Orsaiec

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 46

We are what we do,

always.
Excellence is not an act
but a habit
Aristotele
Registered Office and
Operative Unit
BRENDOLA (VI) - ITALY

Representative Office and


Operation Site
MUMBAI - INDIA

Registered Office: Via Vanderia, 12 36040 SAREGO (VI) ITALY


Operative Unit: Via Pacinotti, 4 36040 BRENDOLA (VI) ITALY
Representative Indian Office/Operation Site: A/209, Vardhaman Complex, LBS Marg, Vikhroli (W) MUMBAY 400 083 INDIA
2 Phone Italy: +39 0444 821506 Fax: +39 0444 740041 - Phone India: +91 9820334880
info@orsaiec.com www.orsaiec.com
A company in the world

orsaiec s.r.l. is a consolidate Private Company and it was born on 2010, on the solid expertise
base of its founder, Sartori Family, with the target of developing the projects for his
customer for systems, equipment and products for automotive and industrial batteries, for
INOX components and for PP (Polypropylene), PVDF (Polyvinylidine fluoride), PVC (polyvinyl
chloride) and PE (Polyethylene) components and accessories.

Thanks to continuous investments in tools and equipment, and with the collaboration of a good
number of companies, orsaiec s.r.l. is able to provide its customers the best solutions with
the most advanced technologies available on the international market.

On 2015, orsaiec s.r.l. has opened new horizons, with a representative agency in India,
based in Mumbai, and with a development of new equipment for acid, water, gas, oil platforms
and chemical treatment.

orsaiec s.r.l. is an international company with products in Asia, America, Europa and North
Africa.

We are a team be able to provide effective and competitive solutions to our


Customers for transforming the ideas into reality

Registered Office: Via Vanderia, 12 36040 SAREGO (VI) ITALY


Operative Unit: Via Pacinotti, 4 36040 BRENDOLA (VI) ITALY
Representative Indian Office/Operation Site: A/209, Vardhaman Complex, LBS Marg, Vikhroli (W) MUMBAY 400 083 INDIA
Phone Italy: +39 0444 821506 Fax: +39 0444 740041 - Phone India: +91 9820334880
3
info@orsaiec.com www.orsaiec.com
Registered Office: Via Vanderia, 12 36040 SAREGO (VI) ITALY
Operative Unit: Via Pacinotti, 4 36040 BRENDOLA (VI) ITALY
Representative Indian Office/Operation Site: A/209, Vardhaman Complex, LBS Marg, Vikhroli (W) MUMBAY 400 083 INDIA
4 Phone Italy: +39 0444 821506 Fax: +39 0444 740041 - Phone India: +91 9820334880
info@orsaiec.com www.orsaiec.com
Dreams, project and production

Technical and Production After Sales


Customer Technical Support
Business and
Dreams Project
Discussion Installation

Thanks to our staff we can realized all our customers ideas.

We design your systems, we can reorganize departments, designing new plants, in


these Project Steps:

Study of the Request,


Presentation of the First Draft,
Processing and Definition Project,
Project Approval

Orsaiec supports the customer from the drawing to the start up.

But we don t forget the client after the sale!!

We have a team of technician that answer to client request in 24/48 hours.

Registered Office: Via Vanderia, 12 36040 SAREGO (VI) ITALY


Operative Unit: Via Pacinotti, 4 36040 BRENDOLA (VI) ITALY
Representative Indian Office/Operation Site: A/209, Vardhaman Complex, LBS Marg, Vikhroli (W) MUMBAY 400 083 INDIA
Phone Italy: +39 0444 821506 Fax: +39 0444 740041 - Phone India: +91 9820334880
5
info@orsaiec.com www.orsaiec.com
Batteries

Environment

Water, Gas, Acid


Treatment

Analysis

Registered Office: Via Vanderia, 12 36040 SAREGO (VI) ITALY


Operative Unit: Via Pacinotti, 4 36040 BRENDOLA (VI) ITALY
Representative Indian Office/Operation Site: A/209, Vardhaman Complex, LBS Marg, Vikhroli (W) MUMBAY 400 083 INDIA
6 Phone Italy: +39 0444 821506 Fax: +39 0444 740041 - Phone India: +91 9820334880
info@orsaiec.com www.orsaiec.com
INDEX

1. BATTERIES
1.1 Formation Department

BATTERIES
Automatic Formation
Acid Filler
Water Bath Formation
Dumper
Acid Recirculation System
1.2 Acid Dilution
Automatic Acid Dilution
Acid Storage Tank
Electrolyte Storage Tank
Acid Cooling System
Acid Filtration and Titration System

ENVIRONMENT
1.3 GEL Technology
Slurry System
1.4 Tubular Plates Technology
1.5 Industrial Formation

2. ENVIRONMENT
2.1 Fume Treatment
Scrubber
Suction System
Ventilation piping
Waste water treatment

WATER, ACID
Waste water recovery

AND GAS
3. WATER, ACID AND GAS TREATMENT
3.1 PVDF/PP/PVC/INOX Mixer
3.2 PVDF/PP/PVC/INOX Dosing System
3.3 PVDF/PP/PVC/INOX Piping
3.4 PVDF/PP/PVC/INOX Manifold
3.5 PVDF/PP/PVC/INOX Tank
3.6 Welding TIG and plastic material

4. ANALISYS
ANALISYS

4.1 System for Probe Mounting


Immersion support straight with/without flange
Immersion support inclined
On line insertion TEE Probe Holder
Cleaning System
Accessories
4.2 Cabinet and sampling system

Registered Office: Via Vanderia, 12 36040 SAREGO (VI) ITALY


Operative Unit: Via Pacinotti, 4 36040 BRENDOLA (VI) ITALY
Representative Indian Office/Operation Site: A/209, Vardhaman Complex, LBS Marg, Vikhroli (W) MUMBAY 400 083 INDIA
Phone Italy: +39 0444 821506 Fax: +39 0444 740041 - Phone India: +91 9820334880
7
info@orsaiec.com www.orsaiec.com
Registered Office: Via Vanderia, 12 36040 SAREGO (VI) ITALY
Operative Unit: Via Pacinotti, 4 36040 BRENDOLA (VI) ITALY
Representative Indian Office/Operation Site: A/209, Vardhaman Complex, LBS Marg, Vikhroli (W) MUMBAY 400 083 INDIA
8 Phone Italy: +39 0444 821506 Fax: +39 0444 740041 - Phone India: +91 9820334880
info@orsaiec.com www.orsaiec.com
Batteries

1. BATTERIES
1.1 Formation Department
Automatic Formation
Acid Filler
Water Bath Formation
Dumper
Acid Recirculation System
1.2 Acid Dilution
Automatic Acid Dilution
Acid Storage Tank
Electrolyte Storage Tank
Acid Cooling System
Acid Filtration and Titration System
1.3 GEL Technology
Slurry System
1.4 Tubular Plates Technology
1.5 Industrial Formation

Registered Office: Via Vanderia, 12 36040 SAREGO (VI) ITALY


Operative Unit: Via Pacinotti, 4 36040 BRENDOLA (VI) ITALY
Representative Indian Office/Operation Site: A/209, Vardhaman Complex, LBS Marg, Vikhroli (W) MUMBAY 400 083 INDIA
Phone Italy: +39 0444 821506 Fax: +39 0444 740041 - Phone India: +91 9820334880
9
info@orsaiec.com www.orsaiec.com
1.1 FORMATION DEPARTMENT
BATTERIES

Automatic formation

Automatic department fully automatic is


composed:
Feeding conveyors with indexing unit
Batch preparation unit + inlet trolley
Water bath mod. WT X-A
Unloading trolley with conveyor
Multilevel warehouse
Acid level control and refiller

Or in two shot:
Dumper
Filling machine

FEEDING CONVEYORS WITH


INDEXING UNIT
To feed tanks a conveyor is necessary. The
conveyors are in different size, models and width
so to assure the complete length.
Are in stainless steel frame with guidelines and
wire for the safety stop-emergency.

BATCH PREPARATION UNIT + INLET TROLLEY


The loading trolley has the purpose to load the batteries that arrive from loading trolleys
into
formation tanks. It has a mainframe made of stainless steel AISI 316L tubulars that
embraces the battery transport conveyor. Trolley runs along special rails placed on the
conveyors.
The tank is selected by the operator in the pc management &
software. The job of the preparation unit and inserting is absolutely mandatory to have a
perfect disposition between batteries (should have a small constant space to let the water
flow).

Registered Office: Via Vanderia, 12 36040 SAREGO (VI) ITALY


Operative Unit: Via Pacinotti, 4 36040 BRENDOLA (VI) ITALY
Representative Indian Office/Operation Site: A/209, Vardhaman Complex, LBS Marg, Vikhroli (W) MUMBAY 400 083 INDIA
10 Phone Italy: +39 0444 821506 Fax: +39 0444 740041 - Phone India: +91 9820334880
info@orsaiec.com www.orsaiec.com
WATER BATHES MOD. WB 320
A certain No. of water bathes is necessary to a good performance on the plant.

BATTERIES
All the tanks are under control on the operative box following the instruction gave from the
plant manager. All process is recorded on the PC hard disk.
All the water bathes dimension will be tailored to plant necessity and moving batteries, let a
space between all lines so the water can easily flow on the sides, reducing the temperature.
On them a PT100 placed inside a battery in each row, check the acid temperature so to rise
the cool water inlet, the flow, and also, if necessary, automatically stop rectifiers.

UNLOADING TROLLEY WITH CONVEYOR


It moves automatically and unload the batteries at the exit of formation tank and place
themselves on the conveyor to go on warehouse multilevel or to finishing line.

ACID LEVEL CONTROL AND REFILLER


The acid level control machine has the purpose to check the acid level, minimum and
maximum, inside the battery.
Mainframe: electro-welded stainless steel AISI 316L that contains the operative head. The
frame is closed with panels and protections realized in according to standards CE

If the machine is completed with acid


refilling head, the battery acid level will
be adjusted.

On two shot double acid process- some


other machines are require:
Acid dumper
Acid refilled

And if necessary our acid collecting


and retitration plant.

Registered Office: Via Vanderia, 12 36040 SAREGO (VI) ITALY


Operative Unit: Via Pacinotti, 4 36040 BRENDOLA (VI) ITALY
Representative Indian Office/Operation Site: A/209, Vardhaman Complex, LBS Marg, Vikhroli (W) MUMBAY 400 083 INDIA
Phone Italy: +39 0444 821506 Fax: +39 0444 740041 - Phone India: +91 9820334880
11
info@orsaiec.com www.orsaiec.com
Acid Filler
BATTERIES

This equipment has the purpose to fill


the acid batteries to a predetermined
level and to verify the presence of the
acid inside the battery.
The number of operative heads
depends to productivity that customer
wants to reach.

Features:
Mainframe: electro-welded stainless
steel AISI 316L that contains the
operative heads.
The frame is closed with panels and
protections realized in according to
standards CE.

FILLING HEAD
It has six little heads with spouts in order to type of battery to work. A pneumatic
actuator for the ascent/descent of filling head.
Two hand wheels to adjust the wheelbase of spouts along Y axle, so its possible to work the
batteries type 3x2 and 6x1. The adjustments of little heads along X axle must do manually
by a screw. The filling head is also adjustable along Y axle in order to holes of battery. Its
possible to adjust the height of filling head by hand wheel.

Registered Office: Via Vanderia, 12 36040 SAREGO (VI) ITALY


Operative Unit: Via Pacinotti, 4 36040 BRENDOLA (VI) ITALY
Representative Indian Office/Operation Site: A/209, Vardhaman Complex, LBS Marg, Vikhroli (W) MUMBAY 400 083 INDIA
12 Phone Italy: +39 0444 821506 Fax: +39 0444 740041 - Phone India: +91 9820334880
info@orsaiec.com www.orsaiec.com
ACID FILLING AND LEVELLING
The acid is pumped constantly by centrifugal pump. A
three way valve, is the core of the machine: this grant

BATTERIES
the flux of the acid in the different directions, while a
pump create the vacuum inside the cells, sucking the
over-level acid and send it to the correct collecting
tank.
Apposite sensors control the complete process to grant
the filing.

Electrical panel of management of machine complete


with PLC Siemens S7 and operator interface panel.
Very fast and simples adjustment when changing type
or model of battery.

Sizes of battery to work: length from 175 to 510


mm, width from 165 to 260 m; height from 160 to
250 mm.
Productivity: from 2 to 10 batteries per minute.
Voltage: 380 V + neutral-50Hz.

Volumetric Acid Filler

AFV-2

This unit is the first real volumetric acid filler. It


works by the volume controls system applied by
orsaiec.

This unit with 2 heads is able to produce 8


batteries per minute type L3, with the accuracy
of 4 gr/kg.

Registered Office: Via Vanderia, 12 36040 SAREGO (VI) ITALY


Operative Unit: Via Pacinotti, 4 36040 BRENDOLA (VI) ITALY
Representative Indian Office/Operation Site: A/209, Vardhaman Complex, LBS Marg, Vikhroli (W) MUMBAY 400 083 INDIA
Phone Italy: +39 0444 821506 Fax: +39 0444 740041 - Phone India: +91 9820334880
13
info@orsaiec.com www.orsaiec.com
Water bath formation
BATTERIES

The Water Table is designed for the formation of automotive batteries Car and Truck and
Semitraction Batteries.
This water table has the capacity of 80 batteries per each formation cycle.
The loading batteries is manual, for push inside the batteries the water table is equipped
with the PE roller that reduce the push force at 0,5 kg the force that need for load the
batteries. When the table is loaded the door with the Up-Down movement can be closed
from two handle with eccentric movement.
With the SC option is an ideal water bath for the AGM Batteries Formation, thanks at
the water recirculation system that permit to mix and chill the water on board of the Water
Bath.

The water table is equipped with the hood and four lateral window for batteries connection
and for the inspection during the formation.
The windows and doors are equipped with micro-switch for the safety; when during the
formation the window is open the rectifiers stop to send the current (it changes from run to
halt its state).
When the window is closed, the rectifiers restart to send the current.

Dimension of the Water Bath:

Length: 5.250 mm. Width: 1.375 mm. Internal high: 300 mm.

Total High from the floor to the


chimney connection: 3.200 mm.

TECHNICAL DETAILS
Frame: Stainless Steel
Structure: PP Windows: PC Fume extraction: PPS
Electrical components: SIEMENS
Pneumatic components: SMC

Registered Office: Via Vanderia, 12 36040 SAREGO (VI) ITALY


Operative Unit: Via Pacinotti, 4 36040 BRENDOLA (VI) ITALY
Representative Indian Office/Operation Site: A/209, Vardhaman Complex, LBS Marg, Vikhroli (W) MUMBAY 400 083 INDIA
14 Phone Italy: +39 0444 821506 Fax: +39 0444 740041 - Phone India: +91 9820334880
info@orsaiec.com www.orsaiec.com
Dumper RVB

BATTERIES
RVB TYPES

The RVB** is designed for the dumping of the


Automotive Batteries.
This unit is developed integrally in Polypropylene
for all parts that are in contact with the acid to
reduce the possible acid contamination.

With three size of dumper we are able to satisfy all market request.

RVB-600: 12 batteries type L3 per


minute
RVB-400: 4 batteries type L3 per
minute
RVB-200: 2 batteries type L3 per
minute

Registered Office: Via Vanderia, 12 36040 SAREGO (VI) ITALY


Operative Unit: Via Pacinotti, 4 36040 BRENDOLA (VI) ITALY
Representative Indian Office/Operation Site: A/209, Vardhaman Complex, LBS Marg, Vikhroli (W) MUMBAY 400 083 INDIA
Phone Italy: +39 0444 821506 Fax: +39 0444 740041 - Phone India: +91 9820334880
15
info@orsaiec.com www.orsaiec.com
Acid Recirculation System
BATTERIES

The Acid Recirculation Batteries Formation is realized in Stainless Steel 316, and
Polypropylene High Impact. The ARSa is one the biggest sys to forms the Car and track
batteries with a short cycle time, 220Ah Truck in less of 10 hours. With the ARSa we supply
also the process to realize the perfect formation cycle designed on the Customers batteries
product.
The structure is designed for an easy loading/unloading of the battery.

It is possible to have configuration with the capacity of:


ARSa180: 10 independent circuits, acid preparation and scrubber on board
ARSa160: 08 independent circuits, acid preparation and scrubber on board
ARSa120: 06 independent circuits, acid preparation and scrubber on board
ARSa080: 04 independent circuits, acid preparation and scrubber on board

Registered Office: Via Vanderia, 12 36040 SAREGO (VI) ITALY


Operative Unit: Via Pacinotti, 4 36040 BRENDOLA (VI) ITALY
Representative Indian Office/Operation Site: A/209, Vardhaman Complex, LBS Marg, Vikhroli (W) MUMBAY 400 083 INDIA
16 Phone Italy: +39 0444 821506 Fax: +39 0444 740041 - Phone India: +91 9820334880
info@orsaiec.com www.orsaiec.com
1.2 ACID DILUTION

BATTERIES
Automatic Acid Dilution
ACID PREPARATION, from the lorry to the end user points

The Acid Preparation start from the 1860/1840 gr/l to arrive at each specific gravity
need. All in automatic, without any manual operation. It isnt works by a batch
preparation, but it is working just by an end user consumption. When the end user
starts to call the SG, the acid preparation starts to reintegrate the volume that was
called at the same gravity. The acid can be chilled at which temperature you need, by
direct exchanger or by a fast cooling just before to use it.

Per each tank you have only one


Specific gravity like per example:
1400 gr/l for the pasting
1100 gr/l for the formation
1330 gr/l after the dumping
1290 gr/l for the top off.

The preparation is under control by the


PLC program and the densimeter
instrument. This instrument is
manufactured under our specification
and with our target range of tolerance
that is 0.1 gr/l.

Structure: Stainless Steel 316 L


Body: PE; Graphite; PP, PVDF
Components: Siemens, SMC.
In optional: Allen & Bradley, Festo

Registered Office: Via Vanderia, 12 36040 SAREGO (VI) ITALY


Operative Unit: Via Pacinotti, 4 36040 BRENDOLA (VI) ITALY
Representative Indian Office/Operation Site: A/209, Vardhaman Complex, LBS Marg, Vikhroli (W) MUMBAY 400 083 INDIA
Phone Italy: +39 0444 821506 Fax: +39 0444 740041 - Phone India: +91 9820334880
17
info@orsaiec.com www.orsaiec.com
GEL TECHNOLOGY
BATTERIES

GEL

The GEL Acid Filler is designed for the initial filling of the GEL 6 and 12 Voltage Batteries.
This type of Unit is developed for give at the end User the possibility to configure it as per
his requirement, with the advantage that is possible to change the configuration after its
installation. With the single head configuration is possible to have the production capacity of
2 batteries per minute. With the double heads is possible to have 4 batteries per minute.
Is possible to use the filler as an Acid Leveling unit, for refill the batteries after the
formation.
With a huge range of possible configuration, we have the conviction that this is the BEST
Solution present on the market in this moment.

Registered Office: Via Vanderia, 12 36040 SAREGO (VI) ITALY


Operative Unit: Via Pacinotti, 4 36040 BRENDOLA (VI) ITALY
Representative Indian Office/Operation Site: A/209, Vardhaman Complex, LBS Marg, Vikhroli (W) MUMBAY 400 083 INDIA
18 Phone Italy: +39 0444 821506 Fax: +39 0444 740041 - Phone India: +91 9820334880
info@orsaiec.com www.orsaiec.com
1.3 TUBOLAR PLATE TECHNOLOGY

BATTERIES
We can supply all process for the Slurry Filling of the tubular plate for the DIN and BS
Standard in terms of:

Tubular Casting Machine


Continuously Slurry Preparation
Slurry preparation
Slurry Filling Desk Automatic or Semiautomatic
Dry Oven
Tunnel Oven.

Slurry System

Registered Office: Via Vanderia, 12 36040 SAREGO (VI) ITALY


Operative Unit: Via Pacinotti, 4 36040 BRENDOLA (VI) ITALY
Representative Indian Office/Operation Site: A/209, Vardhaman Complex, LBS Marg, Vikhroli (W) MUMBAY 400 083 INDIA
Phone Italy: +39 0444 821506 Fax: +39 0444 740041 - Phone India: +91 9820334880
19
info@orsaiec.com www.orsaiec.com
Slurry Preparation
BATTERIES

The slurry preparation is a system that permit to


prepare the active mass for the tubular positive plate.
The system is designed for mixing the PbO and the
Pb3O4 with deionized water and low quantity of SO4.
The advantage of the Slurry System is that the active
mass remains stable for a long time because there
isnt any sulfating of the oxide mixed, because this
suspension required a long time for worsen.
Another important point of the slurry is connecting to
the waste material generated by the drying just after
the filling of the plate: ALL THIS MATERIAL IS
RECYCLING INTO the next slurry preparation.

Slurry Filling Station

The slurry filling station is the unit


that is required for the filling of the
tubular plate with the slurry active
mass.
The station is completely in Stainless
Steel and the configuration are 2 as
describe here below.
The stations are very simple and very
easily to run in production with high
efficiency. The standard plate
production is 1400 per shift (Std. Plate
125Amp)
Easily changeover from DIN to BS and
vice versa and size by size. The
average time is not over 5 minutes

Registered Office: Via Vanderia, 12 36040 SAREGO (VI) ITALY


Operative Unit: Via Pacinotti, 4 36040 BRENDOLA (VI) ITALY
Representative Indian Office/Operation Site: A/209, Vardhaman Complex, LBS Marg, Vikhroli (W) MUMBAY 400 083 INDIA
20 Phone Italy: +39 0444 821506 Fax: +39 0444 740041 - Phone India: +91 9820334880
info@orsaiec.com www.orsaiec.com
1.4 INDUSTRIAL FORMATION

BATTERIES
WATER TANK

For Traction cells


For Stand-by cells

CTF-2: 2 Trays 24 cells


CFT-3: 3 Trays 24 cells
CTF-3a: 3 Trays 12 cells
CTF-4: 4 Trays 12 cells

CTF-* Specifications :
The CTF-* CONTAINERS are projected to
formed the Industrial Cells. The container
that we propose is projected to
accommodate inside it, 24 cells maximum
carrying on the Stainless Steel 316 trays.
According to the height of the elements to
load, in the tank are positioned 24 cells
maximum for each pallet, that will allow to
immerse in the water by a crane. Each
pallet is independent from the others,
therefore is possible to load elements of
different eight for each pallet.
The water-cooling system with automatic
control and handling, is provided of a
recycle system, with close-circuit pump, that permit to generate the correct turbulence for
cool the cells. On the water circuit is installed one heat-exchanger that permit to cool the
water at about 18C. This system it is that improves the water uniformity inside each
single sector, allowing the cooling process to be uniform on each element present in the
pallet.
The water temperature is controlled from a temperature-probe handled by a thermo
regulator that will add extra water in case of increase of temperature. A suction cup and
protection doors are included with the container. There are holes on the Cup, that will
allow the wires coming from the rectifier to be connected.
Technical Specification:
HPP, High Density Polypropylene tank
Coated Iron
PP cooling system and water recycling implant with automatic valves and stainless
steel pump aisi 316/L
Automatic temperature control by PT 100 probe
Suction pipe line for the fume extraction with sliding doors for the WBI only
Automatic control for the container water level
Control panel with Siemens or Allen Bradley PLC CE norm protection
V 400 / 50Hz

Registered Office: Via Vanderia, 12 36040 SAREGO (VI) ITALY


Operative Unit: Via Pacinotti, 4 36040 BRENDOLA (VI) ITALY
Representative Indian Office/Operation Site: A/209, Vardhaman Complex, LBS Marg, Vikhroli (W) MUMBAY 400 083 INDIA
Phone Italy: +39 0444 821506 Fax: +39 0444 740041 - Phone India: +91 9820334880
21
info@orsaiec.com www.orsaiec.com
Registered Office: Via Vanderia, 12 36040 SAREGO (VI) ITALY
Operative Unit: Via Pacinotti, 4 36040 BRENDOLA (VI) ITALY
Representative Indian Office/Operation Site: A/209, Vardhaman Complex, LBS Marg, Vikhroli (W) MUMBAY 400 083 INDIA
22 Phone Italy: +39 0444 821506 Fax: +39 0444 740041 - Phone India: +91 9820334880
info@orsaiec.com www.orsaiec.com
Environment

2. ENVIRONMENT
2.1 Fume Treatment
Scrubber
Suction System
Ventilation piping
Waste water treatment
Waste water recovery

Registered Office: Via Vanderia, 12 36040 SAREGO (VI) ITALY


Operative Unit: Via Pacinotti, 4 36040 BRENDOLA (VI) ITALY
Representative Indian Office/Operation Site: A/209, Vardhaman Complex, LBS Marg, Vikhroli (W) MUMBAY 400 083 INDIA
Phone Italy: +39 0444 821506 Fax: +39 0444 740041 - Phone India: +91 9820334880
23
info@orsaiec.com www.orsaiec.com
2.1 FUME TREATMENT

Scrubber
GENERAL INFORMATION:
The SCR** is for the fumes extraction and treatment for
deployment in the formation room. Manufactured entirely in
PE and reinforced where necessary, this scrubber is
normally installed in or close to the formation room. It is
complete with an independent ventilator fan, water pump,
level controls and electrical control panel. The SCR** is
ENVIRONMENT

composed of three principal parts.


The upper part contains the drop separators and is used to
separate the suspended drops in airflow before the clean air
is expelled into the ambient.
The second part, located below the drop separator
compartment, is where water is sprayed onto the air being
sucked up towards the fan.
The third area is located at the bottom and is where the
water is stored and pumped back up to filter the air.

PROCESS OPERATION:
Dirty air arriving from the formation
room is introduced into the lower
part of the scrubber.
Based on the internal configuration
(applied during construction), the
air is drawn upwards into the mist of
water generated using a water
pump and a set of sprinkler. This
demister effectively covers all the
rising air and drags the particles of
suspended dust towards the water
tank located at the bottom. This
mist passes through the drop
separator section where
condensation occurs and the drops
unite and run back down to the
water tank. The water pump
continuously circulates the water in
the scrubber and is hardwired into
the fan controls.

CENTRIFUGAL WATER PUMP: TECHNICAL CHARACTERISTICS


Mechanical Seal type pump in stainless SCR**
steel 316 L Structure: industrial High
PP. Station Logic: Electro-
PIPES LINES CONNECTION: mechanical Components: SIEMENS
All pipes line connections are dimensioning Emission Level 1 PPM
with ATEX Norms, for have the maximum
working efficiency and the best long life. Safety guards compliant with European
Pipes, Fitting, Connections point: all in Health and Safety regulations.
industrial
PPS only.

Registered Office: Via Vanderia, 12 36040 SAREGO (VI) ITALY


Operative Unit: Via Pacinotti, 4 36040 BRENDOLA (VI) ITALY
Representative Indian Office/Operation Site: A/209, Vardhaman Complex, LBS Marg, Vikhroli (W) MUMBAY 400 083 INDIA
24 Phone Italy: +39 0444 821506 Fax: +39 0444 740041 - Phone India: +91 9820334880
info@orsaiec.com www.orsaiec.com
**The number after the denomination are the cubic meter per hour: SCR 50 is one
complete scrubber for 50 cubic meter per hour of air treatment capacity.

Some different models and technologies are available:


Static bed
Floating spheres
Also different concepts are state of the art
on manufacturing:
Blowing
Aspirating

The neutralization of all the gases present on air is done with our special engineered system
that grant a top quality result thanks to our own engineering philosophy.

ENVIRONMENT
Top quality aspiration system
Top quality air blowing and distribution
Top quality spraying nozzles and shape
Top quality concentration/cleaning element, different shape, different dimendions and
positioning
Top quality water filtration, levelling and distribution
Top quality ph measuring and neutralization
system
Top quality manufacturing, with highest plastic materials and components.
Reinforced anti-implosion systems.

Registered Office: Via Vanderia, 12 36040 SAREGO (VI) ITALY


Operative Unit: Via Pacinotti, 4 36040 BRENDOLA (VI) ITALY
Representative Indian Office/Operation Site: A/209, Vardhaman Complex, LBS Marg, Vikhroli (W) MUMBAY 400 083 INDIA
Phone Italy: +39 0444 821506 Fax: +39 0444 740041 - Phone India: +91 9820334880
25
info@orsaiec.com www.orsaiec.com
Ventilation piping
The ventilation piping is in PP or PPS.
ENVIRONMENT

Registered Office: Via Vanderia, 12 36040 SAREGO (VI) ITALY


Operative Unit: Via Pacinotti, 4 36040 BRENDOLA (VI) ITALY
Representative Indian Office/Operation Site: A/209, Vardhaman Complex, LBS Marg, Vikhroli (W) MUMBAY 400 083 INDIA
26 Phone Italy: +39 0444 821506 Fax: +39 0444 740041 - Phone India: +91 9820334880
info@orsaiec.com www.orsaiec.com
Waste water treatment and recovery
Piping and Tube Collectors for:
Waste Water Treatment
Civil Water Distribution
Chemical transportation and dosing

ENVIRONMENT

Registered Office: Via Vanderia, 12 36040 SAREGO (VI) ITALY


Operative Unit: Via Pacinotti, 4 36040 BRENDOLA (VI) ITALY
Representative Indian Office/Operation Site: A/209, Vardhaman Complex, LBS Marg, Vikhroli (W) MUMBAY 400 083 INDIA
Phone Italy: +39 0444 821506 Fax: +39 0444 740041 - Phone India: +91 9820334880
27
info@orsaiec.com www.orsaiec.com
Registered Office: Via Vanderia, 12 36040 SAREGO (VI) ITALY
Operative Unit: Via Pacinotti, 4 36040 BRENDOLA (VI) ITALY
Representative Indian Office/Operation Site: A/209, Vardhaman Complex, LBS Marg, Vikhroli (W) MUMBAY 400 083 INDIA
28 Phone Italy: +39 0444 821506 Fax: +39 0444 740041 - Phone India: +91 9820334880
info@orsaiec.com www.orsaiec.com
Water, acid and gas treatment

3 WATER, ACID AND GAS TREATMENT

3.1 PVDF/PP/PVC/INOX Mixer


3.2 PVDF/PP/PVC/INOX Dosing System
3.3 PVDF/PP/PVC/INOX Piping and Manifold
3.4 PVDF/PP/PVC/INOX Tank
3.5 Welding TIG and pastic material

Registered Office: Via Vanderia, 12 36040 SAREGO (VI) ITALY


Operative Unit: Via Pacinotti, 4 36040 BRENDOLA (VI) ITALY
Representative Indian Office/Operation Site: A/209, Vardhaman Complex, LBS Marg, Vikhroli (W) MUMBAY 400 083 INDIA
Phone Italy: +39 0444 821506 Fax: +39 0444 740041 - Phone India: +91 9820334880
29
info@orsaiec.com www.orsaiec.com
3.1 PVDF/PP/PVC/INOX MIXER
WATER, ACID
AND GAS

3.2 PVDF/PP/PVC/INOX DOSING


SYSTEM

Registered Office: Via Vanderia, 12 36040 SAREGO (VI) ITALY


Operative Unit: Via Pacinotti, 4 36040 BRENDOLA (VI) ITALY
Representative Indian Office/Operation Site: A/209, Vardhaman Complex, LBS Marg, Vikhroli (W) MUMBAY 400 083 INDIA
30 Phone Italy: +39 0444 821506 Fax: +39 0444 740041 - Phone India: +91 9820334880
info@orsaiec.com www.orsaiec.com
3.3 PVDF/PP/PVC/INOX PIPING AND
MANIFOLD

WATER, ACID
AND GAS

Registered Office: Via Vanderia, 12 36040 SAREGO (VI) ITALY


Operative Unit: Via Pacinotti, 4 36040 BRENDOLA (VI) ITALY
Representative Indian Office/Operation Site: A/209, Vardhaman Complex, LBS Marg, Vikhroli (W) MUMBAY 400 083 INDIA
Phone Italy: +39 0444 821506 Fax: +39 0444 740041 - Phone India: +91 9820334880
31
info@orsaiec.com www.orsaiec.com
3.4 PVDF/PP/PVC/INOX TANK
WATER, ACID
AND GAS

Registered Office: Via Vanderia, 12 36040 SAREGO (VI) ITALY


Operative Unit: Via Pacinotti, 4 36040 BRENDOLA (VI) ITALY
Representative Indian Office/Operation Site: A/209, Vardhaman Complex, LBS Marg, Vikhroli (W) MUMBAY 400 083 INDIA
32 Phone Italy: +39 0444 821506 Fax: +39 0444 740041 - Phone India: +91 9820334880
info@orsaiec.com www.orsaiec.com
3.5 Welding TIG and Plastic Material

WATER, ACID
AND GAS

Registered Office: Via Vanderia, 12 36040 SAREGO (VI) ITALY


Operative Unit: Via Pacinotti, 4 36040 BRENDOLA (VI) ITALY
Representative Indian Office/Operation Site: A/209, Vardhaman Complex, LBS Marg, Vikhroli (W) MUMBAY 400 083 INDIA
Phone Italy: +39 0444 821506 Fax: +39 0444 740041 - Phone India: +91 9820334880
33
info@orsaiec.com www.orsaiec.com
Registered Office: Via Vanderia, 12 36040 SAREGO (VI) ITALY
Operative Unit: Via Pacinotti, 4 36040 BRENDOLA (VI) ITALY
Representative Indian Office/Operation Site: A/209, Vardhaman Complex, LBS Marg, Vikhroli (W) MUMBAY 400 083 INDIA
34 Phone Italy: +39 0444 821506 Fax: +39 0444 740041 - Phone India: +91 9820334880
info@orsaiec.com www.orsaiec.com
Analysis

4 ANALYSIS

4.1 System for Probe Mounting


Immersion support straight with/without flange
Immersion support inclined
On line insertion TEE Probe Holder
Cleaning System
Accessories
4.2 Auto sampler
4.3 Cabinet

Registered Office: Via Vanderia, 12 36040 SAREGO (VI) ITALY


Operative Unit: Via Pacinotti, 4 36040 BRENDOLA (VI) ITALY
Representative Indian Office/Operation Site: A/209, Vardhaman Complex, LBS Marg, Vikhroli (W) MUMBAY 400 083 INDIA
Phone Italy: +39 0444 821506 Fax: +39 0444 740041 - Phone India: +91 9820334880
35
info@orsaiec.com www.orsaiec.com
orsaiec s.r.l. from 2015 started with the production of pressurized cabinet, System for
probe mounting with certified material and wending, for the analysis of water, oil platforms
and chemical treatment.

All the plastic materials are certified as per standard UNI EN10204 certification 2.1 and 2.2,
and for the stainless steel material certification 3.1.
ANALISYS

Registered Office: Via Vanderia, 12 36040 SAREGO (VI) ITALY


Operative Unit: Via Pacinotti, 4 36040 BRENDOLA (VI) ITALY
Representative Indian Office/Operation Site: A/209, Vardhaman Complex, LBS Marg, Vikhroli (W) MUMBAY 400 083 INDIA
36 Phone Italy: +39 0444 821506 Fax: +39 0444 740041 - Phone India: +91 9820334880
info@orsaiec.com www.orsaiec.com
4.1 SYSTEM FOR PROBE MOUNTING

Immersion support straight


with/without flange
Code Family: S (with Flange)

ST (without flange)

This immersion support can be in different material, for the different liquid that you
use for.

We produce it in:

PP (Polyprpylene)
PVDF
PVC-U
PVC-C

The diameter of the immersion support can be:


D40 PN16
D50 PN16
D63 PN16
D75 PN16
The length of this immersion support can be max. 5000mm

Immersion support inclined


Code Family: SO

This immersion support can be in different material, for the different liquid

ANALISYS
that you use for.

We produce it in:

PP (Polyprpylene)
PVDF
PVC-U
PVC-C

The diameter of the immersion support can be:


D40 PN16
D50 PN16
D63 PN16
D75 PN16

The length of this immersion support can be max. 5000mm

Registered Office: Via Vanderia, 12 36040 SAREGO (VI) ITALY


Operative Unit: Via Pacinotti, 4 36040 BRENDOLA (VI) ITALY
Representative Indian Office/Operation Site: A/209, Vardhaman Complex, LBS Marg, Vikhroli (W) MUMBAY 400 083 INDIA
Phone Italy: +39 0444 821506 Fax: +39 0444 740041 - Phone India: +91 9820334880
37
info@orsaiec.com www.orsaiec.com
Online insertion TEE Probe
Holder
Code Family: T

The TEE can be in different material, for the


different liquid that you use for.

We produce it in:

PP (Polyprpylene)
PVDF
PVC-U
PVC-C
INOX 316L
PTFE

The sampler connection line can be:


D25 DN20
D32 DN25
D40 DN32

Cleaning System

Code Family: CL

The cleaning system is for the immersion probe type S or ST.


ANALISYS

The basic type is composed by: Sprinkler mounted on the adjustable


plate and manual valve.

It can be modified to customer requirements with:

- electrical box with fuses or Electrical


explosion proof box
- switch timer and electrical valve.
- PLC to frozen the I/O during the washing
cycle.

It is in PP and INOX316L.

Registered Office: Via Vanderia, 12 36040 SAREGO (VI) ITALY


Operative Unit: Via Pacinotti, 4 36040 BRENDOLA (VI) ITALY
Representative Indian Office/Operation Site: A/209, Vardhaman Complex, LBS Marg, Vikhroli (W) MUMBAY 400 083 INDIA
38 Phone Italy: +39 0444 821506 Fax: +39 0444 740041 - Phone India: +91 9820334880
info@orsaiec.com www.orsaiec.com
Accessories

FLOOR TELESCOPIC SUPPORT

Code Family: FTF

The FTF is in INOX316L.

It is for the immersion probe type SO, and it is predisposed for


piping size:

D40 PN16
D50 PN16
D63 PN16
D75 PN16

It can have an adjustable height and length.

WALL MOUNTED TELESCOPIC SUPPORT

Code Family: WTF

ANALISYS
The WTF is in INOX316L.

It is for the immersion probe, and it is predisposed for piping size:

D40 PN16
D50 PN16
D63 PN16
D75 PN16

It can have an adjustable length.

Registered Office: Via Vanderia, 12 36040 SAREGO (VI) ITALY


Operative Unit: Via Pacinotti, 4 36040 BRENDOLA (VI) ITALY
Representative Indian Office/Operation Site: A/209, Vardhaman Complex, LBS Marg, Vikhroli (W) MUMBAY 400 083 INDIA
Phone Italy: +39 0444 821506 Fax: +39 0444 740041 - Phone India: +91 9820334880
39
info@orsaiec.com www.orsaiec.com
HANDRAIL SUPPORT

Code Family: FC

The FC is in INOX316L.

It is for the immersion probe, and it is predisposed for piping size:

D40 PN16
D50 PN16
D63 PN16
D75 PN16

It can have a rotation of 90.

SUNROOF FOR ANALYSER

Code Family: SR

The SR is in INOX 316L but it also available in PP.

This sunroof for analyser and cleaning valve and it can be also
ANALISYS

explosion proof.

Registered Office: Via Vanderia, 12 36040 SAREGO (VI) ITALY


Operative Unit: Via Pacinotti, 4 36040 BRENDOLA (VI) ITALY
Representative Indian Office/Operation Site: A/209, Vardhaman Complex, LBS Marg, Vikhroli (W) MUMBAY 400 083 INDIA
40 Phone Italy: +39 0444 821506 Fax: +39 0444 740041 - Phone India: +91 9820334880
info@orsaiec.com www.orsaiec.com
4.2 CABINET AND SAMPLING SYSTEM

Autosampler

Wall sampling

ANALISYS

Registered Office: Via Vanderia, 12 36040 SAREGO (VI) ITALY


Operative Unit: Via Pacinotti, 4 36040 BRENDOLA (VI) ITALY
Representative Indian Office/Operation Site: A/209, Vardhaman Complex, LBS Marg, Vikhroli (W) MUMBAY 400 083 INDIA
Phone Italy: +39 0444 821506 Fax: +39 0444 740041 - Phone India: +91 9820334880
41
info@orsaiec.com www.orsaiec.com
Cabinet
ANALISYS

Registered Office: Via Vanderia, 12 36040 SAREGO (VI) ITALY


Operative Unit: Via Pacinotti, 4 36040 BRENDOLA (VI) ITALY
Representative Indian Office/Operation Site: A/209, Vardhaman Complex, LBS Marg, Vikhroli (W) MUMBAY 400 083 INDIA
42 Phone Italy: +39 0444 821506 Fax: +39 0444 740041 - Phone India: +91 9820334880
info@orsaiec.com www.orsaiec.com
Operative Unit: Via Pacinotti 4 - 36040 Brendola, VI Italy
Registered office: Via Vanderia 12 - 36040 Sarego VI - Italy

Tel.: +39 0444 821506


Fax: +39 0444 740041
Posta elettronica: info@orsaiec.com

You might also like