20%
22 2553
D, PE S.F.D. B.M.D.
4 48
.. 24
203352
Free Earth
Fixed Earth Support
(a) free earth support method (b) fixed earth support method
22 2553 4 50
.. 25
203352
(a) free earth support method (b) fixed earth support method
.. 26
203352
22 2553 4 53
(2) D D Pa
Pp D (2) D ( D
20% Pp F.S. = 2.0 Pp )
D () Pa Pp (1) Ap
S.F.D. B.M.D.
22 2553 4 54
.. 27
203352
1.
1 sin
Ka = = 0.490, K a = 0.700
1 + sin
1 + sin
Kp = = 2.040, K p = 1.428
1 sin
22 2553 4 55
22 2553 4 56
.. 28
203352
M @ B = 0
5 + D 0.882 2
2.45(5 + D ) 1 + (5 + D )2 (5 + D ) 1
2 2 3
5 + D 3.672
= 1.4(5 + D ) 1 + (D )2 2 D + 4 + 2.856(D ) D + 4 ---( 6 )
2 2 3 2
(6) D Trial
D 3.0 .
22 2553 4 57
FH = 0
---( 7 )
2
0.882
Ap = 2.45(5 + D ) + (5 + D )2 1.4(5 + D ) 3.672 D 2.856 D
2 2
Ap = 11.532
22 2553 4 58
.. 29
203352
x Max. B.M.
x2
1.05 x + 0.882 11.532 = 0
2
X = 4.06 .
= 16.80 -.
22 2553 4 59
M 1680000
Section Modulus =
fs
=
1400
= 1200 .3 / .
fps = 22.3 .3 / .
PZ27, S = 30.2 3 /
22 2553 4 60
.. 30
203352
.. 31
203352
22 2553 4 63
Unknown 3
AP, PE, D
2
FH = 0, M = 0
Structural Indeterminate
2 F (Point of
Contraflexure) (Hinge) PF
F 0.1 (H)
2
22 2553 4 64
.. 32
203352
Indeterminate Structures
3- Unknowns AP, PE, D
2- Equations FH = 0, M = 0
22 2553 4 65
Unknown AP, PF
M @ B = 0 2 2
PF [(1.1) H H a ] = Pa1 1.1H H a Pp1 H H a + 0.1H ---( 4 )
3 3
(4) PF (3) AP
Unknown D, PE
M @ E = 0 PF ( D 0.1H ) + Pa 2 ( ha 2 ) Pp 2 ( h p 2 ) = 0 ---( 5 )
(5) D D
S.F.D. B.M.D.
20%
22 2553 4 66
.. 33
203352
3
. (Tie Rod)
. (Anchor Size)
. (Anchor Location)
22 2553 4 67
. . Grouting Rod
. Grouting Rod
.
22 2553 4 . 68
.. 34
203352
22 2553 4 69
()
PB = Kp..HA.(HB.T) ---( 8 )
T =
H
FB = s H A B + C H B LB T tan
---( 9 )
2
C =
PB + FB ---( 10 )
F .S . = F.S 2.0
AP
22 2553 4 70
.. 35
203352
Grouting Rod,
22 2553 4 71
()
---( 11 )
F = .DL H A tan
F = .DL c ---( 12 )
F 2.5
---( 13 )
F .S . =
AP
22 2553 4 72
.. 36
203352
Ap
Cp Tp
22 2553 4 73
2
- Tie Rod
- Passive Wedge Active Wedge
22 2553 4 74
.. 37
203352
.. 38
203352
22 2553 4 77
(F.S)
1.2 1.5
22 2553 4 78
.. 39
203352
1. (D)
2. Moment Shear
3. Moment Shear Wall
Beam
4. Compression
22 2553 4 79
()
.
22 2553 4 80
.. 40
203352
()
- (Peak 1969)
Peak (Strut)
65%
22 2553 4 81
()
22 2553 4 82
.. 41
203352
()
- (Terzaghi Pack 1967)
22 2553 4 83
()
- (Terzaghi Peck 1967)
22 2553 4 84
.. 42
203352
BASE HEAVING
(Heaving)
2
1. (Principal Stresses)
I II
22 2553 4 85
BASE HEAVING ()
I , UCS (Principal Stress)
H = qu ---( 14 )
I I,
v = 2qu ---( 15 )
---( 16 )
qs = H
v 2qu
F .S . = = ---( 17 )
s H
22 2553 4 86
.. 43
203352
BASE HEAVING ()
2.
qu = cNc ---( 18 )
qs = H ---( 19 )
F .S . =
qu cNc
= ---( 20 )
qs H
5.14c
Nc = 5.14 F .S . =
H
---( 21 )
22 2553 4 88
.. 44
203352
Relieving Platform
Relieving Platform
22 2553 4 90
.. 45
203352
Relieving Platform ()
Relieving Platform
1. Sheet Pile Platform
2.
Platform (Overturning)
3.
4.
22 2553 4 91
Relieving Platform ()
Relieving Platform
22 2553 4 92
.. 46
203352
Relieving Platform ()
Relieving Platform ()
Relieving Platform
22 2553 4 94
.. 47
203352
www.eng.ku.ac.th/~ce
22 2553 4 95
, ,
.. 48