Enterprise Excellence Form: Technical Support Engineer Field Trip Report

You might also like

Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 2

ENTERPRISE EXCELLENCE FORM

FORM NUMBER REV: PAGE ORIGINAL ISSUE DATE REVISION DATE


1-4-GL-GL-MLS-00133 A 1/1 18-02-2011
PREPARED BY: REVIEWED BY: APPROVED BY: APPROVED BY:
THIO POH KHEE ALAN MORRISON ALAN MORRISON TYSON CAINES

TITLE TECHNICAL SUPPORT ENGINEER FIELD TRIP REPORT


THIS FORM MUST BE COMPLETED BY THE TECHNICAL SUPPORT ENGINEER AND COUNTERSIGNED BY UNIT
MANAGER / SENIOR CREW TO SIGNIFY ACCEPTANCE OF DETAILS OF FIELD TRIP. ORIGINAL MUST BE SENT TO
REGIONAL SERVICE SUPPORT OFFICE AND MAINTAINED FOR REFERENCE

Technical Support Birech Amine


Engineer (sign above UNIT NO. / OFFICE
name)
RIG NAME / TYPE WDI-801 AREA / COUNTRY
INCLUSIVE DATES
Incoming (including standby dates) Duration Outgoing (including standby dates)
8/3/2017 2 day 10/3/2017
COPIES
(Overwrite with Name) Tel Fax email
(Overwrite with Name) Tel Fax email
(Overwrite with Name) Tel Fax email
(Overwrite with Name) Tel Fax email
REPORT DETAILS
BRIEF DESCRIPTION: 3/8/2017

1
DETAILS Arrived to rig at 11:30

BRIEF DESCRIPTION: 8/3/2017

2 Check and install CVT


DETAILS Made test for FCP geologist
Made maintenance overview to our mudlogging team

BRIEF DESCRIPTION: 8/3/2017


Check DAU
3 Check and calibrate TGD and CP4900
DETAILS Recheck the lithology order

BRIEF DESCRIPTION: 9/3/2017

4 Recalibrate all gas sensor CH4


DETAILS
Fixed the CVT device in flowline

BRIEF DESCRIPTION: 10/3/2017

5
DETAILS Return back to hassi messaoud

SUMMARY (Write brief summary of report of visit)

Page 1 of 2
WITNESSES / APPROVALS

1 Signature Position

2 Birech Amine Signature Position Technical Engineer

Page 2 of 2

You might also like