Download as pdf or txt
Download as pdf or txt
You are on page 1of 5

Laporan praktikum metode seismik refraksi: pengolahan berdasarkan metode intercept time

1. ASISTEN
Ebenezer napitupulu
Aditya Kurniawan
Adides G Simanjuntak
2. DATA

No
X (m) T0 (ms) T11 (ms) T23 (ms) T46 (ms)
Geophone

1 0 0 0.019315
2 2 0.002655 0.015306 0.063659
3 4 0.004867 0.012755 0.060708
4 6 0.007965 0.010204 0.058179
5 8 0.011504 0.006195 0.034621 0.055228
6 10 0.015929 0.001458 0.031706 0.053541
SP11 11 0
7 12 0.021239 0.000729 0.028061 0.051855
8 14 0.028761 0.005831 0.021501 0.05059
9 16 0.031858 0.010204 0.015671 0.048904
10 18 0.034071 0.013484 0.012026 0.046796
11 20 0.038496 0.01895 0.008746 0.044688
12 22 0.039823 0.024781 0.004009 0.043002
SP23 23 0
13 24 0.040708 0.028061 0.000729 0.041315
14 26 0.042035 0.033892 0.006195 0.039629
15 28 0.043363 0.036443 0.010569 0.038364
16 30 0.04469 0.03863 0.015671 0.033727
17 32 0.045575 0.021501 0.029511
18 34 0.046903 0.027332 0.02656
19 36 0.047788 0.030248 0.02403
20 38 0.049115 0.031341 0.020236
21 40 0.050442 0.032434 0.016442
22 42 0.05177 0.034257 0.011383
23 44 0.007589
(SP 24) 24 46 0
3. PENGOLAHAN (SP0 dan SP46)
a. Asumsi Lapisan Datar
Grafik T-X

Grafik T-X SP0, SP46


0.07
y = -0.0009x + 0.0639
0.06
y = 0.0006x + 0.0267
0.05 DIRECT SP0
DIRECT SP4
0.04
REFRACTED SP0
t (ms)

0.03 REFRACTED SP4


Linear (DIRECT SP0)
0.02
Linear (DIRECT SP4)
0.01 Linear (REFRACTED SP0)
y = 0.002x - 0.0025
y = -0.002x + 0.094 Linear (REFRACTED SP4)
0
0 10 20 30 40 50
-0.01
x(m)

Gradien

m x c
Direct SP0 0.002 -0.0025
yn = mn x + cn
Direct SP4 -0.002 0.094 mn = 1/Vn
Refracted SP0 0.0006 0.0267
Refracted SP4 -0.0009 0.0639 cn = tintercept-n
V1

v1 v2
SP0 500 1666.667
SP46 -500 -1111.11
500 1388.889

Intercept time

x = source c = t-int y = t01


cross over 1 SP0 0 0.0267 0.0267
cross over 1 SP46 46 0.0639 0.0225
Ketebalan

D1 SP0 6.99730129
D1 SP46 6.29879075

b. Asumsi Lapisan Miring


Vu; Vd; V2

Vu dan Vd dicari melalui rumus:


Vn = 1/m
dimana:
m = nilai gradien dari slope 2

Kemiringan

Sudut Kritis
hu; hd

4. HASIL
a. Perhitungan

SP 0 dan SP 46
Intercept SP 0,
slope 2 (t1u) 0.0267
Intercept SP 46,
slope 2 (t1d) 0.0225
V SP 0, slope 1 500
V SP 46, slope 1 500
V1 rata-rata 500
V SP 0, slope 2
(Vu) 1666.6667
V SP 46, slope 2
(Vd) 1111.1111
V2 1388.8889
Kemiringan () -0.542415
Sudut Kritis () 2.841448
hu -6.98738
hd -5.888241
b. Model Lapisan Datar

model kecepatan lapisan 1 SP0


0
1 3 5 7 9 11 13 15 17 19 21 23 25
-1

-2 v1=500m/s
h=6.99m
-3

-4
h

lapisan 1 SP0
-5

-6

-7
v2=1666m/s
-8 h=inf
x (m)
c. Model Lapisan miring

model lapisan miring SP0; SP46


-5.2
-5.4 1 2
V1=500m/s
-5.6
-5.8 hu=-6.98738

-6 hd=-5.888241
h (m)

-6.2
-6.4
-6.6
-6.8
-7
-7.2
x (m)

You might also like