SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - MAR 2013) Rev 7 31-Mar-13

SATR NUMBER DATE APPROVED QR NUMBER


SAUDI ARAMCO TEST REPORT
DG Set - Motor Insulation Resistance and Functional Testing SATR-P-3413 30-Apr-13 ELECT
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.

LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.

SCHEDULED TEST DATE & TIME ACTUAL TEST DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?

SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL

ITEM
TEST PROCEDURE ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-TEST DATE
No.

A. TEST PROCEDURE AND CHECKLIST

Check that the Generator set is provided with two ground pads welded to 17-SAMSS-518
A1
the skid on diametrically opposite corners. Sec 7.3.2

Check that the Generator rated 1250 kw and above has two platinum 17-SAMSS-518
A2
RTD per phase. Sec 7.3.4

Check that all parts of DG set are accessible for inspection and minor 17-SAMSS-518
A3
maintenance with out removal of enclosure or enclosure roof. Sec 7.4.1

Check and record the stator winding resistance phase to phase. SAES-P-113
A4
[NETA ATS, 7.15.1.2.4] Sec. 3.2

Measure and record the heater resistance. SAES-P-113


A5
[NFPA 70, NEC 110.3B] Sec. 3.2

Measure and record the resistance of RTD circuits ( use digital high SAES-P-113
A6
impedance meter). (NETA ATS, 7.15.1.2.12) Sec. 3.2

Measure and record the drive end and non-drive end bearing insulation SAES-P-113
A7
resistance. [NFPA 70, NEC 110.3B] Sec. 3.2

Perform insulation-resistance tests. Record measurements for each


winding -to-ground by disconnecting and grounding the motor heaters,
RTD's & CT's. Test voltage shall be as per table below:

SAES-P-113
A8
Sec. 3.2

Perform Polarization Index test with megger by measuring the insulation


resistance and recording the test data. Correct readings to 50 degree C.
SAES-P-113
A9 Calculate P.I. and record value, expect minimum value no less than 2.0.
Sec. 3.2
Stop test and report findings to supervisor if lower value is found. [NETA
ATS, 7.15.1.2.2]

If the insulation resistance and PI test results are satisfactory, perform


high potential test recording test data and monitoring the leakage SAES-P-113
A10
current. Stop the test if leakage current starts increasing rapidly and Sec. 3.2
report to supervisor. [NFPA 70, NEC 110.3B]

Ground the motor leads after the test and discharge motor windings. SAES-P-113
A11
[NFPA 70, NEC 110.3B] Sec. 3.2

Verify the motor is ready to energize for no-load run test to measure and
record the followings:
a) Tightening of cable connection in box
b) Coupling is secured
c) Motor controller and auxiliary circuits have been tested and are
SAES-P-113
A12 working properly
Sec. 3.2
d) Motor heater circuits are working properly
e) Correct shaft rotation direction
f) Motor shaft rotates freely un-coupled
g) Visual inspection of motor casing
[NFPA 70, NEC 110.3B]

Page 1 of 4
SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - MAR 2013) Rev 7 31-Mar-13

SAUDI ARAMCO TEST REPORT SATR NUMBER DATE APPROVED QR NUMBER

DG Set - Motor Insulation Resistance and Functional Testing SATR-P-3413 30-Apr-13 ELECT
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

ITEM
TEST RESULTS ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-TEST DATE
No.

Start motor for 4 hour test run (Ref: Motor Manufacturer's Instructions)
a) Two hours- No mechanical load
b) Two hours- Mechanically loaded
Verify lubrication and ventilation systems are functioning correctly.
Measure and record the following values:
i) Voltage phase to phase
ii) Current in each phase SAES-P-113
A13
iii) Power factor Sec. 3.2
iv) Speed
v) Winding temperature
vi) Drive end and non-drive end bearing vibration & temperature
vii) Ambient temperature.
Stop the test if any abnormalities occur that would damage the motor.
[NFPA 70, NEC 110.3B]

If the no-load test is satisfactory, perform on-load test measuring items


SAES-P-113
A14 previously measured and record the test results.
Sec. 3.2
[NFPA 70, NEC 110.3B]

B. TEST EQUIPMENT AND MATERIALS CRITERIA

1. Digital / Analog Multimeter for Continuity Test.

2. Digital Earth Resistance Tester for Ground Resistance Test.

3. Record wet-and dry-bulb temperatures or relative humidity and temperature.

4. Megger Tester

5. Testing Equipment calibration shall not exceed twelve months.


(Schedule Q, Atta. IV Sec. 7.1)

C. TEST RESULT

INSULATION RESISTANCE

Insulation Resistance test:

Megger Voltage 500/1000/2500/5000: _____________ Ambient temperature: ______________

MEGOHMS M POLARIZATION INDEX

Insulation Resistance 1 minute 10 minutes

Phase 1 to 2

Megger Tester Phase 2 to 3


Brand: ______________
Phase 3 to 1
S/N: ______________

Calib. Date:___________ Phase 1 to Ground

Phase 2 to Ground

Phase 3 to Ground

Use 500 Volt Megger for this Test

D. E. Bearing

N.D.E. Bearing

Winding Temp. C 0 10 20 30 40 50 60 70 80 90 100 110

Kt 0.03 0.06 0.12 0.25 0.5 1 2 4 8 16 32 64

Correct for 50C. Rc=Kt x Rt; Rc=insulation resistance corrected to 50C, Rt=insulation resistance at temp "t",

Kt=insulation resistance temp coefficient at temp "t". Polarization Index=Insulation resistance at

10min/1min= __________ mega-ohms/ __________mega-ohms= ___________

Page 2 of 4
SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - MAR 2013) Rev 7 31-Mar-13

SAUDI ARAMCO TEST REPORT SATR NUMBER DATE APPROVED QR NUMBER

DG Set - Motor Insulation Resistance and Functional Testing SATR-P-3413 30-Apr-13 ELECT
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

ITEM
TEST RESULTS ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-TEST DATE
No.

Motor acceptable insulation resistance at 50C

MOTOR RATED VOLTAGE 13,800 4,000 2,400 460

MINIMUM INSULATION RESISTANCE (M) 15 5.5 3.5 1.5

The minimum acceptable polarization index for class B and F insulation is 2.0, however higher values are preferred.

Stator winding resistance in micro-ohms. Measured phase to phase with wye point connected then each phase is measured with the wye

point open and the motor leads separated.

PHASE A to B PHASE B to C PHASE C to A PHASE A PHASE B PHASE C

Motor Heaters:

Insulation Resistance _____________mega-ohms, Continuity _____________ohms

Voltage _____________volts, Current ______________amps.

RTD continuity measurement

Ohm-meter Winding RTD number and location Resistance measured with a digital high impedance ohmmeter
Brand: ______________
1
S/N: ______________

Calib. Date:___________ 2

DC HIGH POTENTIAL TEST

Time DC Test Volts Leakage current; micro-amps

2300 rated motor 4000 rated motor 13200 rated motor


Minutes Phase 1 Phase 2 Phase 3
volts volts volts
1 2300 3700
2 2300 3700
3 2300 3700
4 2300 3700
5 2300 3700
6 2300 3700
7 2300 3700
8 2300 3700
9 2300 3700
10 2300 3700
11 2800 4400
12 3300 5100
13 3800 5900
14 4300 6600
15 4800 7300
16 5300 8000
17 5800 8800
18 6300 9500
19 6800 10300
20 7000 11000

Test Voltage is 1.7 x [0.75 (2 x rated voltage + 1kV)]

Page 3 of 4
SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - MAR 2013) Rev 7 31-Mar-13

SAUDI ARAMCO TEST REPORT SATR NUMBER DATE APPROVED QR NUMBER

DG Set - Motor Insulation Resistance and Functional Testing SATR-P-3413 30-Apr-13 ELECT
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

ITEM
TEST RESULTS ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-TEST DATE
No.

D. CONCLUSION

ITEM
TEST RESULTS ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-TEST DATE
No.

Test results are acceptable and in accordance with Saudi Aramco Schedule Q
D1
Engineering Standards and contractual requirements. Sec. 1.3

REMARKS:

REFERENCE DOCUMENTS:
1. Schedule Q -- Quality Requirements (Pro Forma Contract), Contract Specific
2. Schedule G -- Material, Tools and Equipment (Pro Forma MP-IK-LS Contract), Contract Specific
3. 17-SAMSS-518 -- Diesel Generator Sets, 23 February 2011
4. SAES-P-113 -- Motors and Generators, 30 October 2012.
5. NFPA 70 -- National Electrical Code (NEC), 2011

NOTES:
1. Approved - Acceptable to the authority having jurisdiction (i.e., Saudi Aramco ID).
2. Identified - Recognizable as suitable for the specific application by a qualified testing laboratory (i.e., listing and/or labeling).

3. Listed - Equipment and materials included in a list published by an approved qualified organization concerned with evaluation of products or
services, that maintains periodic inspection of production of listed equipment or materials or periodic evaluation of services, and whose listing states
that the equipment, material, or services either meets appropriate designated standards or has been tested and found suitable for a specified
purpose.

4. Labeled - Equipment or materials to which has been attached a label, symbol, or other identifying mark of an approved qualified organization
concerned with product evaluation, that maintains periodic inspection of production of labeled equipment or materials, and by whose labeling the
manufacturer indicates compliance with appropriate standards or performance in a specified manner.

Contractor / Third-Party Saudi Aramco


Technician Performing Test* PMT Representative
Name, Title, Department, Test Performed Successfully and Results are Acceptable: T&I Witnessed QC Record Reviewed Work Verified
Company, Initials and Name, Initials and Date:
Date:
QC Inspector PID Representative
Witnessed Test Work / Rework May Proceed T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Supervisor Proponent and Others


Quality Record Approved: T&I Witnessed QC Record Reviewed Work Verified
Name, Organization,
Name, Sign and Date:
Initials and Date:

*Person Responsible for Implementation of Test and Analysis of Results Y = YES N = NO F = FAILED

Page 4 of 4