Professional Documents
Culture Documents
Badroadinsalaya 1
Badroadinsalaya 1
Condition/Problem
- They fill up some of cement in the holes, but it could not be enough.
- Limit the weight of a car. To prevent rough road problem because a lot of time that big
- Fill up the holes with concrete inside the alley. To prevent accident that may occurs in
- Make sure to create the safety around the building in process. To prevent people get an
unexpected injury.
Method
1. The day that we going to start this project we need to contract with organization. We will
4. Start the process, working on the process and finish the process.
1 2 3 4 5 6
Contact Contract
with the with the
Organizati organizatio
on n
7 8 9 10 11 12 13
Gathering Gathering Check the Start the
the the location process
equipmen equipment
t
14 15 16 17 18 19 20
Continue Continue Finish up
the The The process
process process
21 22 23 24 25 26 27
28 29 30 31
Clarify:
There are some method that will actually work such as limiting the car weight, make the
pathways fit in the same level, fill up the hole with concrete and make the safety around the
construction site. To make these method more efficient, for limiting the car weight, they will get
fined if they enter the alley. For the pathway, if it on the same level water will be drain out better.
It will drain out at the end of the alley and in the front of the alley. For fill up the hole with
concrete, this method will fix the problem temporarily but it would extend the time until there is a
better method.