Professional Documents
Culture Documents
Sheikh Jaber Causeway Subcontract No.: KUSC-SC-S-0600: Activity/Task: Installation of Cable Tray
Sheikh Jaber Causeway Subcontract No.: KUSC-SC-S-0600: Activity/Task: Installation of Cable Tray
Onshore
c.) Use Proper and correct PPE for the said activity.
1 of 7
SHEIKH JABER CAUSEWAY
Subcontract No. : KUSC-SC-S-0600
b.) Do not use any kind of igniting tools any spark producing
Eletricians and operatives who are going materials and tools.
7 Working In confined space 3 3 9 M 3 1 3 L
inside confined space.
c.) Always follow the safe work on confined space.
8 Condition of working area All workers involved 3 2 6 M d.) Appropriate lighting to work area 3 1 3 L
2 of 7
SHEIKH JABER CAUSEWAY
Subcontract No. : KUSC-SC-S-0600
10 Heat stress/Heat stroke All workers involved 2 2 4 L B.) All workers to be advice minimum requirment of water 2 1 2 L
per day.
3 of 7
SHEIKH JABER CAUSEWAY
Subcontract No. : KUSC-SC-S-0600
Initial Risk
Residual Risk
(With existing Controls)
Significant Health and Saftey Hazard WHO or WHAT is at risk Mitigations / Controls Measures
Risk Risk
S L R S L R
Level Level
8 Condition of working area All workers involved 3 2 6 M d.) Appropriate lighting to work area 3 1 3 L
a.) Rest hours during peak hot time, seasonal project break
hours must be emplemented.
10 Heat stress/Heat stroke All workers involved 2 2 4 L B.) All workers to be advice minimum requirment of water 2 1 2 L
per day.
15 Site Engineer/Operatives
16 Electricians
17 Electricians
18 Electricians
19 Electricians
Onshore
Initial Risk
Residual Risk
(With existing Controls)
Mitigations / Controls Measures
Risk
S L R S L R
Level
All Operatives and Engineers(for New/coming for the First
S 2 3 6 Time on Site) must attend safety induction and go with 2 1 2
somebody who already know the site.
Onshore
Residual Risk
Risk
Level