Putrajaya - 2C1: Retaining Wall
Putrajaya - 2C1: Retaining Wall
Putrajaya - 2C1: Retaining Wall
hw = 0 mm
t0 = 325 mm OK
t2= 0 mm
0.7H = 4270 mm
Loading Data
Soil Data
DESIGN CRITERIA
COMPUTATION
L3 = 5300 mm
H1 = 4700 mm
H2 = 1400 mm
W1 = 42.90 kN b
W2 = 18.15 kN
W3 = 76.32 kN P1 H1
W4 = 366.40 kN w1 WT w4
W5 = 0.00 kN
w2 P2 H2
Active Forces w3 Pw
Soil Pressures
P1 = 69.95 kN
P2 = 44.68 kN
V1 = 0.00 kN
V2 = 0.00 kN
Resultant
P= 114.63 kN
V= 0.00 kN
Surcharge
Ps = 20.33 kN
Vs = 0.00 kN
Water
Pw = 9.61 kN
Eccentricity = 18.99 mm
INPUT DATA
2
Steel Yield Strength = 460 N/mm
Cover to reinforcement = 40 mm
Bar Diameter = 16 mm
STEM
Soil Pressures
P1 = 104.93 kN
P2 = 37.19 kN
P= 142.12 kN
Water Pressure
Pw = 3.14 kN
Surcharge Pressure
Ps = 27.50 kN
At the base
2 2
Area of steel required = 2800 mm Ast = 2800 mm
2 2
Min. steel required = 900 mm Ast = 900 mm
2
Shear stress = 0.47 N/mm
100As/bd = 0.51
2
Permissible conc. shear stress = 0.59 N/mm OK
2
Area of steel required = 1946 mm2 Ast = 1946 mm
Min. steel required = 840 mm2
2
Shear stress = 0.40 N/mm
100As/bd = 0.38
2
Permissible conc. shear stress = 0.54 N/mm OK
BASE SLAB
s1 95.94 kPa
s2 95.48 kPa
Top Steel
2
Area of steel required = 756 mm2 Ast = 900 mm
Min. steel required = 900 mm2
2
Shear stress = 0.18 N/mm
100As/bd = 0.16
2
Permissible conc. shear stress = 0.40 N/mm OK
2
Area of steel required = 778 mm2 Ast = 900 mm
Min. steel required = 900 mm2
100As/bd = 0.16
2
Permissible conc. shear stress = 0.40 N/mm OK
SHEAR KEY
2
Area of steel required = 0 mm2 Ast = 0 mm
Min. steel required = 0 mm2
2
Shear stress = 0.00 N/mm
100As/bd = 0.00
2
Permissible conc. shear stress = 0.00 N/mm NOT OK
EQ
7
EQ.
5 4
3 1
1 0 mm2
2 0 mm2
3 900 mm2
4 900 mm2
5 900 mm2
6 2800 mm2
7 1946 mm2
8 900 mm2