SATR-P-3413 Rev 7 Final
SATR-P-3413 Rev 7 Final
EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.
LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.
SCHEDULED TEST DATE & TIME ACTUAL TEST DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?
ITEM
TEST PROCEDURE ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-TEST DATE
No.
Check that the Generator set is provided with two ground pads welded to 17-SAMSS-518
A1
the skid on diametrically opposite corners. Sec 7.3.2
Check that the Generator rated 1250 kw and above has two platinum 17-SAMSS-518
A2
RTD per phase. Sec 7.3.4
Check that all parts of DG set are accessible for inspection and minor 17-SAMSS-518
A3
maintenance with out removal of enclosure or enclosure roof. Sec 7.4.1
Check and record the stator winding resistance phase to phase. SAES-P-113
A4
[NETA ATS, 7.15.1.2.4] Sec. 3.2
Measure and record the resistance of RTD circuits ( use digital high SAES-P-113
A6
impedance meter). (NETA ATS, 7.15.1.2.12) Sec. 3.2
Measure and record the drive end and non-drive end bearing insulation SAES-P-113
A7
resistance. [NFPA 70, NEC 110.3B] Sec. 3.2
SAES-P-113
A8
Sec. 3.2
Ground the motor leads after the test and discharge motor windings. SAES-P-113
A11
[NFPA 70, NEC 110.3B] Sec. 3.2
Verify the motor is ready to energize for no-load run test to measure and
record the followings:
a) Tightening of cable connection in box
b) Coupling is secured
c) Motor controller and auxiliary circuits have been tested and are
SAES-P-113
A12 working properly
Sec. 3.2
d) Motor heater circuits are working properly
e) Correct shaft rotation direction
f) Motor shaft rotates freely un-coupled
g) Visual inspection of motor casing
[NFPA 70, NEC 110.3B]
Page 1 of 4
SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - MAR 2013) Rev 7 31-Mar-13
DG Set - Motor Insulation Resistance and Functional Testing SATR-P-3413 30-Apr-13 ELECT
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR
ITEM
TEST RESULTS ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-TEST DATE
No.
Start motor for 4 hour test run (Ref: Motor Manufacturer's Instructions)
a) Two hours- No mechanical load
b) Two hours- Mechanically loaded
Verify lubrication and ventilation systems are functioning correctly.
Measure and record the following values:
i) Voltage phase to phase
ii) Current in each phase SAES-P-113
A13
iii) Power factor Sec. 3.2
iv) Speed
v) Winding temperature
vi) Drive end and non-drive end bearing vibration & temperature
vii) Ambient temperature.
Stop the test if any abnormalities occur that would damage the motor.
[NFPA 70, NEC 110.3B]
4. Megger Tester
C. TEST RESULT
INSULATION RESISTANCE
Phase 1 to 2
Phase 2 to Ground
Phase 3 to Ground
D. E. Bearing
N.D.E. Bearing
Correct for 50C. Rc=Kt x Rt; Rc=insulation resistance corrected to 50C, Rt=insulation resistance at temp "t",
Page 2 of 4
SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - MAR 2013) Rev 7 31-Mar-13
DG Set - Motor Insulation Resistance and Functional Testing SATR-P-3413 30-Apr-13 ELECT
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR
ITEM
TEST RESULTS ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-TEST DATE
No.
The minimum acceptable polarization index for class B and F insulation is 2.0, however higher values are preferred.
Stator winding resistance in micro-ohms. Measured phase to phase with wye point connected then each phase is measured with the wye
Motor Heaters:
Ohm-meter Winding RTD number and location Resistance measured with a digital high impedance ohmmeter
Brand: ______________
1
S/N: ______________
Calib. Date:___________ 2
Page 3 of 4
SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - MAR 2013) Rev 7 31-Mar-13
DG Set - Motor Insulation Resistance and Functional Testing SATR-P-3413 30-Apr-13 ELECT
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR
ITEM
TEST RESULTS ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-TEST DATE
No.
D. CONCLUSION
ITEM
TEST RESULTS ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-TEST DATE
No.
Test results are acceptable and in accordance with Saudi Aramco Schedule Q
D1
Engineering Standards and contractual requirements. Sec. 1.3
REMARKS:
REFERENCE DOCUMENTS:
1. Schedule Q -- Quality Requirements (Pro Forma Contract), Contract Specific
2. Schedule G -- Material, Tools and Equipment (Pro Forma MP-IK-LS Contract), Contract Specific
3. 17-SAMSS-518 -- Diesel Generator Sets, 23 February 2011
4. SAES-P-113 -- Motors and Generators, 30 October 2012.
5. NFPA 70 -- National Electrical Code (NEC), 2011
NOTES:
1. Approved - Acceptable to the authority having jurisdiction (i.e., Saudi Aramco ID).
2. Identified - Recognizable as suitable for the specific application by a qualified testing laboratory (i.e., listing and/or labeling).
3. Listed - Equipment and materials included in a list published by an approved qualified organization concerned with evaluation of products or
services, that maintains periodic inspection of production of listed equipment or materials or periodic evaluation of services, and whose listing states
that the equipment, material, or services either meets appropriate designated standards or has been tested and found suitable for a specified
purpose.
4. Labeled - Equipment or materials to which has been attached a label, symbol, or other identifying mark of an approved qualified organization
concerned with product evaluation, that maintains periodic inspection of production of labeled equipment or materials, and by whose labeling the
manufacturer indicates compliance with appropriate standards or performance in a specified manner.
*Person Responsible for Implementation of Test and Analysis of Results Y = YES N = NO F = FAILED
Page 4 of 4