RINCIAN PEKERJAAN BWSS III CV.

KARYA DINAMIS

NO NAMA PAKET PERUSAHAAN

1 Uang Muka CV. Karya D

2 Kontrak

3 Panitia 3%

4 P. Sabri

5 Bu. Yeni

6 Bendera

7 Bu. Era

8 Administrasi 3%

9 Beli Catrid A3

10 Patok BM

11 Diskusi Pendahuluan

12 Pinjam Amrul

13 Makan Panitia

14 Asuransi Basoa

15 Mas Dwi

16 P. Armen

17 P. Ridho
18 Pengawas

11 Pembantu Pengawas

12 Kordinator

13 PPTK 10 %

14 Pinjam Indra

15 Diskusi Antara dan Lain-Lain

16 Sisa
Uang Muka Termin I Termin II Termin III

80,100,000 96,150,000

5,000,000 -

12,000,000 -

1,500,000 ###

1,500,000 ###

4,000,000 5,815,000

200,000 ###

11,900,000 -

1,860,000 -

600,000 -

5,000,000 -

10,000,000 -

700,000 -

700,000 -

20,000,000 -

- 500,000

- 200,000
- 6,000,000 -

- 3,000,000

- 1,500,000

- 20,000,000

5,140,000

- 10,000,000

- 45,935,000
80,100,000 50,215,000 - -

44,960,000 40,215,000

44,960,000 73,975,000
-
RINCIAN PEKERJAAN BWSS III CV. KARYA DINAMIS

NO NAMA PAKET PERUSAHAAN

1 Uang Muka CV. Karya D

2 Kontrak

3 Panitia 3%

4 P. Sabri

5 Bu. Yeni

6 Bendera

7 Bu. Era

8 Administrasi 3%

9 Beli Catrid A3

10 Patok BM

11 Diskusi Pendahuluan

12 Pinjam Amrul

13 Makan Panitia

14 Asuransi Basoa

15 Mas Dwi

16 P. Armen

17 P. Ridho
18 Pengawas

11 Pembantu Pengawas

12 Kordinator

13 PPTK 10 %

14 Pinjam Indra

15 Diskusi Antara dan Lain-Lain

16 Sisa
Uang Muka Termin I Termin II Termin III

80,100,000 96,150,000

5,000,000 -

12,000,000 -

1,500,000 ###

1,500,000 ###

4,000,000 5,815,000

200,000 ###

11,900,000 -

1,860,000 -

600,000 -

5,000,000 -

10,000,000 -

700,000 -

700,000 -

20,000,000 -

- 500,000

- 200,000
- 4,500,000

- 3,000,000

- 1,500,000

- 20,000,000

5,140,000

- 2,500,000

- 54,935,000
80,100,000 41,215,000 - -
459,591,000.00
PPN 10 % 45,959,100.00
Nilai Setelah Pot. PPN 413,631,900.00
Nilai Bersih Setelah PPN PPH 400,689,164.00 -

Fee Perusahaan 6% 24,041,349.84


Administrasi 3% 12,000,000.00
Ekspose (5jt, 2,5jt, 6,5jt) 14,000,000.00
Asuransi Bosoa 700,000.00
PPK 10 % 40,068,916.40
Panitia 13,000,000.00
Kontrak 5,000,000.00
Pengawas ((2jt + 1,5jt + 500rb)*5) 20,000,000.00
Termin ((500rb+200rb)+3,2jt)*4) 15,600,000.00
Laporan 10,000,000.00
Orientasi Lapangan 2,300,000.00
Pesan BM 600,000.00
Survey 74,450,000.00

Total Pengeluaran 231,760,266.24

168,928,897.76 42.16
Bu Uli 500,000.00
Ridho 250,000.00
Kabid SDA Kampar 250,000.00
Juru Air 150,000.00
Makan (10 Orang) 650,000.00
Bensin dan mobil 500,000.00

Topografi 50,000,000.00
Mektan dan hidro 23,700,000.00
ATK 750,000.00