WISMA LIM FOO YONG

A) Additional documents required for submission purpose


Survey layout plan demarcating the existing nearby services

B) Scope of works:-

Works Time spend (Hours)


Authority liaison: -
- To check the submission requirements with
the relevant departments in DBKL
Liaison with contractor. -
Design & checking of the road and drainage -
design.
Drafting of road & drainage submission -
drawings.
Final inspection by DBKL. -
Post inspection DBKL submission (road -
handing-over and etc, if necessary).

Our scope does not include:


Any submission in relation to landscape works