Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 14

KOLEJ KEMAHIRAN TINGI MARA

DIPLOMA IN PROCESS PLANT ENGINEERING TECHNOLOGY MECHANICAL

DPV 4042

PROJECT MANAGEMENT

ASSIGNMENT THEORY

AMAN SEKELUARGA MECHANICAL CLUB

KAMPUNG GONG LIMAU

GROUP MEMBERS: - MOHD FAKHRULLAH FARHAN BIN MOHD DALI

- MOHD HAIRIE BIN MOHD ROHALIN

LECTURER :

PROGRAM : MECHANICAL (DLM 4A)


1.1 Project Title
Aman Sekeluarga Mechanical will be held on 14th March 2017 at Kampung
Gong Limau. This event is a local community event launched by the State
Minister of Terengganu.

The main objective of the event is to clean the environment of the village of
Kampung Gong Limau from any unwanted rubbish. The budget for the event is
sponsored from the District Council of Kemaman.

1.2 Project Objectives

To strengthen the bonds between the villagers.


To establish a higher cooperation among the villagers.
To nourish a more healthy and cleaner attitude in each individual.
To brighten and improve the condition of the environment of Kampung
Gong Limau.
To eradicate any source of Aedes mosquito breeding grounds.

2.1 Gantts Chart

"AMAN SEKELUARGA MECHANICAL CLUB" KAMPUNG GONG LIMAU

2.2 Major Deliverables


Deliverable is a product or service that is given to your client. It has a due date
and is tangible, measurable and specific. It can be given to either an external or
internal customer and satisfies a milestone or due date that is created and
produced in the project plan. (What IS a deliverables in a project management,
http://smallbusiness.chron.com/deliverable-project-management-31615.html )

Community Work.
- All attendants will be group up equally to make 5 groups in total.
Each group will be given a specific task to accomplish by the
organizer, that is Group 1 will take care of the grave site, Group 2
will clean and clear up the drains, Group 3 will clean up the park,
Group 4 will clean and improve the village garbage disposal area
and lastly Group 5 will roam the village picking up any garbage along
the village streets.

Plant New Saplings.


- The new saplings will be given to each family in Kampung Gong
Limau that would be a total of 198 saplings. These saplings will be
planted near their house or a place nearby if possible. The place to
put the sapling is freely determined by the family. In addition, 20 new
sapling will be planted in the village park to further brighten the park
with more trees.

Local Soccer and Futsal Friendly.


- A friendly competition will be held in the village park. The number of
teams must be in even number and not be more than 4 teams with
player of 13 with 2 reserves for soccer. For futsal, team must not be
more than 6 with player of 5 or 6. This is done to ensure that the
game can be manage easily. The venue of the soccer match is held
on the village field while futsal is held on the local futsal centre.

Cooking Competition.
- The competition will be attend by the women. There will be 4 group
in total with 4 to 5 members in each group. For the competition, a
special judge will be invited that is, Chef Kamarol. Before undergo
the competition, a short briefing will be given to the competitors. The
ingredients and equipment will be given. The prize will be given to
the 1st, 2nd, 3rd while the other attendants will be given a consolation
prize.
Karaoke Competition
- The contest is open to all, but limited to the first 10 people. It will be
held during the prize giving ceremony the head village. The prize for
the competition is a hamper for the 1st, 2nd and 3rd place.

2.3 Project Priorities


Project prioritization appears when an organization has two or more either
independent or dependent (portfolio) projects that are performed in parallel. In
order to ensure the achievement of strategic goals and objectives, that organization
needs to focus on right projects among the variety. (Project Prioritization Process :
Definition And Ranking Criteria, http://www.mymanagementguide.com/project-
prioritization-process-definition-and-ranking-criteria/)

Performance (Scope)
Preparation for 37poor families. Each of the family will receive a gift that is
worth RM500.

Cost (Budget)
Equipment and tools must be prepared and estimated by team members to
ensure that cost is below RM1000. While food and beverages must be
below RM3000.

Time (Schedule)

7.00 am: Departure from KKTM Kemaman

7.30 am: Arrives at Kg. Gong Limau and register attendant for mechanical student

7.40 am: Get breakfast

8.00 am: Start aerobics exercise program with the Kg. Gong Limau resident.

9.00 am: Divide the group for cooperative activities

11.00 am: Start preparing for lunch while waiting for the State Minister of Terengganu

12.00 pm: The State Minister of Terengganu arrives at Kg. Gong Limau

12.30 pm: Lunch has been prepared and eat together with the State Minister of

Terengganu and resident of Kg. Gong Limau.

2.00 pm: State Minister of Terengganu gives speech and the next ceremony

3.00 pm: All the activities will start

4.30 pm: Evening meal has been prepared

5.20 pm: The distribution of prizes to the winners and fund RM500.00 for 37 poor

family at Kg, Gong Limau .

6.00 pm: Program has ended and the State Minister of Terengganu leaves and all the

participants clean the area.

6.45pm: Return back to KKTM Kemaman.


List for Food Ingredient and Beverages

No List for food ingredient Quantity Price per unit (RM) Total price (RM)
.
1 Rice 10 RM15.50 RM155.00
2 Cow 1 RM1200 RM1200
3 Chicken 15 RM16.00 RM240.00

4 Noodle 12 packs RM1.20 RM14.40


5 Vegetable RM10.00 RM10.00
6 Cooking Oil 8 bottles RM20.50 RM164.00
7 Drinking Water
- Syrup 3 bottle RM1.50 RM4.50
- Mineral
8 box RM10.00 RM80.00
Water
8. Kuih
- Donut 100 RM0.50 RM50.00
- Currypuff
100 RM0.50 RM50.00
9 Ice Cube 8 packs RM1.50 RM12.00
10 Watermelon 10 RM6.00 RM60.00
11 Saturated Milk 2 box RM30.00 RM60.00
12 Sugar 2 plastic RM40.00 RM80.00
bag
13 Milo 5 packs RM18.00 RM90.00
th
Note: The prize for the competitions on the 14 is a hamper that in total is RM500.00

Total prices of food and beverages is RM2299.90

List for Equipment

No List for equipment quantity Price per unit Total price


. (RM) (RM)
1 Canopies 2 RM150.00 RM300.00
2 Ball 4 RM25.00 RM100.00
3 Wheelbarrow 5 RM25.00 RM125.50
4 Broom 10 RM2.12 RM21.20
5 Shovel 10 RM2.12 RM21.20
6 Black plastic bag 2 pack RM2.2O RM4.40
7 Tools kit (first aid) 2 RM20.00 RM40.00
8 Table* 5 - -
9 Chair* 40 - -
10 Gloves 50 pairs RM5.00 RM250.00
Note: Tables and chairs will be acquired at the village community centre.

Total prices for equipment RM872.30

Menu

Breakfast : Fried noodles

Tea

Lunch : Rice

Beef curry

Fried chicken

Fried vegetables

Mineral and syrup water

Watermelon

Evening meal: Kuih

Milo

Priority Matrix Table


Work Breakdown Structure (WBS)

A work breakdown structure (WBS) is a key project deliverable that organizes the
team's work into manageable sections. WBS is an outline or map of the specific
project. A work breakdown structure starts with the project as the top level deliverable
and is further decomposed into sub-deliverables using an outline hierarchy. (Work
Breakdown Structure Purposes, http://www.workbreakdownstructure.com/ )
1. Charity at Kg. Gong
Limau

1.2 1.4 1.5


1.1 1.3 Plan
Estimate Plan
Planning activities Plan meals
budget equipment
used
1.2.1 1.4.1
1.1.1 1.3.1 Estimate
Discuss 1.5.1
Find place and Briefing budget for Contact
contact food leader of
ministry the village
1.1.2 1.3.2 1.4.2
Develop Divide
event group Buy food 1.5.2
1.2.2 needed
concept Budget for
Get fund the
1.3.3 equipment
1.4.3
1.1.3 Time for Prepare
Invitation 1.2.3 breakfast, food
Prepare lunch and
gift for the tea break
poor
1.1.4 families 1.4.4
Divide Provide
group menu and
schedule

Organization Breakdown Structure (OBS)


The structure helps define the roles and responsibilities of the members of the
department, work group, or organization. It is generally a system of tasks and reporting
policies in place to give members of the group a direction when completing projects. A
good organizational structure will allow people and groups to work effectively together
while developing hard work ethics and attitudes. (Four Basic Elements in an
Organizational Structure, http://smallbusiness.chron.com/four-basic-elements-
organizational-structure-288.html)

Project
Manager

Operation
General
al
Manager
Manager

Treasurer
Project ON Nodes

Project ON Nodes is a visual representation of a projects schedule. Well known


complements to network diagrams. It useful for planning and tracking the project from
beginning to finish. It represents a projects critical path as well as the scope for the
project. (Ronda Bowen, What are network diagram,
http://www.brighthubpm.com/project-planning/12712-connecting-a-projects-parts-with-
a-network-diagram/, 19/5/2010)

F I J K
B

A D E

C G L M
H
N

A PLAN EVENT
B ORGANIZE ACTIVITIES
C CHOOSE PLACE
D CONTACT VILLAGE LEADER
E PLAN BUDGET
F BUDGET FOR MEAL
G BUDGET FOR EQUIPMENT
H RETRIEVE AND SET UP EQUIPMENT
I PLAN MEAL
J LIST OF MENU
K PREPARE FOOD
L BREAKFAST
M EXERCISE (AEROBIC)
N COMMUNITY WORK
O SPEECH FORM STATE OF MINISTRE OF TERENGGANU
P LUNCH
Q SPORTS AND ACTIVITIES
R EVENING MEAL
S GIVE PRIZE AND CHARITY

You might also like