Pelimp.+Pengr.+Gor - Sil.+ B. Sadap Km. 4+706 BANG. SADAP (B.Kb.14) Km. 4+499 (B.Kb.15)

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

P.

85+25
P.85 6 P.8
0.00
1800
162 412
163 212
545
1601 845 161 797 1
155
340 X.4
16 161 560 1655 34
4 799 1600 9480

0
P.8 161 344 156 730 9 4 P.8

00.0
156 8
161 683 7
94
9 155 085 154 406

0
158 156 081 977 157

00.0
155 26 162 265 162 476

1500
1
1 57
05594

5
7 162 399 629 1 59 47

+2
161 162 15569 67256
16060 0 447

1498
29

19
0 2 0
35 155 4885 P.8

P.8
1 56

Y.9
94
161 162 017162
856 8

15 59 7 07
1 097 163 086

6 67
9 7
15
154 558

116 1 4 62 4
158

15 34

Y.9
818
0.00

9
15
160 163 15 70
15 8 7 7

285 160 4 49
1800

1
P.83

40
1
030
643 15 8 94 07
642
X.4

60
154 4 66 3
160

196
158
163
666 6

15569 148
154 549
478

U
160 38
161

159
U

9
16 664
1 1 8

1
16600 8 71

915
PELIMP.+PENGR.+GOR.SIL.+ B. SADAP

160
80609

159
BANG. SADAP (B.Kb.14) Km. 4+706 (B.Kb.15)
Km. 4+499

800.00

2
P.8

1558 2 10
154 4 71110
1 8 2
P.94

159 711

15 3 32 69
P.95

634

10 3
P.91 618

15
P.93 P.97

15 51 0
P.99

+21

8
Y . 9150
149 9 618 7

997
P.98

1 56 628
777
0 154 962

1556 4 446
P.90+26

968
P.9

P.81

4
14 75

15 56 8 3364
157 189 P.92 151 010 156 077

159

1 6 5
P.96 158 524

1 6
157 488 150 130151 465

15 4 7 14
156 2611

15
30

155
P.94+32

3 62
159
157 78
7 154 962 159 659

15577 73910 154 856

9
152 882 152

28
7

58 619
151 010 159 017 156 614
15 157 536 157 480 945

600.00

159 735
3

157 265 155


P.88 92 157 975 155 084 160 742

360
157 536 157 713 159 773 156 711 54
BANG. SADAP (B.Kb.13) P.89 7 38 157 480 157 975
155 013 1 54 74
2

P.81

01
497
157 713 156 766 156 263 151 296

927
15 8 0 328 156 948 157 429 157 588 156 615

P.1
15 54 3286 154 432 156 253 158 130 156 479 161 014 156 938 1 342

1576 455

731 1
157 515
Km. 4+043 160 405 154 778

159
158 707 157 010 159 56

154

265
158 897 91 4 35 0 154 546 154 432 157 093 155 862 438 155 177 156 350 1 17
158 707 54 15158 8 44 0158 276 154 601 156 128 157 164 156 549 155 862 155 578 4 1

Y . 9150
X . 4178 4 158 416 154 420 154 464 156 778 157 217

5
8 158 159 285

15
0 427 156 664 156 116 5
158 943 158 302 1 5 26 315 4 159 275 154 368 154 382 154 155 578 1 25

KM.4
159 293 038 154 445

154
00.00

160 323
8 43 58 158 416 159 462 157 226 155 008 158 890
00+

353
158 427 157 260
154 666 154 593 1554 433 1 158 109 156 881 156 154 445 159
P.1

1
159 293 888
154 666 1 4 14 159 462 784 158 432 159 501 P.100

160
154 750 15 8 1 15
155 388 158 109 156 881 156 784 159 898

400.00
15 8 6 580 158 432

0
161 664 15 58

P.8
158 334

36
161 871 159 016 1 5

5 0
64

15 6 66

0
160 869 158 630 7 0
P.77

1 7 311
15

15 5 0
15
+3

00.0
160 800

1557 6 610
158 630

Y . 9150
9

15 4 8336
P.8

15
BANG. SADAP (B.Kb.16)

15 83 3
BANG. SADAP (B.Kb.17)

7 4 3
156 07
0 P.78

66

1500
Km. 4+783 Km. 4+973

4
2

49
156 662 55

6 7
7

33
5 15 4 497

6 7
15

Y.9
159 05 155 33 7 1
15 2 54 02

15
4
6 1588 41 158 177 156 4415857 5 26222
P.7
4
15 41 0 158 097 10 8 1 5 .00
155 26 0 159 00 15158 4 84 45 0
1780
0
89 155 26
158 097 X . 4178
0 15 4 8 31717
X.4
5 154 873
15
3 15 9 70 4 154 873 158 02 4 15 8 3 00.00
5 81 158 673 154 96 4 15158
5 29
P.7 154 96 3
15 57 9 1790 1 86
4b
159 71 3

0
6 1 57 65 50 1588 28 3 7
15 28 15
b.1

00.0
80 1 54 6 8
1 54 89 159 462 84
4
1 72 0
15 7
B.K
1 7 75 159 160 089 15
4 15 8 4 0 9
4 81 158 99 9 P.7

1502
P.7 1 15 0
15 5 78 159 32
62 9 35
1 25 15 P.78+
15 57 4445

Y.9
684 1157 8

800.00
160 90
4 15 BANG. SADAP (B.Kb.12) 5
15 57 1
0.00 b.1
1780 .14b
684 1 5
160 65
5 56
15 5 5
Km. 3+773
X.4 P B.K
.Kb
Y . 9150
1844
15577 18
15
B DA
AN .SA

0
1 684
.+B

00.0
1546 901 a
15
.13 EW L

600.00
643
.Kb DI
H .SI

1504
156
.1 2a G B 3 AN OR 6 7
554
.Kb N 3b b.1 a TM c .14 a . +G b.1 b.1
A B.K 4 .14 Kb 5 B.K B.K

Y . 9150
b.1 GR

Y.9
X . 4176 b.1 b.1
SIL
156 B A
00.00
b.1
2
B.K P MP 423 .Kb P B. N P P
162 NG NG DA B.K 0.00 TE . 4+ N B DA B.K PE DA DA
RA B.K LA +908 .
SA AN A A AN P.+ SA SA
B.O 751 A SIL G. 043 AT 0 1780 Km AT 3 .S 9 AT 2 G. 783 G. 973
AP T .3 R. N MB 18 X.4 MB 45 NG 49 MB 63 L IM 706 N N
161 M
JE . 3+ AD Km GO BA . 4+ JE . 4+ JE . 4+ BA . 4+ JE . 4+ PE . 4+ BA . 4+ BA . 4+
.S +
Km ANG +773 X . 4176 UR 66 Km Km Km Km Km Km Km Km
160 B .3 00.00 AVO 3+9
.
Km Km
159

158

157

156

155
0 1 2 3 4 5 10 m

154
SKALA VERTIKAL 1 : 100

153 Rehab dinding saluran dan Rehab dinding saluran dan pondasi saluran Type 1 Type 2 Type 3
0 20 40 60 80 100 200 m
pondasi saluran beton cor K 175 setempat setempat dengan beton cor K 175

h w

h w

h w
SKALA HORISONTAL 1 : 2000
152

bidang persamaan 151 b b b


Tipe 1 Type 2
+150.000 m.
Hm 38 Hm 39 Hm 40 Hm 41 Hm 42 Hm 43 Hm 44 Hm 45 Hm 46 Hm 47 Hm 48 Hm 49
PATOK HEKTOMETER
75+28

P.75 P.76 P.77 P.78 P.78+35 P.79 P.80 P.81 P.81+21 P.82 P.83 P.83+25 P.84 P.85 P.85+25 P.86 P.87 P.88 P.89 P.89+30 P.90 P.90+26 P.91 P.92 P.93 P.94 P.94+32 P.95 P.96 P.97 P.98 P.99 P.100
NOMOR PROFIL
3723.00

3773.00

3823.00

3908.00

3923.00

3973.00

4022.00

4043.00

4072.00

4123.00

4148.00

4173.00

4223.00

4248.00

4273.00

4323.00

4373.00

4423.00

4453.00

4473.00

4499.00

4523.00

4573.00

4623.00

4674.00

4706.00

4723.00

4783.00

4823.00

4874.00

4923.00

4973.00
4180.00

4632.00
3751.0

3873.00

JARAK PROFIL/DISTANCE BETWEEN TWO PROFILE 28.00 22.00 50 50.00 35.00 50.00 49.00 21.00 29.00 51.00 25.00 25.00 50.00 25.00 25.00 50.00 50.00 50.00 30.00 20.00 26.00 24.00 50.00 50.00 51.00 32.00 60.00 40.00 51.00 49.00 50.00

154.55 156.47 156.25


154.908 156.817 156.890

154.650 156.883 157.179

155.260 157.198 157.343

155.125 157.032 157.101

154.873 156.752 156.647

154.845 156.586 156.642

154.590 156.660 156.584

154.619 156.494 156.856

154.711 156.404 156.493

154.938 156.404 156.549

154.629 156.445 156.344

154.856 156.432 156.447

154.923 156.589 156.683

155.035 156.367 156.730

154.762 156.371 156.406

154.452 156.331 156.488

154.666 156.269 156.468

154.593 157.135 156.302

154.433 157.040 157.095

154.328 158.356 157.078

154.546 156.248 156.948

154.432 156.197 156.271

154.601 156.238 156.253

154.420 156.303 156.379

154.368 156.125 156.128

153.564 157.193 157.164

154.038 156.142 156.623

154.057 156.013 156.068

155.008 156.763 156.778

155.177 157.116 157.125

154.778 156.718 156.699


156.85

154.37 156.13 156.13


154.964 156.556 157.742

154.833 156.651 156.721

154.856 156.432 156.447


YANG ADA

ELEVASI TANGGUL KIRI


156.85

ELEVASI TANGGUL KANAN

154.464
154.76

ELEVASI DASAR SALURAN PADA AS

ELEVASI TANGGUL
154.654 156.419

154.652 156.417

154.650 156.415
156.316

154.644 156.310

154.639 156.304

154.635 156.300

154.633 156.299

154.628 156.294
154.621 156.293

154.621 156.287

154.619 156.285
156.166

154.614 156.162

154.606 156.154

154.602 156.150

154.599 156.146
154.597 156.145

154.591 156.138

154.587 156.134

154.583 156.130

154.575 156.122

154.567 156.061

154.559 156.053

154.554 156.048

154.550 156.044

154.546 156.040
155.996

154.542 155.992

154.533 155.983

154.524 155.974
154.522 155.972

154.515 155.965

153.564 155.959

154.196 155.949

154.445 155.913

154.391 155.890

154.323 155.859

154.257 155.830

154.191 155.801
ELEVASI MUKA AIR RENCANA
RENCANA

154.409
ELEVASI DASAR SALURAN

TRACE SALURAN

TIPE BANGUNAN
Q v k
DIMENSI SALURAN DAN DATA TAMBAHAN b h w
m I A

Ruas 16 Ruas 17 Ruas 18 Ruas 19 Ruas 20 Ruas 21 Ruas 22


A = 3390.030 Ha A = 3385.900 Ha A = 3384.350 Ha A = 3384.350 Ha A = 3371.030 Ha A = 3367.650 Ha A = 3364.930 Ha

V = 0.629 m/dt V = 0.702 m/dt V = 0.785 m/dt V = 0.800 m/dt V = 0.817 m/dt V = 6.837 m/dt V = 2.166 m/dt
b = 5.000 m b = 5.000 m b = 4.700 m b = 5.000 m b = 5.000 m b = 5.000 m b = 5.000 m
h = 1.765 m h = 1.666 m h = 1.547 m h = 1.494 m h = 1.450 m h = 1.450 m h = 1.610 m
m = 1.000 m = 0.850 m = 0.950 m = 0.850 m = 0.900 m = 1.000 m = 0.000
w = existing w = existing w = existing w = existing w = existing w = existing w = existing
s = 0.000087 s = 0.000115 s = 0.000158 s = 0.000167 s = 0.000179 s = 0.012519 s = 0.001339

POTONGAN MEMANJANG SALURAN PRIMER KALIBAWANG


P.75 - P.100

You might also like